R-05-09-08-11F1 - 9/8/2005 RESOLUTION NO. R-05-09-08-11F1 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ( "Agreement") with HDR Engineering, Inc . for IH-35 modifications from Chandler Road to Westinghouse Road, and WHEREAS, HDR Engineering, Inc. has submitted Supplemental Contract No. 3 to the Contract to modify the provisions for the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 3 with HDR Engineering, Inc. , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 3 to the Contract with HDR Engineering, Inc. , a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act , Chapter 551, Texas Government Code, as amended. RESOLVED this 8th day of September, 2005 . NYLE LL, M r ATTES / . j Cit Round Rock, Texas CHRISTINE R. MARTINEZ, City Secretary @PFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R50908FI.WPD/—C 3) Project Administration: a) The Engineer will coordinate with TxDOT concerning the driveway location. b) The Engineer will complete and submit to the proper jurisdiction application for a Driveway Permit. The Engineer will also prepare and submit the application for work within TxDOT right- of-way. c) Prepare for and attend one (1) meeting with City officials to review and discuss the entrance road relocation. CHANDLER ROAD WATER MAIN RELOCATION The engineering services for the proposed improvements shall consist of completing the following items/information as part of the waterline and valve relocation work necessary to accommodate roadway improvements at Chandler Road and IH35: The plan sheets will be developed on the basis they will be transmitted to the Developer for inclusion in their construction documents for the additional water main improvements to the east along Chandler Road. The plan set will not be completed as a stand alone set of construction drawings. 1) The following sheets will be required to deepen existing 12" and 18" waterlines, relocate the valves, and remove the PRV vault on the north side of Chandler Road near the IH 35.northbound frontage road. a) Develop a Demolition/Removal Plan including the existing water mains and the PRV structure. b) Develop a construction Installation Plan sheet. c) Prepare a Plan and Profile sheet for the 12" waterline. d) Prepare a Plan and Profile for the 18" waterline. e) Develop and complete a construction Detail sheet including construction notes. 2) Utility location services (SUE) will be provided in the project corridor. These services will include Quality Level B (horizontal locates)described as follows: a) Approximately 1,580 linear feet of Round Rock water main will be designated (Quality Level B (QL-B) SUE services). . b) Quality Service Level B (QL-B Designating Services) Designate is to indicate, by marking with paint, the presence and approximate horizontal location of subsurface utilities using geophysical prospecting techniques, including, without limitations, electromagnetic, sonic and acoustical techniques. The Engineer will provide the following designating services to aid the design of site, right-of-way, construction plans or project development plans, or for other purposes as agreed to by the parties. Included will be the following: 1. Provide all equipment, personnel and supplies required for performing designating services. 2. Conduct appropriate investigation of site conditions. B-3 3. Designate the approximate horizontal location of the existing utilities within the project limits as previously described. 4. Mark the utilities on the ground to be surveyed and/or excavated. 5. Markings on the ground are to be used for design purposes and not for construction excavation purposes. The use of information provided does not relieve any contractor from the duty to comply with applicable utility damage prevention laws and regulations, including, but not limited to, giving notification to utility owners or "one-call' centers before excavation. 6. The accuracy of subsurface data can be influenced by factors beyond our control, such as conductivity of materials and their surroundings, soil moisture content,proximity of other underground utilities or structures, depth of utility, etc. Therefore, only the accuracy of data obtained by actual physical verification (through vacuum excavation or otherwise) can be guaranteed to applicable engineering and/or surveying standards. The Engineer will provide all SUE services to the prevailing standard of care applicable in the Subsurface Utility Engineering profession. 3) Project Administration: d) Developer Coordination will include transmittal of design drawings and up to one meeting. e) One meeting will be attended with the City to review the proposed design. B-4 ADDENDUM TO EXHIBIT C Work Schedule The changes to the scope of this project are as follows: IH 35 FRONTAGE RD.FROM CHANDLER RD.TO WESTINGHOUSE RD. ID 0 ixW Nna Durean I a- IFai.e F NaDce to Piocead Oday.- Wed! Wed MeM 4n0 s,eros Onoee ra.e�ea� O31104:I 321104 ✓ PrspN Scherriap ....... to data r._......M 1 ......Tus 4F,1041122/04 ✓ Prepare Ern-rverdd Document 9/13/041 12/17/04 '7x007 Rwfmvol Ennronnnanal c 131 dryf.__.....Mm Mon ••••-•,•",.• .•�- -- --•, ___.,_ ... Dmumanl - ''1220104 820.05:. .,- �.:.:.:. -. ...._.:. -...,.... ..:.:..:. ..:...:.:..� ✓ Prapwe WPAP 15 days Mon Fn 274105 1/17/05 ' ✓ S.bnn W PAP to TCEO 0 days .._Man' Man ♦.wi arena 277,15I 2/7105 ✓ Tra6k Counts ley TYDOTI 46 day..__...,Wed --Fn nt2ntro4 1027/04 1221104 ! ; ! ✓ OedechNcd"jig r w a ]8 days Al. Aeon" •",•••^ :-^ Repen 11/1,14 2/14M5 .IwLt4M...7 11 � ✓ PnWra Mt-INk Aran ... 30 drys .......Alm• .__Frl T I Juet9katbn Repos(IAJR) 1/3,15 2111105 Fn Mtge I ✓ FNWA Review ulLUR ..i .Fa rein soak.......-....�....� ..,....._ .....,-. 2/14/05..' //15/05 i utvoa i t ✓ Conplew Sc i—i.for 5 drys Mm Fd 12105*__.._M tnga i wbdsabn for FHWA 12/051 t ✓ Piewre 30%Draxanga 45 date .......Mon ...Fri Ma/04,12/17/04 1 is ✓ Su6mi130%Drawitpab TxDOT Odays Fri, 12/17/04 12/1710/ I, _...... ) ✓' TxDOT Revbwo(36.Di l6days• ..M .....Fri FntMtq. 1220,14 1221/01 I 1 .. 9e YS dey ... .. ✓' Preponrl TDOT 8 . M Fa ninuv; ReapwkbTxDO730% 1220/041 121105 ICmmmb ',.. ✓ SubM 60%blaWrip,toT DOT Odrya ..F Fn [ I i .... d 1rstAa i 121105 121105 i ✓..."moT RwAm or 60%Dr 10 ..... •'__•:^• I unrps drys. Mm Fd 2/05 ai..tnNa Fn Laos 124MS'. ✓-Prep 90%OaWngs6Ra.pm0 28 drys 121124 Watt t T DOT YFn tnep wN LL'.e 1 - 60%Carmwnb /05 02105X j ie ✓ Subn190%Dravagstp hDOT Odryre Wad Wed i# wN arnw 3./2105 &2105 ; ✓ TOOT Review d 90%Dradrg. 20 drys�Fd 3/a%O5� TMr � �'•"••�:'-' 3/31/115 _ arstm t �. .. ✓ RoapwidbT.DOT Sdrys Fd 6/1/05 Thu yn utna -.:rnu 4r7os 90%Cammintr;nis V7/05 ! 2E ✓ Find My!w Sullmad Odrys Thu Thu .... 42,15 4/7105 ✓ _TOOTPmLat,W - 25 days -- -Tue Man 1 621105 ]2505 Twuatroe saga. x4 (y','�'Lellkq ......... .I.. 0 ......Tue Tw "M5 59/05 ♦Tia— • .. Appmvd k Proceed cm Addilbnal 0 dry, Thu Thu :Wolk 6eiM 9/1105 971/05 TWv M n yW{, -Tum Lew.FnChander Roedd 15 daY. _...Thu• M/0j NaOmrk Frmta9e Rued 911/05 921105 MONeIPvADm r,&V k x.20da/N mon, Fn ' EnUncs Rod Relaetlon 9/5/05 B20.OS ....,.Fri waaos 'Chandkil.allAlkurnki, :...I9 dry. ..mon W. r WYerman Rd0o.i0n &5/05 926105 Men L'::: V, Y•:aa euros Pro)ed CooidnYkn,Dmsary 54 drys ......Thin Tue ' and TxDOT perm)appacadan. 9/1/05!it/15g5 T. -- tv,vos �� 1aµ I :;:'I MMFiaw ♦ Rpya tq Tr / ROFFe 1p AopaFF Eaxna TaW roup ^ Dale:Fri 815/05 min= OIM a'xnnW�� "' '�'�" P4ea t of ADDENDUM TO EXHIBIT D Fee Schedule The changes to the fee schedule for this project are as follows: ADDENDUM TO EXHIBIT D Fee Schedule Project Name: IH 35 Chandler Road to Westinghouse.Road-Supplement No.3 ........................................................................... Consultant: HDR Engineering,lnc............................................................................... ............. Turn McNeil Water Total Cost Component, Hours Lanes Park Main Hours Project Principal Project Manager/Senior Engineer. 18 12 12 42 Design Engineer 22 20 32 74 Engineer-in-Training 24 16 40 Sr. Design Technician 0 CADD Technician 44 40 34 118 Clerical/Steno 4 4 Total Hours 108 88 82 278 Cost Component, Dollars Rate Project Principal $236 $0 $0 $0 $0 Project Manager/Senior Engineer. $151 $2,718 $1,812 $1,812 $6,343 Design Engineer $117 $2,577 $2,342 $3,748 $8,667 Engineer-in-Training $86 $2,071 $1,381 $0 $3,452 Sr. Design Technician $99 $0 $0 $0 $0 CADD Technician $77 $3,390 $3,082 $2,620 $9,092 Clerical/Steno $55 $0 $0 $222 $222 Labor Dollars $10,756 $8,617 $8,402 $27,775 TOTAL EXPENSES $ 572 $ 493 $ 452 $ 1,517 SUE(Surveying &Mapping, Inc.) $ 2,110 Survey $ 3,340 Turn McNeil Water Lanes Park Main TOTAL TOTAL LUMP SUM FEE $ 11,328 $ 12,450 $ 10,964 $ 34,742 v���oPo No w cn GH FM 143A H 35 Improvements -RDUNDROCKTE%AS WRPot�MSW'.P0.MPLPIT�'. DATE: September 1, 2005 SUBJECT: City Council Meeting - September 8, 2005 ITEM: *11.F.1. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 3 to the Contract for Engineering Services with HDR Engineering, Inc. for the IH-35 Improvements Project (Chandler Road to Westinghouse). Department: Transportation Services Staff Person: Tom Martin, Director of Transportation Services Justification: This proposed Supplemental Agreement will revise the scope of services for the inclusion of additional design services for the IH-35 Area Improvements Project. The additional work includes a right turn lane, an acceleration lane, and entrances to the IKEA facilities along the Northbound IH 35 frontage road between Chandler Creek and Chandler Road; a right turn lane and entrances, also for IKEA, along Chandler Road; relocation of the McNeil Park entrance and road; relocation of the waterline and valves at the Northeast quadrant of the intersection of Chandler Road and northbound frontage road; and utility location services (SUE) along the project corridor. Funding: Cost: $34, 742.00 Source of funds: 4B Corporation (1/2 cent Sales Tax) Outside Resources: HDR Engineering, Inc. Background Information: The original scope of this project included the reversing of the on and off ramps at Chandler Road, construction of a turnaround structure at Chandler Road at IH-35. The original contract with HDR Engineering for the design of this work was approved by the Council at their March 11, 2004 meeting. Supplemental Contract No. 1, approved by the City Council at their January 13, 2005 meeting, revised the scope to include the design of a turnaround structure at Westinghouse Road, widening Chandler Road /RM 1431 overpass to a six lane structure, and ancillary roadway work to align with the bridge widening, as well as miscellaneous acceleration and deceleration lane work to improve traffic flow, extension of the north bound frontage road to Westinghouse Road and associated intersection improvements. Supplemental Contract No. 2, approved by the City Council at their July 28, 2005, revised the scope to include work required by TxDOT that included improvements to better allow for increased traffic volumes anticipated due to the proposed Simon/Chelsea Development in the area of Chandler Road/RM 1431, IH-35, and Westinghouse Road. Supplemental Contract No. 2 also included revisions of the traffic control plan; revised storm sewer plans; revised design of Chandler Road bridge for the inclusion of 2 additional lanes; and miscellaneous utility relocation services. Public Comment: N/A EXECUTED DOCUMENT FOLLOWS STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 3 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HDR Engineering, Inc. ("Engineer") ADDRESS: 4401 West Gate Blvd., Suite 400,Austin, TX 78745 PROJECT: 11135 Frontage Road (Chandler Road to Westinghouse) This Supplemental Contract No. 3 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and HDR Engineering, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 1 Ith day of March, 2004 for the IH-35 Frontage Road (Chandler Road to Westinghouse) in the amount of$836,329.00; and WHEREAS,the City and Engineer executed Supplemental Contract No. 1 on January 13, 2005 to modify the provisions for the scope of services and to increase the compensation by$418,431.00 for a total of$1,254,760.00; and WHEREAS,the City and Engineer executed Supplemental Contract No. 2 on July 28, 2005, to modify the provisions for the scope of services and to increase the compensation by$158,520.00 for a total of$1,413,280.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by$34,742.00 for a total of $1,448,022.00; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Agreement is amended as follows: I. Article 2, Scope Of Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. R-05-09-08-OPl II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by$34,742.00 the lump sum amount payable under the Contract for a total of$1,448,022.00 as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. HDR ENGINEERING, INC. By. Ja es K. (Ken) Ha ey, P.E. Executive Vice President Date: F/a/b� CITY OF"VD PROVED AS T FORM: By: L, . -,-�axwX VStephan L. Sheets Mayor City Attorney Date:— 9 - 3- 65" ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope of this project are as follows: The work to be performed under this supplement shall consist of completing the following items/information between Chandler Creek and Chandler Road along the northbound IH 35 frontage road and along Chandler Road to the east of the existing Chandler Road bridge: CHANDLER ROAD AND 11135 NORTHBOUND FRONTAGE ROAD The engineering services for the proposed improvements on the Chandler Road and northbound frontage road will not be developed as a stand alone plan set. They will be prepared for inclusion into the existing construction drawings for the IH 35 Improvement project currently on the TxDOT letting schedule. The services for this project segment will be as follows: 1) The following services will be provided to incorporate a right turn lane and an acceleration lane along the northbound IH 35 frontage road between Chandler Creek and Chandler Road. It is not anticipated the Traffic Control Plan will require modification due to these improvements. a) Revise the geometry and callouts on the Northbound IH 35 Frontage Road Plan & Profile sheets to include the turn and acceleration lanes and corresponding driveways. b) Revise the Drainage Plan sheets along the IH 35 Northbound Frontage Road to account for the right turn lane and acceleration lane. Existing drainage calculations will be reviewed and modified as necessary to reflect the proposed improvements. c) Revise the Summary of Quantity sheets to reflect the additional quantities for these improvements. 2) The following additional sheets will be required along Chandler Road for the addition of a right turn lane between the northbound IH 35 Frontage Road and Oakmont Drive: a) Develop and complete a new Plan & Profile sheet along Chandler Road for the right turn lane and corresponding driveway. This new sheet will include all pertinent information in accordance with the original contract. b) Develop and complete a new Drainage Plan sheet along Chandler Road. Storm inlets trunk lines and cross runs will be reviewed and modified as necessary. Existing drainage calculations will be reviewed and modified as necessary to reflect the proposed improvements. c) Develop and complete culvert layout sheets for the two driveway culverts along the northbound frontage road. This will include drainage calculations to size the culverts. d) Develop and complete a new signing and striping sheet along Chandler Road to reflect the proposed right turn lane. e) Provide new traffic control sheets along Chandler Road incorporating the proposed turn lane.. f) Revise the Summary of Quantity sheets to reflect the additional quantities for these improvements. B-1 3) Project Administration: g) The Engineer will coordinate with the City of Round Rock and area developers as the plan sheets are being completed. This will include one (1) meeting and the sharing of drawing files and design information with the developers' engineer(s). h) The Engineer will coordinate with TxDOT concerning the driveway locations and incorporation of the plans sheets into the IH 35 project documents. i) The Engineer will complete and submit to the proper jurisdiction applications for Driveway Permits. McNEIL PARK DRIVE AND ENTRANCE ROAD RELOCATION The engineering services for the proposed improvements on the McNeil Park driveway and entrance road relocation will be developed as a stand alone plan set. The project scope will include relocating the existing drive approximately 200 to the south and the entrance road will be designed to tie into the existing entrance road approximately 250 feet to the east of the existing northbound frontage road. The plan set will include the necessary geometrics,plan and profile views, elevations,quantities, typicals, details and notes required to construct the proposed improvements. The preparation of bid documents is not included in this scope of services. The services for this project segment will be as follows: 1) The engineering services for the development of plan sheets for the relocation the McNeil Park driveway and entrance road will include the following: a) Develop and complete a Title Sheet showing the name of the project and project location. b) Development of a Removal Plan sheet displaying the removal of the existing McNeil Park driveway, the westernmost segment of the entrance road and the existing culvert at the McNeil Park driveway. This sheet will also include the location of significant (8" diameter of greater) trees slated for removal. c) Development of a Plan & Profile sheet for the relocated driveway and entrance road. d) Development of a Culvert layout sheet for the new culvert at the relocated McNeil Park driveway. This will also include hydrologic and hydraulic information for the new culvert along with any pertinent details required. e) Development of erosion control and surface restoration details. f) Development of construction notes, typical sections and construction details. g) Calculation of quantities and completion of Summary of Quantities for the proposed improvements. 2) Survey services will be completed to facilitate the design of the proposed improvements. These services will include the following: a) Collect data southerly of the entrance to McNeil Park for approximately 250 feet and easterly of the IH 35 Right-of-Way for approximately 250 feet. Data will include existing pavement edges, structures, trees 8" diameter and greater, visible utilities and spot elevations sufficient to generate a one (1) foot contour interval DTM. B-2 3) Project Administration: a) The Engineer will coordinate with TxDOT concerning the driveway location. b) The Engineer will complete and submit to the proper jurisdiction application for a Driveway Permit. The Engineer will also prepare and submit the application for work within TxDOT right- of-way. c) Prepare for and attend one (1) meeting with City officials to review and discuss the entrance road relocation. CHANDLER ROAD WATER MAIN RELOCATION The engineering services for the proposed improvements shall consist of completing the following items/information as part of the waterline and valve relocation work necessary to accommodate roadway improvements at Chandler Road and IH35: The plan sheets will be developed on the basis they will be transmitted to the Developer for inclusion in their construction documents for the additional water main improvements to the east along Chandler Road. The plan set will not be completed as a stand alone set of construction drawings. 1) The following sheets will be required to deepen existing 12" and 18" waterlines, relocate the valves, and remove the PRV vault on the north side of Chandler Road near the IH 35.northbound frontage road. a) Develop a Demolition/Removal Plan including the existing water mains and the PRV structure. b) Develop a construction Installation Plan sheet. c) Prepare a Plan and Profile sheet for the 12" waterline. d) Prepare a Plan and Profile for the 18" waterline. e) Develop and complete a construction Detail sheet including construction notes. 2) Utility location services (SUE) will be provided in the project corridor. These services will include Quality Level B (horizontal locates)described as follows: a) Approximately 1,580 linear feet of Round Rock water main will be designated (Quality Level B (QL-B) SUE services). . b) Quality Service Level B (QL-B Designating Services) Designate is to indicate, by marking with paint, the presence and approximate horizontal location of subsurface utilities using geophysical prospecting techniques, including, without limitations, electromagnetic, sonic and acoustical techniques. The Engineer will provide the following designating services to aid the design of site, right-of-way, construction plans or project development plans, or for other purposes as agreed to by the parties. Included will be the following: 1. Provide all equipment, personnel and supplies required for performing designating services. 2. Conduct appropriate investigation of site conditions. B-3 3. Designate the approximate horizontal location of the existing utilities within the project limits as previously described. 4. Mark the utilities on the ground to be surveyed and/or excavated. 5. Markings on the ground are to be used for design purposes and not for construction excavation purposes. The use of information provided does not relieve any contractor from the duty to comply with applicable utility damage prevention laws and regulations, including, but not limited to, giving notification to utility owners or "one-call" centers before excavation. 6. The accuracy of subsurface data can be influenced by factors beyond our control, such as conductivity of materials and their surroundings, soil moisture content,proximity of other underground utilities or structures, depth of utility, etc. Therefore, only the accuracy of data obtained by actual physical verification (through vacuum excavation or otherwise) can be guaranteed to applicable engineering and/or surveying standards. The Engineer will provide all SUE services to the prevailing standard of care applicable in the Subsurface Utility Engineering profession. 3) Project Administration: d) Developer Coordination will include transmittal of design drawings and up to one meeting. e) One meeting will be attended with the City to review the proposed design. B-4 ADDENDUM TO EXHIBIT C Work Schedule The changes to the scope of this project are as follows: IH 35 FRONTAGE RD.FROM CHANDLER RD.TO WESTINGHOUSE RD. Ip a TUF Meme w.r�., sian .nonlm.y wwe:^e« Nadca to Pmcesl 00 aays Wad f Wed ren 3131/04,.. Ml3 T ✓ Pnpse Sthsndc 177 days'...... Mon T. 4/&04 1214 ' 3 ✓ Prepare Enuimnmadd Dacumsnl 70 day, MonFn 9/1301 12/17/04 TOOT Reviiew of EnnronmeMal 131 days Mon RA. -.. vzams Dacumenl 1220/04 620,05 3 ✓ Prepare WPAP 15 days Mm Fn 2/4/05 sten vtTpS �n vuos ✓ Su-a W PAP to TCEO 0 days Mon. Mon ♦swn ys,� 211105 W/05 3 ./. Traffic Coums(By Tx00T).._ 48 dayswed F^fn,vsvw 1027/04 1231/04 ✓ Osotmhmd lnvestigsho,6 76 days Mon Aton Rgpd 11/1/04 2/1//05 3 ✓ Prepare lntemtde Access 30 days.... Mm, FA t `'••.•:`_. -. -.-• ,�sn—arl Juaaftalon RW,t(WR) 1/3/05.: 2/11/05 ,.:.:._ .:.;..:.:_..___ I ✓ FHWA Reviewol lAJR 45 days. Mon''. Fdas. 2/14105', 4/15,05 ✓ Complete Schematic for 5 days Man Fn 16/05 ,ops sub,,ti—for FHWA 113105 �fn ✓ Prepare 30%Deaxtngs 45 days Mon Fn 10/1&04 1T/17,04 3 J Submil 30%Drawings to TYDOT 0days Fn' Fn t2/17/04 12/1704 ✓ Tv00T Ravww 0130%Drawings 10 days Men Fd fntM,p4 1220/04,.1231,01 ,s ✓ Prepa,60%0ram,&. 25 day's Mon Fn CortmWnls TxDOT 30% 1220/04 121,05-- Is ✓ Subnst 60%9 ramtgs W TxDOT O days Fn Fri sen t n x ps lmros tmros �f . V TxL)OTrl—of60%Drass4rgs 10 days Mm Fn 2/4,05 naps fnvws 12a/Os.. V Prepare 90%Drawtnps&Respond- 28 days. Mm W. sen,n �....� ww vvos to TxDOT(M.Garments 124/05 32,05 0 l rs ✓ Subm190%Drawings W TZDOT 0days Wed Wed Y nd avOs &2ro5 3205 TxDOT Review d 90%Dramings 20 days Fn 3/4105 Thu fn � - Thu vsvos 331,05 n v Rsspor lW TxDOT 6days FM 4/1M5 Thu fn u,ps .._Tnu 4]rM 90%Camrrwnls soros Final Mylar SubrrYnd 0 days Thu The 49/05, 41z/05 ✓' TxDOT Pre-Lalhng 25 days Tue Mon 821/05 725ro5 24 !-Wmg _.... OdaYs.. Tue ....Tue 8/&05 &8,05 .iw Kr05 as 3 Ay alsoPmceedon Addi6ond 0days........_Thu Thu ; Work Items I 9/1/05 9/1,05 Tnu vtros n Tum Lar»on Chander Roast& 15 days Thu Wed _ NodhLound Fmmape Road 911,05 921,05 T..11ts z WNW Pak Diwmw so 20 days Mon' Fn Enlrarce Roel Ral.ation 9/5/05 .,,M5 : too^ s/as f frl vwros za L'�' Chander Road Waterman 1&days.. ......Man Wed sen fps :'.Wna v3sps Wdertnan Rebcspn 9/&OS 92805 `.. ... ... ....,..... 3 P'oiw Caor aaoh.0—ay 54 days. Thu'. Tua end T,D TpsoatapPBcaions 9/1105'.It/15/05 Tnu etre - lovas Date:Fri 8/5/05 Tom. awelww . Rw.e w _ .__j croup ay sww�wr^ D 11111111111 a ^ st. wrw �� oa ADDENDUM TO EXHIBIT D Fee Schedule The changes to the fee schedule for this project are as follows: ADDENDUM TO EXHIBIT D Fee Schedule Project Name: IH 35 Chandler Road to Westinghouse Road -Supplement No.3 ........................................................................... ....................... Consultant: H.DR. .. in En eerin , Inc............................................................................... . ....... ...... Turn McNeil Water Total Cost Component, Hours Lanes Park Main Hours Project Principal Project Manager/Senior Engineer. 18 12 12 42 Design Engineer 22 20 32 74 Engineer-in-Training 24 16 40 Sr. Design Technician 0 CADD Technician 44 40 34 118 Clerical/Steno 4 4 Total Hours 108 88 82 278 Cost Component, Dollars Rate Project Principal $236 $0 $0 $0 $0 Project Manager/Senior Engineer. $151 $2,718 $1,812 $1,812 $6,343 Design Engineer $117 $2,577 $2,342 $3,748 $8,667 Engineer-in-Training $86 $2,071 $1,381 $0 $3,452 Sr. Design Technician $99 $0 $0 $0 $0 CADD Technician $77 $3,390 $3,082 $2,620 $9,092 Clerical/Steno $55 $0 $0 $222 $222 Labor Dollars $10,756 $8,617 $8,402 $27,775 TOTAL EXPENSES $ 572 $ 493 $ 452 $ 1,517 SUE(Surveying &Mapping, Inc.) $ 2,110 Survey $ 3,340 Turn McNeil Water Lanes Park Main TOTAL TOTAL LUMP SUM FEE $ 11,328 $ 12,450 $ 10,964 $ 34,742 STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 3 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HDR Engineering, Inc. ("Engineer") ADDRESS: 4401 West Gate Blvd., Suite 400,Austin, TX 78745 PROJECT: 11135 Frontage Road (Chandler Road to Westinghouse) This Supplemental Contract No. 3 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and HDR Engineering, Inc., hereinafter called the "Engineer". WHEREAS,the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 1 lth day of March, 2004 for the IH-35 Frontage Road(Chandler Road to Westinghouse) in the amount of$836,329.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on January 13, 2005 to modify the provisions for the scope of services and to increase the compensation by$418,431.00 for a total of$1,254,760.00; and WHEREAS,the City and Engineer executed Supplemental Contract No. 2 on July 28, 2005, to modify the provisions for the scope of services and to increase the compensation by$158,520.00 for a total of$1,413,280.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by$34,742.00 for a total of $1,448,022.00; and NOW THEREFORE,premises considered, the City and the Engineer agree that said Agreement is amended as follows: I. Article 2, Scope Of Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. E" HIBIT "Al II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by$34,742.00 the lump sum amount payable under the Contract for a total of$1,448,022.00 as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. HDR ENGINEERING,INC. By. / 9V,4 Jafnes K. (Ken) Ha ey, P.E. Executive Vice President Date: fF//p/0� CITY OF ROUND ROCK APPROVED AS TO FORM: By: Nyle Maxwell Stephan L. Sheets Mayor City Attorney Date: ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope of this project are as follows: The work to be performed under this supplement shall consist of completing the following items/information between Chandler Creek and Chandler Road along the northbound 11135 frontage road and along Chandler Road to the east of the existing Chandler Road bridge: CHANDLER ROAD AND IH 35 NORTHBOUND FRONTAGE ROAD The engineering services for the proposed improvements on the Chandler Road and northbound frontage road will not be developed as a stand alone plan set. They will be prepared for inclusion into the existing construction drawings for the IH 35 Improvement project currently on the TxDOT letting schedule. The services for this project segment will be as follows: 1) The following services will be provided to incorporate a right turn lane and an acceleration lane along the northbound IH 35 frontage road between Chandler Creek and Chandler Road. It is not anticipated the Traffic Control Plan will require modification due to these improvements. a) Revise the geometry and callouts on the Northbound IH 35 Frontage Road Plan & Profile sheets to include the turn and acceleration lanes and corresponding driveways. b) Revise the Drainage Plan sheets along the IH 35 Northbound Frontage Road to account for the right turn lane and acceleration lane. Existing drainage calculations will be reviewed and modified as necessary to reflect the proposed improvements. c) Revise the Summary of Quantity sheets to reflect the additional quantities for these improvements. 2) The following additional sheets will be required along Chandler Road for the addition of a right turn lane between the northbound IH 35 Frontage Road and Oakmont Drive: a) Develop and complete a new Plan & Profile sheet along Chandler Road for the right turn lane and corresponding driveway. This new sheet will include all pertinent information in accordance with the original contract. b) Develop and complete a new Drainage Plan sheet along Chandler Road. Storm inlets trunk lines and cross runs will be reviewed and modified as necessary. Existing drainage calculations will be reviewed and modified as necessary to reflect the proposed improvements. c) Develop and complete culvert layout sheets for the two driveway culverts along the northbound frontage road. This will include drainage calculations to size the culverts. d) Develop and complete a new signing and striping sheet along Chandler Road to reflect the proposed right turn lane. e) Provide new traffic control sheets along Chandler Road incorporating the proposed turn lane.. f) Revise the Summary of Quantity sheets to reflect the additional quantities for these improvements. B-1 3) Project Administration: g) The Engineer will coordinate with the City of Round Rock and area developers as the plan sheets are being completed. This will include one (1) meeting and the sharing of drawing files and design information with the developers' engineer(s). h) The Engineer will coordinate with TxDOT concerning the driveway locations and incorporation of the plans sheets into the IH 35 project documents. i) The Engineer will complete and submit to the proper jurisdiction applications for Driveway Permits. McNEIL PARK DRIVE AND ENTRANCE ROAD RELOCATION The engineering services for the proposed improvements on the McNeil Park driveway and entrance road relocation will be developed as a stand alone plan set. The project scope will include relocating the existing drive approximately 200 to the south and the entrance road will be designed to tie into the existing entrance road approximately 250 feet to the east of the existing northbound frontage road. The plan set will include the necessary geometrics,plan and profile views, elevations, quantities, typicals, details and notes required to construct the proposed improvements. The preparation of bid documents is not included in this scope of services. The services for this project segment will be as follows: 1) The engineering services for the development of plan sheets for the relocation the McNeil Park driveway and entrance road will include the following: a) Develop and complete a Title Sheet showing the name of the project and project location. b) Development of a Removal Plan sheet displaying the removal of the existing McNeil Park driveway, the westernmost segment of the entrance road and the existing culvert at the McNeil Park driveway. This sheet will also include the location of significant (8" diameter of greater) trees slated for removal. c) Development of a Plan &Profile sheet for the relocated driveway and entrance road. d) Development of a Culvert layout sheet for the new culvert at the relocated McNeil Park driveway. This will also include hydrologic and hydraulic information for the new culvert along with any pertinent details required. e) Development of erosion control and surface restoration details. f) Development of construction notes, typical sections and construction details. g) Calculation of quantities and completion of Summary of Quantities for the proposed improvements. 2) Survey services will be completed to facilitate the design of the proposed improvements. These services will include the following: a) Collect data southerly of the entrance to McNeil Park for approximately 250 feet and easterly of the IH 35 Right-of-Way for approximately 250 feet. Data will include existing pavement edges, structures, trees 8"diameter and greater, visible utilities and spot elevations sufficient to generate a one (1) foot contour interval DTM. B-2