Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
R-04-09-23-13F3 - 9/23/2004
RESOLUTION NO. R-04-09-23-13F3 WHEREAS, the City of Round Rock has previously entered into an Agreement for Engineering Services ("Agreement") with Carter & Burgess, Inc . for the preparation of plans, specifications, and estimates for 1 . 5 miles of US 79 from FM 1460 to CR 195, and WHEREAS, Carter & Burgess, Inc . has submitted Supplemental Agreement No. 7 to the Agreement for a change in the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 7 to the Agreement with Carter & Burgess, Inc . , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 7 to the Agreement with Carter & Burgess, Inc. , a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required . by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 23rd day of Septemb 2 04, L, Mayor City of Round Rock, Texas A T: , CHRISTINE R. MARTINEZ, City Secretdry @PFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R40923F3.WPD/Sc STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL AGREEMENT NO. 7 TO AGREEMENT FOR ENGINEERING SERVICES FIRM: Carter&Burgess,Inc. ("Engineer") ADDRESS: 2705 Bee Cave Road, Suite 300,Austin,TX 78746 PROJECT: US 79 (from FM 1460 to CR 195) (Gap Project) This Supplemental Agreement No. 7 to Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Carter & Burgess, Inc.,hereinafter called the "Engineer". WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinafter called the "Agreement", on March 23, 2000 to provide engineering services for the design of a four-lane divided section on US 79 — from FM 1460 to CR 195 to include bridge design at Arterial A, for the sum of$398,182.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 1 on June 28, 2001 to amend the scope of services, to extend the contract date from August 31, 2001 to December 31, 2002, and to increase the compensation by$158,118.00 to a total of$556,300.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 2 on September 13, 2001 to amend the scope of services and to increase the compensation by$68,021.00 to a total of $624,321.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 3 on January 10, 2002 to amend the scope of services and to increase the compensation by$27,275.00 to a total of $651,596.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 4 on June 27, 2002 to amend the scope of services and to increase the compensation by $33,266.00 to a total of $684,862.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 5 on December 19, 2002 to amend the scope of services, to increase the compensation by $32,673.00 to a total of $717,535.00, and to extend the contract period to December 31,2003; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 6 on December 18, 2003 to amend the scope of services, to increase the compensation by $54,918.58 to a total of $772,453.58, and to extend the termination date; and Supplemental Agreement Rev.03/02/04 #71957 1 EXHIBIT All WHEREAS, it has become necessary to amend the Agreement to modify the provisions for the scope of services, to increase the compensation by $98,643.00 to a total of$871,096.58, and to modify the provision for notices to proceed; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Agreement is amended as follows: I. Article 2, Scone Of Services To Be Performed By Engineer and Exhibit B, Services To Be Performed By The Engineer shall be amended as set forth in the attached Addendum To Exhibit B. II. Article 4 Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $98,643.00 the lump sum amount payable under the Agreement for a total of$871,096.58, as shown by the attached Addendum to Exhibit D. III. Article 7,Notice to Proceed shall be amended to read as follows: The Engineer shall not proceed with any task listed on Exhibit B until the City has issued a written Notice to Proceed regarding such task. The City shall not be responsible for work performed or costs incurred by Engineer related to any task for which a Notice to Proceed has not been issued. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agreement in duplicate. CARTEIZ& BUR SS,INC. By: Date CITY OF ROUND ROCK *APVED AS TO ORM: By: Nyle Maxwell,Mayor Sheets,City Attorney Date Supplemental Agreement #71957 Rev.03/02/04 2 Supplemental Agreement No. 7 ADDENDUM TO EXHIBIT A Scope of Services To Be Performed By the City Highway: US 79 Limits: From: FM 1460 To: County Road 195 Length: 1.5 Miles Control: 0204-01-OXX County: Williamson Whereas, Exhibit A, "Scope Of Services To Be Performed By The City", is amended by the following: In conjunction with the services to be provided by the Engineer, as described in Attachment B, the City of Round Rock (City) will furnish to the Engineer the following items: 1. Furnish site plans and intersecting roadway locations for proposed arterials. 2. Furnish plans for realignment of FM 1460. 3. Furnish available and applicable City special specifications, special provisions, and updated list of bid items applicable to the project. 4. Furnish a tabulation of applicable unit prices. 5. Provide as-built construction plans for the 18" water line relocation. 6. Provide the Engineer with timely review and decisions necessary in order to permit the Engineer to maintain an agreed upon project schedule. 7. Provide existing utility information, if available. 8. Provide City of Round Rock Title Sheet. 9. Provide boiler plate from the city. 10. Provide timely reviews and decisions. 11. Assist in coordinating with the Texas Department of Transportation. 12. Any additional information or assistance as required by the Engineer and agreed upon by the City. J:\2000\05-0098\CONTRACT#1\SA#7\CBCONTRACT\REVISION2\SA#7_EXHA_CB.DOC Supplemental Agreement No. 7 ADDENDUM TO EXHIBIT B Scope Of Services To Be Performed By Engineer Highway: US 79 Limits: From: FM 1460 To: County Road 195 Length: 1.5 Miles Control: 0204-01-OXX County: Williamson Whereas, Exhibit B, "Scope Of Services To Be Performed By Engineer', is amended by the following: Additional work performed by the Engineer under Supplemental Agreement #7 shall consist of the following: CULVERT/BORE OPTION Develop construction plans for culvert bored under US 79 1. Project Management & Coordination 2. Develop Construction Plans A. Title Sheet B. Typical Sections C. Traffic Control Plan D. Misc. Roadway Details E. Culvert Plan & Profile F. Temp/Perm Erosion Control Plan G. Hydrologic/Hydraulic Calcs. H. Structural Detail of Improved Inlet I. Striping Plan J. Quantities, Summaries & Cost Estimates K. SWPPP Document L. Construction Documents 3. ROW/SURVEYING 4. Horizon Environmental — Cultural resource survey effort Addendum to Exhibit B Supplemental Agreement No. 7 US 79 Page 2 BETTERMENT OPTION 1. TxDOT Reimbursement Assembly Package A. Williamson County Road 195 to 1,000 feet East of WCR 110 1) Original Utility Easements (by SAMS) 2) Betterment Estimate 3) Non-Betterment Estimate 4) Eligibility Ratio 5) Relocation Plans (4 sets, 2 in color) 6) Specifications 7) Estimated Costs B. West of FM 1460 to East of FM 1460 (Williamson County Road 195) 1) Original Utility Easements 2) Betterment Estimate 3) Non-Betterment Estimate 4) Eligibility Ratio 5) ROW Plan with Field Notes and Sketches 6) Relocation Plans (4 sets, 2 in color) 7) Specifications 8) Estimated Costs 2004 SPECIFICATION UPDATE Update plans to TxDOT's 2004 specifications. This includes reviewing and revising the following: 1. Individual Sheet General Notes 2. Pay Items, Bid Codes, Plan Quantities 3. Master General Notes 4. Estimate 5. Special Provisions and Specifications 6. Standards J:\2000\05-0098\Contract#l\sa#7\CBContract\Revision2\SA#7_ExhB_CB.doc Supplemental Agreement No. 7 ADDENDUM TO EXHIBIT C Work Schedule Highway: US 79 Limits: From: FM 1460 To: County Road 195 Length: 1.5 Miles Control: 0204-01-OXX County: Williamson Whereas, Exhibit C, "Work Schedule", is voided and replaced by the following: Notice to Proceed Date Contract Signed Culvert/Bore Option 2 weeks Betterment#1 1 month Betterment#2 4 months to 12 months 2004 Specifications Update 6 months to 12 months Original Contract Effort 3 months to 12 months Actual schedule subject to change, as agreed upon by the City and the Engineer, based upon timely review from TxDOT, the City and other entities. J:\2000\05-0098\Contract#1\sa#7\CBContract\Revision2\SA#7_ExhC_CB.doc US 79 GAP,CULVERT, ADDENDUM TO EXHIBIT D SUPPLEMENTAL AGREEMENT NO.7 BETTERMENT&2004 SPECS FEE SCHEDULE/BUDGET FOR CITY OF ROUND ROCK SUMMARY OF CONTRACT BY COMPANY ----------- FIRM HOURS I SALARY IOVERHEAD PROFIT PROJECT %OF 15.00% TOTAL TO I.PROJECT MANAGEMENT EM ENT F:... C1 00 . ----_---__ Culvert/Bore Option16L$4,042 _$660 $1,153 $272 $2,084 _ 2.36% Betterment Cost 40 $1,681 $2,937 $693 $5,310 6.02% 2004 Update 96 $7,063 $1,666 $12,772 14.49% TOTAL: 152 $6,383 $11,153 $2,630 $20,166 III.RIGHT-OF-WAY-OF-W AY (FC 30 .. ........ -- CuhrerUBore Option p-- --- $U $0 0.00 Betterment Cost 103 $3,459 $6,045 $1,426 $10,930 12.40% 2004 U ate 0 - - $0 $0 $0 $0 0.00 TOTAL: 103, $3,459 $6,045 $1,426 $10,930 7. V. ... ROADWAY DESIGN N CONTROLS(FC Culvert/Bore Option $0 $0 $0 0.00% 0I $0 Betterment Cost 01 $0 $0 $0 $0 0.00% 2004 U ate 660-- $2,000 $3,495 $824 $6,319 7.17% TOTAL: 601 $2,000 $3,495 $824 $6,319 VI.DRAINAGE(FC 161) ulvertBore Option 142 $4,614 $8,062 $1,901 $14,578 16.54% Betterment Cost 0- -- $0 $0 $0 Sol 0.00 - - 2004 U date 60; $2,000 $3,495 $824 $6,319 7.17% TOTAL: 202 $6,614 $11,557 $2,726 $20,897 VII. SIGNING,N-G MARKINGS KN GS 8DELINEATION ATI ON FC 162 0 --- - CulverUBore Option _ _ _ $0 $0 $0 $0 0.00 Betterment Cost 01 $0 $0 $0 $0 0.00 TOT L date 601 - $2,000 $3,495 $824 $6,319 7.17% - - -777777 7TOTAL: 601 $2,0001 $3,495 $824 $6,319 VIII.MISCELLANEOUS ROADWAY(FC 163) Culy Bore Option 01-- - - -- O -$0 $0 $0 0.00 Betterment Cost - - $0 $0 $0 0.00% 2004 U date - - - -------- 164 $5,441 $9,508 $2242Lj� 19.50% TOTAL: 164, $5,441 $9,508 $2,242 IX.B RID GE DESIGN (FE;1 C17 0 CulverVBoreOption 0! $0 $0 $0 $0 0.00% Betterment Cost -, - - ---- 0 - $0 $0-$() $0 0.00 _ 2004 Update 607, $2,000 $3,495 $824 $6,3191 7.17% TOTAL: 601, $2.000 $3.495 $824 $6.319 TOTAL CONTRACT LABOR COST Culvert(Bore Option _-1-"----- - P -158 -- 5,274 9,215 2,173 16,662 19% betterment Cost 143; 5,140 8,982 2,118 16,240 18% --- - 2004 U date 5001 17,485 30,551 7,205 55,241 63% TOTAL: 801, $27,899 $48,747 $11,497 $88,143 TOTAL L CO NIRA CT DIRECT CT COST CulvertlBor Option - - _ ------- $7,500 2004 Update , Betterment Cost - - ------- $3000 - - -- - __------ _-- - $0 7F :777777777777777777 TOTAL: ' � $10,500 CONTRACTTOTAL CulverUBore Option -- $24,162 24% -- - - Betterment Cost -, $19,240 - 20 -_-___- 2004 U date r--- -- $55,241 56 TOTAL: $98,643 SA#7-ExhD_CB.XLS\GRAND TOTAL Page 1 of 8 Carter Burgess,Inc. US 79 GAP,CULVERT, ADDENDUM TO EXHIBIT D SUPPLEMENTAL AGREEMENT NO.7 BETTERMENT&2004 SPECS FEE SCHEDULEIBUDGET FOR CITY OF ROUND ROCK TASK AND DESCRIPTION I. PROJECT MANAGEMENT FC 100 PROJECT SENIOR DESIGN ASST DES SR DESIGN CADD CLERICAL TOTAL MANAGER ENGINEER ENGINEER ENGINEER SPECIALIST TECH TOTAL HOURS: 8 0 8 0 0 0 0 i6 SALARY RATES: $42.55 _$0.00 $39.90 $30.00 $0.00 $27.00 $16.00 $22.21 DIRECT SALARY COSTS: $340 $0 _ $319 $0 $0 $0 $0 $660 OVERHEAD MULTIPLIER: 1.7473 $595 $0 $558 $0 $0 $0 $0 $1,153 PROFIT: 15.00% $140 $0 $132 $0 $0 $0 $0 $272 TOTAL: $1,075 0 $1,008 0 0 01 $01 $2,084 VI.DRAINAGE(FC 161) PROJECT SENIOR DESIGN ASST DES SR DESIGN _ _ CADD_ CLERICALTOTAL MANAGER ENGINEER ENGINEER ENGINEER SPECIALIST TECH -- _ TOTAL HOURS. 22 0 20 60 0 40 0 142 ---- .- - _ -- -- - SALARY RATES - - -- - - - -_-_ --$42.55 $0 00 $39.90 $30 00- $0.00 - $27.00 _ - $16.00 $22.21 DIRECT SALARY COSTS __ -- $936 $0 _ $798 _ $1,800 __ __ $0 $__1,080 _ _ $0 $4,614 OVERHEAD MULTIPLIER. 1.7473 $1,636 $0 __$1,394 _ _$3,145 - - --- $0 $1,887 _ __$0 _-_$8,062_ -- -- PROFIT: 15.00% $386 $0 $329 $742 $0 $445 $0 $1,901 TOTAL: 2,958 0 2,521 $5,687 0 3,412 0 14,578 CLASSIFICATION TOTAL SALARY DIRECT OVERHEAD PROFIT TOTAL %of _HOURS RATE SALARY MULTIPLIER Bore COST 1.7473 15.00% TOTAL - PROJECT MANAGER 30 $42.55 $1,277 $2,230.43 $526 $4,033 24.21% SENIOR ENGINEER 0 $0.00 $0 $0_00 $0 $0 0.00% _ DESIGN ENGINEER__ _ 28 $39.90_ $1,117_ $1,952.08 $460 $3,530 21.18% - ASST DESIGN ENGINEER_ - _ 60 -- $30.00 _ $1,800 $3,145.14 $742 $5,687 34.13% SENIOR DESIGN SPECIALIST 0CAD $0.00 - - - - - - - -- ------ $0 --$0.00 $0 $0 0.00% --------- --- D TECHNICIAN -- --- --. 40 $27.00 $1,080 $1,887_08 - --$445 $3,412 - -- CLERICAL 0 - $0.00 $0 --- -$0 --20.48%-- $0 0.00% _ - - TOTALS --- --- - 158 $5,2741 $9,215 $2,173 $16,662 100.00% - 4-- DIRECT COST-Bore Mylar Plots _ ______0 Square Feet @ $2.50/Sq.Ft.= $0 Blueline Re roductions or Printing _ 0 Square Feet $.25/Sq.Ft.= --- Express Deliveries _ 0 Deliveries @ $20.00/Del.= - Auto Mileage 0 Miles d �- 1 -$0 Auto Rental --- $0.35/mile - - � $0 - - -- _ 0 Day - -___$60/day=__ROPer WSURVEYING -_--- -- --------0 pay $30/da $0 --- ------ -------- -- - - Horizon Environmental - TOTAL DIRECT COST-Bore $7,500 -- SUMMARY-Bore +- Daect Costerhead+Cost - - I a--- I ' ---1- ----�-- ------ _-- - - ---�- - - $16,662 $7,500 --------------- TOTAL CONTRACT COST-Bore $24,162 SA#7_ExhD_CB.XLSITOTAL COST(Bore) Page 2 of 8 Bore US 79 GAP,CULVERT, ADDENDUM TO EXHIBIT D SUPPLEMENTAL AGREEMENT NO.7 BETTERMENT&2004 SPECS FEE SCHEDULE/BUDGET FOR CITY OF ROUND ROCK TASK AND DESCRIPTION STANDARD NO.OF PROJECT SENIOR DESIGN I ASST DESIGN SR DESIGNCADD CLERICAL TOTAL HRS/SHT SHEETS SHEETS MANAGER ENGINEER ENGINEER ENGINEER SPECIALIST TECHNICIAN HRS/SHTj HOURS HRS/SHT HOURS HRS/SHTI HOURS HRSISHT HOURS HRS/SHT HOURS HRS/SHT HOURS HRSSHT HOURS PROJECT MANAGEMENT FC100 1. PM&Coordination Culvert/Bore Option) 8 0 8 0 0 0 0 16 SUBTOTALS 0 0 8 0 8 0 0 0 0 16 FRAINAGE(50 Scale)(FC161 p Construction Plans(Culvert(Bore Option). Sheet - - ----- ------------ B. --- --- - C. Traffic Control Plan 4 - --- ---- - D. ___ 1 - -- 4 -- ------- Misc.Roadwa Details 4 _ - ___1_ _____-- 4 E. Culvert Plan&Profile 8 8 1P F. Tem/Perm Erosion Control Plan - -- -� 4 - G. H drolo ia(H draulic Calcs. _ 8 4 H. Structural Detail of Im rove Inlet - 16 I. Striping Plan J. Quant.,Summaries&Cost Est. 2 2 4 4 K. SWPPP Document -- L. Construction Documents 0 1 1 8 0 SUBTOTALS1 0 0 22 0 20 60 0 40 0 0 TOTAL SHEETS AND/OR HOURS 0 30 0 T 28 60 0 40 0 158 SA#7 ExhD_CB.XLMPLANS(Bore) Page 3 of 8 Bore US 79 GAP,CULVERT, ADDENDUM TO EXHIBIT D SUPPLEMENTAL AGREEMENT NO. 7 BETTERMENT&2004 SPECS FEE SCHEDULE/BUDGET FOR CITY OF ROUND ROCK TASK AND DESCRIPTION I. PROJECT MANAGEMENT FC 100 PROJECT SENIOR DESIGN ASST DES SR DESIGN CADD CLERICAL TOTAL MANAGER ENGINEER ENGINEER ENGINEER SPECIALIST TECH TOTAL HOURS: 32 _ 0 __ 8 0 0 0 0 40 SALARY RATES: $42.55 $0.00 _ _$39.90 $30.00 $0.00 $27.00 $16.00 $22.21 DIRECT SALARY COSTS: $1,362 $0 $319_ $0 $0 $0 $0 $1,681 -OVERHEAD MULTIPLIER: 1.7473 $2,379 $0 $558 $0 $0 $0 $0 $2,937 PROFIT: 15.00% $561 $0 $132 $0 $0 $0 $0 $693 TOTAL: $4,302 0 $1,008 0 0 0 0 5,310 III.RIGHT-OF-WAY FC 130 PROJECT SENIOR DESIGN ENGINEER SR DESIGN CADD CLERICAL TOTAL___ MANAGER ENGINEER ENGINEER SPECIALIST DRAFTER TOTAL HOURS: 15 0 28 28 0 32 0 103 BILLING RATE $42.55 $0.00 $39.90 $30.00 $0.00 $27.00 $16.00 $22.21 DIRECT SALARY COSTS: $638 $0 $1,117 $840 $0 $864 $0 $3,459 OVERHEAD MULTIPLIER: 1.7473 $1,115 $0 $1,952 $1,468 $0 $1,510 $0 $6,045 PROFIT: 15.00% $263 $0 $460 $346 $0 $356 $0 $1,426 TOTAL: 2,016 0 3,530 2,654 0 2,730 0 10,930 CLASSIFICATION TOTAL SALARY DIRECT OVERHEAD PROFIT TOTAL %of --- --- --- -- ---------- HOURS RATE SALARY MULTIPLIER - --- - ------ - - etterment COST 17473 15.00% TOTAL r PROJECT MANAGER 4- $42.55 $2,000 $3,494 34 $824 $6,318 38.91% - - - - SENIOR ENGINEER - _ ._-_ _._____ 0 - $0.00 -- -- -_ $0_ $0 00_ - - $0 $0 0.66% DESIGN ENGINEER 36 $39.90 $1,436 $2,509.82 $592 $4,538 27.94% - -- - - -_ ASST DESIGN ENGINEER - ._ -.- -__ -_-" --- 28 $30.00 $84o $1,467.73 $346 $2,654 16.34% SENIOR DESIGN SPECIALIST - - - - 0 $_0.00 _ $0 $0.00 ____ $0 _ $0 _ 0.00%__ CADD TECHNICIAN _______ 32 $27.00 $864 $1,509 67 $356 CLERICAL - - - - -- - _ --- $0-- --$0.00 - - - $�--- -- 0 $16.00 - ---a _ $0 0.00% -- TOTALS 143 $5.1401 $8,9821 $2,118 $16,240 100.00% DIRECT COST-Betterment Mylar Plots 0 Square Feet C $2.50/Sq.Ft.= _ - ---- -- Blueline Reproductions or Printing 0 S uare Feet $.25/S .Ft. F - - $0 -- - ---_-- 0 Deliveries $20.00/Del --- ress -- - - 0 Da ---$60/da _ - -- AuPo M Ike Deliveries - --- -_- -_� _-- -__$0 _ Auto Rental � J---- ------ $0 - - - -- - - j- - - ---- -- $0 Per Diem _ 0� $30/day= - - - - SAMS Inc Cost - ----- '--- �---- $0 -- - --- $3,000 TOTAL DIRECT COST-Betterment $3,000 SUMMARY-Betterment --- ---- - - Labor+Overhead+Cost ----- -- ---� -- -- -- $16,240_ Direct Cost - - $3,000 _ TOTAL CONTRACT COST-Betterment $19,240 SA#7-ExhD-CB.XLS\TOTAL COST(Betterment) Page 4 of 8 Betterment US 79 GAP,CULVERT, ADDENDUM TO EXHIBIT D SUPPLEMENTAL AGREEMENT NO.7 BETTERMENT&2004 SPECS FEE SCHEDULE/BUDGET FOR CITY OF ROUND ROCK TASK AND DESCRIPTION STANDARD NO.OF PROJECT SENIOR DESIGN ASST DESIGN SR DESIGN C CLERICAL TOTAL HRS/SHT SHEETS SHEETS MANAGER ENGINEER ENGINEER ENGINEER SPECIALIST TECHNICIAN HRSfSHTj HOURS HRS/SHTj HOURS HRSISHT HOURS HRStSHTl HOURS HRS/SHTj HOURS HRSISHTJ HOURS HRS/SHTI HOURS PREPARATION OF CONSTRUCTION PLANS PROJECT MANAGEMENT FC100) SUBTOTALS 0 0 1.Coordination,preparation and review of Documents 24 0 0 0 0 0MO4 2.Meetings(2 with City) 8 0 8 0 0 0 0 0 0 0 0 0 SUBTOTALS 0 0 32 0 8 0 0 0 RIGHT-OF-WAY FC 130 1. TxDOT Reimbursement Assembly Package A. Williamson Coun Road 195 to 1,000 feet East of WCR 110 1 Original Utility Easements(by SAMS 1 0 0 0 0 0 0 1 2 Betterment Estimate 1 _ 0 _ 2 2 0 0 0 5 3 Non-Betterment Estimate 1 4 0 2 2 0 0 0 5 Eligibility Ratio _ — - — _ - -- - ---- — ---- 5 Relocation Plans 4 sets,2 in color 1 0 0 ---2 2 0 0 0 5 Specifications _ _ -- -_.------ - 2 2 0 16 0 21 --- —_ - 1 --- _7 0 2 2 Estimated Costs 1 5 0 - _ 2----- --- 2 --- -0.. ---- -------- ---- - - - - - B. West of FM 1460 to East of FM 146�Williamson C ---ount�Road 195 _ ---- - " 1) Original Utility Easements 2 Betterment Estimate - - -- -- -- - 0__ 0 0 5 5 3 Non-Betterment Estimate —-- --- — 0 0 0-- --- ---- - ----- - 4 Eligibility Ratio -- 2 0 0 5 - --- -O--__—_-_-.— 1 0 2 __ ______ 0 0 5 __ 5 ROW Plan with Field Notes and Sketches----- _1 0 2 2 0 0 0 5 6 Relocation Plans 4 sets,2 in color __ 1 0 2 2 0 16 0 21 7 Specifications 1 0 2 2 0 0 0 5 8 Estimated Costs 1 0 2 2 0 0 0 5 SUBTOTALS 0 0 15 0 28 28 0 32 0 103 TOTAL SHEETS AND/OR HOURS 0 47 0 36 7M 28 0 32 �01 SA#7_ExhD_CB.XLSTLANS(Betterment) Page 5 of 8 Betterment US 79 GAP,CULVERT, ADDENDUM TO EXHIBIT D SUPPLEMENTAL AGREEMENT NO.7 BETTERMENT&2004 SPECS FEE SCHEDULE/BUDGET FOR CITY OF ROUND ROCK TASK AND DESCRIPTION I. PROJECT MANAGEMENT FC 100 PROJECT SENIOR DESIGN ASST DES SR DESIGN CADD CLERICAL TOTAL MANAGER ENGINEER ENGINEER ENGINEER SPECIALIST TECH TOTAL HOURS: 80 0 16 0 0 0 0 96 SALARY RATES: $42.55 $0.00 $39.90 $30.00 $0.00 $27.00 $16.00 $22.21 DIRECT SALARY COSTS: $3,404 $0 $638 $0 $0 $0 $0 $4,042 OVERHEAD MULTIPLIER: 1.7473 $5,948 $0 $1,115 $0 $0 $0 $0 $7,063 PROFIT: 15.00%1 $1,403 $0 $263 $0 $0 $0 $0 $1,666 TOTAL: $10,755 $0 $2,017 1 $0 $0 $0 $0 $12,772 V.ROADWAY DESIGN CONTROLS FC 160 PROJECT SENIOR DESIGN ENGINEER SR DESIGN CADD CLERICAL TOTAL MANAGER ENGINEER ENGINEER SPECIALIST DRAFTER TOTAL HOURS: 4 020 20 0 16 0 60 SALARY RATES: $42.55 $0.00 $39.90 $30.00 $0.00 $27.00 $16.00 $22.21 DIRECT SALARY COSTS: $170 $0 $798 $600 $0 $432 $0 $2,000 OVERHEAD MULTIPLIER: 1.7473 $297 $0 $1,394 $1,048 $0 $755 $0 $3,495 PROFIT: 15.00% $70 $0 $329 $247 $0 $178 $0 $824 TOTAL: $538 $0 $2,521 $1,896 $0 $1,365 $0 $6,319 VI.DRAINAGE FC 161) _ PROJECT SENIOR _ DESIGN ASST DES __SR DESIGN CADD CLERICAL TOTAL MANAGER ENGINEER ENGINEER ENGINEER SPECIALIST TECH TOTAL HOURS: 4 16 0 ___ 60 ----- --- 0 _ 20 20 0 SALARY RATES: $39..90 - --- - - - -- -- -- _ $42.55 $0 00 _ $30.00 _ $0.00 $27.00 $16.00 $22.21 DIRECT SALARY COSTS: $170 - - -- - -- --_$0 ----$798 $600 ---- - $0 $432 OVERHEAD MULTIPLIER: 1.747_3 _ _- $2,000 --- - 297 $0 _--__ $1,394 _ $1,048 $0 $3,495 ----- $0 $755 _ PROFIT: 15.00% $70 - - $0 $329 $247 -- $0 - $178 - $0 1 $824 TOTAL: $538 1 $0 $2,521 $1,896 $0 $1,365 $0 $6,319 VII.SIGNING,MARKINGS 8,DELINEATION FC 162 PROJECT SENIOR DESIGN ENGINEER SR DESIGN CADD CLERICAL TOTAL MANAGER ENGINEER ENGINEER SPECIALIST DRAFTER TOTAL HOURS: 4 0 20 20 0 16 0 60 SALARY RATES: $42.55 $0.00 $39.90 $30.00 $0.00 $27.00 $16.00 $22.21 DIRECT SALARY COSTS: $170 $0 $798 $600 _ $0 $432 $0 $2,000 OVERHEAD MULTIPLIER: 1.7473 $297 $0 $1,394 $1,048 $0 $755 $0 $3,495 PROFIT: 15.00% $70 $0 $329 $247 $0 $178 $0 $824 TOTAL: $538 $0 $2,521 $1,896 $0 $1,365 $0 $6,319 VIII.MISCELLANEOUS ROADWAY FC 163 -..---- -_-- S ) PROJECT SENIOR DESIGN ASST DES SR DESIGN CADD CLERICAL TOTAL MANAGER ENGINEER ENGINEER ENGINEER SPECIALIST TECH - TOTAL HOURS: 12 - - -- _ - --52 52 0 48 0 164 --- - -- -- ---$- ---- SALARY RATES: - -- - ----- $42.55, $0.00 $39 90 $30.00 $0.00 _ _ $27.00 $16.00 $22.21 DIRECT SALARY COSTS: $511 $0 $2,075 $1,560 $0 $1,296 $0 $5,441 - OVERHEAD MULTIPLIER:- 1.7473 $892 $0 $3,625 $2,726 $0 _ _ $2,265 $0 $9,508 -- PROFIT: 15.00% $210 $0 $855 $643 $0 $534 $0 $2,242 TOTAL: $1,613 $0 $6,555 $4,929 $0 1 $4,0957 $0 $17,182 SA#7_ExhD_CB.XLS\TOTAL COST(2004) Page 6 of 8 2004 Specifications US 79 GAP,CULVERT, ADDENDUM TO EXHIBIT D SUPPLEMENTAL AGREEMENT NO.7 BETTERMENT&2004 SPECS FEE SCHEDULE/BUDGET FOR CITY OF ROUND ROCK IX.BRIDGE DESIGN FC 170 PROJECT SENIOR DESIGN ENGINEER SR DESIGN CADD CLERICAL TOTAL MANAGER ENGINEER ENGINEER SPECIALIST DRAFTER TOTAL HOURS: _ 4 0 20 20 0 __ 16 0 60 SALARY RATES: $42.55 _ $0.00 $39.90 $30.00 $0.00 $27.00 $16.00 $22.21 DIRECT SALARY COSTS: $170 $0 $798 $600 $0 $432 $0 $2,000 OVERHEAD MULTIPLIER: 1.7473 $297 _ $0 $1,394 $1,048 $0 $755 $0 $3,495 PROFIT: 15.00% $70 $0 $329 $247 $0 1 $178 $0 1 $824 TOTAL: $538 1 $0 $2,521 $1,896 $0 $1,365 $0 1 $6,319 CLASSIFICATION TOTAL _SALARY DIRECT OVERHEAD PROFIT TOTAL %of _ _ HOURS RATE SALARY MULTIPLIER —2064-- 60 S_ 004COST 1.7473 15.00% TOTAL PROJECT MANAGER 108 $42.55 $4,595 $8,029.54 $1,894 $14,519 26.28% _ SENIOR ENGINEER 0 $0.00 $0 $0.00 $0 $0 0.00% DESIGN ENGINEER 148 $39.90 $5,905 $10,318.16 $2,434 $18,657 33.77% ASST DESIGN ENGINEER 132 $30.00 $3,960 $6,919.31 $1,632 $12,511 22.65° SENIOR DESIGN SPECIALIST 0 $0.00 $0 $0.00 $0 $0 0.00% -- — CADDTECHNICIAN ----- __ 112 $27.00_ $3,024 $5,283.84 — $1,246 $_9,554__ 17.30°/ _ --- _ CLERICAL 0 $16.00 $0 $0.00 $0 $0 0.00% TOTALS 500 $17,485 $30,551 $7,205 $55,2411. 100.00% DIRECT COST-2004 Specifications M lar Plots 0 Square Feet @ $2.50/S� Ft - ----- - _ - - Bl Re ns Reproductions or Printin�t_ 0 Square Feet @ $25/Sq Ft $0 Express Deliveries 0 Deliveries @ $20.00/Del.- - -- - -- ---- -- - -- - - . - -0 Miles @- _____$0.3_5/mile $0 Auto Mileage - - -- -- - - -- - - -- - --- ------ - - --- — Per Diem -- Auto Rental 0 Da $60/da $0- $0 -- 0 Da $30/da - $0 TOTAL DIRECT COST-2004 Specifications $0 SUMMARY-2004 Specifications _ Labor+Overhead+Cost $55,241 Direct Cost $0 TOTAL CONTRACT COST-2004 Specifications $55,241 SA#7_ExhD_CB.XLS\TOTAL COST(2004) Page 7 of 8 2004 Specifications US 79 GAP,CULVERT, ADDENDUM TO EXHIBIT D SUPPLEMENTAL AGREEMENT NO.7 BETTERMENT&2004 SPECS FEE SCHEDULEBUDGET FOR CITY OF ROUND ROCK TASK AND DESCRIPTION STANDARD NO.OF PROJECT SENIOR DESIGN ASST DESIGNjHRSISHT TEALI GN CARD CLERICAL TOTAL HRS/SHT SHEETS SHEETS MANAGER ENGINEER ENGINEER ENGINEER ST TECHNICIAN HRS/SIR HOURS HRS/SHr HOURS HgS/SHr HOURS HRS/SHF HOURS )URS HRS/SHT HOURS HRS/SH7 HOURS PROJECT MANAGEMENT FC100TC-oortlination, aratbn and reviewofDocuments 64 0 0 0 0 -2.Meetin 2 with Ci and2with State) 0 0 -� 3220t) U _ f o- 0 0 0 -- SUBTOTALS 0 0 80 0 16 0 0 0 0 96 ROADWAY SHEETS 100 scale FC180 Update Plans to TxDOT 2004 S Itications 1. Individual Sheet General Notes 2 10 10 8 30 2. Pa Items,Bid Codes,Plan Quantities 2 10 10 8 30 3. Master General Notes 0 4. Estimate -- - 5. S 'al Provisions antl S ifications 0 8. Standartls 0 0 L 0 20 20 0 6 6p DRAINAGE(50 Scale) FC181 Uate Plfns to fzDOT 2004 S ifications _ - -- -- --- -- 1. Individual Street General Notes 2 10 10 2. Pay Items,Bid Codes.Plan Quantifies 2 10 10 8 30 3. Master General Notes - 4. Estimate 0 5. Special Provisions and Speclfk:ations 00 6. Standards - 0 SUBTOTALS 0 0 4 0 1 20 1 20 0 1 16 0 60 SIGNING,MARKINGS AND DELINEATION FC 162 Update Plans to TxDOT 2004 Specifications 1. Individual Sheet General Notes 2 10 10 8 30 2. P Items,Bid Codes,Plan Quantities 2 10 10 8 30 3. Master General Notes 0 4. Estimate 5. SpNial Provisions and S 0 ifications 0 6. Standards 0 SUBTOTALS 0 0 4 0 20 20 0 16 0 1 60 MISCELLANEOUS ROADWAY FC 163) U ate Plans to TxDOT 2004 S ifications Individual Sheet General Notes---- 2 10 10 � _-8 30 - ---- --- -2 - -- -- 10 --- 10 --- -- --- - ---- -- 2. Pay Items,Bid Codes,Plan Quantities 8 30_ ___ ...._.- __ - ___ _- -__.____ _._ 26 _..._ 3. Master General Notes 2 8 -��---- 8 ---- - 4. Estimate -- - --------- _.__ -- --- - ---- - - 8 8 -- 9 --- 26 - 5. Sped at Provisbns and Specifications 2 8 8 8 _2 26 -.- _._-...._ _.________. _____. _._ __.____ _. _..._.-__._ _.._8._. 8 _..___ 6. Standards __ _ 8 -_- SUBTOTALS 0 0 12 0 52 52 0 1 48 0 164 BRIDGE DESIGN FC 170 Update Plans to TxDOT 2004 Specifications _ 1. Individual Sheet General Notes __ 2 10 10 8 30 2. Pay Items,Bid Codes Plan Quantities _ 2 10 10 8 30 3. Master General Notes - - 4. Estimate 0 0 5. Special Provisions and SpLcifications 0 6. Standards - 0 SUBTOTALS 0 0 4 0 20 200 18 0 60 TOTAL SHEETS AND/OR HOURS 0 108 0 148 132 0 112 0 500 SA✓17_ExhD_CB.XLSWLANS(2004) Pogo 8 of 8 2004 Speolflcatlons M���EYa I Imillull EE CR 195 00 U.S 79 N w E U.S. 79 From CR 195 to FM 1460 y� NOR�K. XAs ---------------- - ' ir.xrrnr ansana.ir��isrrRiri DATE: September 17, 2004 SUBJECT: City Council Meeting - September 23, 2004 ITEM: 13.F.3. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 7 to the Agreement for Engineering Services with Carter & Burgess, Inc. for improvements to US 79 from FM 1460 to CR 195. Department: Transportation Services Staff Person: Tom Martin, Director Justification: This agreement is an addition to the current contract with Carter-Burgess, Inc., which will allow for the development of construction plans for the culvert to be bored under US 79, update existing plans to TxDOT 2004 specifications, and gather and assemble an utility reimbursement package. Funding: Cost: $98,463.00 Source of funds: 4B Corporation (1/2 cent Sales Tax) Outside Resources: Carter-Burgess Inc. Texas Department of Transportation Background Information: The US 79 project is a federally funded project that the City, in conjunction with TxDOT, is working to widen the existing State Highway to a 4-lane divided section that would include drainage, signalization, illumination and signage improvements. Public Comment: N/A EXECUTED DOCUMENT FOLLOWS STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL AGREEMENT NO. 7 TO AGREEMENT FOR ENGINEERING SERVICES FIRM: Carter& Burgess,Inc. ("Engineer") ADDRESS: 2705 Bee Cave Road, Suite 300,Austin, TX 78746 PROJECT: US 79 (from FM 1460 to CR 195) (Gap Project) This Supplemental Agreement No. 7 to Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Carter & Burgess, Inc.,hereinafter called the"Engineer". WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinafter called the "Agreement", on March 23, 2000 to provide engineering services for the design of a four-lane divided section on US 79 — from FM 1460 to CR 195 to include bridge design at Arterial A, for the sum of$398,182.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 1 on June 28, 2001 to amend the scope of services, to extend the contract date from August 31, 2001 to December 31, 2002, and to increase the compensation by$158,118.00 to a total of$556,300.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 2 on September 13, 2001 to amend the scope of services and to increase the compensation by $68,021.00 to a total of $624,321.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 3 on January 10, 2002 to amend the scope of services and to increase the compensation by$27,275.00 to a total of $651,596.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 4 on June 27, 2002 to amend the scope of services and to increase the compensation by $33,266.00 to a total of $684,862.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 5 on December 19, 2002 to amend the scope of services, to increase the compensation by $32,673.00 to a total of $717,535.00, and to extend the contract period to December 31, 2003; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 6 on December 18, 2003 to amend the scope of services, to increase the compensation by $54,918.58 to a total of $772,453.58, and to extend the termination date; and Supplemental Agreement #71957 Rev.03/02/04 ,2-0,q_o9-23^13F3 t WHEREAS, it has become necessary to amend the Agreement to modify the provisions for the scope of services, to increase the compensation by $98,643.00 to a total of$871,096.58, and to modify the provision for notices to proceed; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Agreement is amended as follows: I. Article 2, Scope Of Services To Be Performed By Engineer and Exhibit B, Services To Be Performed By The Engineer shall be amended as set forth in the attached Addendum To Exhibit B. 11. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $98,643.00 the lump sum amount payable under the Agreement for a total of $871,096.58, as shown by the attached Addendum to Exhibit D. III. Article 7, Notice to Proceed shall be amended to read as follows: The Engineer shall not proceed with any task listed on Exhibit B until the City has issued a written Notice to Proceed regarding such task. The City shall not be responsible for work performed or costs incurred by Engineer related to any task for which a Notice to Proceed has not been issued. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agreement in duplicate. CARTERA BURGESS, INC. By: cam . �-- V ���,c Date CIT Y 1. em U O APP VED ASFORM: By: St Sheets, City Attorney 9-0 0'q Date Supplemental Agreement #71957 Rev.03/02/04 2 Supplemental Agreement No. 7 ADDENDUM TO EXHIBIT A Scope of Services To Be Performed By the City Highway: US 79 Limits: From: FM 1460 To: County Road 195 Length: 1.5 Miles Control: 0204-01-OXX County: Williamson Whereas, Exhibit A, "Scope Of Services To Be Performed By The City", is amended by the following: In conjunction with the services to be provided by the Engineer, as described in Attachment B, the City of Round Rock (City) will furnish to the Engineer the following items: 1. Furnish site plans and intersecting roadway locations for proposed arterials. 2. Furnish plans for realignment of FM 1460. 3. Furnish available and applicable City special specifications, special provisions, and updated list of bid items applicable to the project. 4. Furnish a tabulation of applicable unit prices. 5. Provide as-built construction plans for the 18"water line relocation. 6. Provide the Engineer with timely review and decisions necessary in order to permit the Engineer to maintain an agreed upon project schedule. 7. Provide existing utility information, if available. 8. Provide City of Round Rock Title Sheet. 9. Provide boiler plate from the city. 10. Provide timely reviews and decisions. 11. Assist in coordinating with the Texas Department of Transportation. 12. Any additional information or assistance as required by the Engineer and agreed upon by the City. J:\2000\05-0098\CONTRACT#1\SA#7\CBCONTRACT\REVISION2\SA#7_EXHA_CB.DOC Supplemental Agreement No. 7 ADDENDUM TO EXHIBIT B Scope Of Services To Be Performed By Engineer Highway: US 79 Limits: From: FM 1460 To: County Road 195 Length: 1.5 Miles Control: 0204-01-OXX County: Williamson Whereas, Exhibit B, "Scope Of Services To Be Performed By Engineer', is amended by the following: Additional work performed by the Engineer under Supplemental Agreement #7 shall consist of the following: CULVERT/BORE OPTION Develop construction plans for culvert bored under US 79 1. Project Management & Coordination 2. Develop Construction Plans A. Title Sheet B. Typical Sections C. Traffic Control Plan D. Misc. Roadway Details E. Culvert Plan & Profile F. Temp/Perm Erosion Control Plan G. Hydrologic/Hydraulic Calcs. H. Structural Detail of Improved Inlet I. Striping Plan J. Quantities, Summaries & Cost Estimates K. SW PPP Document L. Construction Documents 3. ROW/SURVEYING 4. Horizon Environmental — Cultural resource survey effort Addendum to Exhibit B Supplemental Agreement No. 7 US 79 Page 2 BETTERMENT OPTION 1. TxDOT Reimbursement Assembly Package A. Williamson County Road 195 to 1,000 feet East of WCR 110 1) Original Utility Easements (by SAMS) 2) Betterment Estimate 3) Non-Betterment Estimate 4) Eligibility Ratio 5) Relocation Plans (4 sets, 2 in color) 6) Specifications 7) Estimated Costs B. West of FM 1460 to East of FM 1460 (Williamson County Road 195) 1) Original Utility Easements 2) Betterment Estimate 3) Non-Betterment Estimate 4) Eligibility Ratio 5) ROW Plan with Field Notes and Sketches 6) Relocation Plans (4 sets, 2 in color) 7) Specifications 8) Estimated Costs 2004 SPECIFICATION UPDATE Update plans to TxDOT's 2004 specifications. This includes reviewing and revising the following: 1. Individual Sheet General Notes 2. Pay Items, Bid Codes, Plan Quantities 3. Master General Notes 4. Estimate 5. Special Provisions and Specifications 6. Standards JA2000\05-0098\Contract#1\sa#7\CBContract\Revision2\SA#7_ExhB_CB.doc Supplemental Agreement No. 7 ADDENDUM TO EXHIBIT C Work Schedule Highway: US 79 Limits: From: FM 1460 To: County Road 195 Length: 1.5 Miles Control: 0204-01-OXX County: Williamson Whereas, Exhibit C, "Work Schedule", is voided and replaced by the following: Notice to Proceed Date Contract Signed Culvert/Bore Option 2 weeks Betterment#1 1 month Betterment#2 4 months to 12 months 2004 Specifications Update 6 months to 12 months Original Contract Effort 3 months to 12 months Actual schedule subject to change, as agreed upon by the City and the Engineer, based upon timely review from TxDOT, the City and other entities. J A2000\05-0098\Contract#1\sa#7\CBContract\Revision2\SA#7_ExhC_CB.doc US 79 GAP,CULVERT, ADDENDUM TO EXHIBIT D SUPPLEMENTAL AGREEMENT NO.7 BETTERMENT&2004 SPECS FEE SCHEDULE/BUDGET FOR CITY OF ROUND ROCK SUMMARY OF CONTRACT BY COMPANY HOURS SALARY OVERHEADTROFIT PROJECT %OF _FIRM- _OU - V 15.00% TOTAL TOTALS 77777 I.PROJECT MANAGEMENT(FC 100) CulverVBoreOption- - 16: $6601 $1,153 $272 $2,084 _ _ - -- _ -- Betterment Cost 40 $1,681 $2,937 _$693 $5,310 6.02% - - - _ - - 2004 Update -- - 96 $4,042 - $7,063 $1,666 $12,772 14.49% TOTAL: 152', $6,383 $11,153 $2,630 $20,166 III.RIGHT-OF-WAY(FC 130) -_ Culvert/Bore Option _ 0 $0- - $0 - � $0- --- - Betterment Cost 103' - --- - --- ---- - - , $3,459 $6,045 -- - - -- -- ---- ----- $1,426 $10,930 12.40% 2004 U ate - 0' $0' -- $0 - 0.00 - TOTAL: 103; $3,459 $6,045 $1,426 $10,930 V.ROADWAY DESIGN CONTROLS(FC 160_- CulverVBoreOption 6 $0' - - _-__ __- - - - $0 $0 $0 0.00 l) - w --- - - - - --- Betterment Cost __ _ $0 $0 0.00 - 2004 U date - $824 $6,319 -7.17 - - - 60; $2,000f $3,495 - TOTAL: 60 $2,000 $3,495 $824 $6,319 VI.DRAINAGE(FC 161) " U - Culvert/Bore Option 742 $4,614 $__8,062_ $1,9011 $1_4,578 16.54% --- -- Betterment Cost 01 $0' $0 $0 $0 0.00 - - -- $6,319 2004 Update 60; $2,000' $3,495 - $824 --- --- 7.17 TOTAL: 2021 $6,614' $11,5571 $2,726 $20,897' VII.SIGNING,MARKINGS&DELINEATION(FC 162) -- - Culvert/Bore Option 0' so, $0 $OL -- $0 --0.00 - - Betterment Cost - - - - $Oi -- $0 ._ $0 $0 0.00% 2004 U date 60 $2,000 $3,495 $824 $6,319 7.17 TOTAL: 60 $2,000 $3,495. $824 $6,319 VIII.-MISCELLANEOUS ROADWAY(FC 163)- -.. - - CulvertlBore O tion - --- -- - -- - - - _- - P - �' � � - -� _ $0 0.00% - - -- Betterment Cost 0 $0 $0 - $0 $0 0.00 TOT Ldate 164 $5,441 $9,508 $2,242 $17,192 - 19.50 - - - TOTAL: 1641 $5,441' $9,508 $2,242 $17,192 IX.BRIDGE DESIGN(FC 170) Culvert/Bore Option 0 - -- - $0 $0� $0 $0 0.00 Betterment Cost - 0 $0 -$0 - - - - - - - - - _ $0' - - -$0 - 0.00% -- _TOT L ate 60 $2,000 - $3,495 - - $824 $6,319 7.17% TOTAL: $2,000, $3,495 $824 $6,319 TOTAL CONTRACT LABOR COST Culvert/Bore Option - - - - - P - - 158 5,274 9,215 2173 16,662 19% Betterment Cost 143 5,140 8,9821 2118 16,240 18% e 2004 U at -- - - 500 17,485 30,551 7,2051 55,241 631/6 - - - TOTAL: 807' $27,8991 $48,747 --$11,4971 $88,143 TOTAL CONTRACT DIRECT COST -_ -_ Culvert/Bore Option_ -- - T - - Betterment Cost - -- �-- - $7,500 - 2004 Update - -- $3,000 - $0 TOTAL: $10300 CONTRACTTOTAL Culvert/Bore Option - - - - - _ -- _ _. _ - -- --- - - - - $24,162 24% Betterment Cost --- - ---t- - -20% - - - _ _ 2004 U date - -- - _---- - $19,240` - - - - - $55,241 - 56% TOTAL: $98,643 SA#7_ExhD_CB.XLSIGRAND TOTAL Page 1 of 8 Carter Burgess,Inc. US 79 GAP,CULVERT, ADDENDUM TO EXHIBIT D SUPPLEMENTAL AGREEMENT NO.7 BETTERMENT&2004 SPECS FEE SCHEDULE/BUDGET FOR CITY OF ROUND ROCK TASK AND DESCRIPTION I. PROJECT MANAGEMENT(FC 100) PROJECT SENIOR _ DESIGN ASST DES SR DESIGN CADD CLERICAL TOTAL MANAGER ENGINEER ENGINEER ENGINEER SPECIALIST TECH TOTAL HOURS: 8 0 8 0 _ 0 0 0 16 SALARY RATES: $42.55 $0.00 $39.90 _$30.00 _ $0.00 $27.00 $16.00 $22.21 --- DIRECT SALARY COSTS: - - $340 $0 $319 $0 $0 $0 $0 $660 -- -- - OVERHEAD MULTIPLIER: 1.7473 $595 $0 $558 $0 $0 $0 $0 $1,153 PROFIT: 15.00% -- -- $140 - $0 - - -$132 -- -- $0 --- $0 -- - $0 - $0 $272 TOTAL: 1,075 0 1,008 0 0 so 0 $2,084 VI.DRAINAGE(FC 161) PROJECT SENIOR DESIGN ASST DES SR DESIGN _ C_AD_D CLERICAL__ TOTAL MANAGER ENGINEER ENGINEER ENGINEER SPECIALIST TECH TOTAL HOURS: _ 22 0 20 60 0 40 0 142 SALARY RATES: - - -- -- - _ 2 --------- $42.55 -$0.00 $39.90 - -$30.00 -$0.00 _- $27.00 $16_.00 $22.21 DIRECT SALARY COSTS: __ $936 $0 $798 $1,800 -$0 - $1,080 $0 $4,614 ---- _ OVERHEAD MULTIPLIER: 1.7473 $_1,636 $0 - -- - --- -_$1,394 $3,145 _ _ $0 __$1,887 -- -_ $0 $8,062 PROFIT: 15.00% $386 $0 $329 $742 $0 $445 $0 $1,901 TOTAL: $2,958 so $2,521 $5,687 $3,412 $b-F----$14,578 CLASSIFICATION TOTAL SALARY DIRECT_ OVERHEAD PROFIT TOTAL %of HOURS RATE SALARY MULTIPLIER -- - Bore - COST 1.7473 15.00% TOTAL PROJECTMANAGER _ 30 $42.55 $1,277 $2,230.43 $526 $4,033 24.21% SENIOR ENGINEER - - - - - $0.00 $0 $0.00 $0 __ _ $0 0.00% DESIGN ENGINEER - 28 $39.90 _ - $1,117 $1,952.08 - - $460 $3,530 21.18% - ASST DESIGN ENGINEER _ 60 $30.00 $1,800 $3,145.14 $742 $5,687 34.13% - - SENIOR DESIGN SPECIALIST - - - - - 0 $0.00 $0-00--- - - - - - ---80 $0.00 $0 $0 0.00%- CADD TECHNICIAN - - -- -- _ -- - 40 $27.00 $1,080 - $1,887.08 $445 $3,412 20.48% CLERICAL - --- -- 0 $16.00 $0 $0.00 $0 - ---$0---0.0-0% -- TOTALS --- 158 -- $5,274 $9,215 $2,173 $16,662 100.00% DIRECT COST-Bore _ M lar Plots 0 Square Feet @ $2.50/Sq.Ft.= $0 Blueline Reproductions or Printing - - - 0 S uare Feet @ $.25/S .Ft. - - Ex ress Deliveries -0 Deliveries @ $20.00/Del 0 -- - - -a $0 -- - -- Auto Mileage 0 Miles� $0.35/mile --- Auto Rental - - - - --- 0 D� $60/da ------ ----� -- -- -- - $0 - - -- _ Per Diem --- _ - - - - - = - --- � - $0 � aa $30da ROW/SURVEYING $0 - - ----- Horizon Environmental --- - - - - - - _ _ - � _ _ �---- - -$1,500 $6,000 TOTAL DIRECT COST-Bore $7,500 SUMMARY-Bore Labor+Overhead+Cost - - -- Direct Cost -} � $16,662$7,500 - - - - TOTAL CONTRACT COST-Bore $24,162 SA#7_ExhD_CB.XLS\TOTAL COST(Bore) Page 2 of 8 Bore US 79 GAP,CULVERT, ADDENDUM TO EXHIBIT D SUPPLEMENTAL AGREEMENT NO.7 BETTERMENT&2004 SPECS FEE SCHEDULE/BUDGET FOR CITY OF ROUND ROCK TASK AND DESCRIPTION - - — STANDARD NO.OF IPROJECT SENIOR DESIGN ASST DESIGN SR DESIGN __ CADD CLERICAL qTOTALS/SHTSHEETS SHEETS MANAGER ENGINEER ENGINEER ENGINEER SPECIALIST TECHNICIANHRS/SHT HOURS HRS/SHT HOURSHRSISHT HOURS HRS/SHT HOURS HRS/SHT HOURS HRS/SHT HOURS HRS/SHT HOURS PROJECT MANAGEMENT(FC1008 SUBTOTALS 0 0 8 1 0 1 8 T 6 0 0 0 16 DRAINAGE(50 Scale)(FC161) -- 1. Develop Construction Plan�ulvert/Bore Option) - - - - - - A. Title Sheet B. Typical Sections 4- - 1 C. Traffic Control Plan - __ - 1 4 4 -- - -- . Misc.Roadwa Details_ _ _ 14 --- -- E. Culvert Plan&Profile - - - -- — - ---- 12 F. Tem Perm Erosion Control Plan --- - -- G. HydrologiG4Hydraulic Calcs. -_ - _ -- - -- - -- --let 8-- - - - H. Structural Detail of tri in Plan 16 Improve In - --- 4 - -- - -- -- -- - 1. - - - _ - - 24 16 - - - - - -- J. uant.,Summaries&Cost Est. - - - -- -- -- 2 2 4 4 - K. SWPPP Document -Construction Documents - -- - - ------ -- - L. 1 1 t3 SUBTOTALS 0 10 22 0 20 60 1 0 40 0 T 0 TOTAL SHEETS AND/OR HOURS I 1 0 30 1 0 28 1 60 0 40 0 1 158 SA#7_ExhD_CB.XLS\PLANS(Bore) Page 3 of 8 Bore t US 79 GAP,CULVERT, ADDENDUM TO EXHIBIT D SUPPLEMENTAL AGREEMENT NO.7 BETTERMENT&2004 SPECS FEE SCHEDULE/BUDGET FOR CITY OF ROUND ROCK TASK AND DESCRIPTION 1. PROJECT MANAGEMENT FC 100) - PROJECT SENIOR DESIGN ASST DES SR DESIGN CADD CLERICAL TOTAL MANAGER ENGINEER ENGINEER ENGINEER SPECIALIST TECH - --- - - TOTAL HOURS: 32 0 8 0 0 0 0 40 SALARY RATES: -- -- - --- -- - $42.55 $0.00 $39.90 $30.00 _$_0_.00 $27.00 $16.00 $22.21 DIRECT SALARY COSTS: ---so-- - $1,362 $0 $319 $0 _$0 _ _$0 $0 --$l-,68-1- OVERHEAD MULTIPLIER: 1.7473 $2,379 $0 $558 $0 $0 $0 $0 $2,937 PROFIT. 15.00%- $561 _ $0 $132 -- -$0 $0 $0 $0 - $693 TOTAL: $4,302 0 1,008 1 so so so I so $5,310 III.RIGHT-OF-WAY(FC 130) _ - __ __ PROJECT _ SENIOR DESIGN ENGINEER SR DESIGN CADD CLERICAL TOTAL MANAGER ENGINEER ENGINEER SPECIALIST DRAFTER TOTAL HOURS: 15 0 28 _ 28 _ _ 0 _ 32 0 103 _ BILLING RATE $42.55 $0.00 $39.90_ $30.00 $0.00 $27.00 _ $16.00 $22.21 -_ DIRECT SALARY COSTS: $638 $0 $1,117 $840 _ $0 $864 $0 $3,459 OVERHEAD MULTIPLIER: 1.7473 $1,115 $0 $1,952 $1,468 $0 $1,510 $0 $6,045 PROFIT: 15.00% $263 $0 $460 $346 $0 $356 $0 $1,426 TOTAL: 2,016 sol $3,530 2,654 0 2,730 0 10,930 CLASSIFICATION TOTAL SALARY DIRECT OVERHEAD PROFIT TOTAL %of HOURS RATE SALARY MULTIPLIER Betterment - .- - - COST 1.7473 15.00% TOTAL _ PROJECT MANAGER_ 47 $42.55 $2,000 $3,494.34 $824 $6,318 38.91_% - - 0. -- - $0 -- $0.00 ---$0 --- $0 0.00% -- - SENIOR ENGINEER- - - _ - -- - -- - -- $0.00 --- -- $1.436 -- -$2,509.82 - $592 - ---$4,538 27.94% - DESIGN ENGINEER _ _ _ _ 36 $39.90 + -- -- ASST DESIGN ENGINEER - ---- - 30.00 $840 $1,467.73 $346 $2,654 16.34% SENIOR DESIGN SPECIALIST - ---- -$6-00- - -- 0 -$0.00 -- - - --- - - -- -$0 $0 -- --$0 0.00% - CADD TECHNICIAN - - --- ---- 32 $1,50967 -- -- -- --_ -__ $27.00 $864 . - -$356 - $2,730 16.81% CLERICAL 0 $16.00 - - $0 $0.00 $O $0 0.00% TOTALS -- -- - 143 $5,140 $8,982 $2,118 $16,240 100.00% DIRECT COST-Betterment M lar Plots 0 Square Feet @ $2.50/Sq-Ft.- - - - ---- - _- - -- - Blue6ne Reproductions or Printing ---- -- -_-_ � 0 Square Feet� $25/S�.Ft.= -_ _ _ _ -- - I - - I Ex ress Deliveries ---- - __---- _ -- Auto - -_ -- Deliveries @ $20.00/Del.= Auto Mileage -- - -- - - --- -- �- 0 Miles � - $0.35/mile= -- -- Auto Rental - - - - -- - - -- - -- -- ------ -- - ---- - - -$0 -- _ 0 Day - $60/day- - - -_ - - 0 Da - $30/day= + - --- --- - $0 Per Diem - I -- + SAMS Inc Cost - $0 - - -- - $3,000 TOTAL DIRECT COST-Betterment _ $3,000 SUMMARY-Betterment Labor+Overhead;Cost - - - Direct Cost r - -- - _ _ $16,240 i $3,000 TOTAL CONTRACT COST-Betterment - $19,240 SA#7_ExhD_CB.XLS\TOTAL COST(Betterment) Page 4 of 8 Betterment US 79 GAP,CULVERT, ADDENDUM TO EXHIBIT D SUPPLEMENTAL AGREEMENT NO.7 BETTERMENT&2004 SPECS FEE SCHEDULEIBUDGET FOR CITY OF ROUND ROCK TASK AND DESCRIPTION _ ------ STANDARD NO.OF PROJECT__ SENIOR DESIGN ASST DESIGN SR DESIGN CADD CLERICAL TOTAL HRS/SHT ? SHEETS SHEETS MANAGER ENGINEER ENGINEERENGINEER SPECIALIST TECHNICIAN HRS/SHT HOURS HRS/SHT HOURS HRS/SHTj HOURS HRS/SHTj HOURS JHRStSHT HOURS JHRSISHTJ HOURS HRS/SHT HOURS PREPARATION OF CONSTRUCTION PLANS SUBTOTALS 0 0 PROJECT MANAGEMENT(FC100) - - - - - - -- 1.Coordination,preparation and review of Documents --- - - - ------- - - - ---- --- .---._- 24 0 0 0 0 0 0 24 2.Meetings(2 with City) -- - -- -- - --- - ----- -- - -- - - -- -- --- - 8 - 0 8 0 0 0 0 16 0 0 0 - 0 -- - - 0 0 0 0 --- SUBTOTALS 0 0 32 0 8 0 0 0 0 40 RIGHT-OF-WAY FC 130) 1. TxDOT Reimbursement Assembly Package - - - -- A. Williamson County Road 195 to 1,000 feet East of WCR 110 - -- - -- 11 Original Utility Easements(by SAMS) - -- --- 1 0 2) 0 0 0 0 0 1 Betterment Estimate 1 0 2 2 0 0 0 5 3 Non-Betterment Estimate 1 --- --- ---.--- - -- - 0 2 2 0 0 0 5 - - - - -- 4) El�ibility Ratio _- - 1 - 0 --- 2 - - -2 -- 0-- _ _ 0 - --o - - 5 -- - -- - - - - - 5)_Relocation Plans(4 sets,2 in color) 1 0 2 2 0 __ 16 0 21 - - - - --- -- -- --_0 ____ 6) Specifications__ 1 0 2 2 0 _ __ 0 5 7�_Estimated Costs 1 0 2 2 0 0 0 5 B West of FM 1460 to East of FM 1460(Williamson County Road 195) - - - - -- - 1Lriginal Utiles Easements 1 0 2 2 0 0 0 5 2) Betterment Estimate 1 0 2 2 0 0 0 5 -- - -- - - - - - 3) Non-Betterment Estimate - 1 0 2 2 0 0 0 5 1 - - Eligibility Ratio 0_ 2 _ 2 -- - -- - 5 ROW Plan with Field Notes and Sketches 1 0 - 2 2 0 0 0 __5 - - - - - -Relocation Plans 4 sets,2 in colors 1 0 2 2 0 16 0 21 7) Specifications - - -- - --- ---- --- - --- — - - 0 - - 2 - 2 - 0 0 0 5 - - - -- - 8 Estimated Costs 1 0 2 2 0 0 0 5 SUBTOTALS1 0 0 150 28 28 0 32 0 1 103 0 47 � � 0 - - 36 28 0 32 --- TOTAL SHEETS AND/OR HOURS 0 143 SA#7-ExhD_CB.XLS\PLANS(Betterment) Page 5 of 8 Betterment US 79 GAP,CULVERT, ADDENDUM TO EXHIBIT D SUPPLEMENTAL AGREEMENT NO.7 BETTERMENT&2004 SPECS FEE SCHEDULE/BUDGET FOR CITY OF ROUND ROCK TASK AND DESCRIPTION I. PROJECT MANAGEMENT(FC 100 PROJECT SENIOR DESIGN ASST DES SR DESIGN CADD CLERICAL TOTAL M - MANAGER ENGINEER ENGINEER ENGINEER SPECIALIST TECH TOTAL HOURS: 80 0 16 0 00 0 96 SALARY RATES: $4255__ $0._00 $_39.90__ $30.00 _ $0.00 $_27.00 $16_.00 $22.21 DIRECT SALARY COSTS: $3,404 $0 $638 $0_ _ _ $0 $0 $0 $4,042 -- OVERHEAD MULTIPLIER: 1.7473 $5,948 _ $0 $1,115 $0 $0 $0 $0 $7,063 PROFIT: 15.00% $1,403 $0 $263 1 $0 1 $0 I $0 1 $0 1 $1,666 TOTAL: $10,755 $0 $2,0171 $0 I $0 I $0 1 $0 1 $12,772 V.ROADWAY DESIGN CONTROLS(FC 160) PROJECT_ SENIOR DESIGN ENGINEER SR DESIGN CADD CLERICAL TOTAL MANAGER ENGINEER ENGINEER SPECIALIST DRAFTER TOTAL HOURS: _ 4 0 20 20 0 16 0 60 _ SALARY RATES: $42.55 $0.00 $39.90 $30.00 $0.00 $27.00 $16.00 $22.21 _ DIRECT SALARY COSTS: _ $170 $0 $798 $600 $0 $432 $0 $2,000 OVERHEAD MULTIPLIER: 1.7473 - $297 $0 $1,394 $1,048 $0 $755 $0 $3,495 PROFIT: 15.00% $70 $0 $329 $247 $0 $178 $0 $824 TOTAL: $538 $0 $2,521 $1,896 $0 $1,365 $0 $6,319 VI.DRAINAGE(FC 161 - - PROJECT SENIOR DESIGN ASST DES SR DESIGN ___ CADD CLERICAL TOTAL MANAGER ENGINEER ENGINEER ENGINEER SPECIALIST TECH TOTAL HOURS: 4 0 20 20 0 16 0 60 SALARY RATES: $42.55_ $0.00_ _ $_39._90 $30.00 $0.00 $27.00 $16.00 $22.21 DIRECT SALARY COSTS: --- - -__ -__ $170 __- -$0--- $798_ $_600 $0 _ _ $432_ $0__ $21000 OVERHEAD MULTIPLIER -1747- 7473 $297 $0 $1,394 $1,048 $0 $755 $0 $3,495 -PROFIT:-- 15.00%, - $70 - - - $0 $329 - $247 - $0 $178 - $0 ---- $824 TOTAL: $538 $0 1. $2,521 $1,896 $0 $1,365 $0 $6,319 VII.SIGNING,MARKINGS&DELINEATION(FC 1621 PROJECT SENIOR DESIGN ENGINEER SR DESIGN CADD CLERICAL TOTAL MANAGER ENGINEER ENGINEER SPECIALIST DRAFTER TOTAL HOURS: _ 4 0 20 20 0 16 0 60 SALARY RATES: $42.55 $0.00 $39.90 __ $30.00- $0.00 $27.00_ $16.00 $22.21 DIRECT SALARY COSTS: $170 $0 $798 $600 $0 $432 $0 $2,000 OVERHEAD_M_U__LTIPLIER: 1.7473 $297 $0 _ $1,394 - $1,048 $0 $755 $0 $3,495 PROFIT: 15.00% $70 $0 $329 1 $247 $0 1 $178 $0 $824 TOTAL: $538 $0 $2,521 1 $1,896 $0 $1,365 $0 $6,319 VIII.MISCELLANEOUS ROADWAY FC 1631 PROJECT SENIOR DESIGN ASST DESSR DESIGN CADD CLERICAL TOTAL ____ MANAGER ENGINEER ENGINEER ENGINEER SPECIALIST TECH TOTAL HOURS: 12 0 52 52 0 48 0 164 SALARY RATES: $42.55 _ $0.00 $39.90 . $30.00 _ __$0.00 $27.00 $10 $22.21 - 6.0--- -- DIRECT SALARY COSTS: $511 $0 $2,075 _ $1,560 $0 _ $1,296 $0 $5,441 OVERHEAD MULTIPLIER: 1.7473 $892 $3,625 $2,726 $0 $2,265 $0 $9,508 PROFIT: 15.00% $210 $0 $855 $643 --$0--1- $534 $0 $2,242 TOTAL:1 $1,613 $0 $6,5551 $4,929 1 $0 $4,095 $0 $17,192 SA#7_ExhD_CB.XLS\TOTAL COST(2004) Page 6 of 8 2004 Specifications US 79 GAP,CULVERT, ADDENDUM TO EXHIBIT D SUPPLEMENTAL AGREEMENT NO.7 BETTERMENT&2004 SPECS FEE SCHEDULEIBUDGET FOR CITY OF ROUND ROCK '. IX.BRIDGE DESIGN(FC 170) PROJECT SENIOR DESIGN ENGINEER SR DESIGN CADD _ CLERICAL TOTAL MANAGER ENGINEER ENGINEER SPECIALIST DRAFTER TOTAL HOURS: 4 0 20 20 0 16 0_ 60 SALARY RATES: $42.55 $0.00 $_39.90 $30.00-- $0.00 $27.00 $16.00 $22.21 DIRECT SALARY COSTS: $170 $0 $798 $600 $0 $432 $0 $2,000 OVERHEAD MULTIPLIER: 1.7473 $297 $0 $1,394 $1,048 $0 $755 _ $0 $3,495 PRbFjT-1 15.00% $70 $0 $329 $247 1 $0 1 $178 $0 1 $824 TOTAL: $538 1. $0 $2,521 $1,896 $0 $1,365 $0 $6,319 CLASSIFICATION _ TOTAL SALARY DIRECT OVERHEAD PROFIT TOTAL %of HOURS RATE SALARY MULTIPLIER 2004 COST 1.7473 15.00% TOTAL PROJECT MANAGER _ 108 $42.55 $4,595 $8,029.54 $1,894 $_14,_519 26.28% SENIOR ENGINEER _ _ 0 $0.00 $0 _ $0.00 $0 $0 0.00% DESIGN ENGINEER _ _ _ 148 $39.90 $5,905 $10,318.16 $2,434 $18,657 33.77% --------- --------- ASST DESIGN ENGINEER _ 132 $30.00 $3,960 $6,919.31 $1,632 $12,511 22.65% SENIOR DESIGN SPECIALIST 0 $0.00 $0 $0.00 $0 $0 0.00% CADD TECHNICIAN _ _ 112_ $27.00 $3,024 $5,283.84 $1,246 $9,554 _ 17.30% CLERICAL 0 $16.00 $0 $0.00 $0 $0 0.00% TOTALS 500 $17,485 $30,5511 $7,205 $55,241 100.00% DIRECT COST-2004 Specifications M lar Plots0 Square Feet @ $2.50/S .FL= $0 - - . Blueline Reproductions ductions or Printing 0 S uare Feet -$.25/Sq.Ft.= $0 _ _ _ _ _ $ Express Deliveries _ 0 Deliveries C�? $20.00/Del Auto Mileage 0 Miles 0$0.35/mile t $0 Auto Rental - - - --- -0 Da $60/day= - -- --�-- Per Diem $0 - 0 Da $30/da = $0 TOTAL DIRECT COST-2004 Specifications $0 SUMMARY-2004 Specifications Labor+Overhead+Cost Dire $55,241 ct Cost $0 TOTAL CONTRACT COST-2004 Specifications $55,241 SA#7_ExhD_CB.XLS\TOTAL COST(2004) Page 7 of 8 2004 Specifications US 79 GAP,CULVERT, ADDENDUM TO EXHIBIT D SUPPLEMENTAL AGREEMENT NO.7 BETTERMENT&2004 SPECS FEE SCHEDULE/BUDGET FOR CITY OF ROUND ROCK TASK AND DESCRIPTION STANDARD NO.OF _ PROJECT SENIOR _ DESIGN ASST DESIGN SR DESIGN CADD CLERICAL TOTAL HR_S/SHT SHEETS SHEETS MANAGER ENGINEER ENGINEER ENGINEER SPECIALIST TECHNICIAN HRSISHT HOURS HRS/SHT HOURS HRS/SHT HOURS HRSISHT HOURS HRS/SHr HOURS HRSISHT HOURS HRS/SHT HOURS PROJECT MANAGEMENT FC700 1.Coordination,preparation and review of Documents - 64 0 0 _ -. 0 _ 0 0 0 2.Meetings2 with Ci and 2 with State). _ i 6 0 16 0 0 0 0 32 SUBTOTALS 0 0 80 0 16 0 0 0 0 96 ROADWAY SHEETS 100 scale FC1 SO) Update Plans t0 TxDOT 2004 Specftations -30 1. Individual Sheet General Notes 2 10 _to ____ ___- 8 2. Pa Items,Bid Codes,Plan Quantities 10 ----- 70 --- --- 8- - -_ - - ---_- -_. --- ---- 0 3. Master General Notes _ - ---- -- -- -- -.._ -.- _...- -- --- -----_- --- p 4. Estimate -- ----- 0 ----- 5. Special Provisions and Specifications - - -- 6. Standards SusTi5TT191 0 1 0 1 1 4 0 20 20 0 16 0 60 DRAINAGE(50 Scala)(FC161) Update Plans to TxDOT 2004 Specifications _ -. -- --- _--.- -_- _... -- _ 30 1 Individual Sheet General Notes 2 - -�� 10 - - - - -t3, -- -_ __- _ - 30 2._-P�.Items,Bid Codes,Plan Quantities - _. -_ 2 10 1t) -- - -- - --.8 -- ._O 3. Master General Notes - -- "- 4. Estimate 5. Special Provisionsand Specifications -- 0 6. Standards _ - SUBTOTALS 0 0 4 0r 20 20 0 16 0 66 SIGNING,MARKINGS AND DELINEATION FC 162 Update Plans to TxDOT 2004 Specifications -- 1. Individual Sheet General Notes _ _2 10 10 8 30 2. Pa Items,Bid Codes,Plan Quantities 2 _ 10 10 8 30 _ 3. Master General Notes _ -- -- - -- 0 4. Estlmate _-. -- 5. Special Provisions and Specifications -- -- - _6. Standards -- - SUBTOTALSI 0 0 1 4 1 0 20 20 0 16 0 60 MISCELLANEOUS(ROADWAY) FC 163) U ate Plans to TxDOT 2004 ifications _ - -- --- - -_ - -- -... -- - 30 1. Individual Sheet General Notes -_ 2 - - 10 - _ 10 _ - _ - B _ _ ___-__. _-- - - -_.. -_ _30 2. Pay Items,Bid Codes,Plan Ouantities - - _ _2 ___- ---10 - 10,- -- _ --8 - --- 3. Master General Notes - 2 8 -_-_tl 8 26 4. Estimate - _ _ 2 _ 8 26 5. Special Provisions and Specifications 8 _ --- 28 _.. _ __ _-- ---- -- - -�---- -- -8- -- -- 8. - - _.. - ____ 6. Standards 8 26 SUBTOTALS 00 12 0 52 52 1 1 0 48 0 164 BRIDGE DESIGN FC 170 Update Plans to TxDOT 2004 Specifications8 - 30 1. Individual Sheet General Notes - 2. Pa Items,Bid-Codes,Plan Quantities 2 10 10 8 _ 30 3. Master General Notes -- --� 0 4. Estimate 0 5. Special Provisions and�ifications -_ _-- 0 6. Standards .. - ------ ---- SUBTOTALSI 0 0 4 0 20 20 0 16 0 60 TOTAL SHEETS AND/OR HOURS I 1 0 1 108 1 0 1 148 132 1 0 112 0 500 SAft7_ExhD_CB.XLS%PLANS(2004) Page 8 of 8 2004 Specifications