R-08-03-07-8A1 - 3/7/2008 RESOLUTION NO. R-08-03-27-8A1
WHEREAS, the City of Round Rock has duly advertised for bids
for the Lake Creek Pool and Rabb Pool Resurfacing Project, and
WHEREAS, Progressive Commercial Aquatics, Inc . has submitted
the lowest responsible bid, and
WHEREAS, the City Council wishes to accept the bid of
Progressive Commercial Aquatics, Inc . , Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City a contract with Progressive Commercial Aquatics,
Inc . for the Lake Creek Pool and Rabb Pool Resurfacing Project.
The City Council hereby finds and declares that written notice
of the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to
the public as required by law at all times during which this
Resolution and the subject matter hereof were discussed, considered
and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended.
RESOLVED this 27th day of March, 2008 .
?ity
LL, Mayor
of Round Rock, Texas
ATTEST:
/tip /L- rdWt�
SARA L. WHITE, City Secretary
O:\WDOX\RESOLD 1\R80327AIDOC/mu
THE CITY OF ROUND ROCK
PARKS&RECREATION DEPARTMENT BIDS EXTENDED AND CHECKED
301 West Bagdad BY: JAH
Round Rock, Texas. 78664 DATE: 2/28n008
(512)218-5540 BID TABULATION
SHEET OF 1 OF 1
777
CONTRACT:
Lake Creek and Rabb Pool Resurfacing
LOCATION:PARD Large Conference Room USA Pools Progressive Commercial Commercial Swim Fun n'Swim Pools
DATE:2128/2008 Aquatics
Bid Bond?Yes Bid Bond. Yes Bid Bond?No Bid Bond?Yes
APPROX UNIT UNIT UNIT UNIT 7:.7777777777=
ITEM UNIT QTY. PRICE COST PRICE COSTPRICE COST PRICE COST
x verstze am ram
reparation n esu acing
emove ep ace e an ec az era
InstallTile Floor Marking
TOTAL BASE BID(Ll-L4): $74,200.00 $48,964.00
Rl-24"x 24"Oversized Main Drain
Preparation and Resurface Pool
emove ep aceDepth anec az era
st i e oorMarkingrt--9.
TOTAL BASE BID 1-R4): $15,200.00 $15,625.00 $19,673.00 $10,510.00
TOTAL BID: $89,400.00 $64,589.00 $114,600.75 $70,196.00
Unit Price and/or Cost Do Not Meet Actual Calculated Cost bidtabibidtab
ri.�
DATE: March 20, 2008
SUBJECT: City Council Meeting - March 27, 2008
ITEM: *8A1. Consider a resolution authorizing the Mayor to execute a Contract with
Progressive Commercial Aquatics, Inc. for the Lake Creek Pool and
Rabb Pool Resurfacing Project.
Department: Parks and Recreation
Staff Person: Rick Atkins, Parks and Recreation Director
David Buzzell, Park Development Manager
Justification:
Lake Creek Pool and Rabb Pool are in need of resurfacing due to the age and condition of
the current plaster. Both pools were re-plastered in the early to mid 1990's. The pool
surface will be resurfaced with a higher quality (quartz finish) plaster than what is currently
applied at these pools. In addition to the plastering, this project includes the installation of
oversized drains and depth markers to get these pools up to code.
Funding: $112,000.00
Cost: $64,589.00
Source of funds: General Fund
Outside Resources:
Progressive Commercial Aquatics, Inc.
Background Information•
N/A
Public Comment:
N/A