Loading...
R-04-12-16-14B3 - 12/16/2004 RESOLUTION NO. R-04-12-16-14133 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Enviro Remediation Coating Services, Inc. for the 2002-2003 Wastewater Collection System Rehabilitation Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 1 to the Contract with Enviro Remediation Coating Services, Inc. for the 2002-2003 Wastewater Collection System Rehabilitation Project, a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were -discussed, considered and formally acted upon, all as required by the Open .Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 16th day of December, 00 NYLVIWELIr, ayor C' y A ST: Round Rock, Texas CHRISTINE R. MARTINEZ, City Secre ry @PFDesktop\::ODMA/WORLDOX/O./WDOX/RF.SOLUTI/R41216B3.WPD/sc CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER PAGE 1 OF 1 DEPARTMENT: Public Works DATE: 11-3-2004 PROJECT: 2002-2003 Wastewater Collection CHANGE ORDER NO: System Rehabilitation Unit 1 1 JUSTIFICATION: ORIGINAL CONTRACT PRICE: $300,463.00 1 Additional Service Reconnections PREVIOUS CHANGE ORDERS: $0.00 2 Decrease in certain bid items THIS CHANGE ORDER: $46,190.00 CHANGE ORDERS TO DATE: $46,190.00 CHANGE DATA DESCRIPTION OF UNIT QT ADDED DAYS ITEM# CHANGES UNIT Working Y. PRICE AMOUNT Decrease in 6" PVC Sewer Service 7 Extension EA -50 $25.00 -$1,250.00 12 Delete Fence Repair -5.00 LF -40 $25.00 -$1,000.00 -1.00 20 Decrease in Chemical Grouting EA -22 $255.00 -$5,610.00 22 Decrease in Lower 18"grouting Eq -12 -2.00 6" PVC Sewer Connection @ Main &6" $600.00 -$7,200.00 -1.00 Service Extension to Property Line w/cleanout in unpaved area per D2- 12(5) of the spec book and 37 construction plan EA 20 $1,062.50 $21,250.00 10.00 6" PVC Sewer Connection @ Main &6" Service Extension to Property Line w/cleanout in paved area per D2-12(5) 38 FE of the spec book and construction plan EA 20 $2,000.00 $40,000.00 25.00 TOTAL: $46,190.00 26.00 PREPARED BY: ��/�Zl o PERCENT OF ORIGINAL CONTRACT PRICE ENGINEER t_ DATE THIS CHANGE ORDER: $46,190.00 ��l'I�NfI iC,/ llO� n 5v, L PREVIOUS CHANGE ORDER: 0 1 CONT R (f TOTAL % CHANGE: 15.37% BY. ".-C-'��\ � , ��� ORIGINAL CONTRACT PRICE PLUS TITLE: %(J&-NT CHANGE ORDERS: $346,653.00 APPROVED: CITY OF ROUND ROCK constco2/forms6/lk EEXHIBIT s "An i Terav OC38 CC34 Vsta Brush OC31 4 CC43 CC32 CC42 C 3 OC30 OC26 3CC33C 33 OC2 CC44 OC28 BC20 2 LC09 2 OC24 BC01 EW01 2 RW01 BC23 BC22 BC03 LCO BCO2 BC40 LC09 Brush BC21 9 L 0 BCD4 Cl L 1 BC05 Cil LC18 BC41 LC15 LC79 L 1 C1 LC2 BC07 BC06 B 06 LC45 LCll egend sde.ROUND_ROCK.SUB_BASINS 18—Wastewater–Line–To–Be–Replaced CC36-Z&OC31-Z Not to Scale N WE c"OF Roum Ro" ETmCmm S)m S ME-m-&-a PROGRAM S:lGraphims Council Agenda Items Engi w ringl2004%Wastewater UtilitylW W_REHAB_INS%W W_REHAB_INSP.—d DATE: December 9, 2004 SUBJECT: City Council Meeting - December 16, 2004 ITEM: *14.B.3. Consider a resolution authorizing the Mayor to execute Change Order No. 1 with Enviro Remediation Coating Services, Inc. for the 2002-2003 Wastewater Collection System Rehabilitation Project. Department: Water and Wastewater Utility Staff Person: Tom Clark, Director Justification: Enviro Remediation Coatings Services, Inc. is currently performing rehabilitation of two basins located in the City of Round Rock's wastewater collection system. Enviro Remediation is contracted to do conventional open-cut line replacement, point repairs, and manhole repairs to the wastewater system in the two identified basins. While Enviro Remediation has been working on their wastewater system rehabilitation scope of work, the City has identified additional wastewater service laterals in other areas of the City that require repair work. Because Enviro Remediation is already mobilized and working in the City, the City is recommending that Enviro Remediation repair these additional wastewater service laterals at this time. Enviro Remediation's original contract amount was for $300,463. This change order increases their original contract amount by 15.3%. Funding• Cost: $46,190 Source of funds: Capital Project Funds (Wastewater Utility) Outside Resources• RJN Group, Inc. Background Information• This project is for rehabilitating the wastewater collection system in Basins OC31 and CC36 to meet the Edwards Aquifer requirements of the Texas Commission on Environmental Quality. The schedule of repairs for this project includes line replacement, point repairs, and repair of manholes to eliminate infiltration and inflow of water into the collection system. Public Comment• N/A EXECUTED DOCUMENT FOLLOWS CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER PAGE 1 OF 1 DEPARTMENT: Public Works DATE: 11-3-2004 PROJECT: 2002-2003 Wastewater Collection CHANGE ORDER NO: 1 System Rehabilitation Unit 1 JUSTIFICATION: ORIGINAL CONTRACT PRICE: $300,463.00 1 Additional Service Reconnections PREVIOUS CHANGE ORDERS: $0.00 2 Decrease in certain bid items THIS CHANGE ORDER: $46,190.00 CHANGE ORDERS TO DATE: $46,190.00 CHANGE DATA DESCRIPTION OF ADDED DAYS UNIT QTY. PRICE AMOUNT ITEM# CHANGES UNIT Working Decrease in 6" PVC Sewer Service EMMMEMEMMM 7 Extension EA -50 $25.00 i -$1,250.00 -5.00 12 Delete Fence Repair LF -40 $25.00 -$1,000.00 -1.00 20 Decrease in Chemical Grouting EA -22 $255.00 -$5,610.00 -2.00 22 Decrease in Lower 18"grouting EA -12 $600.00 -$7,200.00 -1.00 6" PVC Sewer Connection @ Main &6" Service Extension to Property Line w/cleanout in unpaved area per D2- 12(5) of the spec book and 37 construction plan EA 20 $1,062.50 $21,250.00 10.00 6" PVC Sewer Connection @ Main &6" Service Extension to Property Line w/cleanout in paved area per D2-12(5) 38 of the spec book and construction plan EA 20 $2,000.00 $40,000.00 25.00 TOTAL: $46,190.00 26.00 PREPARED BY: /1//Zlo PERCENT OF ORIGINAL CONTRACT PRICE ENGINEER DATE THISCHANGE ORDER: $46,190.00 �cr, -t/i)r. , t- i PREVIOUS CHANGE ORDER: CONTRAcTbR,, 0 l ,6 TOTAL % CHANGE: 15.37% —1 BY. ORIGINAL CONTRACT PRICE PLUS TITLE: CHANGE ORDERS: $346,653.00 APPROVED: 0 RO constco2/forms6/Ik