Loading...
R-04-09-23-13A1 - 9/23/2004 RESOLUTION NO. R-04-09-23-13A1 WHEREAS, the City of Round Rock has duly advertised for bids for the construction of the Avery Farms Wastewater Interceptor, and WHEREAS, Schroeder Construction Company, Ltd. has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Schroeder Construction Company, Ltd. , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Schroeder Construction Company, Ltd. for the construction of the Avery Farms Wastewater Interceptor. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 23rd day of September, 2004 . NY WELL, Mayor C ty of Round Rock, Texas A T:. CHRISTINE R. MARTINEZ, City Secre ry ®PFDeSktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R40923A1.WPD/SC CDM 12357-A Riata Trace Parkway,Suite 210 Austin,Texas 78727 tel: 512346-1100 fax: 512 345-1483 August 25, 2004 Mr. Don M. Rundell,P.E. Chief Utility Engineer City of Round Rock 212 Commerce Cove Round Rock,TX 78664 RE: City of Round Rock Avery Farms Wastewater Interceptor Recommendation of Award Dear Mr. Rundell: On August 24, 2004 at 10:00 a.m. at the City of Round Rock's City Hall Council chambers, bids were received and opened for the Avery Farms Wastewater Interceptor. The project includes the installation of 12,851 linear feet of 15-inch to 24-inch gravity sewer. The interceptor is to provide wastewater service for the areas of a tributary of Chandler Creek, the Round Rock Higher Education Center, and future development within Williamson County MUD #11. Eleven bids were received as shown in the summary tabulation below. A detailed tabulation of the unit price items is attached to this letter. Company Name Alternate Bid Amount Schroeder Construction Company Ltd. $918,447.90 Austin Engineering Co.,Inc. $1,044,015.00 McLean Construction,Ltd $1,048,180.50 Cash Construction Co. Ltd. $1,092,686.00 Shelton&Shelton Plumbing,L.P. $1,105,131.98* Key Enterprises,Inc. $1,196,516.80 J. C. Evans Construction Co.,Inc. $1,278,931.50 S.J. Louis Construction of Texas,Ltd,LLP $1,349,779.00 F.T. Woods Construction Services,Inc. $1,395,969.00 KAT Excavation,Inc. $1,479,574.00 C. C. Carlton Industries,Ltd. $1,581,139.00 *Incorrect multiplication W:\City of Round RocMAvery Farms Wastewater Interceptor\Correspondence%Rundell_Rec of Award LtF.doc consulting•engineering•construction•operations CDM Mr. Don M. Rundell August 25,2004 Page 2 The low bidder was Schroeder Construction Company Ltd. of Austin,Texas. They have satisfactorily completed similar projects in the Round Rock area. We believe they are qualified to perform the work included in the Plans and Specifications within the conditions of the Contract. Therefore, Camp Dresser&McKee recommends that the City of Round Rock award the Avery Farms Wastewater Interceptor contract to Schroeder Construction Company Ltd. in the amount of$918,447.90. If you need additional information regarding this recommendation of award, or have any questions regarding the bids, please call. Sincerely, CAMP DRESSER& McKEE C. William T. Reynolds, P.E. Engineer ENCLOSURE W:%City of Round Rock Avery Farms Wastewater InterceptorlCorrespondence%Rundell_Rec of Award Ltr.doc CITY OF ROUND ROCK Avery Farms Wastewater Interceptor Match Bid August 24,2004 Schroeder Construction Austin Engineering Co.,Inc. McLean Construction,Ltd Cash Construction Co.,Ltd. L.P Iton&Shelton Plumbing, 13625 Pond Springs Rd.,#108 P.O.Box 342349 Key Enterprises,Inc P.O.Box 10759 1806 Heatherwilde Blvd. 584 W.Stagecoach Road 12490 FM 2244 Austin,TX 78729 Austin,TX 78734-2349 Killeen,TX 76547 Pflu erville,TX 78660 Killeen,TX 76542 Austin,TX 78797 Item No. Description Quentit Unit Unit Price Total Amt. Unit Price Total Amt. Unit Price Total Amt. Unit Price Total Amt. Unit Price Total Amt. Unit Price Total Amt. 101-C Preparing Right-of-Way 1 L.S. $20,000.00 $20,000.00 $20,1X)0.00 $20,000.00 $30,657.00 $30,657.00 $38,000.00 $38,000.00 $51,978.15 $51,978.15 $50,000.00 $50,000.00 501 Jacking or Boring 36-Inch Steel Casing Pipe, 0.50 inches Thick 141 L.F. $428.00 $60,348.00 $425.00 $59,925.00 $397.00 $55,977.00 $512.00 $72,192.00 $382.68 $53,957.88 506-M-5 New Manhole Construction,5-foot Diameter $500.00 $70,500.00 39 Ea. $4,900.00 $191,11x).00 15,100.00 $198,900.00 $5,675.00 $221,325.00 $5,200.00 $202,800.00 $8,187.51 $319,312.89' $4,300.00 $167,700.00 509 Trench Safety Plan 12,700 L.F. 510-A-24 Pipe,24-inch Diameter,PVC Gravity Sewer, $1.00 $12,700.00 $1.00 $12,700.00 $0.80 $10,160.00 $1.00 $12,700.00 $0.75 $9,525.00 $1.00 $12,700.00 In Trench 2,660 L.F. $46.10 $122,626.00 $56.00 $146,960.00 $54.00 $143,640.00 510-A-240 Pipe,24-inch Diameter,PVC Gravity Sewer, $53.00 $140,980.00 $53.40 $142,044.00' $60.00 $159,600.00 In Trench,Double Ditching 1,490 L.F. $47.00 $70,030.00 $59.00 $87 50,910.00 $55. $82,695.00 $59.00 $87,910.00 $5546 $8263540 510-A-24CP Pipe,24-inch Diameter,PVC Gravity Sewer, . $82,635.40 $65.00 $96,850.00 In CasiPie 141 L.F. $70.00 $9,870.00 $66.00 $9,306.00 $114.20 $16,102.20 $130.00 $18,330.00 $52.78 $7,441.98' $46.00 510-A-21 Pipe,21-inch Diameter,PVC Gravity Sewer, $6,486.00 In Trench 670 L.F. $42.00 $28,140.00 $52.00 $34,840.00 $49.50 $33,165.00 510-A-21D Pipe,21-inch Diameter,PVC Gravity Sewer, $47.00 $31,490.00 $50.19 $33,627.30 $55.00 $36,850.00 In Trench,Double Ditchin 2,520 L.F. $42.50 $107,100.00 $55.00 $138,600.00 $51.20 $129,024.00 $53.00 $133,560.00 510-A-18 Pipe,1B-inch Diameter,PVC Gravity Sewer, $49.40 $124,488.00' $60.00 $151,200.00 In Trench 130 L.F. $35.75 $4,647.50 $45.00 $5,850.00 $41.60 $5,408.00 $40.00 $5,200.00 $40.62 $5,280.60 510-A-18D Pipe,18-inch Diameter,PVC Gravity Sewer, $50.00 $6,500.00 In Trench,Double Ditching 360 L.F. $37.00 $13,320.00 $48.001 $17,280.00 $43.30 $15,588.00 $48.00 $17,280.00 $43.25 $15,570.00 510-A-15D Pipe,15-inch Diameter,PVC Gravity Sewer, $56.00 $20,160.00 In Trench,Double Ditchin 4,880 L.F. $42.50 $207,400.00 $50.00 $244,000.00 $43.20 $210,816.00 $51.00 $248,880.00 $41.93 $204,618.40 604-A Seeding for Erosion Control,Method 8,Fiber $71.00 $346,480.00 Mulch 1 L.S. $16,$20.00 518,000.00 $10,000.00 $10,000.00 $36,439.00 $36,439.00 $9,000.00 $9,000.00 $6,934.20 $6,934.20 $19,500.00 $19,500.00 639 Rock Berm 148 L.F. $20.00 $2,960.00 $16.00 $2,368.00 $12.60 $1,864.80 $20.00 $2,960.00 $7.86 $1,163.28 641 Stabilized Construction Entrance 4 Ea. $1,500.00 $6,000.00 $900.00 $3,600.00 $803.00 $3,212.00 $2,000.00 $8,000.00 $735.00 $12.00 $1,776.00 642 Silt Fence for Erosion Control 12,530 L.F. $2,940.00 $1,000.00 $4,000.00 $1.42 $17,792.60 $1.60 $20,048.00 $1.40 $17,542.00 $2.00 $25,060.00 $1.29 $16,163.70' 701-T Temporary Livestock Fence,3 Strand $1.50 $18,795.00 Barbwire,with 36"Goat Wire 1,774 L.F. $4,70 $8,337.80 $5.00 $8,870.00 $7.40 $13,127.60 $5.00 $8,870.00 702-G Remove and Relocating Existing,5 Strand $3.41 $6,049.34• $3.40 $6,031.60 Barbed Wire Fence 3,839 L.F. $4.00 $15,356.00 $5.00 $19,195.00 $3.70 $14,204.30 $6.00 $23,034.00 $4.20 $16,123.80 803-M Barricades,Signs and Traffic Control 5 Months $3.80 $14,588.20 $400.00 $2,000.00 $275.00 $1,375.00 $1,320.00 $6,600.00 $1,000.00 $5,00000 $466.25 $2,331.25 $1,000.00 $S,000.aO 1001 Pavement Removal and Replacement,14' Roadway36 L.F. $20,00 $720,00 $8.00 $288.00 $17.60 $633.60 $40.00 $1,440.00 $84.00 $3,024.00 $50.00 $1,800,00 TOTAL BASE B/D $918,447.90 $1,044,015.00 $1,048,180.50 $ 1,092,686.00 $1,105,209.17 $1,196,516.80 08-24-04Tab Page 1 CITY OF ROUND ROCK Avery Farms Wastewater Interceptor Match Bid August 24,2004 J.C.Evans Construction Co., S.J.Louis Constriction of FT Woods Construction Inc. Texas Ltd.,LLP Services,Inc. KAT Excavation P.O.Box 1216 10 C.C.Carlton Industries,Ltd, 9862 Lorene,Suite 4 P.O.Box 122 1256 Armidillion Dr. 6207 Bee Caves Rd.,#320 Pleander,TX 78648 San Antonio,TX 78216 Georgetown,TX 78627 Waco,TX Item No. Austin,TX 78746 Description Quantic Unit Unit Price Total Amt. Unit Price Total Amt. Unit Price Total Amt. Unit Price Total Amt, Unit Price Total Amt, 101-C Preparing Right-of-Way 1 L.S. $67,472.00 $67,472.00 $70,000.00 $70,000.00 $83,500.00 $83,500.00 $24,000.00 $24,000.00 $68,250.00 $68,250.00 501 Jacking or Boring 36-Inch Steel Casing Pipe, 0.50 inches Thick 141 L.F. $400,00 $56,400.00 $363.00 $51,183.00 $520.00 $73,320.00 $600.00 $84,600.00 $420.00 $59,220.00 506-M-5 New Manhole Construction,5-fool Diameter 39 Ea. $4,800.00 $187,200.00 $5,900.00 $230,100.00 $7,250.00 $282,750.00 $2,000.00 $78,000.00 $6,500.00 $253,500.00 509 Trench Safety Plan 12,700 L.F. $1.50 $19,050.00 $0.01 $127.00 $1.00 $12,700.00 $1.00 $12,700.00 $1.00 $12,700.00 510•A-24 Pipe,24-inch Diameter,PVC Gravity Sewer, In Trench 2,660 L.F. $76.00 $202,160.00 $93.00 $247,380.00 $69.00 $183,540.00 $94.00 $250,040.00 $89.00 $236,740.00 510-A-24D Pipe,24-inch Diameter,PVC Gravity Sewer, In Trench,Double Ditchin 1,490 L.F. $79.00 $117,710.00 $94.00 $140,060.00 $72.00 $107,280.00 $92.00 $137,080.00 510-A-24CP Pipe,24-inch Diameter,PVC Gravity Sewer, $112.00 $166,880.00 In Casin Pie 141 L.F. $80.00 $11,280.00 $52.00 $7,332.00 $68.00 $9,588.00 $80.00 $11,280.00 $63.00 $8,883.00 510-A-21 Pipe,21•inch Diameter,PVC Gravity Sewer, In Trench 670 L.F. $69.00 $46,230.00 $88.00 $58,960.00 $63.00 $42,210.00 $89.00 $59,630.00 $81.00 $54,270.00 M510-A-15D Pipe,2t-mch Diameter,PVC Gravity Sewer,renchDouble Ditchin 2,520 L.F. $72.00 $181,440.00 $89. $224,280.00 $62.00 $156,240.00 $90.00 $226,800.00 $93.00 $234,360.00e,18-inch Diameter,PVC Gravity Sewer,rench 130 L.F. $57.00 $7,410.00 548.00 $6,240.00 $52.00 $6,760.00 $87.00 $11,310.00 $71.00 $9,230.00e,18-inch Diameter,PVC Gravity Sewer,renchDouble Ditchin 360 L.F. $60.00 $21,600.00 $49.00 $17,640.00 $56.00 $20,160.00 $88.00 $31,680.00 $74.00 $26,640.00,15-inch Diameter,PVC Gravity Sewer,nrench,Double Ditchin 4,880 L.F. $52.00 $253,760.00 $49.00 $239,120.00 $61.00 $297,680.00 $100.00 $488,000.00 $69.00 $336,720.00 604-A Seeding for Erosion Control,Method B,Fiber Mulch 1 L.S. $25,000.00 $25,000.00 $22,000.00 $22,000.00 $35,900.00 $35,900.00 $21,000.00 $21,000.00 $17,000.00 $17,000.00 639 Rock Berm 148 L.F. $16.00 $2,368.00 $10.00 $1,480.00 $17.00 $2,516.00 $6.00 $888.00 $30.00 $4,440.00 641 Stabilized Construction Entrance 4 Ea. $1,250.00 $5,000.00 $800,00 $3,200.00 $900.00 642 Silt Fence for Erosion Control $3,600.00 $800.00 $3,200.00 $3,000.00 $12,000.00 12,530 L.F. $1.85 $23,180.50 $1.30 $16,289.00 $1.50 $18,795.00 $2.00 $25,060.00 701-T Temporary Livestock Fence,3 Strand $3.00 $37,590.00 Sarbwire,with 36"Goat Wire 1,774 L.F. 702-G Remove and Relocating Existing,5 Strand $5.00 $8,870.00 $2.00 $3,548.00 $7.00 $12,418.00 $2.00 $3,548.00 $5.00 $8,870.00 Barbed Wire Fence 3,839 L.F. $9.00 $34,551.00 $2.00 $7,678.00 $8.00 $30,712.00 $2.00 $7,676.00 803-M Barricades,Signs and Traffic Control $6.00 $23,034.00 5 Months $750.00 $3,750.00 $150.00 $750.00 $2,540.00 $12,700.00 $400.00 $2,000.00 $1,500.00 $7,500.00 1001 Pavement Removal and Replacement,14' Roadway 36 L.F. $125.00 $4,500.00 $67.00 $2,412.00 $100.00 , 600.'0'0L $30.00 $1,080.00 $92.00 $3,312.00 00.00 779.00TOTALBASEB/D $1,278,93150 $1,349 $1,479,574.00 $1,581,139.00 08-24-04Tab Page 2 1460 Proposed Avery Farm Wastewater Interceptor Existing Regional Wastewater Line 79 79 N ►very FerM Wastewater Intereeptar w E To Serve ROUND R(xK�TtiXAS S Higher Edueetion Center S/GRAPHICS/COUNCIL AGENDA ITEMS/ENGINEERING/2003/AVERY FARM WASTEWATER INTERCEPTOR RLR 3/27/03 DATE: September 17, 2004 SUBJECT: City Council Meeting - September 23, 2004 ITEM: 13.A.1. Consider a resolution authorizing the Mayor to execute a contract with Schroeder Construction Company, Ltd. for the construction of the Avery Farms Wastewater Interceptor. Department: Water and Wastewater Utilities Staff Person: Tom Clark, Director Justification: On July 27, 2004 we received eleven bids for the Avery Farms Wastewater Interceptor Project and the low bid of $918,447.90 was from Schroeder Construction Company Ltd., with an average bid amount of $1,226,397.34. Based upon the review of the bids by staff and CDM Engineering, Inc., staff recommends awarding the bid to Schroeder Construction Company Ltd. in the amount of $918,447.90. Funding• Cost: $918,447.90 Source of funds: Capital Improvement Project (Self-Financed Utility) Outside Resources• Schroeder Construction Company Ltd. Background Information• The Avery Farm Wastewater Interceptor will serve the Round Rock Higher Education Center and future development within its drainage basin, which includes Williamson County MUD #11. Total estimated project cost is $2,050,000. Public Comment• N/A