CM-2017-1396 - 6/9/2017Page i of 3 Contract Quantity Adjustment/Change order iROUNC *"X mv, Ot 16 Department: Utilities and Environmental Services Project Name: Windy Park Channel Repair 2 Date: 5/19/17 City Project Change Order/Quantity ID Number Adjustment No. 1 Vendor A Plus Asphalt and Concrete, LLC PO Box 6055, Round Rock, TX 78683 512-251-8920 Company Name Address Phone No. Justification )wring demolition, more extensive voids were discovered than originally anticipated; therefore, a proper remediation of the failure area iecessitated an Increase of the concrete riprap repair area. The increase in concrete riprap repair area occurred upslope and required the .ontractor to employ the use of a concrete pump which was not originally anticipated. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment; Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)j: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time; Amount 0/0 $10,275.00 $0.00 $6,105.00 $6.105.00 $0.00 $600.00 $600.00 $16,480.00 $6,705.00 30 0 0 -a -30 'Submitted ifa►' aha proti►__ _ ____ 0% 4% 4% Signature Contractor: Signature r T— City Project Man Manager: Signature Mayor/City Daniel Lynn H' Printed Name, Company -5-h2 Date Engineer, City of Round Rock -5117. D to -- - Date Item * Contract Quantity Adjustment/Change Order Project Name: Windy Park Channel Repair 2 Quan. Adj./Change Order No.: Item Unit Order Data Unit Price Amount Page 2 of Contract Time Adjustment Page 3 of 3 Contract Quantity Adjustment/ Change Order Project Name: Windy Park Channel Repair 2 Quan, Adj./Change Order No.: Ovantifv Arhiecl7nonf- 11nMm Contract Time Bid Item # Item Description Unit Qty. Unit Price Amount Adjustment 1 Remove existing concrete riprap S.F. 267 $15.00 $4,005.00 0 2 Concrete rfprap C.Y. 6 $350.00 $2,100.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 _r $0.00 ios1001 a TK t O �Ar to N ", 1 N 1 City of Round Rock ROUNeOROCK Agenda Item Summary Agenda Number: Title: Consider executing Quanity Adjustment/Change Order No. 1 with A PLus Asphalt and Concrete_ LLC for the Windy Park Channel Repair 2 Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 6/9/2017 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $6,705.00 Indexes: 2014 Drainage Revenue Bonds Attachments: QAC01_Aplus_WindyParkChannelRepair2-5.23.17.pdf, Map WindyParkRepair2_1.12.17.pdf, LAF_QACO No.1_Aplus^WindyParkChannelRepair2_5.24.17.pdf Department: Utilities and Environmental Services Text of Legislative File CM -2017-1396 Consider executing Quanity Adjustment/Change Order No. 1 with A PLus Asphalt and Concrete, LLC for the Windy Park Channel Repair 2 Project. On February 10, 2017, the City entered into a contract with A Plus Asphalt and Concrete, LLC for the repair of a couple of failing areas identified within the concrete -lined drainage channel that traverses through the Windy Park Neighborhood south of the Clay Madsen Recreation Center. Upon demolition of one of the repair areas, more extensive voids were found under the concrete than originally anticipated; therefore, a proper repair necessitated increasing the amount of concrete channel lining to be removed and replaced. Furthermore, the increase in repair area extended higher up the channel slope than anticipated; therefore, the new concrete placement required the use of a pump which had not been originally contemplated. A Plus Asphalt and Concrete, LLC has successfully and satisfactorily completed the project. Contract Quantity Adjustment/Change Order No. 1 provides adjustment for the final quantities of concrete removed and replaced, and provides a change order for the use City o! Round Rock Page t Printed on E/8/2017 Agenda item Surnmary Continued CW2017--1390 of a concrete pump; ultimately increasing the contract by $6,705 for a final total of $16,980. Staff recommends approval. Cost: $6,705 Source of Funds: 2014 Drainage Revenue Bonds City o/Round Rock Page 2 Printed on 0/8/2017