R-04-11-23-9C3 - 11/23/2004 RESOLUTION NO. R-04-11-23-9C3 WHEREAS, the City of Round Rock has duly advertised for bids for the construction of three drainage culverts along US 79, and WHEREAS, Austin Engineering Co. , Inc. has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Austin Engineering Co. , Inc. , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Austin Engineering Co. , Inc . for the construction of three drainage culverts along US 79. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 23rd day of November, 2004 . NW Ma i of Round Rock, Texas Ae�E T: . CHRISTINE R. MARTINEZ, City Secretar @PFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLDTI/R41123C3.WPD/sC Carter Burgess November 4, 2004 Bill Stablein City of Round Rock Traffic Engineer Assoc./Construction Coordinator 212 Commerce Cove Round Rock, Texas 78664 RE: US-79 Culverts Bid Opening Dear Mr. Stablein: Carter& Burgess has performed a review and bid tabulation of the detailed bid forms submitted for the US-79 Culverts project. Bids for this project were received from Austin Engineering Co, Inc., Dayco Construction Co.,Texas Road& Utilities, Inc., C.C. Carlton Industries, Ltd., and Lewis Contractors, Inc. We recommend Austin Engineering Co., Inc. with the low bid of$762,770.00. Sincerely, Carter& Burgess, Inc. " se Skidmore, P.E. QRim r s } 85M �1 V L1200018098-Oo1WEB-CUL\ACORRES\Low Bidder letter doc Date: November 2, 2004 To: Tom Martin Director of Transportation Services From: Bill Stablein Traffic Engineering Assoc. Subject: US 79 Culverts Bids were opened in Round Rock Council Chambers on November 2, 2004, for construction of the US 79 Culvert Project. A total of five bids were received. See below for a complete bid tabulation. Contractor US 79 Culverts Total Austin Engineering Co Inc $762,770 00 $762,770.00 el54 1 � t� Based on the Engineer's review and the staff's review of the bids received, staff recommends that the Contract for construction of US 79 Culvert Project be awarded to Austin Engineering Co., Inc., in the bid amount of$762,770.00. A ' v y•' w c r`, >~ v ._cam'.. _ t5`�y`-p'i" F1` - e_g�b,_. '`'�„ _ ��>y�� �a •+,`- Proposed Culvp-rt 1 A 4 } 'D i l' US 79 Culvert � ,,, »� �a.,.� a s �•• i mA �'4' ��c'n" � t ;.� �.({GSL.. 'Y� :.k.r v r - r , 'iti �S..ka°Y TLs..fn r ,�' A' .M°, •� 1�y ,lir It $ � 'sof � �i� SSS„ `� ri's / ` Wn`� M* � � r S y �I 5• rM- "t J- '�., c,,� ji- As „s ';�.. i-. 5 i _ Vic,' .'` ra 's .`* �i' ,�' ak'>`'��,•�'" ne�� �� " �' '•"j� el-. s. 1c .. _ r a ':.,: Te '.. a ,. .. _ r .,*q�` / tx k.,.(��?eL� �• �l dip,?' � 1T�, t.� �,•:' Y .y/.:. ..;��` � y.'G'�•�.._ r� .;,yam s�- �,�- ,�''��� r_ •` .� ��.�Z.:,. ¢-� � ��`. k� _- Ms ° "{ ,_; � r ai�.r • - • air:.: ila� ', ' �x� AL3 r �i`' x- a Y•%w u N DATE: November 18, 2004 SUBJECT: City Council Meeting - November 23, 2004 ITEM: 9.C.3. Consider a resolution authorizing the Mayor to execute a contract with Austin Engineering Co., Inc. for the construction of US 79 culverts. Department: Transportation Services Staff Person: Thomas G. Martin, P. E., Director Justification: Five bids were received on November 2, 2004. The City Staff has reviewed a bid recommendation from the Design Engineer Carter & Burgess for the US 79 Culvert Project and recommends the award of the contract. Funding: Cost: $ 762,770.00 Source of funds: 4B Corporation (1/2 cent Sales Tax) Outside Resources: Austin Engineering Carter & Burgess Background Information• The US 79 Culvert Project is to provide positive drainage to alleviate an existing flooding problem at US 79 at FM 1460 as well as providing for new development north of US 79. This project will consist of the installation of three 60-inch culverts, which will be bored under the roadway section, with concrete headwalls, as well as other miscellaneous work including stone gabions and rock riprap. This project will result in a reduction in the costs for the A.W. Grimes Boulevard by significantly reducing the size of drainage structures. The HEB development is also prepared to participate in the cost of right-of-way acquisition for this project, which would allow the relocation of the drainage from the existing neighborhood to west of development. Public Comment: N/A