Loading...
CM-2017-1404 - 6/9/2017Department: Project Name: City Project 1D Number Justification Contract Quantity Adjustment/Change Order Transportation Sidewalk Gaps Project - Federal Aid Project #STP 1602,'383) TP - CSJ#i 0914-05186 Hulustments ana Aaaitionai Ketainaing Wall SUMMARY Original Contract Price-. Previous Quantity Adjustments): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustmenr(s): Previus Change Order(s): This Change Order: Total Change Order(s) Ta Elate: Adjusted Contract Price [Or giral Contract Price Plus Quantity Adjustment(s) Plus Changs Order(s)]- Difference between Orig nal and Adjusted Contract Pn-es: Original Contract Time: Time Adjustment by previous Q.ian. Adj :Change Order Time Adjustment by this Quan Add. :Change Order: I'�ct 1 of 3 Date: 5/23/17 Change Order/Quantity Adjustment No. i Amount % Change $431,076.00 -$38,004.00 -$38,004.00 $393,072.00 0.00 $12,005.00 0.03 $12,005.00 0.03 S405,077.001 -$25,999.00 90 0 Neve Contract Time: 90 _ Submtttd dor Approval c Prepared By. - '' Tim Patin, President, Patin Construction LLC f ' 2 e 7 _ Signarure Pr nted Name, Title, Company r Da,e ApproVals ContraJor: Tim Patin, President, Patin Construction LLC S 2 City Project Signature Panted Name, Title, Company Date Manage' �� I 6-31-17 Printed Name, Date cam.np io ui c - z 0 -7- / 110J4 Rage 3 tsl'3 Contract Quantity Adjustment/Change Order Ps. Vit. r Project Name, Sidewalk Gaps Project - Federal Aid Project #STP 1602 (383) TP - CS3# 0914-05-186 Quan. Ad}./Change Order No. uantity Adjustment Data Contract Time Bid Item # Item Description p Unit Qty. Unit Price Amount Adjustment 1 Concrete Sidewalk (4") SY 254$55-00 -$13,970.00 2 Concrete Sidewalk (6") SY 1 20 $70.00 $1,400.00 3 Driveways (Cont) SY 33 $90.00 $2,970.00 4 Concrete Sidewalks w/6" Standup Curb SF 56 $10.00 $560.00 5 Concrete Sidewalks w/6" Retaining Wall SF -1600 $15.00 -$24,000.00 13 Sod for Erosion Control SY 659 $4.00 $2,636.00 20 Tree Protection EA -19 $400.00 -$7,600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.130 $0.00 Sa.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0,001 TALS; -3S,Li]d,00. a Pace 2 city' IV_ Contract Quantity Adjustment/ Change Order r Project Name: Sidewalk Gaps Project - Federal Aid Project #STP 1602 (383) 7P - CS30a 0914-05-186 Quan. Adj./Change Order No.: C hnn"a nrri— Ilam Contract Time Item # Item Description Unit Qty, Unit Price Amount Adjustment Adjusus(Das C01-1 Additional Retaining Wall LF 343 S35.00 $12,005.Q0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TSA S: $12008.001fl City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Patin Construction, LLC for the 2014 Sidewalk Gaps Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 6/9/2017 Dept Director: Gary D Hudder, Transportation Director Cost: $12,005.00 Indexes: Attachments: CO-QA#1, LAF - QA -CO No. 1 w- Patin - Sidewalk Gaps Project (00379455xA08F8 ). pdf Department: Transportation Department Text of Legislative File CM -2017-1404 Consider executing Quantity Adjustment/Change Order No. 1 with Patin Construction, LLC for the 2014 Sidewalk Gaps Project. This change order/quantity adjustment # 1 is for the additional retaining walls installed on the Sidewalk Gap Project and for additions and under -runs of plan quantities. Approximately 343 liner feet of additional retaining wall was installed along the sidewalk on Greenlawn Boulevard to aid in the stabilization of the slopes encountered during construction, The plan quantities include several sections of sidewalk that was not constructed, some tree protection that was not used and some additional driveway that was added. The amount for these quantity adjustments is a reduction in the amount of $38,004.00, however the net reduction for the overall project after inclusion of this change order, is $25,999.00. The dollar amount for the change order item is $12,005.00. City of Round Rock Paye i PNnted on d/8/2017