Loading...
R-04-10-14-14E1 - 10/14/2004 RESOLUTION NO. R-04-10-14-14131 WHEREAS, the City of Round Rock has duly advertised for bids for the Sidewalk Gap Remediation (2001 G.O. Bond) Project, and WHEREAS, Muniz Concrete & Contracting, Inc . has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Muniz Concrete & Contracting, Inc. , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Muniz Concrete & Contracting, Inc . for the Sidewalk Gap Remediation (2001 G.O. Bond) Project . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 14th day of October, 2004 . WELL, Mayor City of Round Rock, Texas R CHRISTINE R. MARTINEZ, City Secret ry CPPDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R41014E1.WPD/sc THE CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED ENGINEERING& DEVELOPMENT SERVICES DEPARTMENT 2008 Enterprise Dr. BY: Ruth S.Haberman,P.E. Round Rock, Texas. 78664 DATE: 9/28/04 (512)218-5555 BID TABULATION SHEET 1 OF 1 CONTRACT: Sidewalk Gap Remediation 2001 G.O.Bond Contractor: Muniz Concrete&Contracting,Inc. Contractor: Myers Construction,Inc. LOCATION: City Hall Council Chambers Addendum Acknowledged? Yes Addendum Acknowledged? Yes DATE: September 28 2004 at 2:00 pm Safety Experience? Yes Safety Experience? Yes Bid Bond? 5% Bid Bond? 5%— # APPROX UNIT UNIT ITEM UNIT QTY. PRICE COST PRICE COST 1 Four inch thick concrete sidewalk S.F. 16,175 $4.50 $72,787.50 $4.55 $73,596.25 2 Removal and disposal of existing concrete S.F. 264 $2.75 $726.00 $3.68 $971.52 3 Sidewalk Pedestrian Ramp(Type 1) EA 3 $975.00 $2,925.00 $1,247.00 $3,741.00 4 Sidewalk Pedestrian Ramp(Type 2) EA 0 $0.00 $0.00 $1,247.00 $0.00 5 Sidewalk Pedestrian Ramp(Type 3) EA 0 $0.00 $0.00 $1,545.00 $0.00 6 Sidewalk Pedestrian Ramp(Type 4) EA 10 $1,150.00 $11,500.00 $1,369.00 $13,690.00 7 Sidewalk Pedestrian Ramp(Type 5) EA 3 $1,050.00 $3,150.00 $1,190.00 $3,570.00 8 Reconstruct concrete driveway S.F. 2,750 $9.25 $25,437.50 $7.31 $20,102.50 9 Steel plate(Enterprise Dr.) EA 1 $1,400.00 $1,400.00 $4,344.00 $4,344.00 10 Steel plate(Texas Ave.) EA 1 $950.00 $950.00 $2,026.00 $2,026.00 11 Four inch thick concrete sidewalk(McNeil Rd.) S.F. 483 $18.00 $8,694.00 $13.71 $6,621.93 12 Box culvert and retaining wall extension EA 1 $2,400.00 $2,400.00 $5,126.00 $5,126.00 13 Handrails L.F. 195 $42.00 $8,190.00 $47.91 $9,342.45 14 Dry stack rock wall F.S.F. 10 $35.00 $350.00 $104.92 $1,049.20 15 Crosswalk EA 3 $1,750.00 $5,250.00 $598.00 $1,794.00 16 Traffic control L.S. 1 $8,600.00 $8,600.00 $9,806.00 $9,806.00 TOTAL BASE BID(Items 1 thru 16) $152,360.00 $155,780.85 Prepared and certified by: 0T1�tEE RUTH S.HABERMAN / .0.......... .. .4........' :• 93602 ,� .f Ti N"`OCH►"��tIN+N�...•�.- • c IIN �' Sr �� . a1\"l1 rr0t •1N • .N�� 111 � r?r ��I�I�r 11 1 •�• a• •i i '�r•y•i�ice• I •� �♦ 7 r i �i: �•r is�i•♦ ►� � r ♦• y� S •►i,' '��•ii a` • � N NI I/� 1'HIIII �'j• • a r ii�•r i• moi.�r i• _ ••♦ r ��C .-� .� . �tllullppt�.�. _ ,• 7 i :• Vii. I S► IItiI11I S:re i�11' , _ • , �1,® a�1IIII 11111� �S , . ,j,lIN11N11t SL. • ��\H1I;S:� �f• ♦►N 1! Np N► NaN pt�,+`pNllls , , �fl• f •Nf1�N Nl/xr t man as��i•� ••♦1• I ♦� t -:.�•.�,•.. ,. ►— a 11 ,11 � .:,.. � tOt' �•wt♦'�•�i\,����a"'SIN■� + // ���/ • I • • i�' a�0►aptl is- ■�t=• f Sr. ! H �pip p��J . ___... � = 1 101 OOIO/MOI 1.O•„a`�p�p.� ♦��= . a_ ♦ � 1 .. �i ■� HNI OMNI►Illxtxtuuq NO aP.� O•�.. „ r _. R � h '1 ...:�iiia,NNIN • � •�Ly ■� r / '_ ' j■t.num 1 NonNO n NNu ,,,f = p -- ■\�♦ ��. 1 � r UIOtIN IIIIINtN1�utIt111111111Nq 11'_�,•• t�' ♦,.o` ,qa♦-y? \••... ..♦.�,� •l .a '� N. f/i.ouWlla".► 114/1 � N``N♦rr.♦ ♦ � � ♦��' ■• •■ . 1111/ ►•I\Illi t iI ♦.��.. • ,Bio ��� 1:■ __ ►. "\. �.. • ::AN••... 69 rp . ! ♦ i O .�`a/•'=�1 .: :=.Nt.a�.�.,tlla,\\+`I=1► J'S� �♦ ♦•• • �: :'::nllal�//d/1111111i.0�.�.ha����0 a S ♦♦♦♦♦ •� • ♦ ■■.■�UxNo uxx11ul11tf♦ ♦♦♦♦♦♦♦.��� ♦ � 1, ■.._ �• ♦gyp �. 0.♦.r.I� ��►� n_t►_ ..► .�: , �•iT►-••■•�� .xnn11 NN�• •_ .•�'� Iq�, ` �► a♦�� �•I �q1\ilie; i����/ �♦�`:♦♦i►♦.�,4v�.�������.��♦jiC�� . SpA♦ ,a,�♦N����' ♦ �.■� i►��� � � ,v' •�'.♦@.♦.♦.♦ •• •�ii �• it i.r :1 September 2004 •.rte■ .� a•• I� ♦ �i♦. ♦ ♦♦ a:i� �'�' r •��� N•�. s•••-�•. ��■� mss..■� h.� .� ,N NN•r ,y.• �r r••-,.. ►r ���;•'$��� x 11��♦�OC♦♦.�aii1�♦��'y.dull jji\SS!_�3•`_.a•!.a�r S ,_ '. ���` ♦♦�� ��isi i d _ tl` O,O♦.�' ♦�■a .I 11111�III/xu11NtH/utI ♦• . .'�••� �i��G��.�• .,`.+�0 aa`` � •g11111/IIIINli111 r = �� wA• P�jN�•,NI� ii�rt+"' � ,► ♦ .... g!. ♦ =��.Zg1111111111111�C•t�• ♦ ••4�N aaa,t/.. '�'•v .i'' ji►8 � � `'1 v ♦.y , C.�ttlrgi� r• • N N•`f• ♦rS S:�a1'G .y ANN• ��1 � � ��io'��i.- N L% ♦• • •► � �.Ap� s i♦♦• h♦L �� O�atii'G �t ♦ �vp•p■i: 491n►�� ♦•t►. • z S N Iii �S�j �vI rn//',�. =.,,w.�I�•u ♦r♦i���riS S.•� •. iZ�y'. ,'N \�� N b .♦ •ii . ,� s Nr ♦ N� ♦�i s{♦ �ii•S.• � s so •9 .N N\a* ��♦♦�may.:,����,,�� ?��=�s��.a• =.�rN,�y`� �♦•NC i�•t11� G•' r�� ,i • ►I�1 � , it �• ►N`N REVISIONS SIDEWALK GAP REMEDIATION - OVERALL PROJECTr r•r DATE: October 8, 2004 SUBJECT: City Council Meeting - October 14, 2004 ITEM: 14.E.1. Consider a resolution authorizing the Mayor to execute a contract with Muniz Concrete & Contracting, Inc. for the construction of the Sidewalk Gap Remediation (2001 G.O. Bond) Project. Department: Engineering & Development Services Staff Person: Tom Word, Chief of Public Works Operations Justification: On September 28, 2004 we received two (2) bids for the Sidewalk Gap Remediation project and the low bid of $152,360.00 was from Muniz Concrete & Contracting, Inc. Based upon the review of the bids, staff recommends awarding the bid to Muniz Concrete & Contracting, Inc. This project will complete portions of the Overall Citywide Sidewalk Plan. Funding• Cost: $152,360.00 Source of funds: Capital Project Funds (2001 G.O.Bond) Outside Resources: Muniz Concrete & Contracting, Inc. Background Information: This project will build approximately 4,100 Lf. of sidewalks in various area throughout the City, filling several gaps in pedestrian routes that have some, but not all of the necessary sidewalks. These sidewalks will be built along Enterprise Drive, Texas Avenue, Greenhill Drive, Lake Creek Drive, Round Rock West Drive, Oakridge Drive, Lime Rock Drive, Logan Street, Greenlawn Blvd. and a portion of sidewalk that will connect McNeil Road sidewalks to the walking trail in the greenbelt. This will complete portions of the Overall Citywide Sidewalk Plan. Public Comment: N/A