Loading...
R-08-03-07-8A1 - 3/7/2008 RESOLUTION NO. R-08-03-27-8A1 WHEREAS, the City of Round Rock has duly advertised for bids for the Lake Creek Pool and Rabb Pool Resurfacing Project, and WHEREAS, Progressive Commercial Aquatics, Inc . has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Progressive Commercial Aquatics, Inc . , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Progressive Commercial Aquatics, Inc . for the Lake Creek Pool and Rabb Pool Resurfacing Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 27th day of March, 2008 . ?ity LL, Mayor of Round Rock, Texas ATTEST: /tip /L- rdWt� SARA L. WHITE, City Secretary O:\WDOX\RESOLD 1\R80327AIDOC/mu THE CITY OF ROUND ROCK PARKS&RECREATION DEPARTMENT BIDS EXTENDED AND CHECKED 301 West Bagdad BY: JAH Round Rock, Texas. 78664 DATE: 2/28n008 (512)218-5540 BID TABULATION SHEET OF 1 OF 1 777 CONTRACT: Lake Creek and Rabb Pool Resurfacing LOCATION:PARD Large Conference Room USA Pools Progressive Commercial Commercial Swim Fun n'Swim Pools DATE:2128/2008 Aquatics Bid Bond?Yes Bid Bond. Yes Bid Bond?No Bid Bond?Yes APPROX UNIT UNIT UNIT UNIT 7:.7777777777= ITEM UNIT QTY. PRICE COST PRICE COSTPRICE COST PRICE COST x verstze am ram reparation n esu acing emove ep ace e an ec az era InstallTile Floor Marking TOTAL BASE BID(Ll-L4): $74,200.00 $48,964.00 Rl-24"x 24"Oversized Main Drain Preparation and Resurface Pool emove ep aceDepth anec az era st i e oorMarkingrt--9. TOTAL BASE BID 1-R4): $15,200.00 $15,625.00 $19,673.00 $10,510.00 TOTAL BID: $89,400.00 $64,589.00 $114,600.75 $70,196.00 Unit Price and/or Cost Do Not Meet Actual Calculated Cost bidtabibidtab ri.� DATE: March 20, 2008 SUBJECT: City Council Meeting - March 27, 2008 ITEM: *8A1. Consider a resolution authorizing the Mayor to execute a Contract with Progressive Commercial Aquatics, Inc. for the Lake Creek Pool and Rabb Pool Resurfacing Project. Department: Parks and Recreation Staff Person: Rick Atkins, Parks and Recreation Director David Buzzell, Park Development Manager Justification: Lake Creek Pool and Rabb Pool are in need of resurfacing due to the age and condition of the current plaster. Both pools were re-plastered in the early to mid 1990's. The pool surface will be resurfaced with a higher quality (quartz finish) plaster than what is currently applied at these pools. In addition to the plastering, this project includes the installation of oversized drains and depth markers to get these pools up to code. Funding: $112,000.00 Cost: $64,589.00 Source of funds: General Fund Outside Resources: Progressive Commercial Aquatics, Inc. Background Information• N/A Public Comment: N/A