Loading...
R-07-11-08-10E3 - 11/8/2007 RESOLUTION NO. R-07-11-08-10E3 WHEREAS, the Round Rock Transportation System Development Corporation ( "RRTSDC") has previously adopted a Transportation Capital Improvement Plan ( "Plan") , and WHEREAS, the RRTSDC wishes to amend said Plan, and WHEREAS, the bylaws of the RRTSDC require that said amendments to the Plan be approved by the City Council, and WHEREAS, the City Council wishes to approve said amendments to the Plan, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the amendment to the Transportation Capital Improvement Plan approved by the Round Rock Transportation System Development Corporation, which is attached hereto as Exhibit "A" , is hereby approved. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 8th day of November;ofRou 7 . lity� EL Mayor d Rock, Texas 4-1 A ST: CHRISTINE R. MARTINEZ, City Secret y 0:\wdox\RESOLUTI\rrtsdc\R71108E3.WPD/rmc TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION Project Name Project LimitsEstimated Prior Corporation Additional Corporation Work Description Construction Date Corporation Other Funding Total Cost Funding Amendment Funding This Funding #19 Amendment Arterial A From US 79 to Forest Creek Drive Preliminary engineering to establish alignment and ROW N/A $1,650,000 $1,650, 000 a requirements. Protective ROW purchase Arterial M From Old Settlers Boulevard to Jeffrey Way Design,purchase right-of-way and construct 4-lane divided arterial Fall 2008 $3,550,000 $3,550, $3,550,000 Forest Creek From Double Creek Drive to 800'West of Forest Ridge Completed $2,745,647 $1,326,513 b $4,131,221 $59,698 Subdivision $59,061 e Double Creek Drive From Gattis School Rd to MKT ROW Completed $2,731,852 $2,850 AW Grimes Blvd(Arterial B) From US 79 to Louis Henna Blvd Fall 2000 $24,572,768 $1,982,701 b $28,018,685 $130,363 $149,999 c Arterial C From RM 620 to Sam Bass Rd Acquire ROW for Arterial C and construct bicycle/sidewalk e e/sidewalk facility to N/A $0 $ access high school and swimming pool Design Kiphen Road(CR 113) ,purchase righright-of-wayy and construct 4-lane divided arterial Winter 2006 From FM 1460 to CR 122 $12,898,314 $1,135,895 b $15,246,561 $787,616 $411,792 $1,000,000 d $212,352 e FM 1460 From US 79 to 1200'N of US 79 Acquire ROW for highway relocation and relocate City utilities Fall 2007 $1,062,384 $8,200,000 a $9,262,384 -$37,616 Greenlawn Extension From Louis Henna Blvd to IH 35 Frontage Road Construct 4 lane divided arterial Completed $3,633,868 $86,533 b $4,267,54 -$18,203 $547,139 e Greenlawn Interchange At IH 35 Construct Greenlawn Interchange with IH 35 Not Scheduled $0 $12,000,000 a $12 000 00 IH 35 Turnarounds FM 1325/1-ouis Henna/Hester's Crossing Construct frontage road turnarounds Completed $3,533,562 $3,175,000 a $7,036,56 $328,000 c IH 35 Area Improvements from Westinghouse Road to FM 1431 Relocate ramps,widen frontage road,and construct frontage road Fall 2005 $10,269,090 $4,042,766 a $14,311,85 turnaround IH 35 Frontage Rd C-D and Hester's Crossing Construct Frontage road collector-distributor and replace Hester s Spring 2007 $17,880,000 $17,880,0 Bridge Replacement IH 35 Hester's Crossing Crossing Bridge Feasibility Study IH-35&RM 620 and IH 35&US 79 Alternatives to alleviate congestion N/A $92,203 $87 4 OR Oakmont Drive(Arterial"S") From Teravista to Chandler Road Construct 4-lane divided roadway Fall 2005 $2,235,610 $2,235,61 Prime Strategies Assist City in interagency coordination for SH 45 Completed $52,326 $52,32 Red Bud Lane(CR 122,Phases 1&2) From Gattis School Road to CR 123 Construct 2-lane divided roadway Fall 2004 $1,162,071 $1,162,071 -$33,891 Red Bud Lane(CR 122,Phase 3) From CR 123 to US 79 PS&E Design services;Construct 5-lane section,Bridge,Railroad Fall 2006 $617,363 $0 $61736 crossing , -$300,000 $3,075,909 $140,264 $3,216,173 RM 620 At Union Pack Railroad Construct railroad grade separation FY 2008 $2,500,000 $8,500,000 a $11,000, Acquire ROW for SH 45 FY 2000 $27,435,322 $215,200,000 a $268,635,32 SH 45 Round Rock East City Limits to Round Rock West City Limits -$3,941,589 $26,000,000 d (e South Mays Street,Dell Way,Gattis School Road Extension&Realign streets,widen streets,extend streets e South Mays Street Improvements Completed $4,720,270 $21,465 a $4,741,735 $49,363 qDellway/Boardwalk Connection Traffic S'mals Design and construct traffic signals On-going $2,230,000 $2,230,00 r9 Various locations Traffic Signal Coordination FM 1325/Louis Henna McNeil/IH 35/RM 620 US 79 Construct and implement coordinated traffic signal systems Completed $99,597 -$99,597 US 79 From CR 195 to CR 110 Reconstruct highway to 4 lane divided highway Completed $2,285,892 $3,500,000 a $6,085,892 $300,000(e t) t sruct 4-lane divided hi hwa d US 79 From FM 1460 to CR 195 Con9 Y Winter 2005 $9,562,745 $3,000,000 a $12,562,745 $550,000 Teravista From IH-35 to Oakmont Drive Construct 4-lane divided roadway Fall 2005 $1,250,000 $1,250,00 Transportation Consulting Miscellaneous consuming work in support of transportation programs On-going $656,351 $656,351 and planning Sp Arterial T From University Blvd to CR 112 Construct halt of a 4-lane divided roadway ring 2007 $2,000,000 $2,000,00 Wyoming Springs Drive From RM 620 to Brightwater Boulevard Construct ham of a 4-lane divided roadway Fall 2009 $3,400,000 $3,000,000 d $6,400,00 $3,400,000 TOTAL $147,903,144 $292,220,905 $443,237,39 $831,00 LEGEND $3'558'411 a=State/Federal Fund Page 1 of 1 b=Private Amendment#20 ■■ c-GO&CO Transportation Updated 11/08/07 T7 d=Williamson County EXHIBIT e-City Utility Fund DATE: November 1, 2007 SUBJECT: City Council Meeting - November 8, 2007 ITEM: 10E3. Consider a resolution approving the action of the Round Rock Transportation System Development Corporation in amending the Transportation Capital Improvement Program (TCIP). Department: Transportation Services Staff Person: Thomas G. Martin, P.E., Director Justification: The following amendments to the TCIP are as follows: 1. Provide funding for Arterial M (Mays/Oakmont) extension in the amount of $3.55 million. The funds are required to fully fund design, right-of-way acquisition, utility relocation, and construction. The project limits are Old Settlers Boulevard to Jeffrey Way. 2. Provide funding for Wyoming Springs improvements in the amount of $3.4 million. At the request of the City, Williamson County allocated $3.0 million of their 2006 Road and Parks Bond Issue for the construction of Wyoming Springs between RM 620 and Brightwater Boulevard. This project will construct the remaining two lanes of the proposed MAD 4 and includes paving, curb, gutter, drainage and other associated appurtenances. This project will include a pedestrian crossing facility for students attending Fern Bluff Elementary School. The project limits are RM 620 to Brightwater Boulevard. 3. Provide funding for the US 79 Gap project in the amount of $550,000.00. These funds will be used for right-of-way acquisition. 4. Provide additional funding for the Old Settlers Boulevard (Kiphen Road) Project in the amount of $411,792 for right-of-way expenses. The project limits are FM 1460 to Red Bud Lane (CR 122). 5. Reduce funding for SH 45 by $3,941,589.00 for project close out. 6. Reduce funding for Red Bud Lane (CR 122 Phase 3) by $300,000 for project close out. 7. Reduce funding for the Forest Creek Project by $59,698.00 for project close out. 8. Reduce funding for the Greenlawn project by $18,203.00 for project close out. 9. Reduce funding for Red Bud Lane (CR 122 Phase 1 & 2) by $33,891.00 for project close out. Funding: Cost: $ 31558,411.00 Source of funds: 4B-Round Rock Transportation System Development Corporation Outside Resources: N/A Background Information: The TCIP is a multi-year spending plan for improvements to major roads and arterials in the City. Funding for this plan is provided through the 1/2 cent sales tax established for the purpose of transportation system improvements that support economic development. Public Comment: Public hearing held on November 8, 2007 by the Round Rock Transportation System Development Corporation.