R-05-09-08-11A1 - 9/8/2005 RESOLUTION NO. R-05-09-08-11A1 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with H. Deck Construction for the Wastewater Collection System Rehabilitation of Three Edwards Aquifer Basins, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 2 to the Contract with H. Deck Construction for the Wastewater Collection System Rehabilitation of Three Edwards Aquifer Basins, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 8th day of September, 5 NYL ELL, or ATTES City 6f Round Rock, Texas CHRISTINE R. MARTINEZ, City Secr ary @PFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R50908A1.WPD/—C CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER PAGE 1 OF 1 DEPARTMENT: Public Works DATE: 07-26-05 PROJECT: 2003-2004 Wastewater Collection CHANGE ORDER NO: 2 System Rehabilitation JUSTIFICATION: ORIGINAL CONTRACT PRICE: $1,200,298.00 1 Replace point repair Job No. 1037 with PREVIOUS CHANGE ORDERS: $76,551.00 complete line replacement THIS CHANGE ORDER: $44,316.30 CHANGE ORDERS TO DATE: $120,867.30 CHANGE DATA ADDED DAYS DESCRIPTION OF UNIT CALENDAR/ ITEM# CHANGES UNIT QTY. PRICE AMOUNT WORKING W20= lammusulm 1 Traffic control EA 1 $500.00 $500.00 2 Trench Safety LF 291 $1.00 $291.00 3 AI halt removal and replacement LF 120 $10.00 $1,200.00 5.00 4 Tree protection EA 9 $75.00 $675.00 Remove and disoposal of concrete 5 flume LF 90 $52.42 $4,717.80 10.00'. 6 Fence replacement LF 62 $30.00 $1,860.00 7 Install 8"SDR 26 Sanitary Sewer Pie LF 291 $55.00 $16,005.00 20.00 Install and grout two 8" inverts 8 in manholes EA 2 $350.00 $700.00 9 Install 15"storm drain LF 260 $48.50 $12,610.00 5.00 Install 2 15'Concrete Flared 10 End sections EA 2 $750.00 $1,500.00 10.00 11 Offsite fill compacted in place CY 185 $9.50 $1,757.50 10.00 12 Concrete paving SY 25 $60.00 $1,500.00 13 Seed in /sodding to match existing SY 500 $10.00 $5,000.00 14 Delete job number 1037 EA 1 $4,000.00 $4,000.00) TOTAL: $44,316.30 60.00 PREPARED BY: 7/26/2005 PERCENT OF ORIGINAL CONTRACT PRICE ENGINEER DATE THIS CHANGE ORDER: $44,316.30 c,K �c7N ST �b . PREVIOUS CHANGE ORDER: 0 CONTRACTOR TOTAL% CHANGE: 3.69% BY: /`(%J �jL��f` /L�,-u� ORIGINAL CONTRACT PRICE PLUS TITLE: 5t,04- a+ CHANGE ORDERS: $1,244,614.30 i' APPROVED: EEXHIBIT CITY OF ROUND ROCK constco2/forms6ft DATE: September 1, 2005 SUBJECT: City Council Meeting - September 8, 2005 ITEM: *11.A.1. Consider a resolution authorizing the Mayor to execute Change Order No. 2 with H. Deck Construction Company for the 2003-2004 Wastewater Collection System Rehabilitation of three Edwards Aquifer Basins. Deg_artment: Water and Wastewater Utilities Staff Person: Tom Clark, Director of Utilities Justification: The City is required to inspect, repair, and certify its wastewater collection system is in compliance with the TCEQ's Edwards Aquifer Recharge Zone Protection Program. The elimination of defects reduces inflow and infiltration entering the sewer system, thereby reducing the City's treatment cost to the LCRA and BRA, who own and operate the Brushy Creek Regional Wastewater Treatment Plant. This Change Order No. 2 is for a change to the original plans for repairing a wastewater line that extends between Bellview and Christopher Streets. The original plans called for a point repair to replace 10 feet of wastewater line that was located under an existing concrete flume. Because of the damage to the concrete flume that would have occurred during the point repair and the difficulty in replacing the flume, the City requested that the contractor replace the entire length of the 8-inch wastewater line from manhole to manhole, and then replace the concrete flume with a 15" corrugated high-density polyethylene storm drain. Funding: Cost: $44,316.30 Source of funds: WW Utility Fund (F260) Outside Resources: R)N Group, Inc. (Engineering Consultant) Background Information: This project is rehabilitating defective areas determined from the 2002-2003 Wastewater Collection System Inspection Project in three Edwards Aquifer Basins (LC15-Z, LC16-Z, and CC34-Z). The scope of the project included pipe bursting, wastewater line replacement, line boring and encasement, point repairs, and rehabilitation of manholes. Public Comment: N/A