R-04-12-16-14B2 - 12/16/2004 RESOLUTION NO. R-04-12-16-14132 WHEREAS, the City of Round Rock has previously entered into an Agreement for Engineering Services ( "Agreement" ) with S.D. Kallman, L.P. for the design of a 12 inch water line from South Mays Street to Gattis School Road, and WHEREAS, S .D. Kallman, L. P. has submitted Supplemental Agreement No. 1 to the Agreement for a change in the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 1 with S.D. Kallman, L.P. , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 1 to the Agreement for Engineering Services with S.D. Kallman, L.P. , a copy of said same being attached hereto as Exhibit "A" and incorporated herein for all purposes . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public. as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 16th day of December, 2004 . 7 NYE ayor ST: - CK��found Rock, Texas CHRISTINE R. MARTINEZ, Ci"Secretar @PFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R41216H2.WPD/SC STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES FIRM: S.D.Kallman,L.P. ("Engineer") ADDRESS: 1106 S. Mays, Ste. 100,Round Rock,TX 78664 PROJECT: Gattis School Road 12-inch Water Line Improvements This Supplemental Agreement No. 1 to Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and S. D. Kallman, L.P., hereinafter called the"Engineer". WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinafter called the "Agreement', on the 12th day of February, 2004 for the Gattis School Road 12-inch Water Line Improvements in the amount of$25,400; and WHEREAS, it has become necessary to amend the Agreement to modify the provisions for the scope of services, to extend the termination date, to increase the compensation by $8,900 to a total of$34,300, and to modify the provision for notices to proceed; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Agreement is amended as follows: I. Article 2, Scone Of Services To Be Performed By Engineer and Exhibit B, Services To Be Performed By The En ineer shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. 11. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $8,900 the lump sum amount payable under the Agreement for a total of $34,300, as shown by the attached Addendum to Exhibit D. III. Article 7.Notice to Proceed shall be amended to read as follows: Supplemental Agreement sdkallman-gattisl2-inch wl;#76449 Rev.03/02/04 64836 l EXHIBIT "An The Engineer shall not proceed with any task listed on Exhibit B until the City has issued a written Notice to Proceed regarding such task. The City shall not be responsible for work performed or costs incurred by Engineer related to any task for which a Notice to Proceed has not been issued. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agreement in duplicate. S. D. KALLMAN,L.P. By: �- s �• E bee /o gya y Date CITY OF ROUND ROCK APPROVED AS TO FORM: By: Nyle Maxwell,Mayor Stephan L. Sheets, City Attorney Date Supplemental Agreement Rev.03/02/04 sdkallman-gattis 12-inch wl;#76449 64836 2 ADDENDUM TO EXHIBIT B Services to be Performed by the Engineer The changes to the scope of this project are as follows: EXHIBIT"B" SERVICES TO BE PERFORMED BY THE ENGINEER Basic Services: Design Phase 1. Attend preliminary conferences with the City regarding the requirements of the project. Determine necessity for any acquisition of any additional real property/easements/ROWs. 2. Preparation of Plans and Specifications. Construction plans include the horizontal and vertical location of all existing utilities within the construction area. The utilities shall include, but not be limited to electric, gas, water,wastewater and communication utilities. 3. Prepare bid quantities. 4. Prepare pre-design estimate after utility locations and determination of scope of work, final design estimate, specifications and general notes. 5. Supplemental Agreement#1 —Revise construction plans and specifications for the realignment of the proposed water line through the church property. Bidding Phase -1. Prepare bidding documents and all copies for the bidding process. 2. Attend pre-bid conference and attend public bid opening. 3. Review bids received for completeness and accuracy and prepare detailed bid tabulations. 4. Make recommendation for bid award and prepare notice of award. 5. Prepare seven sets of final contract documents. Construction Phase 1. Provide periodic construction inspection services to assure compliance with plans and specifications. 2. Attend construction meetings as requested by City. 3. Review and make recommendations to City on submittals, pay requests and change orders. 4. Punchlist the project when contractor requests consideration for acceptance. Sign off on completed punchlist. 5. Prepare and submit a Plan of Record for the completed project. Special Services: Design Phase 1. Design field surveys and tree locations. 2. Locate existing marked underground and overhead utilities. 3. Set horizontal and vertical controls. 4. Property surveys and field notes for waterline easements. 5. Supplemental Agreement#1 —Additional design field surveys for the realignment of the proposed water line through the church property. 6. Supplemental Agreement#1 —Additional property surveys and field notes for water line easement for realignment of proposed water line through the church property. ADDENDUM TO EXHIBIT C Work Schedule The changes to the Work Schedule for this project are as follows: EXHIBIT"C" WORK SCHEDULE Week: Milestone: 02/13/04 Notice to Proceed Given to Engineer to Design Project 03/25/04 Submit Field Notes and Sketches for Water Line Easements to City of Round Rock Public Works Department 12/03/04 Notice to Proceed with Supplemental Agreement#1 Given to Engineer 01/01/05 Submit Field Notes and Sketches for Additional Water Line Easement to City of Round Rock Public Works Department 02/01/05 60%Design Submitted to City of Round Rock Public Works Department for Review 03/01/05 Final Design Submitted to City of Round Rock Public Works Department for Review 03/15/05 Plans Approved by City of Round Rock Public Works Department 04/07/05 & Public Notice Advertising Bids 04/14/05 05/12/05 Bids Received at City Hall 05/19/05 City Awards Contract 06/02/05 Contractor Returns Contract Documents with Signature, Bonds, and Certificate of Insurance 06/09/05 City Signs Contract Documents; City and Engineer Hold Pre- Construction Conference and Issues Notice to Proceed 06/16/05 Begin Construction 09/16/05 Construction Substantially Complete -Water Line in Service (3 Months) 10/16/05 Final Project Acceptance ADDENDUM TO EXHIBIT D Fee Schedule The changes to the fee schedule for this project are as follows: EXHIBIT "D" FEE SCHEDULE Basic Services: Design Phase 1. Attend preliminary conferences with the City regarding the $1,000. requirements of the project. Determine necessity for any acquisition of any additional real property/easements/ROWS. 2. Preparation of Plans and Specifications. Construction plans include $8,700. the horizontal and vertical location of all existing utilities within the construction area. The utilities shall include,but not be limited to electric, gas, water,wastewater and communication utilities. 3. Prepare bid quantities. $1,000. 4. Prepare pre-design estimate and final design estimate. $1,000. Bidding Phase Total Basic Services -Design Phase $11,700. 1. Prepare bidding documents and all copies for the bidding process. $800. 2. Attend pre-bid conference and attend public bid opening. $250. 3. Review bids received for completeness and accuracy and prepare $200. detailed bid tabulations. 4. Make recommendation for bid award and prepare notice of award. $150. 5. Prepare seven sets of final contract documents. $100. Construction Phase Total Basic Services-Bidding Phase $1,560. 1. Provide periodic construction inspection services to assure $1,540. compliance with plans and specifications. 2. Attend construction meetings as requested by City. $300. 3. Review and make recommendations to City on submittals,pay $100. requests and change orders. 4. Punchlist the project when contractor requests consideration for $200. acceptance. Sign off on completed punchlist. 5. Prepare and submit a Plan of Record for the completed project. $200. Total Basic Services-Construction Phase $2,340. Special Services: Total Basic Service Fees $15,600. Design Phase 1. Design field surveys and tree locations. $4,300. 2. Locate existing marked underground and overhead utilities. $1,500. 3. Set horizontal and vertical controls. No Charge 4. Property surveys and field notes for waterline easements. $4,000. Total Special Services-Design Phase $9,800. Total Basic Service Fees $15,600. Total Special Service Fees _ $9,800. Total 12" Gattis School Road Water Line Project Fees $25,400. Supplemental Agreement#1 Basic Services: Design Phase 1. Revise Construction Plans and Specifications for the realignment of $3,500. the proposed water line through the church property. Total Supplemental Agreement#1 Basic Services—Design Phase $3,500. Supplemental Agreement#1 Special Services: Design Phase 1. Additional Design Field Surveys for realignment of the proposed $3,400. water line through the church property. 2. Additional Property Surveys and Field Notes for the realignment of $2,000. the proposed water line through the church property. Total Supplemental Agreement#1 Special Services—Design Phase $5,400. Total Supplemental Agreement#1 Basic Services $3,500. Total Supplemental Agreement#1 Special Services $5,400. Total Supplemental Agreement#1 Fees $8,900. Total 12" Gattis School Road Water Line Project Fees Including Supplemental Agreement#1 $34,300. Note: Since it is assumed that the construction contractor shall provide construction staking for this project,no fees have been included for that task. Above fees shall be invoiced monthly, based upon the percentage of services completed. i 1 s � • • �-.. — P ULM RIM bct v L2i ► . { r r jkq f r F �� z _ � �ro� �•= � �..v Y �''"� n S[.,.-1. 41 'Ile _ ♦ r Vk . y r VF s ��, ,/f��' mom^ i ....m tr4 '•7. ,3� ��• �� � ��`�± �\ `♦� � •ate i DATE: December 9, 2004 SUBJECT: City Council Meeting - December 16, 2004 ITEM: *14.8.2. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 1 to the Agreement for Engineering Services with S.D. Kallman, L.P. for the design of a 12-inch water line from South Mays Street to Gattis School Road. Department: Water and Wastewater Utilities Staff Person: Tom Clark, Director Justification: This Supplemental Agreement Number 1 is for additional surveying and to re- design the Gattis School Road 12-inch Water Line. This is necessary to coordinate the proposed development of the Sweet Home Baptist Church Property and align the waterline with street right-of-away to allow better access for maintenance. With the realignment, the Sweet Home Baptist Church will donate the easements required for the line. Funding• Cost: $8,900.00 Source of funds: Capital Project Funds (Self-Financed Utility) Outside Resources: S.D. Kallman, L.P. Background Information• The Gattis School Road 12-inch Water Line will allow for more use of ground water from the Lake Creek pump station. This supplemental agreement will redesign the line to follow the proposed right-of-way alignment of the Surrey Drive extension through this development from Gattis School Road to School Days Lane. This change will increase the length of water line by approximately 800 linear feet. The property owner is donating the easement for the waterline. Public Comment: N/A EXECUTED DOCUMENT FOLLOWS STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES FIRM: S. D. Kallman, L.P. ("Engineer") ADDRESS: 1106 S. Mays, Ste. 100, Round Rock,TX 78664 PROJECT: Gattis School Road 12-inch Water Line Improvements This Supplemental Agreement No. I to Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and S. D. Kallman, L.P., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinafter called the "Agreement", on the 12th day of February, 2004 for the Gattis School Road 12-inch Water Line Improvements in the amount of$25,400; and WHEREAS, it has become necessary to amend the Agreement to modify the provisions for the scope of services, to extend the termination date, to increase the compensation by $8,900 to a total of$34,300, and to modify the provision for notices to proceed; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Agreement is amended as follows: I. Article 2, Scope Of Services To Be Performed By Engineer and Exhibit B, Services To Be Performed By The Engineer shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $8,900 the lump sum amount payable under the Agreement for a total of $34,300, as shown by the attached Addendum to Exhibit D. III. Article 7, Notice to Proceed shall be amended to read as follows: Supplemental Agreement Rev.03/02/04 sdkallman-gattisl2-inch wl;#76449 64836 1 The Engineer shall not proceed with any task listed on Exhibit B until the City has issued a written Notice to Proceed regarding such task. The City shall not be responsible for work performed or costs incurred by Engineer related to any task for which a Notice to Proceed has not been issued. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agreement in duplicate. S. D. KALLMAN, L.P. By: �- S r E, oU�r� b 2-06V Date CITY OFR APPROVED AS TO ORM: By: N / a L . N well,14ayor Stepha6 L. Sheets, City Attorney 1 - lu - O4 Date Supplemental Agreement Rev.03/02/04 sdkallman-gattis 12-inch wl;#76449 64836 2 ADDENDUM TO EXHIBIT B Services to be Performed by the Engineer The changes to the scope of this project are as follows: EXHIBIT "B" SERVICES TO BE PERFORMED BY THE ENGINEER Basic Services: Desijzn Phase 1. Attend preliminary conferences with the City regarding the requirements of the project. Determine necessity for any acquisition of any additional real property/easements/ROWs. 2. Preparation of Plans and Specifications. Construction plans include the horizontal and vertical location of all existing utilities within the construction area. The utilities shall include,but not be limited to electric, gas, water, wastewater and communication utilities. 3. Prepare bid quantities. 4. Prepare pre-design estimate after utility locations and determination of scope of work, final design estimate, specifications and general notes. 5. Supplemental Agreement#1 —Revise construction plans and specifications for the realignment of the proposed water line through the church property. Bidding_ Phase 1. Prepare bidding documents and all copies for the bidding process. 2. Attend pre-bid conference and attend public bid opening. 3. Review bids received for completeness and accuracy and prepare detailed bid tabulations. 4. Make recommendation for bid award and prepare notice of award. 5. Prepare seven sets of final contract documents. Construction Phase 1. Provide periodic construction inspection services to assure compliance with plans and specifications. 2. Attend construction meetings as requested by City. 3. Review and make recommendations to City on submittals,pay requests and change orders. 4. Punchlist the project when contractor requests consideration for acceptance. Sign off on completed punchlist. 5. Prepare and submit a Plan of Record for the completed project. Special Services: Design Phase 1. Design field surveys and tree locations. 2. Locate existing marked underground and overhead utilities. 3. Set horizontal and vertical controls. 4. Property surveys and field notes for waterline easements. 5. Supplemental Agreement#1 —Additional design field surveys for the realignment of the proposed water line through the church property. 6. Supplemental Agreement#1 —Additional property surveys and field notes for water line easement for realignment of proposed water line through the church property. ADDENDUM TO EXHIBIT C Work Schedule The changes to the Work Schedule for this project are as follows: EXHIBIT "C" WORK SCHEDULE Week: Milestone: 02/13/04 Notice to Proceed Given to Engineer to Design Project 03/25/04 Submit Field Notes and Sketches for Water Line Easements to City of Round Rock Public Works Department 12/03/04 Notice to Proceed with Supplemental Agreement#1 Given to Engineer 01/01/05 Submit Field Notes and Sketches for Additional Water Line Easement to City of Round Rock Public Works Department 02/01/05 60% Design Submitted to City of Round Rock Public Works Department for Review 03/01/05 Final Design Submitted to City of Round Rock Public Works Department for Review 03/15/05 Plans Approved by City of Round Rock Public Works Department 04/07/05 & Public Notice Advertising Bids 04/14/05 05/12/05 Bids Received at City Hall 05/19/05 City Awards Contract 06/02/05 Contractor Returns Contract Documents with Signature, Bonds, and Certificate of Insurance 06/09/05 City Signs Contract Documents; City and Engineer Hold Pre- Construction Conference and Issues Notice to Proceed 06/16/05 Begin Construction 09/16/05 Construction Substantially Complete -Water Line in Service (3 Months) 10/16/05 Final Project Acceptance ADDENDUM TO EXHIBIT D Fee Schedule The changes to the fee schedule for this project are as follows: EXHIBIT "D" FEE SCHEDULE Basic Services: Design Phase 1. Attend preliminary conferences with the City regarding the $1,000. requirements of the project. Determine necessity for any acquisition of any additional real property/easements/ROWS. 2. Preparation of Plans and Specifications. Construction plans include $8,700. the horizontal and vertical location of all existing utilities within the construction area. The utilities shall include,but not be limited to electric, gas,water,wastewater and communication utilities. 3. Prepare bid quantities. $1,000. 4. Prepare pre-design estimate and final design estimate. $1,000. Total Basic Services-Design Phase $11,700. Bidding Phase 1. Prepare bidding documents and all copies for the bidding process. $800. 2. Attend pre-bid conference and attend public bid opening. $250. 3. Review bids received for completeness and accuracy and prepare $200. detailed bid tabulations. 4. Make recommendation for bid award and prepare notice of award. $150. 5. Prepare seven sets of final contract documents. $100. Total Basic Services-Bidding Phase $1,560. Construction Phase 1. Provide periodic construction inspection services to assure $1,540. compliance with plans and specifications. 2. Attend construction meetings as requested by City. $300. 3. Review and make recommendations to City on submittals,pay $100. requests and change orders. 4. Punchlist the project when contractor requests consideration for $200. acceptance. Sign off on completed punchlist. 5. Prepare and submit a Plan of Record for the completed project. $200. Total Basic Services-Construction Phase $2,340. Total Basic Service Fees $15,600. Special Services: Design Phase 1. Design field surveys and tree locations. $4,300. 2. Locate existing marked underground and overhead utilities. $1,500. 3. Set horizontal and vertical controls. No Charge 4. Property surveys and field notes for waterline easements. $4,000. Total Special Services-Design Phase $9,800. Total Basic Service Fees $15,600. Total Special Service Fees $9,800. Total 12" Gattis School Road Water Line Project Fees $25,400. Supplemental Agreement#1 Basic Services: Design Phase 1. Revise Construction Plans and Specifications for the realignment of $3,500. the proposed water line through the church property. Total Supplemental Agreement#1 Basic Services—Design Phase $3,500. Supplemental Agreement#1 Special Services: Design Phase 1. Additional Design Field Surveys for realignment of the proposed $3,400. water line through the church property. 2. Additional Property Surveys and Field Notes for the realignment of $2,000. the proposed water line through the church property. Total Supplemental Agreement#1 Special Services—Design Phase $5,400. Total Supplemental Agreement#1 Basic Services $3,500. Total Supplemental Agreement#1 Special Services $5,400. Total Supplemental Agreement#1 Fees $8,900. Total 12" Gattis School Road Water Line Project Fees Including Supplemental Agreement#1 $34,300. Note: Since it is assumed that the construction contractor shall provide construction staking for this project, no fees have been included for that task. Above fees shall be invoiced monthly,based upon the percentage of services completed.