R-08-03-27-8B2 - 3/27/2008 RESOLUTION NO. R-08-03-27-8B2 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract" ) with F. T. Woods Construction for the Arterial "T" Roadway (now known as Seton Parkway) Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 1 to the Contract with F.T. Woods Construction for the Seton Parkway Project, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 27th day of March, 2008 . LL, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Secretary 0:\WDOX\RESOLUTI\R80327B2.DOC/rmc CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER PAGE 1 OF 1 DEPARTMENT: Public Works DATE: 2/3/2008 PROJECT: Seton Parkway CHANGE ORDER NO: Final aka Arterial 'T', Phase I, Segment A & B JUSTIFICATION: ORIGINAL CONTRACT PRICE: $1,098,489.30 Contract Changes: French drain, headwalls, PREVIOUS CHANGE ORDERS: $0.00 geogrid for subgrade,added concrete thick- THIS CHANGE ORDER: $66,785.80 ness to driveways, ribbon curb,deleted one CHANGE ORDERS TO DATE: $66,785.80 valve,deduct for erosion blanket&filter fabric CHANGE DATA ADDED DAYS DESCRIPTION OF UNIT CALENDAR/ ITEM# CHANGES QTY UNIT PRICE AMOUNT WORKING 1 Excavation & Backfill for F.D. 887 Cy $6.00 $5,322.00 2 2 Install 4" Perforated Pipe w/Sock 1182 If $6.50 $7,683.00 1 3 Place 1 to 1-1/2" Rock 1313 to $16.25 $21,336.25 0 4 Filter Fabric Barrier 12876 sf $0.25 $3,219.00 0 5 4"Concrete Headwall 2 ea $650.00 $1,300.00 0 6 Erosion Matting 400 sf $4.50 $1,800.00 1 7 Haul off spoils 727 Cy $8.50 $6,179.50 3 8 Synteen SF-11 GeoGrid 4834 sf $3.25 $15,710.50 3 9 Street Excavation -239 Cy $6.00 $1,434.00 0 10 Flex Base -260 cy $21.00 $5,460.00 0 11 8" Lime Treated Subgrade -783 sy $4.75 $3,719.25 -1 12 5"PC Concrete Driveways -7042 sf $4.75 $33,449.50 -1 13 8" PC Concrete Driveways 7042 sf $7.65 $53,871.30 3 14 12"Gate Valve -1 ea $1,700.00 $1,700.00 0 15 Erosion Matting 1516 sy ($3.00) $4,548.00 0 16 PC Ribbon Curb 75 If $9.00 $675.00 1 _ TOTAL: $66,785.80 12 PREPARED BY: 4"VPERCENT OF ORIGINAL CONTRACT PRICE ENG EER DATE THIS CHANGE ORDER: 6.08% FTWOODS Construction PREVIOUS CHANGE ORDER: 0 CONTRACTOR TOTAL%CHANGE: 6.08% BY. Mt cthwX514 Z S 0b ORIGINAL CONTRACT PRICE PLUS TITLE: Project Ma a er CHANGE ORDERS: $1,165,275.10 APPROVED: EXHIBIT CITY OF ROUND ROCK nstco2fforms6/Ik All .._...................... ...... EXECUTED DOCUMENT FOLLOWS CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER PAGE 1 OF 1 DEPARTMENT: Public Works DATE: 2/3/2008 PROJECT: Seton Parkway CHANGE ORDER NO: Final aka Arterial 'T', Phase I, Segment A & B JUSTIFICATION: ORIGINAL CONTRACT PRICE: $1,098,489.30 Contract Changes: French drain, headwalls, PREVIOUS CHANGE ORDERS: $0.00 geogrid for subgrade,added concrete thick- THIS CHANGE ORDER: $66,785.80 ness to driveways, ribbon curb,deleted one CHANGE ORDERS TO DATE: $66,785.80 valve, deduct for erosion blanket&filter fabric CHANGE DATA ADDED DAYS DESCRIPTION OF UNIT CALENDAR/ ITEM# CHANGES QTY UNIT PRICE AMOUNT WORKING 1 Excavation & Backfill for F.D. 887 cy $6.00 $5,322.00 2 2 Install 4" Perforated Pipe w/Sock 1182 If $6.50 $7,683.00 1 3 Place 1 to 1-1/2" Rock 1313 to $16.25 $21,336.25 0 4 Filter Fabric Barrier 12876 sf $0.25 $3,219.00 0 5 4"Concrete Headwall 2 ea $650.00 $1,300.00 0 6 Erosion Matting 400 sf $4.50 $1,800.00 1 7 Haul off spoils 727 cy $8.50 $6,179.50 3 8 Synteen SF-11 GeoGrid 4834 sf $3.25 $15,710.50 3 9 Street Excavation -239 cy $6.00 $1,434.00 0 10 Flex Base -260 cy $21.00 $5,460.00 0 11 8" Lime Treated Subgrade -783 sy $4.75 $3,719.25 -1 12 5"PC Concrete Driveways -7042 sf $4.75 $33,449.50 -1 13 8" PC Concrete Driveways 7042 sf $7.65 $53,871.30 3 14 12"Gate Valve -1 ea $1,700.00 $1,700.00 0 15 Erosion Matting 1516 sy ($3.00) $4,548.00 0 16 PC Ribbon Curb 75 1 If $9.00 1 $675.00 1 _ TOTAL: Sss,785.80 12 PREPARED BY: /1 FC,.�(� PERCENT OF ORIGINAL CONTRACT PRICE ENG EER DATE THIS CHANGE ORDER: 5.08% FTWOODS Construction PREVIOUS CHANGE ORDER: 0 CONTRACTOR TOTAL%CHANGE: 6.08% BY. (�61�E. G1fS/Ot ORIGINAL CONTRACT PRICE PLUS TITLE: Project Ma a er CHANGE ORDERS: $1,155,275.10 APPROVED: WJC!�� NDROCK constco2/forms6/Ik R ��� 0S,-2,-+�W_