R-04-10-14-14E1 - 10/14/2004 RESOLUTION NO. R-04-10-14-14131
WHEREAS, the City of Round Rock has duly advertised for bids for
the Sidewalk Gap Remediation (2001 G.O. Bond) Project, and
WHEREAS, Muniz Concrete & Contracting, Inc . has submitted the
lowest responsible bid, and
WHEREAS, the City Council wishes to accept the bid of Muniz
Concrete & Contracting, Inc. , Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City a contract with Muniz Concrete & Contracting, Inc .
for the Sidewalk Gap Remediation (2001 G.O. Bond) Project .
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended.
RESOLVED this 14th day of October, 2004 .
WELL, Mayor
City of Round Rock, Texas
R
CHRISTINE R. MARTINEZ, City Secret ry
CPPDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R41014E1.WPD/sc
THE CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED
ENGINEERING& DEVELOPMENT SERVICES DEPARTMENT
2008 Enterprise Dr. BY: Ruth S.Haberman,P.E.
Round Rock, Texas. 78664 DATE: 9/28/04
(512)218-5555 BID TABULATION SHEET 1 OF 1
CONTRACT: Sidewalk Gap Remediation
2001 G.O.Bond Contractor: Muniz Concrete&Contracting,Inc. Contractor: Myers Construction,Inc.
LOCATION: City Hall Council Chambers Addendum Acknowledged? Yes Addendum Acknowledged? Yes
DATE: September 28 2004 at 2:00 pm Safety Experience? Yes Safety Experience? Yes
Bid Bond? 5% Bid Bond? 5%—
# APPROX UNIT UNIT
ITEM UNIT QTY. PRICE COST PRICE COST
1 Four inch thick concrete sidewalk S.F. 16,175 $4.50 $72,787.50 $4.55 $73,596.25
2 Removal and disposal of existing concrete S.F. 264 $2.75 $726.00 $3.68 $971.52
3 Sidewalk Pedestrian Ramp(Type 1) EA 3 $975.00 $2,925.00 $1,247.00 $3,741.00
4 Sidewalk Pedestrian Ramp(Type 2) EA 0 $0.00 $0.00 $1,247.00 $0.00
5 Sidewalk Pedestrian Ramp(Type 3) EA 0 $0.00 $0.00 $1,545.00 $0.00
6 Sidewalk Pedestrian Ramp(Type 4) EA 10 $1,150.00 $11,500.00 $1,369.00 $13,690.00
7 Sidewalk Pedestrian Ramp(Type 5) EA 3 $1,050.00 $3,150.00 $1,190.00 $3,570.00
8 Reconstruct concrete driveway S.F. 2,750 $9.25 $25,437.50 $7.31 $20,102.50
9 Steel plate(Enterprise Dr.) EA 1 $1,400.00 $1,400.00 $4,344.00 $4,344.00
10 Steel plate(Texas Ave.) EA 1 $950.00 $950.00 $2,026.00 $2,026.00
11 Four inch thick concrete sidewalk(McNeil Rd.) S.F. 483 $18.00 $8,694.00 $13.71 $6,621.93
12 Box culvert and retaining wall extension EA 1 $2,400.00 $2,400.00 $5,126.00 $5,126.00
13 Handrails L.F. 195 $42.00 $8,190.00 $47.91 $9,342.45
14 Dry stack rock wall F.S.F. 10 $35.00 $350.00 $104.92 $1,049.20
15 Crosswalk EA 3 $1,750.00 $5,250.00 $598.00 $1,794.00
16 Traffic control L.S. 1 $8,600.00 $8,600.00 $9,806.00 $9,806.00
TOTAL BASE BID(Items 1 thru 16) $152,360.00 $155,780.85
Prepared and certified by: 0T1�tEE
RUTH S.HABERMAN /
.0.......... .. .4........'
:• 93602 ,� .f
Ti N"`OCH►"��tIN+N�...•�.- • c IIN �' Sr �� .
a1\"l1 rr0t •1N • .N�� 111 � r?r ��I�I�r
11
1
•�• a• •i i '�r•y•i�ice• I
•� �♦ 7 r i �i: �•r is�i•♦ ►� � r
♦• y� S •►i,' '��•ii a` • � N NI I/� 1'HIIII
�'j• • a r ii�•r i• moi.�r i• _
••♦ r ��C .-� .� . �tllullppt�.�.
_ ,• 7 i :• Vii. I S► IItiI11I S:re i�11'
, _ • , �1,® a�1IIII 11111� �S
, . ,j,lIN11N11t SL.
• ��\H1I;S:� �f•
♦►N 1!
Np N► NaN
pt�,+`pNllls
, , �fl• f •Nf1�N
Nl/xr
t
man
as��i•� ••♦1•
I ♦�
t
-:.�•.�,•.. ,. ►— a 11 ,11 � .:,..
� tOt' �•wt♦'�•�i\,����a"'SIN■� +
// ���/ • I • • i�' a�0►aptl is-
■�t=• f Sr. ! H �pip p��J .
___... � = 1 101 OOIO/MOI 1.O•„a`�p�p.� ♦��=
. a_ ♦ � 1 .. �i ■� HNI OMNI►Illxtxtuuq NO aP.� O•�..
„ r _. R � h '1 ...:�iiia,NNIN • � •�Ly
■� r / '_ ' j■t.num 1 NonNO n NNu ,,,f =
p -- ■\�♦ ��. 1 � r UIOtIN IIIIINtN1�utIt111111111Nq 11'_�,•• t�'
♦,.o` ,qa♦-y? \••... ..♦.�,� •l .a '� N. f/i.ouWlla".► 114/1
� N``N♦rr.♦ ♦ � � ♦��' ■• •■ . 1111/ ►•I\Illi t iI ♦.��..
• ,Bio ��� 1:■ __ ►. "\. �.. •
::AN••... 69 rp . ! ♦ i O .�`a/•'=�1 .: :=.Nt.a�.�.,tlla,\\+`I=1► J'S�
�♦ ♦•• • �: :'::nllal�//d/1111111i.0�.�.ha����0
a S ♦♦♦♦♦ •� • ♦ ■■.■�UxNo
uxx11ul11tf♦ ♦♦♦♦♦♦♦.���
♦ � 1, ■.._ �• ♦gyp �. 0.♦.r.I�
��►� n_t►_ ..► .�: , �•iT►-••■•�� .xnn11 NN�• •_ .•�'� Iq�, ` �►
a♦�� �•I �q1\ilie;
i����/ �♦�`:♦♦i►♦.�,4v�.�������.��♦jiC�� . SpA♦ ,a,�♦N����'
♦ �.■� i►��� � � ,v' •�'.♦@.♦.♦.♦ •• •�ii �• it i.r :1
September 2004
•.rte■ .� a•• I� ♦ �i♦. ♦ ♦♦ a:i� �'�' r •��� N•�. s•••-�•.
��■� mss..■� h.� .� ,N NN•r ,y.• �r r••-,..
►r ���;•'$��� x 11��♦�OC♦♦.�aii1�♦��'y.dull jji\SS!_�3•`_.a•!.a�r S ,_ '. ���`
♦♦�� ��isi i d _ tl` O,O♦.�' ♦�■a .I 11111�III/xu11NtH/utI ♦• . .'�••�
�i��G��.�• .,`.+�0 aa`` � •g11111/IIIINli111 r = �� wA• P�jN�•,NI� ii�rt+"' � ,►
♦ .... g!. ♦ =��.Zg1111111111111�C•t�• ♦ ••4�N aaa,t/.. '�'•v .i'' ji►8
� � `'1 v ♦.y , C.�ttlrgi� r• • N N•`f• ♦rS S:�a1'G .y
ANN• ��1 � � ��io'��i.- N L% ♦• • •► � �.Ap�
s i♦♦• h♦L �� O�atii'G �t ♦ �vp•p■i: 491n►�� ♦•t►. • z S N Iii
�S�j �vI rn//',�. =.,,w.�I�•u ♦r♦i���riS S.•� •. iZ�y'. ,'N \��
N b .♦ •ii . ,� s Nr
♦ N� ♦�i s{♦ �ii•S.• � s so •9 .N N\a*
��♦♦�may.:,����,,�� ?��=�s��.a• =.�rN,�y`�
�♦•NC i�•t11� G•' r�� ,i
• ►I�1 � , it �• ►N`N
REVISIONS
SIDEWALK GAP REMEDIATION
-
OVERALL PROJECTr r•r
DATE: October 8, 2004
SUBJECT: City Council Meeting - October 14, 2004
ITEM: 14.E.1. Consider a resolution authorizing the Mayor to execute a contract with
Muniz Concrete & Contracting, Inc. for the construction of the Sidewalk
Gap Remediation (2001 G.O. Bond) Project.
Department: Engineering & Development Services
Staff Person: Tom Word, Chief of Public Works Operations
Justification:
On September 28, 2004 we received two (2) bids for the Sidewalk Gap Remediation project and
the low bid of $152,360.00 was from Muniz Concrete & Contracting, Inc. Based upon the review
of the bids, staff recommends awarding the bid to Muniz Concrete & Contracting, Inc. This project
will complete portions of the Overall Citywide Sidewalk Plan.
Funding•
Cost: $152,360.00
Source of funds: Capital Project Funds (2001 G.O.Bond)
Outside Resources: Muniz Concrete & Contracting, Inc.
Background Information:
This project will build approximately 4,100 Lf. of sidewalks in various area throughout the City,
filling several gaps in pedestrian routes that have some, but not all of the necessary sidewalks.
These sidewalks will be built along Enterprise Drive, Texas Avenue, Greenhill Drive, Lake Creek
Drive, Round Rock West Drive, Oakridge Drive, Lime Rock Drive, Logan Street, Greenlawn Blvd.
and a portion of sidewalk that will connect McNeil Road sidewalks to the walking trail in the
greenbelt. This will complete portions of the Overall Citywide Sidewalk Plan.
Public Comment: N/A