R-08-03-27-8B2 - 3/27/2008 RESOLUTION NO. R-08-03-27-8B2
WHEREAS, the City of Round Rock has previously entered into a
contract ( "Contract" ) with F. T. Woods Construction for the Arterial
"T" Roadway (now known as Seton Parkway) Project, and
WHEREAS, the Council has determined that it is necessary to
make changes to the quantity of work to be performed or materials,
equipment, or supplies to be provided, and
WHEREAS, it has been determined that it is necessary to change
said Contract in accordance with the attached Contract Change Order
No. 1, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City Contract Change Order No. 1 to the Contract with
F.T. Woods Construction for the Seton Parkway Project, a copy of
said change order being attached hereto as Exhibit "A" and
incorporated herein for all purposes.
The City Council hereby finds and declares that written notice
of the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to
the public as required by law at all times during which this
Resolution and the subject matter hereof were discussed, considered
and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended.
RESOLVED this 27th day of March, 2008 .
LL, Mayor
City of Round Rock, Texas
ATTEST:
SARA L. WHITE, City Secretary
0:\WDOX\RESOLUTI\R80327B2.DOC/rmc
CITY OF ROUND ROCK
CONSTRUCTION CHANGE ORDER
PAGE 1 OF 1
DEPARTMENT: Public Works DATE: 2/3/2008
PROJECT: Seton Parkway CHANGE ORDER NO: Final
aka Arterial 'T', Phase I, Segment A & B JUSTIFICATION:
ORIGINAL CONTRACT PRICE: $1,098,489.30 Contract Changes: French drain, headwalls,
PREVIOUS CHANGE ORDERS: $0.00 geogrid for subgrade,added concrete thick-
THIS CHANGE ORDER: $66,785.80 ness to driveways, ribbon curb,deleted one
CHANGE ORDERS TO DATE: $66,785.80 valve,deduct for erosion blanket&filter
fabric
CHANGE DATA
ADDED DAYS
DESCRIPTION OF UNIT CALENDAR/
ITEM# CHANGES QTY UNIT PRICE AMOUNT WORKING
1 Excavation & Backfill for F.D. 887 Cy $6.00 $5,322.00 2
2 Install 4" Perforated Pipe w/Sock 1182 If $6.50 $7,683.00 1
3 Place 1 to 1-1/2" Rock 1313 to $16.25 $21,336.25 0
4 Filter Fabric Barrier 12876 sf $0.25 $3,219.00 0
5 4"Concrete Headwall 2 ea $650.00 $1,300.00 0
6 Erosion Matting 400 sf $4.50 $1,800.00 1
7 Haul off spoils 727 Cy $8.50 $6,179.50 3
8 Synteen SF-11 GeoGrid 4834 sf $3.25 $15,710.50 3
9 Street Excavation -239 Cy $6.00 $1,434.00 0
10 Flex Base -260 cy $21.00 $5,460.00 0
11 8" Lime Treated Subgrade -783 sy $4.75 $3,719.25 -1
12 5"PC Concrete Driveways -7042 sf $4.75 $33,449.50 -1
13 8" PC Concrete Driveways 7042 sf $7.65 $53,871.30 3
14 12"Gate Valve -1 ea $1,700.00 $1,700.00 0
15 Erosion Matting 1516 sy ($3.00) $4,548.00 0
16 PC Ribbon Curb 75 If $9.00 $675.00 1
_ TOTAL: $66,785.80 12
PREPARED BY: 4"VPERCENT OF ORIGINAL CONTRACT PRICE
ENG EER
DATE THIS CHANGE ORDER: 6.08%
FTWOODS Construction PREVIOUS CHANGE ORDER: 0
CONTRACTOR
TOTAL%CHANGE: 6.08%
BY. Mt cthwX514 Z S 0b ORIGINAL CONTRACT PRICE PLUS
TITLE: Project Ma a er CHANGE ORDERS: $1,165,275.10
APPROVED: EXHIBIT
CITY OF ROUND ROCK nstco2fforms6/Ik
All
.._...................... ......
EXECUTED
DOCUMENT
FOLLOWS
CITY OF ROUND ROCK
CONSTRUCTION CHANGE ORDER
PAGE 1 OF 1
DEPARTMENT: Public Works DATE: 2/3/2008
PROJECT: Seton Parkway CHANGE ORDER NO: Final
aka Arterial 'T', Phase I, Segment A & B JUSTIFICATION:
ORIGINAL CONTRACT PRICE: $1,098,489.30 Contract Changes: French drain, headwalls,
PREVIOUS CHANGE ORDERS: $0.00 geogrid for subgrade,added concrete thick-
THIS CHANGE ORDER: $66,785.80 ness to driveways, ribbon curb,deleted one
CHANGE ORDERS TO DATE: $66,785.80 valve, deduct for erosion blanket&filter
fabric
CHANGE DATA
ADDED DAYS
DESCRIPTION OF UNIT CALENDAR/
ITEM# CHANGES QTY UNIT PRICE AMOUNT WORKING
1 Excavation & Backfill for F.D. 887 cy $6.00 $5,322.00 2
2 Install 4" Perforated Pipe w/Sock 1182 If $6.50 $7,683.00 1
3 Place 1 to 1-1/2" Rock 1313 to $16.25 $21,336.25 0
4 Filter Fabric Barrier 12876 sf $0.25 $3,219.00 0
5 4"Concrete Headwall 2 ea $650.00 $1,300.00 0
6 Erosion Matting 400 sf $4.50 $1,800.00 1
7 Haul off spoils 727 cy $8.50 $6,179.50 3
8 Synteen SF-11 GeoGrid 4834 sf $3.25 $15,710.50 3
9 Street Excavation -239 cy $6.00 $1,434.00 0
10 Flex Base -260 cy $21.00 $5,460.00 0
11 8" Lime Treated Subgrade -783 sy $4.75 $3,719.25 -1
12 5"PC Concrete Driveways -7042 sf $4.75 $33,449.50 -1
13 8" PC Concrete Driveways 7042 sf $7.65 $53,871.30 3
14 12"Gate Valve -1 ea $1,700.00 $1,700.00 0
15 Erosion Matting 1516 sy ($3.00) $4,548.00 0
16 PC Ribbon Curb 75 1 If $9.00 1 $675.00 1
_ TOTAL: Sss,785.80 12
PREPARED BY: /1 FC,.�(� PERCENT OF ORIGINAL CONTRACT PRICE
ENG EER
DATE THIS CHANGE ORDER: 5.08%
FTWOODS Construction PREVIOUS CHANGE ORDER: 0
CONTRACTOR
TOTAL%CHANGE: 6.08%
BY. (�61�E. G1fS/Ot ORIGINAL CONTRACT PRICE PLUS
TITLE: Project Ma a er CHANGE ORDERS: $1,155,275.10
APPROVED: WJC!��
NDROCK constco2/forms6/Ik
R ���
0S,-2,-+�W_