Loading...
R-08-03-27-8B1 - 3/27/2008 RESOLUTION NO. R-08-03-27-8131 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract" ) with RGM Constructors, L. P. for the Gattis School Roadway Improvements Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Contract Change Order No. 1 to the Contract with RGM Constructors, L. P. for the Gattis School Roadway Improvements Project, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 27th day of March, 8 N W Mayor I y ATTEST: of ound Rock, Texas SARA L. WHITE, City Secretary 0:\WDOX\RESOLUTI\R80327BLDOC/me CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER Page 1 of 2 DEPARTMENT: Transportation Services DATE: 1/15/2008 PROJECT: Gattis School Road CHANGE ORDER NO: JUSTIFICATION: Reference page 2 of 2 ORIGINAL CONTRACT PRICE: $2,741,843.54 PREVIOUS CHANGE ORDER: $0.00 THIS CHANGE ORDER: $185,823.00 CHANGE ORDERS TO DATE: $185,823.00 CHANGE DATA ADDED DAYS DESCRIPTION OF UNIT CALENDAR ITEM# CHANGES UNIT QTY. PRICE AMOUNT DAYS 1 DUCTILE IRON FITTING TON 11 $3,000.00 $33,000.00 mmmT 144 2 VALVE(GATE AND BOX)6" EA 2 $800.00 $1,600.00 2 3 VALVE(GATE AND BOX)12" EA 1 $1,800.00 $1,800.00 2 4 VALVE(GATE AND BOX)16" EA 1 $5,000.00 $5,000.00 2 5 FIRE HYDRANT EA 1 $4,900.00 $4,900.00 3 6 WET CONNECTION(16"x16") EA 2 $16,000.00 $32,000.00 7 7 PIPE(16"DIA)(DI)(W) LF 150 $92.00 $13,800.00 7 8 PIPE(6"DIA)(DI)(W) LF 94 $50.00 $4,700.00 6 9 PIPE(12"DIA)(DI)(W) LF 601 $70.00 $42,070.00 13 10 CONDUIT 2-INCH PVC SCH 40 LF -249 $4.00 ($996.00) 0 11 VEH DETECT(14AWG XHHW) LF -3510 $0.10 ($351.00) 0 12 WET CONNECTION(16"x16") EA 3 $16,000.00 $48,000.00 14 13 FILTER CURB INLET PROTECTION EA 5 $60.00 $300.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 PREPARED BY: TOTAL: $185,823.00 70 PERCENT OF ORIGINAL CONTRACT PRICE SIGMATME NGIN All DATE THIS CHANGE ORDER.: $185,823.00 1/15/2008 PREVIOUS CHANGE ORDER: $0.00 SIGNATURE(CONTRACTOR) DATE TOTAL%CHANGE ORDER: 6,78% PRINTED NAME: Martin Morello ORIGINAL CONTRACT PRICE PLUS TITLE: Project Manager CHANGE ORDER: $2,927,666.54 APPROVED: CITY OF ROUND ROCK DATE EXHIBIT "An CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER 2 DEPARTMENT: Transportation Services Page 2 of DATE: 1/15/2of 2 PROJECT: Gattis School Road CHANGE ORDER NO: JUSTIFICATION: 1 Per the City of Round Rock, RGM to install bypass waterline to isolate system one from system two as discussed on November 27, 2007 2 Quantity adjustments for fire hydrants,ductile iron fittings and valves 3 Quantity adjustments for wet connections(16"x16")and 16-inch ductile iron pipe. 4 Quantity adjustments for 12-inch and 6-inch ductile iron pipe. 6 Per direction from The City of Round Rock, eliminate the loop detectors from the signalization at the intersection of A.W. Grimes Blvd and Gattis School Road 7 Quantity adjustments for filter curb inlet protection S GATTIS SCH OL RD v► SN A�5 N Gattis School Road `�ROUNDROCK."TEXAS Z � YLkYR>F..F%'SitX:'PriSPFXIIY DATE: March 20, 2008 SUBJECT: City Council Meeting - March 27, 2008 ITEM: 8B1. Consider a resolution authorizing the Mayor to execute Change Order No. 1 with RGM Constructors for the Gattis School Roadway Improvements Project. Department: Transportation Services Staff Person: Thomas G. Martin, P.E., Director of Transportation Services Justification: In order to complete the proposed waterline installation on Gattis School Road, the contractor was required to install a bypass to isolate the waterline on Gattis School Road from the waterline on A.W. Grimes Blvd. Each of these waterlines is on separate pressure planes and there was no provision for a Pressure Reducing Valve (PRV) in the Gattis School Road construction project. Funding: Cost: $185,823.00 Source of funds: 2002 GO Bonds Amount % Chan e Ori inal Contract 2 741 843.54 N/A Previous Chan e Orders N/A N/A Chan e Order #1 185-893 nn 6.78% Revised Contract $ 2 927 666.54 6.78% Outside Resources: N/A Background Information• The City Council approved a resolution # 07-08-09-8A1 authorizing the contract to perform the Gattis School Improvements. The project will widen the existing roadway from Dry Branch Creek Tributary to Dry Branch Creek; this project also includes widening improvements from Dixie Lane to 385 feet east of Surry Drive and improvements a Via Sonoma Trail. Public Comment: N/A EXECUTED DOCUMENT FOLLOWS CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER 2 of DEPARTMENT: Transportation Services Page DATE: 1/15 1 1 of 2 PROJECT: Gattis School Road CHANGE ORDER NO: 1 JUSTIFICATION: Reference page 2 of 2 ORIGINAL CONTRACT PRICE: $2,741,843.54 PREVIOUS CHANGE ORDER: $0.00 THIS CHANGE ORDER: $185,823.00 CHANGE ORDERS TO DATE: $185,823.00 CHANGE DATA DESCRIPTION OF ADDED DAYS UNIT CALENDAR ITEM# CHANGES UNIT QTY. PRICE AMOUNT DAYS 1 DUCTILE IRON FITTING TON 11 $3,000.00 $3755'57175157- 14 2 VALVE(GATE AND BOX)6" EA 2 $800.00 $1,600.00 3 VALVE(GATE AND BOX)12" EA 1 2 4 VALVE(GATE AND BOX)16" EA 1 $1,800.00 $1,800.00 2 5 FIRE HYDRANT $5,000.00 $5,000.00 2 EA 1 $4,900.00 $4,900.00 3 6 WET CONNECTION(16"x16") EA 2 $16,000.00 $32,000.00 7 PIPE(16"DIA)(DI)(W) LF 150 7 8 PIPE(6"DIA)(DI)(W) $92.00 $13,800.00 ] LF 94 $50.00 $4,700.00 6 9 PIPE(12"DIA)(DI)(W) LF 601 $70.00 $42,070.00 10 CONDUIT 2-INCH PVC SCH 40 LF -249 13 11 VEH DETECT(14AWG XHHW) LF -3510 $4 00 ($996.00) 0 12 WET CONNECTION 16"x16") $0.10 ($351.00) 0 ( EA 3 $16,000.00 $48,000.00 14 13 FILTER CURB INLET PROTECTION EA 5 $60.00 $300.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.400 -:: PREPARED BY: TOTAL: x185823 70 I S-0 b PERCENT OF ORIGINAL CONTRACT PRICE SIGN R NG E DATE THIS CHANGE ORDER.: $185,823.00 1/15/2008 PREVIOUS CHANGE ORDER: $0.00 SIGNAT E(CONTRACTOR) DATE TOTAL%CHANGE ORDER: 6.78% PRINTED NAME: Martin Morello ORIGINAL CONTRACT PRICE PLUS TITLE: Pro eCt Manager CHANGE ORDER: $2,927,666.54 APPROVED: ��T �*)CITY OF 9,-00-63 - _ ✓I CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Transportation Services Page 2 of 2 PROJECT: Gattis School Road DATE: 1/15/2008 CHANGE ORDER NO: 1 JUSTIFICATION: 1 Per the City of Round Rock, RGM to install bypass waterline to isolate system one from system two as discussed on November 27,2007 2 Quantity adjustments for fire hydrants, ductile iron fittings and valves 3 Quantity adjustments for wet connections(16"x16")and 16-inch ductile iron pipe. 4 Quantity adjustments for 12-inch and 6-inch ductile iron pipe. 6 Per direction from The City of Round Rock, eliminate the loop detectors from the signalization at the intersection of A.W. Grimes Blvd and Gattis School Road 7 Quantity adjustments for filter curb inlet protection