CM-2017-1411 - 6/16/2017M, ol; 16 Department: Project Name: City Project ID Number Vendor ]ustification Nage I of 3 Contract Quantity Adjustment/Change Order Utilities & Environmeental Services Texas Avenue Waterline Relocation Date: 611117 Change Order/Quantity TEXAV Adjustment No. 1 Whitestone Civil Construction, LLC P.O. Box 1537, Cedar Park, TX 78630 512.963.6746 Company Name Address Phone No. For the lowering of 210 L.F. of the waterline 2 additional feet for storm sewer clearance. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted far Approval 0 Amount $99,995.001 $3,187.86 $3,187.86 $103,182.86 $0.00 $0.00 $103,182.86 $3,187.86 Prepared By: SignaturePrinted Name, Title, Company Date /I (14�1 ., Approvals Change Contractor A Carrie Lewis member, Whitestone Civil Construction, LLC 6/IJ17 Signatur V Printed Name, Title, Company Date City Project Manager: i.r 7. #A, , i n re Printed Name, Title Date Mayor/City Manager _ % �(4 rl " (1 Signature Printed Name, Title - Date - �'� 20 r7 -/ qlf 0% 0% 0% Contract Quantity Adjustment/ Change Order J ROIINO NOtl{ - Zr. C u] L Project Name: Texas Avenue Waterline Relocation Quan. Adj.fChange Order No.- Chanue Order Data Page 2 of Item # Item Description tion Unit Qty. Unit Price Amount Contract Time Adjustment (Days) Material Rock/additional excavation LF 210 $5.00 $1,050.00 Ductile Iron Pipe material 12 -inch LF 60 $28.00 $1,680.00 PVC Pipe material, 12 -inch LF 60 -$18.24 -$1,094.40 12" Bend EA 1 4 $124.80 $499.20 12' Megalug E A 8 $7.50 $60.00 ncr-ere $2,634.80 markup/overhead o Total $2,898.28 Labor Operator HR 1 $17.50 $17.50 Pipelayer HR 2 $13.00 $26.00 Labor HR 1 2 $11.50 $23.00 Labor $89.50 Labor Burden 55% $49.23 markup/overhead o Total $147.68 Equipment CAT 320 Excavator HF 1 $115.00 $115.00 Small oo s $129.00 markup/overhead o Total $141.90 TOTALS: 1 r !L.,, rI:16 Contract Quantity Adjustment/ Change Order Project Name: Texas Avenue Waterline Relocation Quan. Adj./Change Order No.: Ouantity Adiustment Data Page 3 of 3 Bid Item # Item Description Unit qty. Unit Price Amount Contract Time Adjustment $0.001 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 0 10 Eo 1 w 0 City of Round Rock TEXAS ROCK Agenda Item Summary Agenda Number: Title: Consider executing Quanity Adjustment/Change Order No.1 with Whitestone Civil Construction, LLC for the Texas Avenue Waterline Relocation Project. Type: City Manager Item Governing Body, City Manager Approval Agenda Date: 6/16/2017 Dept Director: Michael Thane, Director of Utilities & Environmental Services Cost: $3,187.86 Indexes: Self -Financed Water Construction Attachments: QA.CO#1_WhitestoneCivil_CM_6.16.17.pdf, LAF_Wh itestoneC ivi I_C M_6.16.17. pdf, Agmt_WhitestoneCivil_TexasAveWaterlineRelocation_R-2017-4339. pdf, Map TexasAveWaterlineRelocation.pdf Department: Utilities and Environmental Services Text of Legislative File CM -2097-1411 Consider executing Quanity Adjustment/Change Order No.1 with Whitestone Civil Construction, LLC for the Texas Avenue Waterline Relocation Project. The City acquired new Right -of -Way (ROW) from Williamson County (WilCo) for the continuation of Texas Avenue near Gregory Lane to Greenhill Drive. The City agreed in an ILA with WilCo to abandon the existing 12 -inch waterline and relocate it within the newly acquired ROW prior to the construction of the road. The City's Utility Staff designed the waterline "in house" and advertised it out to bid. On April 13th, the City entered into a contract with Whitestone Civil, LLC for the construction of this waterline for $99,995. The roadway design includes a section of storm sewer that conflicts vertically with the waterline's design. It is necessary to lower approximately 210 linear feet of the waterline an additional two feet. This Change Order/Quantity Adjustment (CO/QA) No. 1 reimburses the contractor for the extra fittings and the increased excavation. The Utility staff recommends Clfy or Round Rock Page 1 Printed on 0/15/2017 Agenda Item Summary Continued (CM -2017-1441) the City Manager approve CO/QA No.1 for $3,187.86 increasing the total contract to $103,182.86. Cost. $3,187.86 Source of Funds: Self -Financed Water Construction Cityo/Round Rock Page 2 Printed on On 57017