Loading...
R-04-10-26-15E2 - 10/26/2004 RESOLUTION NO. R-04-10-26-15E2 A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF ROUND ROCK ("CITY") REQUESTING FINANCIAL ASSISTANCE FROM THE STATE INFRASTRUCTURE BANK IN AN AMOUNT NOT TO EXCEED$7,000,000; AUTHORIZING THE FILING OF AN APPLICATION FOR FINANCIAL ASSISTANCE; AND MAKING CERTAIN FINDINGS IN CONNECTION THEREWITH. WHEREAS, the City Council of the City hereby finds and determines that there is an urgent need for the City to construct improvements to the City' s transportation system, and WHEREAS, such capital improvements cannot be reasonably financed unless financial assistance is obtained from the State Infrastructure Bank, and WHEREAS, the City Council now desires to request financial assistance in an amount not to exceed $7, 000, 000, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, Section 1 . An application to the State Infrastructure Bank is hereby approved and authorized to be filed with the State Infrastructure Bank seeking financial assistance in an amount not to exceed $7, 000, 000 to provide for the costs of construction of improvements to the City' s transportation system. Section 2 . The Mayor is hereby designated as the authorized representative of the City for purposes for furnishing such information and executing such documents as may be required in connection with the preparation and filing of such application for financial assistance and with complying with the Rules of the State Infrastructure Bank. MPFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R41026E2.WPD/Sc Section 3 . The following firms and individuals are hereby authorized and directed to aid and assist in the preparation and submission of such application and appear on behalf of and represent the City before any hearing held by the State Infrastructure Bank on such applications, to wit: Mr. Garry Kimball First Southwest Company 98 San Jacinto Blvd. , Suite 370 Austin, Texas 78701 The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 26th day of October, 2004 . WELL, ayor AT EST: City of Round Rock, Texas CHRISTINE R. MARTINEZ, City Secreta 2 City of Round Rock, Texas IH-35 Area Improvements Westinghouse Road to Chandler Road Updated by: 'fROUND ROCK, TEXAS PURPOSE.PASSION.PROSPERITY. Original Document Prepared by: lual HDR Engineering,Inc. October 2004 Table of Contents Table of Contents Section Page ExecutiveSummary........................................................................................ iv 1 Project Background ........................................................................................ 1-1 2 Design Considerations.................................................................................... 2-1 3 Right-of-Way and Utilities............................................................................. 3-1 4 Environmental Impacts................................................................................... 4-1 5 Drainage Impacts............................................................................................ 5-1 6 Cost Estimates ................................................................................................ 6-1 City of Round Rock it IH-35 Area Improvements October 2004 List of Figures and Tables List of Figures Figur Paqe 1-1 Project Location.............................................................................................. 1-3 1-2 Ramps Reversed............................................................................................. 1-4 1-3 Turnaround Bridge at Chandler Rd. ............................................................... 1-5 1-4 Operational Improvements at Chandler Rd.................................................... 1-6 List of Tables Table Page 6-1 Summary of Estimated Costs.......................................................................... 6-1 City of Round Rock i11 IH-35 Area Improvements Ortnber 2004 Executive Summary Executive Summary A major development has been proposed in Round Rock just east of IH-35 between Westinghouse Road and Chandler Road. The proposed mixed-use development will include high and low-density residential and commercial land uses. As part of the project planning, the City of Round Rock has retained HDR Engineering, Inc. to define the extent and cost of the transportation improvements needed to address the traffic impacts that will occur during the various stages of the development. The following improvements are needed to meet the transportation needs of the area. They are listed with the recommend time of construction and the estimated cost of the improvement. 1. Reverse the northbound on/off ramps on IH-35 between Chandler Road and Westinghouse Road, modify the northbound frontage road to by-pass Chandler Road, and widen the northbound frontage road between the new ramps. Estimated Cost: $4.2 million To be constructed by Summer 2006 2. Add a southbound frontage road turnaround bridge over IH-35 at Chandler Road, which will allow turnaround movements from the southbound frontage road of IH-35 to the northbound frontage road. Estimated Cost: $1.4 million To be constructed by Summer 2006 3. Construct operational improvements at the intersection of Chandler Road and IH-35 service roads. This will provide turn lanes and signal modifications for the new intersection configuration. Estimated Cost: $0.5 million To be constructed by Summer 2006 City of Round Rock iv IH-35 Area Improvements nrtoher 2004 Project Background Section 1 Project Background A significant development has been proposed in the City of Round Rock just east of IH-35 between Chandler Road and Westinghouse Road. The proposed mixed-use development will include high and low-density residential and commercial land uses. As part of the project planning, the City of Round Rock has retained HDR Engineering, Inc. to define the extent and cost of the transportation improvements needed to address the traffic impacts that will occur during the various stages of the development. The first step in the process of defining the needed transportation improvements was to identify traffic studies that have already been performed for the area and improvements that are currently underway. The second step was to perform a traffic study to determine when the capacity of existing roadways will be exceeded and quantify the traffic that improved facilities will need to handle in the future. The following transportation studies have been conducted and/or are being conducted near the study area: In 1988, the Texas Department of Transportation (TxDOT) developed an Environmental Assessment to add a third lane to IH 35 in both directions and modify the ramps on IH 35 from FM 3406 in Round Rock to Loop 418 in Georgetown. TxDOT is currently performing a Major Investment Study (MIS) on the IH 35 corridor from north of the City of Georgetown through the City of Austin. The growing traffic volumes in Austin and the surrounding cities, including Round Rock and Georgetown, have resulted in a need for highways with increased capacity and better interchange connections with local roadway systems. The MIS provides for continuous frontage roads and reconfigured entrance and exit ramps throughout the study area. The improvements in the MIS were taken into consideration in this study. The traffic study associated with the new development was prepared by HDR Engineering and delivered under separate cover. The following summarizes the findings of that study. The major improvements associated with the new development are as follows: • Reversing the northbound on/off ramps on IH-35; • Modifying the northbound frontage road to bypass Chandler Road; • Widening the northbound frontage road; and • Adding frontage road turnaround bridge at Chandler Road. City of Round Rock IH-35 Area Improvements 1-I October 2004 Project Background In addition, several improvements are necessary in order for the intersections in the study area to operate with sufficient capacity with the additional site generated trips. The improvements are listed as follows: • Add a westbound free right-turn lane and improve the northbound right-turn lane to a free movement at northbound frontage road of IH-35/Chandler Road; • Convert shared southbound through/left-turn lane to a dedicated left-turn lane at southbound frontage road of IH-35/Chandler Road; and • Add a northbound right-turn lane at the intersection of northbound frontage road of IH-35/Teravista Boulevard. The traffic study found that the operations of the intersections of Chandler Road with the two IH-35 frontage roads are limited until the Chandler Road bridge over IH-35 is improved by adding additional lanes. However, since HOV lanes will be added to IH-35 in the future, it is anticipated that TxDOT will be replacing the Chandler Road bridge over IH-35 in the future. Given the regional importance of traffic flow at this interchange, and the need for replacement of the bridge with or without the proposed development, replacing the bridge was not included as an option. The replacement of the Chandler Road Bridge over IH-35 can more efficiently be done with the TxDOT project that adds capacity to the main lanes of IH-35. The overall project location is shown in Figure 1-1, along with the various improvements described previously. Figures 1-2 through 1-4, which follow, graphically present the individual improvements. The proposed improvements are consistent with the recommended alternatives currently included in the MIS being performed by TxDOT. Each of the individual figures is discussed in the following. Figure 1-2 indicates the changes that must be made to reverse the ramps on northbound IH-35 and realign the frontage road to allow traffic the option of bypassing Chandler Road. Figure 1-3 shows the proposed turnaround at Chandler Road. Figure 1-4 indicates the operational improvements that will be needed at Chandler Road. City of Round Rock IH-35 Area Improvements 1-2 October 2004 Project Background GN0 FZD 5~(11a Q 2 W U7 FM 14.31 N W+E IH 35 Area Improvements Figure 1-1: Project Location City of Round Rock IH-35 Area Improvements 1-3 October 2004 N � o � � O A � , o � - ep eD y �Q Vol, PA CD --- cu cv CL 1. ..., ..a �:. - ..w.w.-.. ' tie "• ..::, .r :: ._ IH 35 Ramps Between m Chandler Road 5 Figure 1-2 Westinghouse Road Project 1 m•• Rand Rock,Texas Ramps Reversed o SCALE: 1 "a 300' TT c a _ __ _ HDR Enpinserinp,Inca' Q i� I s w� A. 'v b Oe j �e am- Imp k m ism L r y ir.- cn • 4,. . ., .7;m ....> ,. k SID l l .wvwx a j Figure 1-9 Project 4 Turnaround at Chandler Road SCALE: 1 "- 100' w IH 35 Turnaround Bridge At Chandler Road Roux)Rock,Tex" _.. ...._. __.. __ _.. . ._. _.... _.. hR HDR Engineering.Inc. Project Background t k2' p Fm. Major Elements Chandler Road Right Tum Lane Northbound Right Turn Lane Signalization Modification Figure 1-11. Operational Improvements at I1-1-35 and Chandler Road PRELIMINARY t Nol IPeROUND ROCK.TEXAS �mll.BNidllg.o�DonSlnlciwn i IY�SI W I'F!F(I FI IY Eng J—P Scfleppers P.E.Se.'al No..80675 Date February 25.2003 Scale: 1"=100' NOR E�p1eNAnE�Ine. Figure 1-4: Operational Improvements at Chandler Road City of Round Rock IH-35 Area Improvements 1-6 October 2004 Design Considerations Section 2 Design Considerations The design of modifications to transportation facilities administered by the Texas Department of Transportation will be completed following TxDOT's design criteria and will be consistent with the recommendations of the advanced planning completed for the corridor. Ramps will be designed for 50 mph and the frontage roads will be design for 40 mph. The turnaround bridge will be designed for low speed turns with the design accommodating WB-67 truck turning movements allowing the truck to stay within its own lane entering and exiting the turnaround. The Chandler Road turnaround bridge will be constructed consistent with the proposed interstate centerline and will not have to be reconstructed, along with the existing bridges, if HOV lanes are added to IH-35. HS-20 loading and 16'6" minimum clearances will be incorporated in the design for the turnaround bridge. City of Round Rock IH-35 Area Improvements 2-1 October 2004 Right-of-Way and Utilities Section 3 Right-of-Way and Utilities No right-of-way (ROW) is needed for the roadway improvements associated with the proposed development. TxDOT owns all of the land required for the improvements. Utility companies were contacted to determine if there are any potential conflicts. The following utilities were identified with facilities in the project area: TXU-GAS-UQ, MCLEODUSA, ONCOR-ELEC-UQ-SMP&C, and VERIZON VALLEY. The utilities identified run north south along the outside of the IH 35 ROW. The development plans for the roadway improvements will only construct new elements inside the existing frontage roads. No significant conflicts are anticipated with these parallel utilities. An underground telephone line that crosses IH-35 just north of Chandler Road was also identified, and this utility has the potential to conflict with the retaining wall for the frontage road by-pass of Chandler Road. The exact location of this line will be determined prior to final design of the new frontage road. City of Round Rock IH-35 Area Improvements 3-1 October 2004 Environmental Impacts Section 4 Environmental Impacts An Environmental Assessment (EA) is required for all of the TxDOT projects, and the Austin District of TxDOT has indicated that a separate EA may be required for the turnaround bridge. It appears the environmental impacts associated with these improvements will be minimal since the improvements will only be modifying an existing major transportation facility. It appears likely a Finding of No Significant Impact (FONSI) will be the result of the EA. Preparation of the EA is underway. City of Round Rock IH-35 Area Improvements 4-1 October 2004 Drainage Impacts Section 5 Drainage Impacts A review of FEMA floodplain maps for the area indicated that none of the improvements will be in a floodplain. A preliminary hydraulic analysis indicates that the current drainage structures on TxDOT right of way will need to be extended but not enlarged. Development that is being added to the watershed will need to retain or detain increased runoff, which will allow drainage structures on lH 35 to be maintained at their current capacity. City of Round Rock IH-35 Area Improvements 5-1 October 2004 Cost Estimates Section 6 Cost Estimates Table 6-1 presents the summary of estimated costs for each improvement. The cost estimates were developed using TxDOT standard specifications and TxDOT's average low bids for their construction projects. The actual bids will vary somewhat from these estimates depending on the demand for construction services at the time when bids are obtained. The total cost shown for each improvement includes 10 percent for contingencies, 10 percent for engineering and design development, and 7 percent for construction administration. Table 6-1. Summary of Estimated Costs Total Costs Ramp Reversals $ 4,200,000 Turnaround Bridge at Chandler Road $ 1,400,000 Operational Improvements at Chandler Road $ 500,000 Total Estimated Cost $ 6,100,000 City of Round Rock IH-35 Area Improvements 6-1 October 2004 DATE: October 21, 2004 SUBJECT: City Council Meeting - October 26, 2004 ITEM: 15.E.2. Consider a resolution requesting financial assistance from the State Infrastructure Bank in an amount not to exceed $7,000,000 for the IH-35 Area Improvements, Chandler Road to Westinghouse Road Project. Department: Finance Department Staff Person: Cindy Demers, Finance Director Justification: Obtaining a State Infrastructure Bank (SIB) Loan for this project will facilitate timely construction of the IH-35 Area Improvements without adversely impacting other scheduled projects on the TCIP. SIB loans offer favorable terms, including a secondary lien position to bonded debt. Funding• Cost: N/A Source of funds: N/A Outside Resources: Texas State Infrastructure Bank Background Information• This project is included in the corporation's currently approved transportation capital improvement program. The project scope includes the addition of auxiliary lanes and turn lanes to the northbound frontage road and constructing a turnaround structure at Chandler Road. Public Comment: N/A