Loading...
R-04-12-16-14F4 - 12/16/2004 RESOLUTION NO. R-04-12-16-14F4 WHEREAS, the City of Round Rock wishes to enter into Pipeline License Agreement with Georgetown Railroad ( "GRR" ) , and WHEREAS, the Council wishes to accept the terms and conditions of said Agreement with GRR, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a Pipeline License Agreement with Georgetown Railroad, a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 16th day of December 00 WELL, M or City of Round Rock, Texas E T: CHRISTINE R. MARTINEZ, City Secretary I @PFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R41216F4.WPD/sc PIPELINE LICENSE AGREEMENT PARCEL 2 This Pipeline License Agreement(the"License") is made and entered into effective the date last executed herein below, by and between Georgetown Railroad Company, a Texas corporation ("GRR"), as licensor, and the City of Round Rock, Texas ("Round Rock"), as licensee. WITNESSETH: WHEREAS, the City of Round Rock desires to construct a 18 inch wastewater pipeline, with a thirty (30) inch steel incasement, for the transportation of wastewater (the "Pipeline"), which Pipeline will cross under the tracks of GRR; and WHEREAS, GRR wishes to grant to the City of Round Rock a license to construct and maintain the Pipeline, NOW THEREFORE, the parties hereby agree as follows: Article I License Granted, Term: Consideration For and in consideration of the mutual covenants and contracts herein contained, GRR hereby grants to Round Rock a license to construct and maintain the Pipeline to cross under GRR's main line track and future side track, 3547 feet north of Mile Post 4 and further described in Exhibit "A" attached hereto and incorporated herein for all pertinent purposes, on the terms and conditions described herein below. This License shall be effective from and after the date fully executed, and shall terminate at such time as the Pipeline is no longer used by the City of Round Rock for the use provided hereinabove. Article II Pipeline Location The Pipeline shall be located as described in Article I hereof. The Pipeline, when installed by Licensee, shall be installed so that the upper surface of the pipe is at least five and one-half(5'/)feet below the bottom of the rail thereover, or at such lower depth which may be necessary to provide adequate support for the rail. Installation shall be made in conformity with the engineering profile contained in Exhibit "A" hereto. PIPELINE LICENSE AGREEMENT EEXHIBIT PAGE 1 Article III Responsibilities of Round Rock 3.1. Installation and Maintenance: Removal of Pipe Round Rock shall install or cause to be installed the Pipeline at the location provided in Article 1 herein above. The Pipeline shall be installed safely and in a good workmanlike manner, and during the construction, Round Rock or its contractor involved in the construction shall secure a policy of Railroad Protective Liability Insurance with limits of liability of at least $2,000,000.00, naming GRR as the named insured and loss payee. Round Rock agrees to provide satisfactory evidence of such insurance coverage prior to beginning construction of the Pipeline. During the term of the License, Round Rock agrees that it will properly maintain the Pipeline and will take any and all actions and expend any and all funds which may be required to maintain the Pipeline. Round Rock further agrees that the construction, maintenance, and operation of the Pipeline will comply with all applicable State, Federal and local laws, rules or regulations, and upon any notification by any person that the Pipeline is not in compliance with such laws, rules and regulations, Round Rock agrees to take prompt action to bring the Pipeline into such compliance. In the event that Round Rock fails to properly maintain the Pipeline or to take any action required to bring the Pipeline into conformance with all applicable laws, rules or regulations, the GRR, after 10 days notice to Round Rock, may take any such action as may be reasonably necessary to render the Pipeline safe for railroad operations or in compliance with applicable laws, rules and regulations, and Round Rock agrees that in the event GRR takes such action, Round Rock shall, with twenty (20) days, reimburse GRR for the actual cost of labor performed by or on behalf of GRR, including wages of foremen, plus 10% to cover supervision and accounting, plus vacation allowances, paid holidays and health and welfare benefit payments applicable to such labor, GRR's cost price of all materials f.o.b. GRR's rails plus 10%to cover handling and accounting, plus freight at tariff to point of use, and excise taxes applicable to said labor and materials. Upon termination of this License, Round Rock shall take prompt action to remove the pipe and all associated materials and repair any damage to GRR's property which may be caused by such removal. Such removal shall be undertaken by Round Rock without any demand from GRR, but shall in any event commence within thirty (30) days after termination of this License and written demand for removal being made by GRR. 3.2. Indemnification and Hold Harmless During the term of this License, Round Rock agrees to indemnify GRR and hold it harmless from any suits, claims, costs, loss or damage which may accrue to GRR, Round Rock or third parties, from the operation of the Pipeline arising out of, or occasioned by, the negligent acts of Round Rock or its employees or agents. The loss or damage for which Round Rock shall indemnify GRR and hold it harmless shall specifically include, but PIPELINE LICENSE AGREEMENT PAGE 2 not be limited to, the following: (a) damage to or destruction of railroad track and track bed, railroad cars and engines, or to the Pipeline; (b) personal injury to or damage to property, owned, leased or operated by (i) GRR employees or agents, (ii) Round Rock employees, agents or contractors, or (iii) any third parties; and (c) economic loss to any party caused by damage to or destruction of the Pipeline or the interruption of Pipeline service, caused by negligence of Round Rock, its employees or agents. Such indemnification shall include all actual monetary cost to GRR, including expenses and attorney's fees. 3.3. No At Grade Crossing This license does not permit Round Rock to cross over the GRR main line track at grade or above grade at any time. Article IV Representations and Warranties of Round Rock Round Rock hereby represents and warrants to GRR that the construction, operation and maintenance of the Pipeline have been properly approved by the City of Round Rock, and that Round Rock has been authorized by resolution, or if required by its Charter, by ordinance, to enter into this Pipeline License Agreement, that the resolution or ordinance has not been repealed and is in effect at the date of execution hereof, and that this License Agreement is enforceable against Round Rock in accordance with its terms. Round Rock further warrants and represents that the city officer executing this License has been duly authorized to execute the same on behalf of, and as the act and deed of, the City of round Rock. Article V Assi nment The License hereby granted by GRR to Round Rock is personal to the grantee hereof, and Round Rock shall have no right to assign this License without the express prior written consent of GRR. GRR's rights hereunder shall be freely assignable. Article VI Notice Any notice required or permitted hereunder shall be personally delivered or sent by registered or certified mail, return receipt requested to the addressee at the address listed below, and such notice shall be effective on the date of delivery, or date of mailing. PIPELINE LICENSE AGREEMENT PAGE 3 Round Rock City of Round Rock 221 East Main Street Round Rock, Texas 78664 Georgetown Railroad Company Georgetown Railroad Company P. O. Box 529 Georgetown, Texas 78627 EXECUTED on the date indicated below: City of Round Rock ATTEST: By. Title: NYLE MAXWELL, Mayor Date: (City Seal) Georgetown Railroad Company ATTEST: By. W. B. SNEAD, Chairman of the Board Title: Date: (Seal) GRR PARCEL 2(PIPELINE)WP9 DISK#701 (02-034 11 Dec 04)) PIPELINE LICENSE AGREEMENT PAGE 4 PLACE ARROW INDICATING NORTH FORM OR-0404-8 DIRECTION RELATIVE TO CROSSING REV. O5-OI-90 v p APPLICATION FOR ENCASED NON-FLAMMABLE PIPELINE CROSSING w NOTE:. ALL AVAILABLE DIMENSIONS MUST BE v2 !r? NO SCALE FILLED IN TO EXPEDITE THIS APPLICATION. -4 �I 6 2( FT. v A. • FT. FT. I SEE NOTE )l S! FT. O' 1 SEE NOTE )1-SI•' • TO OGK w �G-��-�� s a� • �Z/R�RET-Y� ' (NEAREST R.f. TORT()4t\ g IAGGLE Of CROSSING( TO u /v 1 NEAREST a.A. TORN( ty = SwITCH INT f IOESCRIWE FIxEO 04JECTI IOESCRIWE FIx[o OWJECII yid 1 SEE NOTE sl I SEE NOTE SI 161 STAKES.TRACS FRW SECTION LINE CROSSING( 30 FT. FT. � /Wiry IHOTV THIS OIIENSION REOUI*M IN ALL CASES. M'S II/f AT LOCATIONS NOT USING SECTIONS, OISTANCE -- TO A LEGAL SMIVET LINE IS IIEOUIREDI A FT. O FT. •�� O 3�FT. STEEL CASING WALL, THICKNESS CHART WIN, GIST 151»Note 21. 1 OPOUND THICKNESS CASIINNGEIT PE M ' SURFACE SU§CRADE .2500' 1/4' 1 r OR LESS NOADWED .3125- 5/16- OVER 12--16- 3750- 316- OVER It'-22- .s•5 FT.MI/1/. .437S- 7/16' OVER 2r-26- 1 HIM.I ' /MW` .ssow112- ova 20'--34- —FT. 4 20 FT. VAX.x.1 FT. .5625. 1/16. OVER 34'-42- SEAL CASING o CASING PIPE I(Sao Note b. 1) FT. HIL I SM CASING .625W 5/6' OVER 42'-46- OVER 46- WST BE / _ _ _ `CARRItr PI►E ` APPROVED BY R.R. C0. - - - - - - ^ NOTE: THIS CHART IS ONLY © I V FOR SMOOTH STEEL CASING PES WITH MINIMUM t o Is FT.— T. `% PSTRENCT14 OF ] 000 PSI.D FT. --► i FT. FORMULA TO FIGURE h CASING 60 FT' LENGTH WITH ANGLE OF FT. CROSSING OTHER THAN go- NOTES (CASING LENGTH WHEN MEASIAED ALONG PI/ELINE.1 SIN I) ALL HORIZONTAL DISTANCES TO BE MEASURED AT RIGHT ANGLES FRdA f OF TRACK, EXCEPT AS NOTED. ��� B 2) CASING TO EXTEND BEYOND THE CENTERLINE OF TRACK AT RIGHT ANGLES THE GREATEROF 20 • 20 FT., OR 30 FT., MIN.DIST. AND BEYOND LIMIT OF RAILROAD RIGHT-OF-WAT IF NECESSARY TO PROVIDE PROPER LENGTH OUTSIDE OF TRACK. 0 /more 21 31 MINIMA( OF 50' FROM THE ENO OF ANY RAILROAD BRIDGE, f OF ANY CULVERT, OR FROM ANY SWITCHING AREA. IRA 41 SIGNAL REPRESENTATIVE LUST BE PRESENT DURING INSTALLATION IF RAILROAD SIGNALS ARE IN THE VICINITY OF CROSSING. 51 ALLOWABLE FIXED OBJECTS INCLUDE: BACKWALLS OF BRIDGES; f OF ROAD CROSSINGS 6 OVERHEAD VIADUCTS (GIVE ROAD NAME), OR of OF CULVERTS. Al IS PIPELINE CROSSING WITHIN DEDICATED STREET ? YES; ' 0; B) IF YES, NAME OF STREET -- EXHIBIT "A" SW-Y-N C) DISTRIBUTION LINEX.__OR TRANSMISSION LINE- 'P•"Auu1"a W K1-a 011 wort to 1111s Om 01 CARRIER PIPE : COLWOITY TO BE CONVEYED_ WASTE WATtR OPERATING PRESSURE c PSI ��-�'� GEO.eGE rowA/ oq/GRpAb LC). WALL THICKNESS-;DIAMETER-151m; MATERIAL VC. . E) CASING PIPE : 1 1lanal«1 WALL THICKNESS�_f 2S ; DIAMETER30//1I/Al ;MATERIAL Sr M• P• t REATEST {6 7 E. S. �'72{ 88 OUTSIDE CDIAMETASING E SOFHCARRIER AVE 2" CPIPE AAND INTERIOR NCE BETWEEN GDIAMETER OF WASTE RCROSSING AT ENCASED wArF CASING PIPE. WHEN FURNISHING DIMENSIONS, GIVE OUTSIDE OF F-E1.,� �/L -�� CARRIER PIPE AND INSIDE OF'CASING PIPE. F t-/1417 pA/, (4=XR.5 F) METHOD OF INSTALLING CASING PIPE UNDER TRACKI S): '•KAMT OR Si'r1«' 1w1111 1Itarts DRY BORE AND JAC 1 ET BORE OT ERM[TTED)' FOR 0,ITY COP 9'0' 41 /?oCK TUNNEL ; OTHER 0 CN Ct3T /p 1 laud G) WILL CONSTRUCTION BE BY AN OUTSIOE CONTRACTOR? X YES;_ NO. 1UKICY1,1 H) DISTANCE FROM CENTER LINE OF TRACK TO NEAR FACE OF BORING AND RR FILE NO.a p'Sl-6GSDA T EC Dy JACKING PITS WHEN MEASURED AT fjjGHT ANG`ES T TRACK IN I) APPLICANT HAS CONTACTED G 6O/C6�rTb N �K 430' WIN.I �R P6 COMMUNICATION DEPARTMENT AND HAS DETERMINED FIBER OPTIC CABLE DOES ;,-.X_DOES NOT ; EXIST IN VICINITY OF WORK TO BE PERFORMED. DATE: December 9, 2004 SUBJECT: City Council Meeting - December 16, 2004 ITEM: 14.F.4. Consider a resolution authorizing the Mayor to execute a pipeline license agreement with Georgetown Railroad. (Parcel 2) Department: Administration Staff Person: Jim Nuse, City Manager Justification: In order for the City to complete the reconstruction of a wastewater line from the City's Water Treatment Plant to IH-35, it is necessary to cross property owned by Georgetown Railroad Company. Funding: Cost: The license is at no cost to the City but is granted as partial consideration for the extension of the Industrial District. Source of funds: N/A Outside Resources: Georgetown Railroad Company Background Information: This Industrial District outlines terms and conditions whereby Texas Crushed Stone and Georgetown Railroad Company may continue to operate outside Round Rock's city limits. The District was first created in 1978 and has been extended four other times. Public Comment: N/A EXECUTED DOCUMENT FOLLOWS IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIillllillllllllllllilll AGR 2005019454 6 PGS PIPELINE LICENSE AGREEMENT PARCEL 2 This Pipeline License Agreement(the"License") is made and entered into effective the date last executed herein below, by and between Georgetown Railroad Company, a Texas corporation ("GRR"), as licensor, and the City of Round Rock, Texas ("Round Rock"), as licensee. WITNESSETH: WHEREAS, the City of Round Rock desires to construct a 18 inch wastewater pipeline, with a thirty (30) inch steel incasement, for the transportation of wastewater (the "Pipeline"), which Pipeline will cross under the tracks of GRR; and WHEREAS, GRR wishes to grant to the City of Round Rock a license to construct and maintain the Pipeline; NOW THEREFORE, the parties hereby agree as follows: Article I License Granted: Term: Consideration For and in consideration of the mutual covenants and contracts herein contained, GRR hereby grants to Round Rock a license to construct and maintain the Pipeline to cross under GRR's main line track and future side track, 3547 feet north of Mile Post 4 and further described in Exhibit "A" attached hereto and incorporated herein for all pertinent purposes, on the terms and conditions described herein below. This License shall be effective from and after the date fully executed, and shall terminate at such time as the Pipeline is no longer used by the City of Round Rock for the use provided hereinabove. Article II Pipeline Location The Pipeline shall be located as described in Article I hereof. The Pipeline, when installed by Licensee, shall be installed so that the upper surface of the pipe is at least five and one-half(5'/2)feet below the bottom of the rail thereover, or at such lower depth which may be necessary to provide adequate support for the rail. Installation shall be made in conformity with the engineering profile contained in Exhibit "A" hereto. R-oy- t2-11P- jyFy PIPELINE LICENSE AGREEMENT PAGE 1 Article III Responsibilities of Round Rock 3.1. Installation and Maintenance; Removal of Pipe Round Rock shall install or cause to be installed the Pipeline at the location provided in Article I herein above. The Pipeline shall be installed safely and in a good workmanlike manner, and during the construction, Round Rock or its contractor involved in the construction shall secure a policy of Railroad Protective Liability Insurance with limits of liability of at least $2,000,000.00, naming GRR as the named insured and loss payee. Round Rock agrees to provide satisfactory evidence of such insurance coverage prior to beginning construction of the Pipeline. During the term of the License, Round Rock agrees that it will properly maintain the Pipeline and will take any and all actions and expend any and all funds which may be required to maintain the Pipeline. Round Rock further agrees that the construction, maintenance, and operation of the Pipeline will comply with all applicable State, Federal and local laws, rules or regulations, and upon any notification by any person that the Pipeline is not in compliance with such laws, rules and regulations, Round Rock agrees to take prompt action to bring the Pipeline into such compliance. In the event that Round Rock fails to properly maintain the Pipeline or to take any action required to bring the Pipeline into conformance with all applicable laws, rules or regulations, the GRR, after 10 days notice to Round Rock, may take any such action as may be reasonably necessary to render the Pipeline safe for railroad operations or in compliance with applicable laws, rules and regulations, and Round Rock agrees that in the event GRR takes such action, Round Rock shall, with twenty (20) days, reimburse GRR for the actual cost of labor performed by or on behalf of GRR, including wages of foremen, plus 10% to cover supervision and accounting, plus vacation allowances, paid holidays and health and welfare benefit payments applicable to such labor, GRR's cost price of all materials f.o.b. GRR's rails plus 10%to cover handling and accounting, plus freight at tariff to point of use, and excise taxes applicable to said labor and materials. Upon termination of this License, Round Rock shall take prompt action to remove the pipe and all associated materials and repair any damage to GRR's property which may be caused by such removal. Such removal shall be undertaken by Round Rock without any demand from GRR, but shall in any event commence within thirty (30) days after termination of this License and written demand for removal being made by GRR. 3.2. Indemnification and Hold Harmless During the term of this License, Round Rock agrees to indemnify GRR and hold it harmless from any suits, claims, costs, loss or damage which may accrue to GRR, Round Rock or third parties, from the operation of the Pipeline arising out of, or occasioned by, the negligent acts of Round Rock or its employees or agents. The loss or damage for which Round Rock shall indemnify GRR and hold it harmless shall specifically include, but PIPELINE LICENSE AGREEMENT PAGE 2 not be limited to, the following: (a) damage to or destruction of railroad track and track bed, railroad cars and engines, or to the Pipeline; (b) personal injury to or damage to property, owned, leased or operated by (i) GRR employees or agents, (ii) Round Rock employees, agents or contractors, or (iii) any third parties; and (c) economic loss to any party caused by damage to or destruction of the Pipeline or the interruption of Pipeline service, caused by negligence of Round Rock, its employees or agents. Such indemnification shall include all actual monetary cost to GRR, including expenses and attorney's fees. 3.3. No At Grade Crossing This license does not permit Round Rock to cross over the GRR main line track at grade or above grade at any time. Article IV Representations and Warranties of Round Rock Round Rock hereby represents and warrants to GRR that the construction, operation and maintenance of the Pipeline have been properly approved by the City of Round Rock, and that Round Rock has been authorized by resolution, or if required by its Charter, by ordinance, to enter into this Pipeline License Agreement, that the resolution or ordinance has not been repealed and is in effect at the date of execution hereof, and that this License Agreement is enforceable against Round Rock in accordance with its terms. Round Rock further warrants and represents that the city officer executing this License has been duly authorized to execute the same on behalf of, and as the act and deed of, the City of round Rock. Article V Assignment The License hereby granted by GRR to Round Rock is personal to the grantee hereof, and Round Rock shall have no right to assign this License without the express prior written consent of GRR. GRR's rights hereunder shall be freely assignable. Article VI Notice Any notice required or permitted hereunder shall be personally delivered or sent by registered or certified mail, return receipt requested to the addressee at the address listed below, and such notice shall be effective on the date of delivery, or date of mailing. PIPELINE LICENSE AGREEMENT PAGE 3 s Round Rock City of Round Rock 221 East Main Street Round Rock, Texas 78664 Georgetown Railroad Company Georgetown Railroad Company P. 0. Box 529 Georgetown, Texas 78627 EXECUTED on the date indicated below: City of Round Rock D ATTEST: /l- AMAXWLEELL, Mayor Title: Date: Georgetown Railroad Compan ATTEST: By: G'V- Y n W. B. SNEAD, Chairman of the Board Title: ViCr ! �2c3rD�v� - �N G�iJ��2i.�� Date: OY /YdAClY RCOD57 (Seal) GRR PARCEL 2(PIPELINE)WP9 DISK#701 (02-034 0 Dec 04)) PIPELINE LICENSE AGREEMENT PAGE 4 PLACE ARROW INDICATING NORTH FORM DR-0404-8 DIRECTION RELATIVE TO CROSSING REV. 05-01-90 • �� opt C3Q.a APPLICATION FOR ENCASED NON-FLAMMABLE PIPELINE CROSSING w NOTE: ALL AVAILABLE DIMENSIONS MUST BE �Z NO SCALE FILLED IN TO EXPEDITE THIS APPLICATION. �� y� 35Y7T, FT. 2`�I AllI M•S now F r r ra FT. 6 Z FT, 30 J•,^ �• r t SEE NOTE 3 R SI I SEE NOTE i R SI" f T. TO ocK or °'F2•_'— g ' C?t�ORGEJs v 1 NEAREST R.R. TOfH! `1� I4NGLE OF CROSSINGt _� TO V, t NEAREST R.R. T0w,11 " � SWITCH IJJr IDLSCRIK FIXED OOJECTI r� ISEE NOTE Sl •. I.DESCRIGE FIXED OOJECTI SEE NOTE S) qtr` v 101 STANCE ALONG TRACK FROM SECTION UNE CROSSING, 30 FT. •.� 1 MOT'O THIS OIIENiIOM REOIJIRED IN ALL CASEL IMI'i R/W AT LOCATIONS NOT USING SECTIONS. DISTANCE —— TO A LEGAL SURVEY UNE IS REQUIRED) 47.; FT. FT. +;� SOFT• STEEL CASING MALL THICKNESS CHART MILL GIST I MINILW DIAMETER OF M ISM Nate tl. , GROUND E1 THICKNESS CASING PIPE SURFSUSGRADE .2500• 1/4' 12' OR LESS ROADGED , .3125. 5/16' OVER 12'-18• :3TS0' 3/4' OVER IG'-22' •�' FT.^'1�/1/. ( .43TS• T/16' OVER 22--2G' 14.5 FT NI)L) / .5000' I/2' FT. Ito FT. wX.) 3 M N OVER 2t'-34- SEAL CASING G I 43 FT. YI 1 SEAL CASINO .6250' 9S/6. OVER i2'-4d' CASING PIPE ,ISM )q» �t, OVER 48- MUST BE CAM IEII FIrE APPROVED BY R.R. CO. - - - - - - NOTE: THIS CHART IS ONLY O I I ® FOR SMOOTH STEEL CASING PIPES WITH " Y Z 0I5 FT. `% STRENGTH OF MINI 000 PS(0 S FT i FT. ---► Ire FT. FORMULA TO FIGURE y2 CASING FT. LENGTH WITH ANGLE OF �Q FT. CROSSING OTHER THAN 900 NOTES ,CASING LENGTH OIEN MEASURED ALONG PIPELINL) B SIN 0 II ALL HORIZONTAL DISTANCES TO BE MEASURED AT RIGHT ANGLES FROM F OF TRACK, EXCEPT AS NOTED. 2) CASING TO EXTEND BEYOND THE CENTERLINE OF TRACK AT RIGHT ANGLES THE GREATEROF 20 • 20 FT., OR 30 FT., I► WIN.DIST. AND BEYOND LIMIT OF RAILROAD RIGHT-OF-WAY IF NECESSARY TO PROVIDE PROPER LENGTH OUTSIDE OF TRACK. D 1man X' 3) MINIMUM OF SO' FROM THE ENO OF ANY RAILROAD BRIDGE, f OF ANY CULVERT, OR FROM ANY SWITCHING AREA. 4) SIGNAL REPRESENTATIVE MUST BE PRESENT DURING INSTALLATION IF RAILROAD SIGNALS ARE IN THE VICINITY OF CROSSING. 51 ALLOWABLE FIXED OBJECTS INCLUDE: BACKWALLS OF BRIDGES; 4 OF ROAD CROSSINGS A OVERHEAD VIADUCTS (GIVE ROAD NAME), OR f OF CULVERTS. A) IS PIPELINE CROSSING WITHIN DEDICATED STREET Z YES; 0; 8) IF YES, NAME OF STREET -- EXHIBIT "A" SM-Y-N C) DISTRIBUTION :LINE _.�-OR TRANSMISSION L 1 NE 'FO1��I WC«u-w WT wltc ,r nOs Ns, D) CARRIER PIPE • COMMODITY TO BE CONVEYEDWASTE WATER OPERATING PRESSURE-0 - PSI ��'•� CtEO�G 6 770W / lfi goJ4,6 C j. WALL TH I CKNESS_;O I AMIETER r�■b(.; MATER I AL VC- E) CASING PIPE : ► IntsalsuR, WALL TH I CKNESS�•62�; D I AMETER 301AI MATER 1 AL ST6BL ; M• P• �' 6 E. S. 272{ 88 NOTE: 2' BETWEEN OUTSIDECASING DIAMET RSOFHAVE CARRIERCPIPEANCE AND IINTERIORGREATEST DIAMETER OFENCASED ASTEwAt'F 0RCROSSING AT CASING PIPE. WHEN FURNISHING DIMENSIONS, GIVE OUTSIDE OF /LyA -�' CARRIER PIPE AND INSIDE OF CASING PIPE. FEi b, I�AS4w-/, 4-2xgs F) METHOD OF INSTALLING CASING PIPE UNDER TRACK( S): '"""""R s"""' 1 T+ ISTATEI DRY BORE AND JAC ( ET BORE NOT ERMITTED)• FOR CITY O/C RDtln/� DOCK TUNNEL ; OTHER DIN Ct3T /P AEA,;d G) WILL CONSTRUCTION BE BY AN OUTSIDE CONTRACTOR?D0YES;__10; ,, H) DISTANCE FROM CENTER LINE OF TRACK TO NEAR FACE OF BORING AND RR FILE NO.�G�•6G3DA T EC Dy JACKING PITS WHEN MEASURED AT ;&T ANG E55 T RACK 3D"/'91AJ I) APPLICANT HAS CONTACTED G�O/C�irTDl�/V /g/� I3o• MIN.) MaRA►�11�UNI 4w- we COMMUNICATION DEPARTMENT AND HAS DETERMINED FIBER Ali or puu of the text On this p��not OPTIC CABLE DOES ;_DOES NOT ; EXIST IN VICINITY OF WORK TO BE PERFORMED. dplyll"f4r+Ilwfiw loyromf4taon