R-05-07-28-11C1 - 7/28/2005 RESOLUTION NO. R-05-07-28-11C1 WHEREAS, §8 . 503 Code of Ordinances (1995 Edition) provides for the reimbursement for the oversizing of water mains, and WHEREAS, Forest Creek Condominiums, Ltd. has submitted a reimbursement request for the oversizing of water mains associated with the Forest Creek Townhomes development, and WHEREAS, the City Council wishes to approve said reimbursement, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the City Council hereby authorizes the reimbursement to Forest Creek Condominiums, Ltd. of $4, 680 . 00, which is the cost of oversizing water mains associated with the Forest Creek Townhomes development . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this the 28th day of July, 2005 . lop W L May ity of Round Rock, Texas A7ET CHRISTINE R. MARTINEZ, City Secret-*y @PFDeSktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R50728C1 WPD/sC i Forest Creek Condo., Ltd. 900 Congress Ave., #L-110 Austin, Texas 78701 OFF: 512478-6400ext5036 FAX: 512478-5678 e-mail: chrismengd@pruowens.com July 6, 2005 Danny Halden City of Round Rock 2008 Enterprise Drive . Round Rock, Texas 78664 Off: 512-218-7043 Fax: 512-671-2751 RE: Forest Creek Condominiums Reimbursement Dear Danny, Forest Creek Condominiums, Ltd is requesting reimbursement for an oversized waterline as described in J. Keith Collins letter dated July 18,2001. Forest Creek Condominiums, Ltd. has not conveyed any rights to the reimbursement and is the original developer of the project. If you have any questions please do not hesitate to contact me. Sinc ely, ick Je i s Presi en RECEIVED: 5/23/05 1 :51PM; ->5124785678; #191 ; PAGE 2 05/23/2005 14:48 8364817 RANDALL JONES ENG ' PAGE 02 RANDALL JONES ENGINEERING, INC. Engineering Consultants/Planners/Surveyors July 18, 2001 rT e-printed -May 25,2005 Mr. Randy Wright Forest Creek Condominiums 900 Congress Ave., Suite L-110 Austin, Texas 78701 RE: Forest Creek Townhomes Waterline Reimbursements RJE Project #556 Dear Mz, Wrigbt, The purpose of this letter is to provide you with information regarding reimbursements from the City of Round Rock that you may be eligible for over sizing certain waterlines within the above referenced project. Per the City of Round Rock's Development Code and more specifically the Water and Wastewater Oversize Policy,"If a development is required to oversize utility lines in excess of the developments direct needs,the development will be given credit.for the amount oversized."It is the opinion of Randall Jones Engineering,Inc.that the .l2"water line Located within County Road 122 was oversized beyond the needs of this development.Typically an 8"would have been sufficient and adequate to serve the 59 units within this development.Therefore,in accordance with the City's policy you may request reimbursement of$2.60 per. inch diameter oversized,per linear foot of line installed. For this project,450 feet of 12"line was constructed. The reimbursement calculation is$2.60/inch-foot x 4"x 450 feet= $4,680.00. Approved construction plans are on file at the City of Round Rock for this project that show the water line location and sizing. Please let us know if you need any additional information regarding this reimbursement request. P�� OF•TF-1^�O� Sincerely, ` •.• •••�ycA 1"►•"N•NINH•••"""A" _A-18TH coLUNS Keith Collins,P.E. so8057a Project Manager FS •�• -•• a� NVALFile—reimburse—mf 1212 F— Braker Lane Austin,Texas 78753 5.12/836-4793 TAX 512/836-4817 CITY OF ROUND ROCK ��•t lig 221 East Main Street •""'"'"• �� Round Rock,Texas 78664 512-218-5400 DATE: January 17, 2002 TO: Betty Rierson FROM: Danny Halden, P.E. 1� City of Round Rock Public Works Department RE: Forest Creek Townhomes The following items must be furnished/completed in order for the City to formally accept the public improvements constructed in conjunction with the above-referenced subdivision. Upon satisfactory submission/completion of the following items,we will be able to process the water main oversize reimbursement requested and also issue the certificate of occupancy(CO) for the project. 1. Complete a small portion of sidewalk along Co. Rd. 122 near the northwest corner of the townhomes site. 2. Furnish a sidewalk easement to the City of Round Rock for portions of sidewalk that are outside the public right-of-way of Forest Creek Drive. 3. Furnish the City an itemized construction cost schedule for the following improvements: A. 450 linear feet of 12"water main along Co. Rd. 122. B. Two 8"compound water meter installation. C. One 12"gate valve. D: Two 8"gate valves. E. 676 linear feet of 8"wastewater main. F. Six wastewater manholes. 4. Submission of a subdivision inspection fee to the City equal to 1.5%of the total construction costs of the items in 3 above. Mayor Your prompt attention to these matters will be greatly appreciated. Robert A.Stluka,Jr. cc: File Mayor Pro-tem Tom Nielson Terry Cox, City of Round Rock Council Members Alysha Girard, City of Round Rock Alan McGraw Mark Remmert, City of Round Rock Carrie Pitt Keith Collins, P.E., Randall Jones Engineering, Inc. Earl Palmer Isabel Callahan Gary Coe R:mhaley/GeneralCorr/ForestCkCondo City Manager Robert L Bennett,Jr. City Attorney Fax:512-218-7097 1-800-735-2989 TDD 1-800-735-2988 Voice Stephan L Sheets www.ci.round-rock.tx.us N Forest Creek Townhomes - Water Main Oversize Reimbursementl*MN RO&TEX,�S DATE: July 22, 2005 SUBJECT: City Council Meeting - July 28, 2005 ITEM: *11.C.1. Consider a resolution approving a reimbursement to Forest Creek Condominiums, Ltd. for the cost of oversizing water mains associated with the Forest Creek Townhomes development. Department: Engineering and Development Services Staff Person: Danny Halden, City Engineer Justification: The 12" waterline located within CR 122 was oversized beyond the needs of the Forest Creek Townhome development. Staff recommends reimbursement to Forest Creek Condominiums, Ltd. for the oversizing as provided for under Chapter 8 of the Round Rock Code of Ordinances. Funding: Cost: $4,680.00 Source of funds: Oversize Account Outside Resources: Randall Jones Engineering, Inc Forest Creek Condominiums, Ltd. Background Information: With development of Forest Creek Townhomes subdivision, 450 feet of 12" water main was extended along CR 122 north from the Forest Creek Drive intersection. The engineer for the developer has certified that an 8" water main would have been sufficient for the Townhome development and therefore oversizing was provided. The oversized main provides benefits for other developments in the Forest Creek area. Even though the water main was completed around the end of 2001, the City was unauthorized to accept the main because all requirements under Chapter 8 of the Round Rock Code of Ordinances had not been met. The outstanding requirements have recently been satisfied and the water main has been accepted by the City. Therefore, the City is now authorized to consider an oversize reimbursement. Public Comment: N/A