R-07-12-06-9C1 - 12/6/2007 RESOLUTION NO. R-07-12-06-9C 1
WHEREAS, the City of Round Rock has duly advertised for bids for
the RM 1431 36-Inch Water Line Improvements Project, and
WHEREAS, Cash Construction Company, Ltd. has submitted the lowest
responsible bid, and
WHEREAS, the City Council wishes to accept the bid of Cash
Construction Company, Ltd. , Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City a contract with Cash Construction Company, Ltd. for
the RM 1431 36-Inch Water Line Improvements Project.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended.
RESOLVED this 6th day of December, 07
0 2
WE, , Mayor
City of Round Rock, Texas
ATTEST: r
l�•
SARA L. WHITE, City Secretary
0:\wdox\RESOLUTI\R71206C1.WPD/rmc
44
,�t 4
4 5
t
4,
k.
� v
'i
44
04 4
CORR TAKE �1 031
POIN QQ 1
RE 'kpNp�' 3"Air N
00,
1431
PROPOSED
w ELEVATED
<� W�-• 2MG TANK
' Z� pRpPps�O 3� PP 1031
PRpPps�O
N
NOT TO SCALE RM 141 — 36
„ WATER E 'rROCK.TEXAS
5
SWIAPS\20074C0LIN CIL MAPS\WASTEWATER\.36in_weteriine_RM1431_SC*l.mxd-11/15/2007 X4.36.17 PM
DATE: November 29, 2007
SUBJECT: City Council Meeting - December 6, 2007
ITEM: 9C1. Consider a resolution authorizing the Mayor to execute a construction
contract with Cash Construction Company, Ltd. for the RM 1431 36-
Inch Water Line Improvements Project.
Department: Water and Wastewater Utilities
Staff Person: Michael D. Thane, Director of Utilities
Justification:
The RM 1431 36-Inch Water Line Improvements project will connect the existing City of
Round Rock water system on the northwest side of the City to the future regional Lake
Travis water system. The project was publicly bid on November 6, 2007. The City received
eight bids for the construction of the project with the low-bid amount being less than the
engineer's construction estimate of $2,200,000. The low bid was submitted by Cash
Construction Company, Ltd. for $1,964,642. K. Friese & Associates and City-staff
recommend awarding this construction contract to Cash Construction Company, Ltd.
Funding:
Cost: $1,964,642.00
Source of funds: Capital Project Funds (Self-Financed Utility)
Outside Resources: K. Friese & Associates, Inc. (Engineering Consultant)
Background Information:
This project is identified in our 2004 Water System Master Plan to be completed by 2020.
However, now that Lake Travis has become the future water supply to the City, this water
line is required to be completed by 2013 for the regional water to be delivered to Round
Rock. In addition, for the City to deliver 4 mgd of interim water to the City of Cedar Park by
the summer of 2009 (per an inter-local agreement), this water line project as well as two
other water system improvement projects are required. The other two projects are the RM
1431 two million gallon Elevated Water Storage Tank and the 7.5 mgd High Service Pump at
our Water Treatment Plant. In consideration for the City of Round Rock completing these
projects sooner than was planned, the City of Cedar Park will pay the City of Round Rock a
lump sum of $1,000,000, once this initial water line project has been awarded for
construction.
Public Comment: N/A
t
K FRIESE
November 8, 2007
Mr. Don Rundell, P.E.
Chief Utility Engineer
City of Round Rock
212 Commerce Cove
Cedar Park, Texas 78664-3227
RE: Cedar Park--Round Rock Interconnect
36-Inch Water Transmission Main
Dear Don,
Sealed bids were received for the above-referenced project on November 6, 2007 at
2:00 PM from the following contractors:
Joe Bland Construction, LP
J. C. Evans Construction
Cash Construction Co., Ltd.
Lewis Contractors, Inc.
McLean Construction
Key Enterprises, Inc.
Royal Vista Inc.
Austin Engineering Co., Inc.
The certified bid tabulation is attached. The lowest bid was $1,984,642.00, received
from Cash Construction Co., Ltd. with ductile iron pipe. The second lowest bid was
$2,090,978.00, received from Lewis Contractors, Inc. with steel pipe. The third lowest
bid was$2,125,126.50, received from Key Enterprises, Inc. with steel pipe.
It is KFA's recommendation to award the contract to Cash Construction Co., Ltd. Should
you have any questions, please feel free to contact me.
Sincerely,
f
Jennifer N. Sullivan, P.E.
Attachments
OF
r •'►;����� CEDAR PARK- ROUND ROCK INTERCONNECT
36-INCH WATER TRANSMISSION MAIN
JENNIFER N.SUErI.... November 6,2007
97593 . u,j
of-
WWI
NSA;.•
Brand ConstruiCtIon, cass Construction- o.,
Bid 1�► tp J.C.Evans Construction Ltd. Lewis Contractors,Inc.
Bid
i Item Descri tJon Ouanii Units Unit Cost Total Cost Unit Cast Total Cast Unit Cost Total Cost Unit Cast Total Cost
B-1 Pipe,hless h Ductile Iron Class rto 190 LF $590.00 $112,100.00 $590.00 $112,100.00 $650.00 $123,500.00 $550.00 $104,500.00
Trenchless Installation, r linear teat
B-2 Pipe,42-inch Ductile Iron Class 250, 288 LF $950.00 $273,600.00 $790.00 $227,520.00 $1,000.00 $288,000.00 $900.00 $259,200.00
Trenchless installation,per linear foot
B-3 Pipe,12-inch Ductile Iron Class 250,per 20 LF $50.00 $1,000.00 $120.00 $2,400.00 $10fl.00 $2,000.00 $85.00 $1,700.00
linear foot
8.4 Pipe,16-Inch Ductile Iron Class 250.per 10 LF $65.00 $650.00 $210.00 $2,100.00 $140.00 $1,400.00 $140.00 $1,400.00
linear foot
B-5 Pipe,24-nch Ductile Iron Gass 260,per 114 LF $150.00 $17,100.00 $128.00 $14,592.00 $150,00 $17,100.00 $175.00 $19,950.00
linear foot
Pipe,36-inch Ductile Iron Class 250,per 4,953 LF $220.00 $1,089,660.00 $223.10 $1,105,014.30 $162.00 $802,386.00 $205.00 $1,015,365.00
linear foot
B-7 Pipe,42-inch Ductile Iron Class 250,per linear foal 144 LF $400.00 $57,600.00 $420.00 $$0,460.00 $260.00 $40,320.00 $375.00 $.54,000.00
B-8 Pipe*48-inch Ductile iron Class 250,per linear foot 20 LF $500.00 $10,000.00 $340.00 $6,800.00 $300.00 $6,000.00 $400.00 $6,000.00
8-9 124nch Plug,per each 2 EA $120.00 $240.00 $145.00 $290.00 $500.00 $1.000.00 360.00 $700.00
8.10 364nch Plug,Per each 3 EA $2,700.00 8,100.00 $2,950.00 $8,860-00 $3,000.00 $9,000-00 $3.200-00 $9.600.00
8-11 36-inch Blind Flange,per each 1 EA $4,500.00 $4,500.00 $3,060.00 $3,060.00 $4,000.00 $4,000.0-0-1 $3.200.00 $3 200.00
B-12 484nch Dished Head Plug with 2-Inch 1 EA $4,600.00 $4,600.00 $3,645.00 $3,645.00 $5.000.00 $5,000.00 $4,500.00 $4,500.00
Sam ii Ta each
B-13 2-inch Sam in T er each 4 EA $3,800.00 $15.200.00 $575.00 $21300.00 $500.00 $2.000.00 $500.00 $2,000.00
8-14 484nch by 45 degree Bend,pZ each 1 EA $11 000.00 $11,000.00 $9 125.00 $9,125.00 $9.000.00 $0,000.001 $10,000.00 $101000-00
B-15 424nch gy 45 gNree Bend each 3 1 EA $8 500.00 $25500.00
$6,572.00 $19,716.00 $7,000.00 $21,000.00 $7500.00 $22.500.00
B-16 364nch by 45 d ree Bend each 4 EA $6,600.00 $26,4013.00_$_41640.D0 $18.560,00 $5.000.00 $20000. $5 SOO.00 $22 000.00
B-17 24-inch by 90 degree Bend per each 2 EA $3,000.00 $6,000.00 $1.976.00, $3,950.00 $2#000100 $4,000. $2.500-00 $6,000.00
B-18 244nch by 24-inch Tse,per each / EA $4,000.00 $4,000.00 $2.925.00 $2,925.00 $3.000.00 $3,000.00 $4,000.004 000.00
B-19 36-inch Tee r each 2 EA $8,5N.00 $17.000.00 $7.100.001 $14,200.00 $8.000.00 $16.000.00 $8,500.00 $17,000.00
B-20 42-inch Tee r each 3 EA $15,000.00 $45 000.00 $13.275-00 $39,825.001--$l 1 4000.00 $42,000.00 $15 000.00 $45,000.00
B-21 424nch by 24-inch Tee,per each 1 EA $11,000.00 $11,000.00 $8,830.00 $8,830.00 $9,000.00 $9,000.00 $111000.00 $11,000.00
B-22 24-inch by 12Anch Reducer.-Per each 2 EA $2.000.001 $4,000.00 $1,240.00 $2,480.00 $2,000.00 $4,000.00 $1,800-00 $360000
B-23 244nch b 16-inch Reducer, r each 1 EA $2,100.00 $2,100.00 $1 350.00 $1 350.00 $2 000.00 $2 000.00 $1 800.00 $1 900.00
K#FRIESE
Page 1 Of 10 & ASSOCIATES, INC.
CEDAR PARK- ROUND ROCK INTERCONNECT
36-INCH WATER TRANSMISSION MAIN
November 6,2007
oeConstruction, J.C.Evans Construction Cash ons on Lewis Contractors,Inc.
Bass Bid LP
Bid
item Descrl on Quanta Units Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost
B-24 36-inch b 24-inch Reducer,-per each 1 EA $4,600.00 $4.600.00 $3,620.001- $300. $4.000.0Q $4,000.00 $4,400.00 $4.400.00
B-28 42-inch b 24-inch Reducer,per each 2 EA $6,000.00 $12,000.00 $5,945.00 $11,890. §6,000-00 $12,000.00 $6 900,00 $13,800.00
B-26 42-inch b 36-�Reducer,-Per each 2 EA $7,000.00 $14000.00 $7100.00 $14 200.00 $7,000.00 $14.000.00 $8,000.00 $16,000.00
B-27 48-inch 42-Inch Reducer, r each 1 EA $8,500.00 $8,500.04 __$8,320.00 $8,320.00 $8,000-00 $8,000.00 $9,550-00 $9,550-00
B-28 Clea�in and Grubbing, r acre 6.3 AG $2,500.00 15 750.00 $6 050.00 $38.115.00 $1 00,00 $9,450.00 $5,000.00 $31.500.00
B-29 Trench Safety Systems(Ali Depths),per 5,230 LF $1.00 $5,230.00 $1.70 $8,891.00 $1.00 $5,230.00 $1.00 $5,230.00
linear foot
B-30 Wet Connections,24-Inch Diameter x 1 EA $30,000.00 $30,000.00 $3,500.00 $3,500.00 $8,000.00 $8,000.04 $6,540.00 $6,500.0
24-inch Diameter, r each
B-31 Valves Gate T e 12-inch per each 2 EA $2,500.00 $5.D001,00 $2,300-00 $4,600.00 $2 000.00 000.00 $1,600.00 600.00
B-32 Valves Gate T e 24-Inch per each 2 EA $16 000.00 $32 000.00 $15,000.00 $30.000.00 $15 000.04 $30,000.00 $14,000.00 $28.000.00
B-33 Valves Butted Type,36-inch-per each 3 EA $19,000.00 $57.000.00 $20,5W.00 $61,5W.55 $25,000.00 $75.000.00 $21,000.00 $63,000.00
B-34 Valves,Butted Two,-42-inch,per each 2 EA $3,000.00 $6,000.00 S31,000,00, $62 000.00 $30.000.00 $60,000.00 $30.000.00 $60.000.00
8-35 Fire Hydrants . . $47
,_Ve --.=."50.00 $14 250.00 $5 000.00 $15 000.00 $3,500.00 10,500.00
B-36 Automatic AirNacuum Valve Assembly, 1 EA $12,500.00 $12,500.00 $6,200.00 $6,200.00 $10,000.00 $10,004.00 $8,500.00 $8,500.00
6-inch Diameter, r each
B-37 Automatic AirNacuum Valve Assembly, 1 EA $25,000.00 $25,000.00 $7,800.00 $7,800.00 $15,000.00 $15,000.00 $10,500.00 $10,500.04
84nch Diameter, r each
Non-(Native Seeding for Erosion Control,
B-38 Method A,Straw or Shredded Brash 6.3 AC $2,420.00 $15,246.00 $2,600.00 $16,,380.00 $1,500.00 $9,450.00 $1,500.00 $9,450.00
Mulch r acre
B-39 Soil Retention Blanket Class 2.Type E, 36 SY $2.00 $72.00 $19.00 $684.00 $10.00 $360.00 $15.00 $540.00
r square rd
B-40 Protection Fencing Type A Gain Link 2,� LF $3.00 $7,020.00 $2.00 $4,680.00 $2.50 $5,850.00 $2.00 $4,680.00
Fence r linear foot
B-41 Rock Berm,per linear foot 100 LF $20.00 $2,000.00 $15.00 $1,500.00 $25.00 $2,500.00 $15.00 $1,500.00
B-42 e8lizedConstruciion Entrance,per ch 7 EA $1,000.00 $7,000.00 $1,500.00 $10,500.00 $2,500.00 $17,500.00 $1,000.00 $7,000.00
B-43
Silt RootFence for Erosion Control,per linear 5,890 LF $2.00 $11,780.00 $2.25 $13,252.50 $2.00 $11,780.00 $2.00 $11,780.00
K*FRIESE
Page 2 of 10 &AssocIATEs, INC.
CEDAR PARK- ROUND ROCK INTERCONNECT
36-INCH WATER TRANSMISSION MAIN
November 6,2007
Bland ons ru ion, Cash J.C,Evans Construction con
Bid ease Bid LP Ltd. Lewis Contractors,Inc.
Item Description lQuant1tvUnits Unit Cost Total Cost Unit Cost Total Cost Unit Cast Total Cost Unit Cost Total Cost
B-44 TotalIUoblli
zatian Payment,per lump sum 00 1 LS $90,000.00 $90,000.00 580,0 .00 $80,000.00 $38,000.00 $38,000.00 $75,000.00 $75,000.00
Maintenance of Erosion and
B-45 Sedimentation Controls shown on Sheet 1 LS $5,000.00 $5,000.00 $500.00 $500.00 $2,000.00 $2,000.00 $1,500.00 $1,500.00
5per lump sum
B-46 Barricades,Sign and Traffic Handling, 4.6 MQ $1,000.00 $4,500.00 $2,650.00 $11,925.00 $1,200.00 $x,400.00 $1,350.00 $6,475.00
r month
B-47 Construction Staking,per linear foot 5,708 LF $2.00 $111416-00 $1.25 7135.00 $2.00 $11,416.00 $2. $11,416.00
B-48 Vault Assembly at STA 6+48.35,per 1 LS $115.000.00 $115,000.00 $77,000.00 $77,000.00 $170,000.00 $170,000.00 $105,000.00 $105,000.00
lumpsum
B-49 60-inch Diameter Manhole at STA 1 LS $7,500.00 $7,500.00 $3,900.00 $3,900.00 $5,000.00 $5,000. $4,300.00 $4,300.00
5+96.00 per lumpsum
8-50 6-Inch Concrete er linear foot x0 LF $25.00 $1 250.00 $13.00 $650.00 $40.00 $2,000. $20.00 $1,000.00
B-51 Braca P wer Pole er lum sura 1 LS 000.00 $4 000.00 $350.00 $350.00 $2 000.00 52 000. $1.250.001 $1 250.00
Total Amount Base Bid 2,266,814.00 $2173,454.80 $16"4,642.j $2,137,686,00
!Multiplication error corrected
value shown here
K FR!ESE
Page 3 Of 10 $ASSOCIATES, INC.
}
4
CEDAR PARK- ROUND ROCK INTERCONNECT
36-INCH WATER TRANSMISSION MAIN
November 6,2007
f
Base Bid McLean Construction Key Enterprises,Inc. Royal Vista Inc. Austin Engineering co.,
Bid Inc.
Item111PIpe,
Description Quantity Units Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost
B-1Pipe,hless h Ductile Iron D Class rfo 190 LF $586.0 $111,340. $550,00 $104,500.0 $750.00 $142,500.0 $555.00 $105,450.0
Trenchless Installation, r linear foot
8-2Pipe,hless h Ductile iron Class r foot
288 LF $927. $266,976. $925.00 $266,400. $950.00 $273,600. $855.00 $246.240.
Trenchless Installation, r linear foot
B-3 12-Inch Ductile Iron Class 250,per 20 LF $80.50 $1,610.0 $195.40 $3,900.0 $55.0 $1,100.0 $90.00 $1,800.0
linear foot
&4 Pipe,16-inch Ductile Iron Class 250,per 10 LF $139.60 $1,396.0 $205.00 $2,050.0 $105, $1,050. $120.00 $1,200.0
linear foot
B_5 Pipe,24-inch Ductile Iron Class 250,per 114 LF $137.50 $15,675.0 $250,00 $28,500.0 $145.00 $16,530. $190,0 $21,8+60.0
linear foot
B-6 Pipe,36-inch Ductile Iron Class 250,per 4,953 LF $211.00 $1,045,083.0 $209.00 $1,435,177.0 $255.00 $1,263,015. $235,00 $1,163,955.
linear foot
B-7 Pipe,424nch Ductile Iron Class 250,per 144 LF $316.00 $45,792.0 $350.00 $50,400. $395.00 $56,880.00 $490.00 $70.560.
00
linear foot
B-$ Pipe,48-inch Ductile Iron Class 250,per 20 LF $300,40 $6,008.0 $400. $8,000.00 $460.00 $9.800. $523.00 $10,460.00
linear foot
B-9 12-inch Plugpar each 2 EA $401.00 $802.0 $425.001 $850.00 $300.00 $600. $200,00 $400.00
B-10 36-inch Plu r each 3 EA $3,210.00 $9.630.001 $3,700.0 $11 100.00 $3,145.00 $9,435.0 $4,600.001 $13,800.00
B-11 36-inch Blind Flange,per each 1 EA $3,998.00 $3,998.00 $3.500-001 $3,500,001431W.00 $3,540,001 $3,000.001 $3,000.00
B-12 48-inch Dished Head Plug with 2-Inch 1 EA $4,439.00 $4,439. $4,300.0 $4,300.00 $4,895,00 $4,895.0 $6,400,0 $8,400.00
S i Ta , r each
8-13 24rxh Sampling Taper each 4 EA $663.00 $2 652.00 $900-00 $3,600-00 $1,200.00 $4,800.0 $1.000.0 $d 000.
00
B-14 484nch by 45 degree Be"der each 1 EA _$9,796.00----j9,-796.Q9j $13.000.00 $13,000-00 $10,600.00 $101500.0 $13,8W.00I $13.800.00
B-15 42-inch by 45degree Bend,_per each 3 EA $7 054.00 $21,162-001 $10,500-001 $31.500.00 $7,590.00 $22770-001 $12,200,001 $36,600,00
B-16 36-inch by 45 d ree Bendper each 4 EA $5,049.00 $20,196.001 $7 00. 28 800. $5.370.00 $21,480.0(1 $7,5W.00I $30,200.00
B-17 24-inch by 80 degree Bend r each 2 EA $2,366.00 14,M.001 $3 500. $7,000. $2,275-00- $4.550.001 $5,$00.001 $11,600.001
B-18 24-inch by 24-inch Tee,per each 1 EA $3,371.0 $3,371.00 $5.500-00 $5,500. $3,260.00 $3.260.0Qj $7.200.001 $7,200,
B-19 36-inch Tee,Per each 2 EA $7.558,001 $15.116.001 $9,685.00 $19370. $6,195.00 $16,390,0 $13,000. $26 000,
Od
661
B-20 42-Inch Yee r each 3 EA $13,8384 H1,514-001 $15.92_5.22---$47,7 5. 15 350.00 $46.050.1001 $23.000.009 000.0
CI
B-21 42-inch by 24-inch Tee per each 1 EA $9488.0 $9,488.00 $10 800.00 $10,800.29 $10,200.00 $10200,001 $jo,()00M $10,000.001
8-22 24-inch by 12-inch Reducer,per each 2 EA $1,608.0 $3,216.00 3,700.001 $7,400. $1,440.00 $2,880.001 $31000.w $6,000,001
B-23 24-Inch bX 16-inch Reducer,per each 1 EA $1,686.0 $i 686. $3,800.001 $3.800,001 $1,525,00 $1.525.0 $3 400.00 $3,400A4
8-24 36-inch by 24-Inch Reducer,per each 1 EA $3,935-0 $3,935.DO $8185.00 $6,1 FV;, 185.00 _,tft-001 $6,000.001000.0
Page 4of10 K#FRIESE
&AssocI ETES, INC.
CEDAR PARK-ROUND ROCK INTERCONNECT
36-INCH WATER TRANSMISSION MAIN
November 6,2107
f
Base Bid McLean Constructlon Key Enterprises,Inc. R n ng ngCo.,
B
id oyal Vista Inc.
Inc.
Description Quantity Units Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cast
42-inch b 24-inch Reducer, r each 2 EA $6 12. $12 424.0 $8 500. $17 000. $6 875. 13 750. 9 t300. $19,600.
42-inch b 36-inch Reducer, r each 2 EA $7,314.0A $14,628.001 $9,650.00 $19?300.001 $8178.00 $16,356. $13,000.00 $26,000.001
B-27 48-inch bv 424nch Reducer, r each i EA $8"6.001 $8,535.001 10 900.00 __$10,906:001 $9.650.00 $9.650.001 $13,200.00 $13200.0
B-28 �Plsadng and Grubbing, r acre 6.3 AC $2.415.00 $15,214.5 $3,500.00 $22,050, $5.500.00 $34,650. $2,750.00 $17325.001
B-29 Trench Safety Systems(Ali Depths),per linear toot 5.230 LF $2.20 $11,506.0 $2.00 $10,460. $8.00 $41,840. $1.00 $51230.
8-30 Wet Connections,24-inch Diameter x 1 EA $24,131. $24,131.0 $7,500. $7,500. $21,500. $21,500.0 $5.000.00 $5 000,0
24-inch Diameter,per each
B-31 Valves Gate Type,12-inch per each 2 EA $2 236.00 $4,472. $3.200-00 6 400.0 150. $4,300.0 $1,850.00 $3,700,0
B-32 Valves Gate Type,244nch r each 2 EA 517171.00 $34 342. $17 500.00 _$35,000.0 $14,7r>0.00 $29.500, $14.400.00 $28,800.001
B-33 Valves,Butterfly Type,36-inch,per each 3 EA $15,886.00 $47,664, $15,500.00 $46,500.0 $24,000.0 $72,000. $14,000. $42,000.0
B-34 Valves,Butterfly Type,42-inch,per each 2 EA $23,186.00 $46,372. $24,500.00 $49,000. $32,000.0 $64,000, $27,000, $54,000.0
B-35 Fire Hydrants, r each 3 EA 550,449.00 $151,347,00 $4,300.00 $12,900.0 $3,200.0 $9,600-00 $15,000.00 $45.000.
B-36 Automatic Diameter,
uumper
Valve Assembly, 1 EA $9,213.00 $9,213. $9,150.00 $9,150.0 $11,000.00 $11,000.00 $17,200.0 $17,200.0
6-inch Diameter er each
11
B-37 Automatic Air1V$cuu a Valve Assembly, 1 EA $8,185. $8,185.00; $10,650.00 $10,650.0 $14,000.00 $14,000. $18,800.00 $18,800.0
8-inch Diameter-per each
Nan-Native Seeding for Erosion Control,
B-38 Method A,Strew or Shredded Brush 6.3 AC $6,812,00 $42,915.60 $3,500.00 $22,050.0 $5,000.00 $31,50{3.00 $3,630.00 $22,869.
Mulch r acre
B-39
Soil Retortion Blanket Class 2,Type E, 36 SY $2.3 $82. $2.00 $72.0 $30. $1,080.00 $4.00 $144.
or s are rd
B-40 Protection Fencing Type A Chain Link 2,340 LF $2.20 $5,148. $2.50 $5,850.0 $3.0 $7,02{?. $2.50 $5,850.
Fence, r linear foot
B-41 Rack Berm, r linear foot 100 LF $13. $1390
Stabilized Construction Entrance,per = ,00 516.00 $1 600.0 $30.00 $3 000.00 $1$.00 $1 800.0
B-42 7EA $696. $4,872. $800.00 $5,600,0 $900.00 $6,300.00 $800.00 $5,600.
each
8-43 Slit Fence for Erosion Control,per linear 5,890 LF $1.6 $9,424.00
foot $1,85 $10,896.50 $2.00 $11,780.00 $1.80 $10,602.0
Tota
B-44 sum Mobilization Payment,per lump 1 LS $119,727.40 $119,727.00 $20,000.00 $20,000.0 $150,000.00 $150,000.00 $30,000.00 $30,000.
Kf FRIESE
Page 5 of 10 &ASsoCiATES, INC.
CEDAR PARK- ROUND ROCK INTERCONNECT
364NCH WATER TRANSMISSION MAIN
November fi,2007
Base Bid McLean Construction Key Enterprises,Inc. Royal Vista Inc. $ n nginng ,,
Bid Inc.
herr► Descripoon Quantity Units Unit Cast Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost
Maintenance of Erosion and
B-45 Sedimentation Controls shown on Sheet 1 LS $2,802.00 $2,902.0 $5,000. $5,000.00 $10,000.00 $10,000.0 $5,000-00 $5,00010
5per lump sum
B-46 Barricades,Sign and Traffic Handling, 4.5 MO $372.00 $1,674. $9,500. $42,750. $6,000. $27,000. $4,830.0 $21,735.0
r month
B-47 Construction Staking, r linear foot 5,708 LF $2.70 $15,411.6 $1, $5,708, $3. $17124.00 $1.i $6,878.3d
8-48 Vault Assembly at STA 6+48.35,per 1 LS $144,907. $144,907. $145,000.00 $145,000. $155,000.00 $155,000. $98,000.0 $98,000.
lump sum
B-48 60-inch t)iameter Manhole at STA 1 LS $5,464. $5,464.0 $4,350.00 $4,350.0 $6,500.00 $6,500. $7,000.00 $7,000.
5+96.00 as lumpsum
B-50 6-inch Co+icreteer linear toot 51;1 LF 526.00 $1 300.0 $90.00 $4 500.0 $60.00 $3,000. $10.---
P,- $500.
B-51 Brace Paver Dole,per lumpsum 1 LS $1,367.001 $1,367.001 $2,000.001 52 000. $3 000,00 000, 000. $2 000.
Total Amount Bass Bid $2,394,231-501 $2,235,593. $2,706,785. $2,384,358
K*FRI ESE
Page 6 of 10 &AssocIATES, INC.
t
s
i
P
CEDAR PARK- ROUND ROCK INTERCONNECT
36-INCH WATER TRANSMISSION MAIN
November 6,2007
Joe a landconstruction, J.C.Evans Construction on conCo.,
Alternate Bid LP Ltd. Lewis Contractors,Inc.
Bid
Item Description Quantity Units Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cast Total Cost
8-1-A Pipe,24-inch Steel,Trenchless 190 LF
Installation, r linear foot $590.00 $112,100. $590.0 $112,100.00 $650. $123,500.0 $550.00 $104,500.
8-2-A Pipe,42-inch Steel,Trenchless
Installation, r linear bot 288 LF $950.00L $273,600.00 $790, $227,520. $11000. $288,000. $907.0 $261,216.
B-3-A Pi 12-Inch Steel r linear fool 20 LF $50.0004___ $1,000. $120. $2,400. $110.00_-- $2,200. 85. $1 700.
B-4-A Pipe,16-inch Ductile Iron Class 250,per 10 LF $65.0 $650. $210.00 $2,100. $155.00 $1,550.00 140.
linear foot $ $1,400
LB-5-A Pi 24-inch Steel er Nnear foot 114 LF 150. $17,100. $138.00 $15,732.0 $165.00 18,810. $175.00 $19 950.
001
6-A Pi 36-inch Steel erlinear foot 4953 LF $255. $1 263 015. 73.00 $1,352,169. $160, $891 40. $219.00 $1$1 707.001
7-A P) a 42-inch Steel er linear foot 144 LF $400. $57,600.0 $472.00 $67968.0 $310.00 640. $311.00 784.008-A Pi 48-inch Steel r linear foot 20
LF $500.00 $10 000.0 $385.00 7,700.0 $340. $6,800. $400.04 $8 110000
9-A 12-Inch Piu r each 2 EA $1120.00 $240.001 $145. $290.0 $500.00 1 000.0 $350.00 $700.
8-10-A 36-inch Plugpor each 3 EA $2,700.00 $8,100.0 $4,200. $12,600.0 $3,000.00 $9,000-001 $3.200.001 $9 640.00
8.11-A 36-inch 81n Flanae, er each 1 EA $4,500.00 $4,500.0 $4,200.00 $4200.0 000.00 $4,000-001 $4.200.001 S4,200.
01
9-12-A 48-inch Dished Head Plugwith 2-inch 1 EA $4 600.00 $4 600.0 $1,932.00 $1,932.0 $5,000.00 $5,000.0 $3,500.0 500.
8-13-A 48-Inc Sampling Ta reach 4 EA $3 800.00 $15,200-00 $575.00 $2,300.0 $600.00 $2,000.00 $500.0 $2 000.
8.14-A 48-inch b 45 de ree Bend er each 1 EA $11,000-001 $t 1,000.0 $4 440.00 $4 440.0 $9 000.00 $9 000.0 $5.000.00 $5,000.
B-1S-A 42-inch b 45 degree Bend per each 3 EA $e 500. 5500.0 ._$1,80o.001 $11,400.0 $7000.00 $21.000. $4,000.00 $12000.
B-16-A 3B-inch b 45 degree Bend per each 4 EA $6 600. S 400. $3,300.00 13,200.0 $5,000.00 $20,000. $3,000.00 $12,000.
8.17-A 24-inch b 90 degree Bend per each 2 EA $3,900.00F $6,000.001 $1,975.001 $31950.01 $2.Q00.00 . _$2,500.00 $5,000.001
B-184.0 24-Inch b 244rich T r each 1 EA $4,000.00 4 000.0 $2,925.001 $2,925.0 $3.000.00 $3.000. $4,000.00 $4 000-0
6.19-A 36-Inch Tee per each 2 EA $8 500. $17,000 0 $4 567.0 $9134.0 $8 000.00 $16 000. $41_8_60.00 8 700.0
Cj
B-20-A,42-inch Tee per each 3 EA $15,000. $45,000.0 $5,200.00 $15,600. $14,000.00 $42,000.0 500.00 _$19,500.001
6-21-A 42-inch b 24-inch Tea, r each 1 EA $11 000. $11.000,0 $4#500.00 $4500.0 $9.000.00 -$91000.1 $5 500.00 $5,500.
8.22-A 24-inch bv 12-inch Redug@L_pereach 2 EA 2,000.
I4 000. 1 240.00 $2,480. 00
$2 000.00 $4,0 .0 $1,800.00 $3.606-001
B-23-A 24-inch by 16-inch Reducer,per each 1 EA $2,100.00 $2100.0 $1,350-00 $1,360. $2.000-001 $2.0100.001 $1.900.00 $1900.001
B-24-A 36-inch bv 244nch Reducer r each 1 EA $4,600.00 $4,W01001 $4100.00 4100. $4.000-001 $4,000.0 $4,000,00 4000.0
B-25-A 42-inch b 24-inch Reducer, r each 2 EA $6,000.00 $12,000.0 $4.400.001 $8,800. x6.000. $12,000.0 $4,500.00 $9.000.
B-26-A 42-inch 36-inch Reducer r each 2 EA $72000.00 $14.000.001 $4,800.001 S9 600. $7,000.001 $4,500. $9,000.
B-27-A 484nch 42-inch Reducer,_per each 1 EA $8,500.00 $8 500. $6,000.001- $6 000. $8,000.021 $8,000.0 $6,00 p.00 $6-1000.
B-28-A Clearin and Grubbin per acre 6.3 AC $2,500.00 $15,750. $6,050.00 $3l3 115, $1 500.0 $9,450---.0 $5 000.0 $3t 500.
B-29-A Trench Safety Systems(All Depth),per 5,230 LF $1.00 $5,230. $1.7 $8,891. $1.0 $5,230.0 $1.0 $5,230.
linear foot
B-30-A Wet Connections.24-inch Diameter x 1 EA $30,000.00 $30,000.00 $3,500. $3,500. $8,000.0 $8,000. $6,500.0 $6,500.
24-inch Diameter, reach
B-31-A Valves Gate Two,12-inch per each 2 EA $2,r>00-001 $5,000.001 $2,300.001 $4,600.001 $2,000.001 $4 000, $1.800.001 $3 600.
B-32-A Valves,Gate T e,24-inch, er each 2 EA $1 B 000.00 000. $15,000.001 15 000.0 $30 000. $14,000.001 $28,000.001
8-33-A Valves,Butterfly Type,36-inch per each 3 EA 19,000.00 $57,000.00 $20,500-2A $61.5w. $25,000.0 $75,000. $21,000.0 $63 000.
8-34-A Valves,ButterflyType,42-inch60
reach 2 EA $3,000. $6,000. 31 000. 000. 30 000. $!30 000.00 $30 040. $60 000.0
IS-35-AlFire H rants reach 01
3 EA $3 700. $t 1 100.00 $4 750.00 14 250. 5000. 1500 . 500. 10500.0
Page 7 of 10 ,`f F R I ES E
8.ASSOCIATES, INC.
CEDAR PARK- ROUND ROCK INTERCONNECT
36-INCH (NATER TRANSMISSION MAIN
November 6,2007
Joe Bland Construction, Cash Construction Co.,
Alternate Bid LP J.C.Evans Constructlon Ltd. Lewis Contractors,Inc.
Bid
Item Description Ouantity Units Unit Cast Total Cost Unit Cost Total Cost Unit Cost Toted Cost Unit Cost Total Cost
B-36-A Automatic AeNacuum Valve Assembly, 1 EA $12,500.00 $12,500. $6,200.00 $6,240, $10,000.00 $10,000. $8,500.00 $8,500.
6-inch Diameter, reach
&37-A Automatic AlrNacuum Valve Assembly,
8-inch Diameter, r each 1 EA $25,000.00 $25,000. $7,800.00 $7,800. $15.000.00 $15,000.0 $10,500.00 $10.500.0
Non-Native Seeding for Erosion Control,
B-38-A Method A,Straw or Shredded Brush 6.3 AC $2,420,00 $15,246.0 $2,600.00 $16,380. $1,500.Q $9,450.0 $1,500.00 $9,450.0
Mulch r acre
B-39-A Soil Retention Blanket Class 2,Type E, � SY $2,00 $72.0 $19.00 $684. $1 p, X60,
Br are $15.0 $540.fl
B-40-A Protection Fencing Type A Chain Link
Fence r linear foot 2,340 LF $3.0 $7,020.0 $2.0 $4,680. V. $5,850.00 $2.0 $4,680.0
8.41•A Rack Genn rlinearfoot 100 LF $20.0 $2.000.0 $15.00 $1,500. $25.00 $2,500-00 $15.0 $1,500.0
8-42-A each Stabilized Construction Entrance,per 7 EA $1,000. $7,p0o.0 $1,500.00 $10,500. $2,500.00 $17,500. $11000.40 $7,000.
B-43-A�SiilttFence for Erosion Control,per linear
5.890 LF $2.0 $11,780.0 $2.25 $13,252. $2.00 $11,780.00 $2.00 $11,7$0.0
9-44-A um!Mobilization Payment,per lump 1 LS $90,000. $90,000.0 $94,000.00 $94,000.00 $ 000,00
$38,000. $75,000.00 $75,000.00
Maintenance of Erosion and
B-45-A Sedimentation ConbDis shown on Sheet 1 LS $5,000.00 $5,000, $500.0 $500,00 $2,000,00 $2,000,00, $1,500.00 $1,600.00
5 perlump sum
B-46-A Barricades,Sign and Traffic Handling, 4.5 MO $1,000.00 $4,500. $2,650.0 $11,925. $1,200.00 $5,400. $1,350.00 $6,075.
00
r month
18-47-A Construction Staking,per linear foot 5.708 LF $2.00 $11,416. $1.2 $7,135. $2. $11,416. $2.0 $11,416.00
8.48-A vault Assembly at STA 6+48.35,per 1 LS $115,000.00 $115,000.00 $77,000.0 $77,000.00 $170,000.00 $170,000. $75,000.00 $75,000.00
tum sum
8.49-A 60-inch Diameter Manhole at STA 1 LS $7,500.00 $7,500. $3,900.0 $3,900.00 $5,000.
5+96.00 r lump sum $5,000.0 $4,300.0 $4,300.
8-50-A 6-inch Concrete C r linear foot 50 LF $25.00 $1,250.001[ $13.0 $650. $40A $2 000. $20.0 $1 000
ed
B-51-A race Power Bola r lumpsum 1 LS $4,000.00 _S4,00D.001 350.0 350.00 $2 000,0 S2 000.0 41.250.01 -$1,26--0.
Total Amount Base Bid 2444169. 385 2. .080 978. $2 090 278.00
on error Corrected A tion error on id orm
value shown here Corrected value shown here
Page aof10 K#FRIESE
$ASSOCIATES, INC.
CEDAR PARK- ROUND ROCK INTERCONNECT
36-INCH WATER TRANSMISSION MAIN ,
November 6,2007
Alternate Bid McLean Construction K IM. Royal Vista Inc. Austin Engineerirtig Co.,
Ente rises,IInc,
Bid
nen Descri Son Quanfityl Units Unit Cost Tota{Cost Unit Cost Tata)Cost Unit Cost Total Cost Unit Cost Total Cost
B-1-A Pipe-.24-inch Steel,Trench{ess 190 LF $611.40 $116,090.00
Installation, linear foot $550.00 $104,500.00 $825.00 $156,750.00 $555.00 $105,450.00
8-2-A Pipe,42-inch Steel,Trenchless 288 LF
Installation r linear foot $998.00_ $28&,848.00 $850.00 $273,600.00 $1,045.00 $300.960.00 $855.00 $246,240.00
8-3-A P 12-inch Steel per linear foot 20 LF 103.80 $2,076,00 $195.00 $3,900. $65.00 $1300.00 $91.00 $11.820.00
B-4-A Pipe,16-4nch Ductile Iron Class 250,per 1Q LF $162.90 $1,629.00 $205.00 $2,050.00 $115.OQ $1,150.00 $121.00 $1210.00
linear foot
&5-A Pi a -inch Sleet ger linear foot 114 LF 160.80 $18,331.20 $300.00 $34 00,00 165.00 $181810.00 $191.00 $212774.00
B-6-A Pie 364rich Steed,per linear fool 4,953 LF $212.00 $1,050,036.00 10.00 $1 040130.00 $285.00 $1,411,605.00 $237,00 1 173,8fi1.00
B-7-A Pi 4244 ch Steel linear foot 144 LF $320.00 $46,080.00 $250.00 $36,000.00 $440.00 $631360.00 $494.00 $71,136,
B-B-A Pim48-inch Steel linear foot 20 LF $375.20 $7.504.00 $3113.00 $6,360.00 $525.00 $-1-0,5-00.00 523.00 $10460.00
8-9-A 12-inch PI u each 2 EA $646.00 $1,292.00 $425.00 $850.0 $330.00 $660.00 $200-00 $400.00
B-10-A 364nch Plug, r each 3 EA $6,296.001- $18.888-00 $1,400.00 $4,200.00 $3,500.00 $10,500.00 $4 600.Q0 13$00.00
6.11-A 36-inch Blind Flange,per each 1 EA $5,622.00 $5,622.00 $4,700.00 $4 700.00 $3 950.00 $3,950. $3,000.00 $3,000.00
8-12-A 48-fnch Dished Head Plug with 2-inch 1 EA $2.888-00 $2,888.00 $2,400.00 $2,400.00 $5,300.00 $5,300. $8,400.00 $8,400.00
Sam lin T reach
B-13-A 2-inch Sam n T per each 4 EA $663.00 $2,652.00 00.00 $3 600.00 $1 200.00 $4 800.00 1 QOO,QO $4 OOO.OQ
8-14-A d8-inch b 45 deares Bend each 1 EA $41579.00; $4 579.00 $7 200.00 $7 200.00 $11 500.00 $11,500.0 $13,800.00 $13,8W.00
8•15-A 42-inch 45 door"Bend, reach 3 EA $3,637.00 $10,911-00 $8 550.00 $19 650.00 8 390.00 $25 170.00 $12.200.00 $36,600.00
8-16-A 364nch 45 degree Bend, each 4 EA $2,762.00 $11 048.00 $4,625.00 518 500.00 $5900 $23.600.001 $7,50.00 $30.200.00
8-17-A 24-inch b 90 degree Send, reach 2 EA 05(3.00 ,112.00 $1 775.00 $3 550.00 $2 500.00 $5,000.0 $5,800.00 $11.600.00
8-18-A 244nch b 24-inch Tee per each 1 EA $3 366.00 $3 366.00 $2 800.00 $2 800.00 $3 SQO.pO $3 500.0 $7 Q0.00 $7 00,00
B-19-A 36-I424nch Tee r each 2 EA $6,963.00 $13,926,00 $51700.00 $11,400.00 $9,000.00 $18,000.0 $13.000.00 $26,000.00
B-20-A 42-inch Tee reach 3 EA $4.633.00 $13,899.00 $6000.00
1i-___ $18,.000.00 $17 000.00 $51 000.00 $23 000.00 $69 000,04
8-21-A 42-inch 24-inch Tee, er each 1 EA $3,581.00 $3,581445,800.00
$4,40000 $4,400.00 $11800.00 $11,800. $10,000.00 $10.000.00
8-22-A 24-inch 12-inch Reducer, ereach 2 EA $3 421.00 842750.00 6.5w.00 1,660.00 3,300.03,000.00 6 000.00
B-23-A 24-inch b16-inch Reducerper each 1 EA $3,381.00 $3 381 $2 800.00 $2,8W.00 $1 725.00 $1726.O $3.400.00 $3 400.00
B-24-A 36-Inch b 244nch Reducer r each 1 EA $3,865.00 $3.865 $5 800.00 $4 400.00 $4 400.0 $6 000.00 $6 000.008.25-A 42-inch b 244nch Reducer
er each 2 EA $3 941.00 $7 882. $5.850-00 $11700.00 $7400.00 $14,8W.00 $9 800.00 $19 600.00
B-28-A 42-inch b 36anch Reducerpr each 2 EA $3,634.00 $7,268-00 $5 500.00 $11 000.00 $9,000.00 $18,000.0 $13.000.00: $26,000.00
8.27-A 48-inch b 42-}rich Reducer,-Pereach 1 EA $5139.00 ,139.00 $7 000.00 7 000.00 $10 600.00 10 600.0 $13 00.00 13 00,00
8-28-A Clears and Grubbs r acre 6.3 AC $2,415.00 $15,214.50 $4 000.00 $25,200.00 $5,500.00 $34.6W.00 $2,750.00 17 325.00
8-29-A Trench Safety Systems(Ali Depths),per linear foot 5,230 LF $2.20 $11,506.00 $2.00 $10,4600.00 $8.00 $41,840.00 $1.00 $5,230.00
B-30-A Wet Connections,24-inch Diameter x 1 EA $24,131.00 $24,131.00 $7,500.00 $7,500.00 $21,500.00 $21,500.00 $5,000.00 $5,000.00
24-inch Diameter, r e
9-31-A lValves,Gate Type,12-inch,__per each 2 EA $2,236.00 $4,472.001 $3,000.00 $6.000,00 $2150.00 $4130000 $185000 $3,700.00
t3-32•A Valves Gate T 24-inch reach 2 EA $21,345.07 $42 690.00 $16.500.001 $33,000.001 19 500.00 $39,000.001 $14 400.00 $28,8W
Page 9 of 10 Kf FRIES E
&ASSOCIATES, INC.
CEDAR PARK- ROUND ROCK INTERCONNECT
36-INCH WATER TRANSMISSION MAIN
November 6,2007 -
Austin Engineering Co.,
Alternate Bid McLean Construction K Enter prises,Inc.. . R Vista Inc. Inc.
Bid
item Description Quanti Units Unit Cost Total Cost Unit Cost Total Cost Unit Cost Tata)Cost Unit Cost Total Cost
8-33-A Valves Butterfl T ,36-inch reach 3 EA $16,735.00 $50 05.00 $13,250.00 $39 750.00 $3705M.00 $112,500.00 $14,000.00 $42 000.00
B-34-A Valves Butt Me,42-inch,per each 2 EA $30 880.OD $61,760.00 $3Q 600.00 $61 00.00 $42500,00 $$5.000.00 $27,000.00 $54 000.00
&35-A Fire H rants, er each 3 EA $50 522.00 $151,566.00 $4,200.00 $12 600.00 $3,200.0o $9 600.00 $15.000-00 $45,000.00
B-36-A Automatic AIrNacuum Valve Assembly, 1 EA
ul oh Diameter, u each $9,145.00 $9.145.0 $8,000.00 $8 000.00 $11 0x00.00 $11 000.00 $17 00,00 $17,200.00
B-37-A Aulanatic AtrNacuum Valve Assembly, 1 EA
8-inch Diameter,per each $8,188.00 $8,188.00 $10,250-00 $10.260.00 $14.000-00 $14,000.00 $18,800.00 $1818W'00
Non-Native Seeding for Erosion Control,
B-38-A Method A,Straw or Shredded Brush 6.3 AC
Mulch acre $6,812.00 $42,915.60 $3,500.00 $22,050.00 $5,000.00 $31,500.00 $3,630.00 $22,869.00
8-39-A Soil Retention Blanket Class 2,Type E, 36 SY
per s are rd $2.30 $82.80 $2.00 $72.00 $30.00 $1.080.00 $4.00 $144.00
B-40-A Protection Fencing Type A Chain Unk 2.340 LF
Fence, r linear foot $2,20 $5,148.00 $2.50 '►5,850.00 $3.00 $7,020.00 $2.50 $5,850.00
B-41-A Rock Berm.-Per linear foot 100 LF $13.90 $1,390.00 $16.00 $1,600.00 $30.00 $3,000.00 $18.00 $1,800.00
B-42-A Stabilized Construction Entrance,per 7 EA
each $696.00 $4,872.00 $800.00 $5,600.00 $900.00 $6,300.00 $800.00 $5.600.00
B-43-A$�tFence for Erosion Control,per linear 5.890 LF
$1.60 $9,424.00 $1.85 $10,896.50 $2.00 $11780.00 $1.80 $10,602.00
B-44-A�m Mobilization Payment,per lump 1 LS
$120,932.00 $120,932.00 $20,000.00 $20 000.00 $150,000.00 $150,000.Q0 $30,000.00 $30,000.00
Maintenance of Erosion and
B-46-A Sedimentation►Controls shown on Sheet 1 LS
5per lump sum $2,902.00 32 902.00 $5 000.00 $5 000.00 510 000.00 $10 000.00 $5,000.00 $6,000.00
B-46-A Barricades,Sign and Traffic Handling, 4.5 MQ
r month $372.00 $1 674.00 $9,500.00 $42,750.00 $6,000.00 $27,000.00: $4,830.00 $21,735.00
B-47-A Construction Staking, r linear foot 5,708 LF $2.70 $15,411.50 $1.00 $5,708.00 $3.00 $17,124.00, $1.17 $6,678.36
B-48-A Vault Assembly at STA 6+48.35,per 1 LS
m
lusum $169,954.00 $169,954.00 $135,000.00 $135 000.00 $155,000.00 $155,000.0064,00000.,000 $104,000.00
B-49-A 60-inch Diameter Manhole at STA 1 LS
5+96.00, r lumpsum $5,464.00 $5,464.00__$4,350.00 $4#350.00 $6,500.00 $6500. $7,000.00
B-50-A 6-inch Concrete Ca , er linear foot 50 LF $26.00 $1,300.00 $90.00 $4,500,00 60,00 $3 000.00 $500.00
B-51-A race ower o e,per ump sum 1 LS $1,367.00 $1,367.00 $2,000.00 $2,000.00 $3,000.04 $3,000.00 32,QO0.00
otai ant a $2,425,449.70 $2,125,126.50 !2 997,734.002 4110,964.36
Addition error on Bid Form
Corrected value shown here
Page 10 of 10 K*F R I ES E
&ASSOCIATES, INC.