CM-2017-1416 - 6/23/2017STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 11 TO CONTRACT FOR ENGINEERING SERVICES FIRM: ATKINS NORTH AMERICA, INC. ("Engineer") ADDRESS: 11801 Domain Boulevard, Suite 500, Austin, TX 78758 PROJECT: Creek Bend Boulevard This Supplemental Contract No. I 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Atkins North America, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 26th day of January, 2012 for the Creek Bend Boulevard Project in the amount of $179,898.43; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on July 12, 2012 to amend the scope of services and to increase the compensation by $805,808.42 to a total of $985,706.85; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on December 14, 2012 to amend the scope of services and to increase the compensation by $21,570.57 to a total of $1,007,277.42; and WHEREAS, the City and Engineer executed Supplemental Contract No. 3 on March 8, 2013 to amend the scope of services and to increase the compensation by $49,900.00 to a total of $1,057,177.42; and WHEREAS, the City and Engineer executed Supplemental Contract No. 4 on August 22, 2013 to amend the scope of services and to increase the compensation by $160,332.84 to a total of $1,217,510.26; and WHEREAS, the City and Engineer executed Supplemental Contract No. 5 on October 15, 2013 to amend the provisions for the scope of services; and WHEREAS, the City and Engineer executed Supplemental Contract No. 6 on March I3, 20I4 to amend the scope of services and to increase the compensation by $82,089.99 to a total of $1,299,600.25; and 20/7-/W(-,:, upple ental Contract 0199.7202;00380184 Rev.b6;16 84275 WHEREAS, the City and Engineer executed Supplemental Contract No. 7 on October 9, 2014 to amend the scope of services and to increase the compensation by $186,383.73 to a total of $1,485,983.98; and WHEREAS, the City and Engineer executed Supplemental Contract No. 8 on August 13, 2015 to amend the scope of services and to increase the compensation by $159,095.13 to a total of $1,645,079.11; and WHEREAS, the City and Engineer executed Supplemental Contract No. 9 on June 9, 2016 to amend the scope of services and to increase the compensation by $319,208.46 to a total of $1,964,287.57; and WHEREAS, the City and Engineer executed Supplemental Contract No. 10 on February 6, 2017 to amend the Contract to modify the work schedule; and WHEREAS, it has become necessary to amend the Contract to modify the work schedule; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Exhibit C. Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. /signature pages follow] Supplemental Contract Rev.06.16 0199.7202;00380184 84275 AT] By: (01 Date Supplemental Contract Pev,O& 16 0199.7202;00380184 84275 CITY By: _ G Date APPROVEDAS TO F t e s, City At Supplemental Contract Rev.06.16 0199.7202;00380184 84275 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page 1 d H 'N N N N N b '' µ µ � �✓ µ µ Y 4! wl Fl 1 � � = .4. s u s uz Y 888aa888888888$a88888888888$a8 88888" I• AAA88aNy:�N�7°8888�8s�,����?�� • City of Round Rock ROUAS ND ROCK Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 11 with Atkins North America, Inc. for the Creek Bend Boulevard Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 6/23/2017 Dept Director: Gary D Hudder, Transportation Director Cost: Indexes: Attachments: SC#11 with Atkins North America for the Creek Bend Boulevard Project Department: Transportation Department Text of Legislative File CM -2017-1416 Consider executing Supplemental Contract No. 11 with Atkins North America, Inc. for the Creek Bend Boulevard Project. The Creek Bend Blvd Extension project extends Creek Bend Blvd from its existing terminus at Creek Bend Circle to Wyoming Springs Drive in Williamson County. The improvements will extend the existing four -lane divided roadway from Creek Bend Circle across Brushy Creek and Hairy Man Road to connect with Brightwater Boulevard at Wyoming Springs Drive. The project will include raised medians, sidewalks, and bicycle accommodations. On January 26, 2012, an engineering services contract for $179,898.43 with Atkins North America, Inc. was approved by the City Council. Services covered in this contract were 30% schematic drawings for a four lane divided roadway connection between Wyoming Springs Drive and Creek Bend Circle. Supplemental Agreement No. 1 was approved on July 12, 2012 by the City Council at a cost of $805,808.42. Services covered under this contract amendment included 100% plans, specifications, and estimates; and bidding and construction phase services. Supplement Agreements No. 2 through No. 6 included geophysical studies and geotechnical investigations for an assessment of voids and related features within the City of Round Rock Page Z Printed on dr=2047 Agenda Item Summary Continued Chl62017-1410 right of way of the project. The final geotechnical studies were recommended after completing the geophysical studies of five (5) study areas along the entire proposed alignment. Construction plans had been 95% complete since February 2013 and were on hold until the completion of these services. These supplementals were approved by the City Council from December 2012 through March 2014 for a total amount of $322,893.40. Supplemental Agreement No. 7 was executed October 9, 2014 and included construction phase services for the entire project as well as adding improvements and extending corridor enhancements along Creek Bend Boulevard to Sam Bass Road. Landscaping and irrigation will be added to the medians, street lighting will be extended to Sam Bass Road, and the existing fences along the right of way from Creek Bend Circle to Sam Bass Road will be replaced with a precast concrete fence. Creek Bend Boulevard will be milled and overlayed from Pena Cove to Sam Bass Road with only minor utility adjustments expected. Services for this supplemental were performed at a cost of $186,383.73 which included approximately $80,000 for construction phase services. Supplemental Agreement No. 8 in the amount of $159,095.13 was approved on August 13, 2015 and consisted of construction inspection services related to the bridge structure, including foundations, substructure and superstructure, for compliance with the Contract documents. Based on the contractor's baseline schedule it was assumed that the bridge inspection would last for 4 months. Inspection scope of services included but was not limited to verifying that the bridge structure was built according to the plans and specifications, and all contract documents, verifying the accuracy of the work and determining pay quantities by taking measurements of the quantities placed and verify all the specifications are met for inspected items of work regarding materials, construction, measurement and payment. Supplemental Agreement No. 9 includes Construction Engineering and Inspection (CEI) services on the project. These services will be provided on an as requested basis by the City of Round Rock. Invoicing for these services will be based on actual labor charged to the project and any budget remaining at the end of the contract will not be invoiced. These CEI services will be provided in addition to the one full time inspector (40 hours per week) currently assigned. Seven (7) months of additional inspection time is included over the original scope because of changes (delays) in the construction timeline. Inspection scope of services shall include, but not be limited to: structure inspection (bridge and bridge class culverts); Storm Water Pollution Plan (SW3P) inspection; and Traffic Control Plan (TCP) inspection to verify the project is built according to the plans, specifications, and contract documents and in compliance with the Environmental Plan. Construction management services shall include, but not be limited to, documenting project progress, reviewing and monitoring Contractor's work schedule, proposed plan changes and construction issues, identifying and making recommendations to the City for the correction of errors and omissions, substitutions, defects and deficiencies in the work of Contractor, subs, and vendors, as well as general project coordination and contract administration. Also included in Supplemental Agreement No. 9 are additional environmental and geological services for preparation of up to three (3) more cave closure plans and submission and City ofRoundRock Page 2 Printed on 4,22(2017 Agenda Item Summary Continued CM -2047-1416 coordination with TCEQ for approval. These services are scheduled through January 2017 for a fee of $319,208.46 ($13,578.41 funded by Utilities) bringing the total contract amount to $1,964,287.57. Supplemental Agreement No. 10 is for the extension of time to allow for final close out of the project. There is no change to the contract value. Supplemental Agreement No. 11 is for the extension of time to allow for final FEMA review and close out of the project. There is no change to the contract value. City of Round Rock Pape 3 Printed on W21017