R-07-12-20-9F3 - 12/20/2007 RESOLUTION NO. R-07-12-20-9F3 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract") with F.T. Woods Construction for the Round Rock Police Facility, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 8, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 8 to the Contract with F.T. Woods Construction for the Round Rock Police Facility, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 20th day of December, 2007 . 0:\wdox\RESOLUTI\R71220F3.WPD/rMC N W , Mayor Cit of Round Rock, Texas ATTEST: �r SARA L. WHITE, City Secretary 2 EXHIBIT a a "All If ROUND ROCK POLICE FACILITY CONSTRUCTION CHANGE ORDER Project: Round Rock Police Facility Change Order No.: 8 Address: 3001 Tellabs Drive Initiation Date: 11/26/2007 Round Rock,Texas Contract For: General Construction To: FT Woods Construction Contract Date: 2/22/2007 1966 South Austin Avenue Georgetown,Texas 78626 (Contractor) The Contract is changed as follows: #82 revision to plans site utility/fire lines Add $ 36,985 16 VE#7 Alternative carpet Add $ 39,018 00 VE#9 Alternative lighting package Add $ 35,066.00 Total $ 111,069.16 This Change C fd�r r at e e fa t and urll nc�t be me u+�ad in the Contrast J c r eats rn±t nod b{�the f finer CU., nd Contractor .khan `�tn�ltaded Fi�reir�are�u E�t#c alb conditions affe�t� �tiem�i%tid�;rre,siibst�tufi�ons +ectftr,�ti4n'sect�c�n. Summary The original Contract Sum was:....................................................... $ 10,884,000.00 Net change by previous authorized Change Orders:............................................................... $ 169,885.80 The Contract Sum prior to this Change Order was:............................................................ $ 11,053,885.80 The Contract Sum will be increased by this Change Order $ 111,069.16 The new Contract Sum including this Change Order will be:................................................ $ 11,164,954.96 The Contract time will be changed by( 4 )days: The Date of Substantial Completion as of the date of this Change Order therefore is: 1/22/08 Brinkley Sargent FT Woods Construction City of Round Rock Architect ontractor caner 5000.Q V,0 ,$uite 600 1966 South Austin Avenue 221 East Main Street Address "_' r Address Address F Dallas,l�ex�s,75254 s � Georgetown,Texas 78626 Round Rock,Texas 78664 By By By ®. Gary Beeman. S.C. Inman, IV Mayor, Nyle Maxwell Oita- "YV 0 1112,71,0:1 Date Date Date LU P.O.Sox 122 Georgetown,TX 78627 RWOODS Ph:512-930-2607 Construction Change Request To: Gary Beeman Number. 82 R Brinkley Sargeant Date: 11/2/07 5000 Quorum Suite 600 Job: 2007-010-001 Round Rods Police Department Dallas,TX 75240 Phone: (512)238-0930 Ph:972-960-9970 Description: Site utility/fire line revisions We are pleased to offer the following moons and pricing to make the following changes: Site utility/fire tine revisions from 6122/07 meeting between City of Round Rods with J.Hurley. Includes removal of existing FDC,removal of existing 8"backflow preventer assembly,removal of existing concrete water vautt, removal of 3 existing PIV,removal of existing tinhom,capping of existing 8"water fine. Addition of(2)fire hydrants,(2)8"X 6" tapping sleeves,taps and valves,(2)gate valves,(1)8"X 2"tapping saddle,6"and 8"ductile Won piping. Chlorination and testing of revised fire line. 11/2/07-Revised per meeting with CORR and Owner. The total amount to provide this work is.................................................................................................. $36,985.16 (Please refer to attached sheet for details.) Please note that FTWOODS Construction Services Inc will require an extra 2 days. If you have any questions,please contact me at. Submitted by: SC Inman Approved by- FTWOODS Date: Cc: Page 1 of 2 492— LU ��lOODS P.O.Boot 122 r 11111 � � 86 9 ►.Tx 727 Ph:512-930-2607 Construction Change Request 82 R Price Breakdown Continuation Sheet Description: Site utility1fire line revisions Description Labor Material Equipment Subcontract other Price Plumbing ����Service $30,721.90 $30,721.90 $250.00 $250.00 Subtotal: $30,971.90 Project Management $120.00 Field Management $480.00 Insurance $31,571.90 0.61% $192.59 Bond $31,764.49 0.81% $257.29 Overtread $32,021.78 10.00% $3,202.18 Profit $35,223.96 5.00% $1,761.20 Total: $36,985.16 Page 2 of 2 KINNEYS COMMERCIAL, INC. Job Name: ROUND ROCK POLICE STATION Date: -Nov-07 _D Re: SITE UTILITY EXCAVATION v 'n Description: SITE UTILITY EXCAVATION AND RENEVATIONS PREFORMED AT THE n NEW POLICE STATION SITE. Deacri tion MATERIAL LABOR Q Ea Unit Total M.Hra Unit Total s' REMOVAL OF 8" BACKFLOW ASSEMBLY. _ REMOVAL OF 5' X 10 ' CONCRETE VAULT 1 EA. $ _ $ 8 $65.00 $ 520.00 a $ - 6 $65.00 N INSTALL 8" GATE VALVE . 1 EA. $ 862.50 $ 862.50 3 65 $ 390.00 INSTALL VALVE BOX ASSEMBLY. 1 EA. $ 92.50 $ 92.50 1 $ 00 $ 195.00 p INSTALL NEW PIPE AND RECONNECT LINE. 15 L $65.00 $ 65.00 h REMOVAL OF EXISTING 8" BUILDING RISERS. 2 EA. $ 85.00 9.90 $ 148.50 - 4 - $65.00 $ 260.00 PLUGGING OF EXISTING TEES. $ 70.00 3 $65.00 $ 390.00 REMOVAL OF POST INDICATOR VALVES 3 EA. $ 75.00 $ 225.00 3 $65.00 $ 585.00 INSTALL NEW FIRE HYDRANT ASSEMBLIES. 2 EA. $ 2,100.00 $ 277.50 3 $65.00 $ 585.00 INSTALL 8" X 6" SWIVEL TEES � 0 $ 4,200.00 4 $65.00 $ 520.00 2 EA. $ 165.00 $ 330.00 2 $65.00 $ 260.00 � INSTALL 6 " D.I. - CL-350 PIPE 100 L.F. $ 9.90 $ 990.00 8 INSTALL NEW 8 " BUILDING RISER $65.00 $ 520.00 1 EA. $ 1,325.00 $ 1,325.00 6 $65.00 $ 390.00 �• INSTALL 8" D.I. CL-350 PIPE 30 L.F. $ 13.00 $ 390.00 8 7. INSTALL 8" MJ TEE $65.00 $ 520.00 1 ? INSTALL 8" RW GATE VALVE EA. $ 140.00 $ 140.00 31 EA. $ 862.50 $ 862.50 2 $65.00 $ 195.00 INSTALL 8" D.I. CL-350 PIPE $65.00 $ 130.00 80 L.F. $ 13.00 $ 1,040.00 15 INSTALL M.J 8" X 8 " TAPPING SLEEVE 1 EA. $ 875.00 $ 875.00 6 $65.00 $ 975.00 $65.00 $ INSTALL 8" TAPPING VALVE. 1 EA. $ 390.00 INSTALL 8" RW GATE VALVE - $ - 0 $0.00 $ - a INSTALL 8" LONG SLEEVES 1 EA. $ - $ 0 $65.00 $ _ 410 G BACKHOE 4 EA. $ - $ - 0 $65.00 $ _ HOE RAM 34 HR. $ 45.00 $ 1,530.00 $ _ a 15 HR. $ 75.00 $ 1,125.00 _ CLORINATION OF ALL WATER LINES. 7 EA. $ 24.50 $ 171.50 15 $ • PRESSURE TESTING OF LINES PER C.O.R.R. $65.00 $ 975.00 FLUSHING OF WATER LINES PER C.O.R.R. $ 6 $65.00 $ 390.00 BEDDING MATERIAL $ - 8 $65.00 $ 520.00 SPOILS - HAUL OFF 25 CY $ 15.00 $ 375.00 5 $65.00 $ 325.00 2 EA. $ 125.00 $ 250.00 $ $ - $ $ - r Material $ 15,380.00 Labor $ 9,100.00 Labor $ 9,100.00 0 n Material&Equipment $ 15,380.00 n small tools $ 910.00 n sub total $ 25,390.00 oh 70% $ 2,539.00 $ 27,929.00 profit 10% $ 2,792.90 ? sub total $ 30,721.90 Payment to be made as per contract bond 0 _ N total 301721.90 v n v n c� C a g Ct 0 Value Engineer Items FT Woods Contract Police Facility Project VE Item#9 Lighting Package FT Woods Construction had proposed saving up to $46,066.00 for alternate lighting package during value engineering of the original contract. The MEP reviewed the submittals for the alternate lighting package and only a small portion of the package were acceptable and would be cost efficient for the city. $11,000 savings were identified and the balance of the lighting package in the amount of$35,066 is being added back into the project. VE Item#7 Carpet FT Woods Construction during the original value engineering discussionsropos changing the carpet brand and possibly saving$39,018 in the overallproject. Upon review of submittals and carpet samples the carpet substitution was disapproved of by the architect and police representative. It did not meet the performance specs needed for this project. The original carpet that was specified and bid will be installed and there will not be savings in these costs. DATE: December 13, 2007 SUBJECT: City Council Meeting - December 20, 2007 ITEM: 9F3. Consider a resolution authorizing the Mayor to execute Construction Change Order No. 8 with FT Woods Construction for the Round Rock Police Facility. Department: Engineering and Development Services Staff Person: Tom Word, Chief of Public Works Larry Madsen, Construction Manager Justification: This change order includes an addition of $36,985.16 for revisions to site utility work from original plans. This change order deals with requests from the city inspector for corrections and improvements that had to be made on the water and fire line. Two additional fire hydrants were added to provide fire protection for the facility. This change request also adds cost of two items that were valued engineered from the project at original contract time back into the project cost. Once construction started and submittals of an alternate carpet package were reviewed it became evident that this was not the best buy for the city and the original specified carpet is being put back into the project. An alternate lighting package was reviewed by construction team and the alternate lighting package was changed to meet the police department needs. These items were reviewed and the total value engineered savings was reduced and the difference added back into the project as listed below. Original Savings Actual Savings Net Cost VE#7 Alternative Carpet Selection $39,018.00 $0 $39,018.00 VE#9 Alternative Lighting Package 9 9 9 $46,066.00 $11,000.00 $35,066.00 Funding: Total: $111,069.16 Cost: $111,069.16 Source of funds: 2002 GO Bonds & General Self Finance Construction Amount % Change Original Contract $ 10,884,000.00 N/A - Previous Change Orders $ 169,885.80 1.56% Change Order No. 8 $ 111,069.16 1.02% Revised Contract $ 1111641954.96 2.58% Outside Resources: Brinkley Sargent Architects and FT Woods Construction Background Information: N/A Public Comment: N/A EXECUTED DOCUMENT FOLLOWS f t ROUND ROCK POLICE FACILITY CONSTRUCTION CHANGE ORDER Project: Round Rock Police Facility Change Order No.: 8 Address: 3001 Tellabs Drive Initiation Date: 11/26/2007 Round Rock,Texas Contract For: General Construction To: FT Woods Construction Contract Date: 2/22/2007 1966 South Austin Avenue Georgetown,Texas 78626 (Contractor) The Contract is changed as follows: #82 revision to plans site utility/fire lines Add $ 36,985.16 VE#7 Alternative carpet Add $ 39,018 00 VE#9 Alternative lighting package Add $ 35,066 00 Total $ 111,069.16 This Change Order is not in effect and will not be inctuded in the Contract Documents uhti�signed by the Owner,Architect acrd Contractor, Changes included herein are subi0dt to ns all conditioaffectin them under the substitution s ed ication section. Summary The original Contract Sum was:....................................................... $ 10,884,000.00 Net change by previous authorized Change Orders:............................................................... $ 169,885.80 The Contract Sum prior to this Change Order was:............................................................ $ 11,053,885.80 The Contract Sum will be increased by this Change Order $ 111,069.16 The new Contract Sum including this Change Order will be:................................................ $ 11,164,954.96 The Contract time will be changed by( 4 )days: The Date of Substantial Completion as of the date of this Change Order therefore is: 1/22/08 Brinkley Sargent FT Woods Construction City of Round Rock Architect ontractor Owner 5000 Quorum Drive,Suite 600 1966 South Austin Avenue 221 East Main Street Address Address Address Dallas,Texas.75254 Georgetown,Texas 78626 Round Rock Texas Z0664 1ir�Q.r2►�Ay �� By By By Gary Beeman S.C. Inman, IV Mayor, Nyle Maxwell 11 �2-7]0:2 �6 4,01 Date •�°� Date Date P.O.Boot 122 Georgebwn,TX 78627 F MOODS Ph:512-930-2607 Construction Change Request To: Gary Beeman Number. 82 R Brinkley Sargeant pate: 11/2/07 5000 Quorum Suite 600 Job: 2007-010-001 Round Rods Police Department Dallas,TX 75240 Phone: (512)238-0930 Ph:972-960-9970 Description: Site utility/fire line revisions We are pleased to offer the following specifications and pricing to make the following changes: Site utility/fire line revisions from 6/22/07 meeting between City of Round Rods with J.Hurley. Includes removal of existing FDC,removal of existing 8"backflow preventer assembly,removal of existing concrete water vault, removal of 3 existing PIV,removal of existing tinhom,capping of existing 8"water fine. Addition of(2)fire hydrants,(2)8"X 6" tapping sleeves,taps and valves,(2)gate valves,(1)8"X 2"tapping saddle,6"and 8"ductile iron piping. Chlorination and testing of revised fire line. 11/2/07-Revised per meeting with CORR and Owner. The total amount to provide this work is.................................................................................................. $36,985.16 (Please refer to attached sheet for details.) Please note that FTWOODS ConstnxXion Services Inc will require an extra 2 days. If you have ary questions,please contact me at. Submitted by: SC Inman Approved by: FTWOODS Date: Cc: Page 1 of 2 2— LU P.O.Box 122 Georgetown,TX 78627 F-MOODS Ph:512-930-2607 Construction Change Request 82 R Price Breakdown Continuation Sheet Description: Site utility/fire line revisions Description Labor Material Equipment Subcontract Other Price Plumbing $30,721.90 $30,721.90 Dumpster Service $250.00 $250.00 Subtotal: $30,971.90 Project Management $120.00 Field Management $480.00 Insurance $31,571.90 0.61% $192.59 Bond $31,764.49 0.81% $257.29 Overhead $32,021.78 10.00% $3,202.18 Profit $35,223.96 5.00% $1,761.20 Total: $36,985.16 Page 2 of 2 KINNEYS COMMERCIAL, INC. Job Name: ROUND ROCK POLICE STATION Date: -Nov-07 Re: SITE UTILITY EXCAVATION v n Description: SITE UTILITY EXCAVATION AND RENEVATIONS PREFORMED AT THE 0 NEW POLICE STATION SITE. w MATERIAL LABOR Description Qty. Ea Unit Total M.Hrs Unit Total REMOVAL OF 8" BACKFLOW ASSEMBLY. 1 EA. $ - $ - 8 $65.00 $ 520.00 a REMOVAL OF 5' X 10 ' CONCRETE VAULT 1 EA. $ - $ - 6 $65.00 $ 390.00 INSTALL 8" GATE VALVE . 1 EA. $ 862.50 $ 862.50 3 $65.00 $ 195.00 w INSTALL VALVE BOX ASSEMBLY. 1 EA. $ 92.50 $ 92.50 1 $65.00 $ 65.00 p INSTALL NEW PIPE AND RECONNECT LINE. 15 L.F. $ 9.90 $ 148.50 4 $65.00 $ 260.00 REMOVAL OF EXISTING 8" BUILDING RISERS. 2 EA. $ 85.00 $ 170.00 3 $65.00 $ 390.00 PLUGGING OF EXISTING TEES. 3 EA. $ 75.00 $ 225.00 3 $65.00 $ 585.00 In REMOVAL OF POST INDICATOR VALVES 3 EA. $ 92.50 $ 277.50 3 $65.00 $ 585.00 INSTALL NEW FIRE HYDRANT ASSEMBLIES. 2 EA. $ 2,100.00 $ 4,200.00 4 $65.00 $ 520.00 INSTALL 8" X 6" SWIVEL TEES 2 EA. $ 165.00 $ 330.00 2 $65.00 $ 260.00 INSTALL 6 " D.I. - CL-350 PIPE 100 L.F. $ 9.90 $ 990.00 8 $65.00 $ 520.00 INSTALL NEW 8 " BUILDING RISER 1 EA. $ 1,325.00 $ 1,325.00 6 $65.00 $ 390.00 INSTALL 8" D.I. CL-350 PIPE 30 L.F. $ 13.00 $ 390.00 8 $65.00 $ 520.00 INSTALL 8" MJ TEE 1 EA. $ 140.00 $ 140.00 3 $65.00 $ 195.00 INSTALL 8" RW GATE VALVE 1 EA. $ 862.50 $ 862.50 2 $65.00 $ 130.00 INSTALL 8" D.I. CL-350 PIPE 80 L.F. $ 13.00 $ 1,040.00 15 $65.00 $ 975.00 INSTALL M.J 8" X 8 " TAPPING SLEEVE 1 EA. $ 875.00 $ 875.00 6 $65.00 $ 390.00 INSTALL 8" TAPPING VALVE. 1 EA. $ - $ - 0 $0.00 $ - INSTALL 8" RW GATE VALVE 1 EA. $ - $ - 0 $65.00 $ - a INSTALL 8" LONG SLEEVES 4 EA. $ - $ - 0 $65.00 $ - 410 G BACKHOE 34 HR. $ 45.00 $ 1,530.00 $ - HOE RAM 15 HR. $ 75.00 $ 1,125.00 $ CLORINATION OF ALL WATER LINES. 7 EA. $ 24.50 $ 171.50 15 $65.00 $ 975.00 • PRESSURE TESTING OF LINES PER C.O.R.R. $ - 6 $65.00 $ 390.00 3 FLUSHING OF WATER LINES PER C.O.R.R. $ - 8 $65.00 $ 520.00 BEDDING MATERIAL 25 CY $ 15.00 $ 375.00 5 $65.00 $ 325.00 SPOILS - HAUL OFF 2 EA. $ 125.00 $ 250.00 $ - r Material $ 15,380.00 Labor $ 9,100.00 Labor $ 9,100.00 _0 Material&Equipment $ 15,380.00 v small tools $ 910.00 n sub total $ 25,390.00 0 oh 10% $ 2,539.00 a� $ 27,929.00 proflt 10% $ 2,792.90 sub total $ 30,721.90 bond 0 ? Payment to be made as per contract total 30,721.90 a CD N X v n v n CD c. c a m C4 W C6 T3 Value Engineer Items FT Woods Contract Police Facility Project VE Item#9 Lighting Package FT Woods Construction had proposed saving up to$46,066.00 for alternate lighting package during value engineering of the original contract. The MEP reviewed the submittals for the alternate lighting package and only a small portion of the package were acceptable and would be cost efficient for the city. $11,000 savings were identified and the balance of the lighting package in the amount of$35,066 is being added back into the project. VE Item#7 Carpet FT Woods Construction during the original value engineering discussions proposed changing the carpet brand and possibly saving$39,018 in the overall project. Upon review of submittals and carpet samples the carpet substitution was disapproved of by the architect and police representative. It did not meet the performance specs needed for this project. The original carpet that was specified and bid will be installed and there will not be savings in these costs.