R-04-09-09-11D1 - 9/9/2004 RESOLUTION NO. R-04-09-09-11D1 WHEREAS, Sections 395 . 053 and 395 . 054, Texas Local Government Code, require a municipality modifying impact fees to adopt a resolution setting a public hearing date to consider updates to the land use assumptions and capital improvements plan and amendments to the impact fees for the designated service area, and WHEREAS, the City has determined the land use assumptions, capital improvements plan and/or the impact fees need to be updated, and WHEREAS, it is necessary for the City Council to set a date, time, and place for the holding of the public hearing in order to comply with said Texas Local Government Code requirements for same, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That a public hearing to consider updates to the land use assumptions and capital improvements plan and amendments to the impact fees for the designated service area be held on the 14th day of the month of October, 2004, at 7 : 00 o' clock p.m. at 221 E. Main Street, Round Rock, Williamson County, Texas . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. @PFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R40909D1.WPD/sls RESOLVED this 9th day of September, 2004 . Mayor City of Round Rock, Texas (Xq�-t ' CHRISTINE R. MARTINEZ, City Secre ry 2 '�s �y;.'�jY'gls. �yF yCS� ��il��'r�`�� �"'"3�.'v�, s,- � "'.•,... _'_ � .- Capital Improvement Impact Fee Executive Summary The City of Round Rock is in the process of updating its water and wastewater impact fees to keep the fee current with newly-acquired service areas and updated CIP information. The determined fee amount was calculated using the prospective land uses and capital improvements plan, the cost of existing and new utility capacity, and consideration of a credit to new customers for capital contributions made through rate payments. Maximum impact fees were developed in component pieces comprised of separate amounts for water supply, treatment, pumping, elevated storage, ground storage, and transmission which will facilitate the consideration of credits from the applicable fee if a developer builds and dedicates eligible facilities to the City. The rate credit calculation considered existing capital obligation to wholesale providers, existing debt, future debt payments incurred in the year in which the facilities would be built and financed, and the projected LUEs at the mid-point year of 2008 specific rate credit. This results in the maximum impact fee calculation of$4,296 per LUE for water and $1,306 per LUE for wastewater, totaling $5,602 per LUE. Approximately 72% of total City area is currently in residential land uses with 18% in commercial/industrial land uses and 9% in various open space or floodplain land uses. Projected residential land uses are expected to decease slightly to 70% of total potential service land area with non-residential and open space/floodplain shares of total land use growing slightly to 19% and 10% of total land area, respectively. The City's future ETJ was used as the primary basis for the impact fee service area. The current 2004 water service area population is estimated at about 96,093 persons. A projected water service area population of 145,260 persons is anticipated by the end of 2013, reflecting an anticipated 10-year growth of about 51%. Given the projected growth in water and wastewater demands, existing capacity, and the modeling of additional infrastructure needs, various additional facilities have been identified to help meet the needs for the next ten years. In year 2004 dollars, the City's 10-year capital need for new capacity totals approximately$100 million for water and $50 for wastewater. The projected rapid growth of City has necessitated the need for major water supply and treatment projects and the need to update the fees. The City's near-term implementation of the Lake Stillhouse Hollow water supply will only last the City until 2010. It is then forecast that a new water supply from Lake Travis will be required at that time to meet the additional water demands during the remainder of the 10-year planning period. Related water treatment plant, water storage, and pumping improvements are also identified in the report associated with the new Lake Travis supply. Memorandum To:Members, Impact Fee Technical Advisory Committee From: Tony Bagwell Date: August 5, 2004 Re:Changes Resulting from Comments from Advisory Committee Meeting of 8/4/04 As requested, I have made three changes to the impact fee model and report. The first change was a matter of better clarity and presentation. The following two changes affected the maximum fee calculation. (1) The first change involved clearly delineating in Table 5 the existing delivery capacity of the Lake Stillhouse Hollow supply from that of additional improvements still needed to make full use of the contracted Stillhouse water. The existing Stillhouse delivery capacity shown in Table 5 is now shown separately and matches the existing supply capacity shown in Table 3. Two footnotes and some additional text were added to facilitate the comparison of the supply and demand numbers between the two tables. (2) The second change that was made involved changing the per capita water use assumption that was employed to forecast future water demand. As was explained at the prior meeting, had previously used 2003 water use data from the City so that it correlated with the 2003 meter count and LUE determination that was needed to calibrate how much an LUE uses. The year 2003 was not a hot, dry year. Alternatively, the City's Water Distribution Master Plan report used a"dry-year" per capita water use value as the basis for its water demand forecast which indicated a need for additional water supply (beyond the Stillhouse supply) by the year 2010. As discussed, the "dry-year" per capita approach is more appropriate for forecasting water supply and would provide consistency with the Master Plan report, so that change was also made to the water demand forecasts. This change, however, had implications on the available LUE capacity of water facilities and the maximum water impact fee calculation. i , Since each LUE is now using more water because of the higher dry-year per capita assumption, this not only increases water demand, but it also reduces the LUE capacity of various facilities. For example, a facility that previously had a capacity of serving 10,000 LUEs may only now have a capacity to serve 9,000 LUEs, because each LUE is now using more water. The physical capacity of the facility hasn't change, but how many LUEs it can serve has changed due to this higher per-LUE use. With the facility still costing the same amount of money and the LUE facility capacity being lowered, the unit capital cost per LUE went up thus putting upward cost pressure on the water fee amount. (3) The third change involved some reallocation of utility demand between the existing and new water facilities so that the Stillhouse water supply was essentially"used-up"first with the Lake Travis supply servicing the remainder of the 10-year water needs. As reflected in the attached revised report, the net result of these changes was an increase in the maximum water fee from $4,000 per LUE to $4,296 per LUE. The wastewater fee of $1,306/LUE was unaffected. The requested revisions now result in a maximum combined w/ww fee of $5,602/LUE. ` 2004 UPDATE OF THE - WATER AND WASTEWATER IMPACT FEES OF THE CITY OF ROUND ROCK t Prepared by. HDR Engineering, Inc. 2211 S. I1-1-35, Suite 300 5 , Austin, Texas 78746 August 2004 2004 UPDATE OF THE WATER AND WASTEWATER IMPACT FEES OF THE CITY OF ROUND ROCK Table of Contents r Section Page f ' 1.0 INTRODUCTION AND SUMMARY 1 2.0 UTILITY SERVICE AND FEE APPLICATION AREA 2 3.0 LAND USE ASSUMPTIONS 3 t 4.0 CURRENT AND PROJECTED UTILITY DEMAND AND SUPPLY 4 5.0 IDENTIFIED MAJOR CAPITAL IMPROVEMENT NEEDS AND COSTS 8 6.0 CONSIDERATION OF OTHER METHODS OF CAPITAL PAYMENT 11 a 7.0 ALTERNATIVE IMPACT FEE CALCULATIONS 12 s ' E h ; I ' Attachment A— Location of Proposed Improvements Identified in the Water CIP 14 i . ii Upstate of Water Impact Fees 2004 UPDATE OF THE WATER AND WASTEWATER IMPACT FEES OF THE CITY OF ROUND ROCK r . 1.0 INTRODUCTION AND SUMMARY The City of Round Rock is in the process of updating its water and wastewater impact fees to keep the fee current with newly-acquired service area and updated CIP information. This report presents HDR Engineering, Inc.'s maximum impact fee determination for consideration by the City's Impact Fee Advisory Committee and the Round Rock City Council. Consistent with State law, the methodology that determines the maximum fee amount considers for each fee component either: (1) consideration of a credit for other methods of payments for utility capital by a new customer, such as through utility rates or taxes, or alternatively (2) a reduction of maximum fee amount equal to 50 percent of the unit capital cost of providing new service. By maximum amounts, this means that the determined fee amount was calculated as the highest that can be lawfully levied by the City, given the prospective land uses and capital improvements plan, the cost of existing and new utility capacity, and consideration of a credit to new customers for capital contributions made through rate payments. The City Council can decide to enact fees less than the maximum amounts shown in this report. r - i As detailed later in this report, the maximum impact fees were developed in component pieces. For instance, the overall water fee is comprised of separate amounts for water supply, treatment, pumping, elevated storage, ground storage, and transmission. This will facilitate the consideration of offsets or credits from the applicable fee if a developer builds and dedicates eligible facilities to the City or the City provides wholesale service to a neighboring utility and ` wishes to charge only certain portions of the fee. The maximum fee amounts do not include f . capital costs for any donated facilities provided by developers at their own expense. i , Planning, service demand, and design factors assumptions used in the water and wastewater facility sizing and costing were developed by HDR and CDM engineers, respectively. Data on current utility demand, existing utility assets, outstanding utility debt and prospective cash versus debt financing were obtained from or coordinated with the City of Round Rock staff. HDR combined these elements into the maximum impact fee calculations presented in this report. Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 1 Update of Water Impact Fees 2.0 UTILITY SERVICE AND FEE APPLICATION AREA The City's future ETJ was used as the primary basis for the impact fee service area of the City shown in Figure 1. This fee application area boundary will comprise the area in which Round Rock may levy the impact fees, in-part or in-full, if City service is provided. This boundary does not, however, imply a legal obligation of the City of Round Rock to serve beyond its incorporated limits. If the City does not provide service, in full or in-part, then the impact fees would not apply. r , f 1431 146 79 CIN OF ROUND ROCK Water and Wastewater Impact Fee Application Boundary Figure 1 Water and Wastewater Impact Fees Application Area Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 2 Update of Water Impact Fees 3.0 LAND USE ASSUMPTIONS Table 1 provides an estimate of the current and future land use patterns of the potential service area with information obtained from the City of Round Rock. As indicated, about 72% of total City area is currently in residential land uses with 18% in commercial/industrial land uses and 9% in various open space or floodplain land uses. TABLE 1 CURRENT AND PROJECTED LAND USE CITY OF ROUND ROCK Current Future(including ETJ) ITEM Acres % Acres % Residential 27,645 72% 31,854 70% CommerciaVlndustrial 6,980 18% 8,490 191% Public Facility 425 1% 945 2% Subtotal Developed 35,050 91% 41,289 90% Open Space 3,464 9% 4,522 101% Total Land Use Acreage 38,514 100% 45,811 100% Source:City of Round Rock,2004. Does not include acres for mining. Over time as the City grows into its future ETJ and utility service area, developed land areas will both increase and become a higher percentage of overall land uses. Projected residential land uses are expected to decease slightly to 70% of total potential service land area with non- residential and open space/floodplain shares of total land use growing slightly to 19%and 10% of total land area, respectively. The current 2004 water service area population is estimated at about 96,093 persons. A projected water service area population of about 145,260 persons is anticipated by the end of 2013, reflecting an anticipated 10-year growth of about 51%. t 3 Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 3 Update of Water Impact Fees 4.0 CURRENT AND PROJECTED UTILITY DEMAND AND SUPPLY Table 2 relates the number of water and wastewater utility connections by water meter size and what is termed a Living Unit Equivalent (or LUE) conversion factor for meters of varying sizes. A typical single family residential house in Round Rock uses a 5/8" water meter and is considered to be one LUE. Based on American Water Works Association standards, the equivalent number of 5/8" meters can be determined for water meters of larger size. In this manner, meters of larger size (i.e. larger potential service demands) can be couched in terms the equivalent demand of a number of typical single family homes. For this reason, the LUE concept is a useful tool for being able to apply a base fee amount to service requests of varying meter sizes. TABLE 2 LUE EQUIVALENT CONVERSION FACTORS CITY OF ROUND ROCK Living Units Number of Number of Equivalent(LUEs) Meters LUE's Meter Size per Meter(a) in 2004(b) in 2004 WATER 5/8" 1.0 23,418 23,418 3/4" 1.5 86 129 V. 2.5 311 778 1.5" 5.0 218 1,090 2" 8.0 313 2,504 3" 16.0 71 1,136 4" 25.0 32 800 6" 50.0 15 750 8" 80.0 8 640 f 10" 115.0 - - Total Water 24,472 31,245 WASTEWATER F 5/8" 1.0 23,242 23,242 3/4" 1.5 71 107 1" 2.5 210 525 £ 1.5" 5.0 165 825 2" 8.0 214 1,712 3" 16.0 58 928 4" 25.0 24 600 6" 50.0 13 650 8" 80.0 7 560 10" 115.0 - - Total Wastewater 24,004 29,149 (a) Derived from AWWA C700-C703 standards for continuous rated flow performance scaled to 5/8"meter. (b) Source: City of Round Rock,meter count as of April 2004. Update of WaterlWastewater Impact Fees of the City of Round Rock, Texas 4 Update of Water Impact Fees Tables 3 and 4 summarize the City's current and projected water and wastewater service demands and existing supply (service) capabilities by facility. Current and future service demands are also compared with the existing service capacity of the utility systems. Water demand was forecast using population forecasts from the City Planning Department, meter count/LUE estimates from the City Utility Billing Section, and a dry-year per capita water use statistic used the Texas Water Development Board and the Regional Water Planning Group in their water supply planning efforts. Wastewater demand was forecast using historical data and technical studies of the City system. With the anticipated rapid growth of the City and surrounding area, potable water utility demand in certain service areas is expected to exceed the available capacity of raw and treated water supply, pumping, elevated and ground storage, and transmission during the planning period. Additional facilities need was also identified for wastewater treatment, pumping, and interceptors within the futurel0-year period. a Update of Water/Wastewater impact Fees of the City of Round Rock, Texas 5 Update of-Water Impact Fees TABLE 3 EST.WATER SERVICE DEMAND&AVAILABLE CAPACITY CITY OF ROUND ROCK Faciity Type 2004 2013 Supply Existing 2004 Capacity(mgd) 20.188 20.188 Est.Service Demand 19.507 29.488 Excess(Deficiency) 0.681 (9.300) Existing 2004 Capacity(LUES)' 32,335 32,335 Est.Service Demand 31,245 47,231 Excess(Deficiency) 1,090 (14,896) Treatment Existing 2004 Capacity(mgd) 52.500 52.500 Est.Service Demand 39.014 58.976 Excess(Deficiency) 13.486 (6.476) Existing 2004 Capacity(LUEs)' 42,045 42,045 Est.Service Demand 31,245 47,231 Excess(Deficiency) 10,801 (5,186) Pumping Existing 2004 Capacity(mgd) 106.000 106.000 Est.Service Demand 48.429 73.208 Excess(Deficiency) 57.571 32.792 Existing 2004 Capacity(LUEs)' 68,387 68,387 Est.Service Demand 31,245 47,231 Excess(Deficiency) 37,143 21,156 Ground Storage ( Existing 2004 Capacity(mg) 4.330 4.330 f a Est Service Demand 2.343 3.542 Excess(Deficiency) 1.987 0.788 € Existing 2004 Capacity(LUEs)' 57,733 57,733 Est.Service Demand 31,245 47,231 Excess(Deficiency) 26,489 10,502 Elevated Storage Existing 2004 Capacity(m9) 9.870 9.870 Est.Service Demand 3.906 5.904 Excess(Deficiency) 5.964 3.966 Existing 2004 Capacity(LUEs)' 78,960 78,960 Est.Service Demand 31,245 47,231 Excess(Deficiency) 47,716 31,729 Transmission Existing 2004 Capacity(mgd) 45.000 45.000 Est.Service Demand 48.429 73.208 Excess(Deficiency) (3.429) (28.208) Existing 2004 Capacity(LUEs)' 29,032 29,032 Est.Service Demand 31,245 47,231 Excess(Deficiency) (2,212) (18,199) Assume LUE conversion factor of: 624 gpd/LUE for water supply 1,249 gpd/LUE for treatment 1,550 gpd/LUE for pumping 75 gals/LUE for ground storage 125 gals/LUE for elevated storage 1,550 gpd/LUE for transmission .,� Update of Water/Wastewater Impact Fees LL of the City of Round Rock, Texas 6 ,- Update of Nater Impact Fees TABLE 4 EST.WASTEWATER SERVICE DEMAND&AVAILABLE CAPACITY CITY OF ROUND ROCK FaciRy Type 2004 2013 Treatment Existing 2000 Capacity(mgd) 9.600 9.600 f Est.Service Demand 10.872 16.786 Excess(Deficiency) (1.272) (7.186) Existing 2000 Capacity(LUEs)' 25,737 25,737 Est.Service Demand 29,149 45,001 Excess(Deficiency) (3,411) (18,264) Pumping Existing 2000 Capacity(mgd) 19.900 19.900 Est.Service Demand" 22.603 15.509 Excess(Deficiency) (2.703) 4.391 Existing 2000 Capacity(LUEs)' 18,477 18,477 Est.Service Demand 20,987 14,400 Excess(Deficiency) (2,510) 4,077 Interceptors Existing 2000 Capacity(mgd) 84.000 94.000 Est.Service Demand 31.393 48.467 Excess(Deficiency) 52.607 35.533 Existing 2000 Capacity(LUEs)' 77,994 77,994 f . Est.Service Demand 29,149 45,001 Excess(Deficiency) 48,846 32,993 i , 2004 2013 Assume LUE conversion factor of: 373 373 gpd/LUE for ww treatment 1,077 1,077 gpd/LUE for ww pumping 1.077 1,077 gpd/LUE for interceptors t "Assumes 72% 32% of ww demand pumped is Update of Water/Wastewater Impact Fees Of the City of Round Rock, Texas 7 Update of Water Impact Fees 5.0 INDENTIFIED MAJOR CAPITAL IMPROVEMENT NEEDS AND COSTS Given the projected growth in water and wastewater demands, existing capacity, and the modeling of additional infrastructure needs, various additional facilities have been identified to help meet the needs for the next ten years. In year 2004 dollars, the City's 10-year capital need for new capacity totals about$100 million for water and $50 for wastewater. Maps of the proposed water and wastewater capital improvements to the City-owned utility systems can be found in Attachment A. The projected rapid growth of City has necessitated the need for major water supply and treatment projects. The City's near-term implementation of the Lake Stillhouse Hollow water supply will only last the City for a limited period of time. As shown in Table 5, some additional near-term improvements are still needed to make full use of the Stillhouse supply by 2010. It is then forecast that a new water supply from Lake Travis will be required at that time to meet the additional water demands during the remainder of the 10-year planning period. Related water treatment plant, water storage, and pumping improvements are also identified associated with the new Lake Travis supply. The ultimate cost of the Lake Travis supply system will depend on several factors, including more advanced design estimates, whether the City assumes an equity role in the project and which facilities are built at ultimate capacity and which are phased and at what size. The costs shown in Table 5 for the Lake Travis supply assume maximum economies of scale with full development of the City contracted water supply from this source. As indicated in Tables 4 and 6, the City has exceeded its existing contracted share of the Brushy Creek Regional Wastewater Treatment Plant capacity and is currently being allowed to use un-used capacity reserved for other participants. The current need for additional capacity, as well as the project additional capacity needs of the next ten years, is necessitating a major expansion of the plant and a major wastewater conveyance tunnel. Tables 5 and 6 show the details related to the existing capacity of the water and wastewater systems and proposed new facilities along with their cost, capacity, unit cost, and allocation of existing and projected demand to these facilities. A weighted unit cost of service ($ per LUE) is then calculated by facility type based on the proportionate share of use of existing and new facility capacity by the growth anticipated over the next ten years. Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 8 lul �i CL J � u a � e � s �� mas �� � ss �� ss �� � m U W a � � m asa 93 r ^^ R N, Iss U J N N N w N N w N N N N N N N N N N N N N N N N N N N w N M ¢lll 1¢11 W 1¢�1 W W 8 G G L g 3 9 9 � E R9 n� E9 RR � � .'. � EJB R 0 3 $ Ci Cli N N w N w w w w N N N N N w N w w w»»»»» »» w ci a F « »» N w N w N w « »w »w w»»«»«»««N»««N w«w«»« « R R R R R R R R 1C a a- V b F Cr N � H it 9gg a a .1 ZQ £ 3 Mw W W N 2 ti ILL W 0 u ¢ ti W W ti WqLL y < W Ib O �` W iv b Zv Zu .4 y > om � io , < . A 4z Ql � eg" � � Ra 3 � e � `�LS � Se .n0 pe 'nc� 3 e G � e G N E ♦.1 Update of abater Impact Fees TABLE 6 WASTEWATER CIP INVENTORY AND COSTING CITY OF ROUND ROCK Fac118y Gpac j Allocrtions(LUEs) Date d Cost Capacity Cost Existing Growth Usa in Exes» Total Facility Nems Need Original S Installed E' Total LUE* per LUE Customers Next 10 Veare Capacity Capacity TREATMENT EXISTWG FACILITIES mod Existiro W WTPs n.a. S 36,530.333 S 36.530 333 9.600 25 737 S 1 419 25 737 25 737 Suotdal Existig FacYrties E 36,530,333 S 36,530,333 9.600 25,737 E 1,419 25,737 - - 25,737 FUTURE FACttITIES E.Regional W WTP Expansion 2006 E 32.651 020 S 32 651,020 7.500 20,107 f 1,624 3,411 15,853 643 20.107 Subtotal Future Facilities E 32.651020 S 3651,020 7.500 20,107 E 1,624 3,411 15,853 843 20,107 TOTAL WASTEWATER TREATMENT E 69,181,353 S 69.181,353 17.100 45,845 29,149 15,853 843 45,845 AVERAGE CAPITAL COST PER NEW LUE>: S 1,624 PUMPING EXISTING FACILITIES mod f Exsstno LS n.a. E 1213.5% $ 1.213,596 19.900 78 477 S 66 18 477 18 477 Subtohl Existing Facilities S 1,213,5% $ 1,213,5% 19.900 18,477 S 66 18,477 - - 16.477 FUTURE FACILITIES Oak Bluffs LS Rehab(growth portion) 2006 E 6,780 f 7,193 0017 16 E 448 11 5 16 The Shops LS Rehab(growth portion) 2006 E 5,666 $ 6,013 0.014 13 f 450 9 4 13 ` Forest Creek LS Rehab(growth porUm) 2006 f 91,584 S 97,161 0229 213 f 457 142 71 213 Trevino Court LS Rehab(growth poRion) 2008 S 21,984 E 23 323 0.055 51 E 459 34 17 51 Subtotal Future Facilities S 126 016 S 133 690 0.315 293 E 457 195 98 293 TOTAL PUMPING $ 1,339,612 S 1,347286 20.215 18,770 18,477 195 98 18,770 AVERAGE CAPITAL COST PER NEW LUE= f 8 r INTERCEPTORS EXISTING FACILITIES rood Existi o Interceptors n.a. E 10A98.161 E 10 498161 84.000 77.994 E 135 29,149 6.341 42.505 77.994 Subtotal Existing Facilities E 10,498,161 S 10,498,161 84.000 77,9% E 135 29,149 6,341 42,505 T7,994 FUTURE FACILITIES Avery Farms 2004 S2,104,973 $ 2,104,973 Brushy Creek Tunes S 11,100,414 E 11,100,414 ChanxBer Creek 2009 E 1,932,500 $ 2240297 McNutt Basin 2009 $ 8,079,750 S 9,366,645 15.300 142% E 659 Misc.IMen:eotors 2007 S 3 000 000 $ 3,278,181 Sutldal Future Factities S 26217,637 S 28.090,510 33.900 31.476 E 892 9,512 21 965 31476 / - TOTAL INTERCEPTORS f 36,715,798 $ 38,588,670 117.900 109,471 29,149 15,853 64,469 109,471 Y AVERAGE COST PER NEW LVE AVERAGE CAPITAL COST PER NEW LUE= S 589 WASTEWATER TOTAL E 107,236,763 E 109,117,310 AVERAGE CAPITAL COST PER NEW LUE= S 2,221 t 'Assunes an.annual illation rate of 3.0% r " i t t t 1 " S Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 10 Update of Water Impact Fees 6.0 CONSIDERATION OF OTHER METHODS OF CAPITAL PAYMENT For utilities that charge an impact TABLE 7 fee, the new customer generally EXISTING OR ANTICIPATED DEBT TO BE PAID THROUGH UTILITY RATES CITY OF ROUND ROCK pays for capital in two ways: (1) Est.Debt 2008 Est Debt in initially through the up-front impact Facility Type in Rates LUES Rates per LUE ' WATER UTILITY fee, and (2) over the longer-term Supply through utility rate payments, Existing Debt $ 411,339 38,350 $ 11 Series 2004-2013 New Growth $ 79,532 38,350 $ 2 where typically some portion of Subtotal Water Supply $ 490,871 $ 13 customer rate payments also Treatment j Existing Debt $ 1,109,565 38,350 $ 29 i funds capital projects. Series 2004-2013 $ 572,058 38,350 $ 15 Subtotal Water Treatment $ 1,681,623 $ 44 Pumping r The recent 77th Texas Legislature Existing Debt Series 2004.2013 $ ,03,604 38,350 $ 3 amended Chapter 395 of the Local Subtotal Pumping $ 103,604 $ 3 Government to require either: (1) a Subtotal Water Pumping calculated credit for rate payments Ground Storage Existing Debt be reflected in the fee amount, or Series 2004-2013 $ 21,121 38,350 $ 1 (2) a credit equal to 50 percent of Subtotal Water Storage $ 21,121 $ 1 the total projected cost of the Elevated Storage p Existing Debt capital improvements plan be Series 2004-2013 $ 47,937 38,350 $ 1 Subtotal Water Storage $ 47,937 $ 1 given in calculating the maximum Transmission fee amount. Series 2004-2013 $ 593,766 38,350 $ 15 Subtotal Transmission Lines $ 593,766 $ 15 f Total Water $ 77 Table 7 indicates the estimated WASTEWATER UTILITY cost per LUE that is projected to Treatment Existing Debt $ 25,536,844 38,350 $ 666 be borne in the utility rates by the Series 2004.2013 $ 3,465,118 38350 $ 90 average new customer. The rate Subtotal WWTP $ 29,001,962 $ 756 Pumping r , credit calculation considered: (a) Existing Debt existing capital obligation to Series 20042013 $ 11,162 38,350 $ 0.29 Subtotal WWTP $ 11,182 $ 0.29 wholesale providers, (b) existing Interceptors debt (c) future debt payments Existing Debt $ 3,174,544 38,350 $ 83 Series 2004-2013 $ 3,075,342 38,350 $ 80 incurred in the year in which the Subtotal Interceptors $ 6,249,886 $ 163 facilities would be built and Total Wastewater $ 920 financed, and (d) the projected Total Water and Wastewater $ 9% LUEs at the mid-point year of 2008. Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 11 FM Update of'Water Impact Fees 7.0 ALTERNATIVE IMPACT FEE CALCULATIONS Table 9 summarizes the unit capital cost of providing new service and the two alternative credit calculations for new customers. The alternative approach that calculates a specific rate credit (Option A) results in the maximum impact fee calculation of $4,296 per LUE for water and $1,306 per LUE for wastewater, totaling $5,602 per LUE. As can be seen, the alternative 50% of capital cost method for calculating a rate credit (Option B) results in a lesser water impact fee of$2,184 per LUE and wastewater fee of $1,115 per LUE, yielding an overall $3,303 per LUE. TABLE 8 DERIVATION OF ALTERNATIVE MAXIMUM WATER AND WASTEWATER IMPACT FEE AMOUNTS CITY OF ROUND ROCK Weighted Optional Adjustments Capital Cost of -Option A- -Option B- New Service Rate 50%Cost Highest of ITEM per LUE Credit Adjustment -Option A- -Option B- Option A or B WATER Supply $ 616 $ 13 $ 308 $ 603 $ 308 $ 603 Treatment $ 1,691 $ 44 $ 845 $ 1,647 $ 845 $ 1,647 Pumping $ 255 $ 3 $ 127 $ 252 $ 127 $ 252 Ground Storage $ 34 $ 1 $ 17 $ 33 $ 17 $ 33 Elevated Storage $ 75 $ 1 $ 37 $ 74 $ 37 $ 74 Transmission $ 1,698 $ 15 $ 849 $ 1,682 $ 849 $ 1,682 Allocated Impact Fee Study Cost $ 4 $ 4 $ 4 $ 4 Total Water $ 4,372 $ 77 $ 2,184 $ 4,296 $ 2,188 $ 4,296 WASTEWATER Treatment $ 1,624 $ 756 $ 812 $ 868 $ 812 $ 868 Pumping $ 8 $ 0 $ 4 $ 8 $ 4 $ 8 Interceptors $ 589 $ 163 $ 295 $ 426 $ 295 $ 426 Allocated Impact Fee Study Cost $ 4 $ 4 $ 4 $ 4 Total Wastewater $ 2,225 $ 920 $ 1,111 $ 1,306 $ 1,115 $ 1,306 TOTAL WATEWWASTEWATER $ 6,598 $ 996 $ 3,295 $ 5,602 $ 3,303 $ 5,602 The fee methodology was replicated for each major facility type in the utility system (ex. Supply, treatment, pumping, elevated storage, ground storage and transmission) so that the total fee amount is the sum of the component facility fees. This provides a basis for extending the fee to wholesale customers of the City or granting fee offsets if a developer cost-participates with the City on CIP projects. Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 12 Im Update of Water Impact Fees For comparison purposes, the current impact fees of other near-by cities are listed below: 9ts Water Wastewater Total Austin N.E. Preferred Development Zone $ 700 $ 400 $1,100 Western city $1,500 $1,200 $2,700 Pflugerville $2,491 $1,362 $3,853 Round Rock(current) $2,910 $1,059 $3,969 Georgetown $2,295 $1,869 $4,164 Buda $2,721 $1,514 $4,234 Cedar Park $2,250 $2,000 $4,250 Leander $2,850 $1,550 $4,400 San Marcos $2,466 $2,185 $4,651 Jonah SUD (water only) $4,125 n.a. -- Round Rock(maximum potential) $4,296 $1,306 $5,602 Chisholm Trail SUD (water only) $4,600 n.a. -- f f Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 13 Update of Water Impact Fees f Attachment A Location of Proposed Improvements Identified in the 10-Year Water and Wastewater CIPs f f i Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 14 Update of Water Impact Fees �\ zoos 2011 201 2005-2006 2006 2012 2006 1471 T 2007 / 2011 2008 �— zols 2004-2005 — { 09 t 2008 1 2008 200 620 \ I/ a CITY OF ROUND ROCK 2010 WATER DISTRIBUTION SYSTEM i ; Location of Proposed Water Improvements Between 2004-2013 Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 15 Update of Water Impact Fees handler' u>� ` E Creek ! to " ;7 Oak u Forest ree ,Trevin �� <CquR ,. e Sho I Leg 1 ' ' CII < • Existlna Manholes ■ Utt Stations . }.- • 2D13 New Mmiholes 2D13 New Pipes t ■ 2013 LA Station Uppr 4ame q ® East VMrrP f i YVn t NNVfP f Location of Proposed Wastewater Improvements Between 2004-2013 Update of WaterlWastewater Impact Fees of the City of Round Rock, Texas 16 'ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY August 11, 2004 Mayor&Council Round Rock City Hall 221 E.Main Street Round Rock,Texas 78664 RE: Written comments of the Round Rock Capital Improvements Advisory Committee concerning Land Use Assumptions and Capital Improvements Plan used to determine water and wastewater impact fees. Dear Mayor Maxwell and Council members: The Capital Improvements Advisory Committee (Committee) met four times to review the 2004 Update of the Water and Wastewater Impact Fees of the City of Round Rock, Texas"("Report")prepared by HDR Engineering, Inc. These comments are being provided to you pursuant to §§ 395.050, 395.056, and 395.058(c)of the Local Government Code. Our review has resulted in the following comments: 1. The Committee reviewed the Land Use Assumptions used in the Report and agrees that these are reasonable and correct assumptions to utilize to develop a ten(10)year demand for new water and wastewater service requirements. 2. The Committee has reviewed the Capital Improvement Plan contained in the Report and requested clarification of demand calculations and the difference Mayor between the 2003 demand per Living Unit Equivalent("LUE"),using wet year Nyle Maxwell figures and the more commonly used demand per LUE used by the Texas Water Development Board("TWDB").We requested that calculations be based on the Mayor Pro-tem same TWDB dry year per capita use used in the Water and Wastewater Master Alan McGraw Plan. Council Members 3. The Committee requested assurance that the Lake Travis water supply would be Tom Nielson Carrie Pitt required within the ten(10)year period. The usage of the common TWDB per Scot Knight capita use figures clearly showed the need for that additional supply within the Scott Rhode ten-year period. Gary Coe 4. The Committee reviewed the amended Capital Improvements Plan and agrees City Manager that the capital improvements included therein are reasonably required to serve James R.Nuse,P.E. new development. City Attorney Stephan L.Sheets CITY OF ROUND ROCK Planning and Community Development Department 301 West Bagdad•Round Rock,Texas 78664 Phone:512.2185428 -Fax: 512.218.3286•www.ci.round-rock.tx.us 5. The Committee reviewed the calculations used to determine the maximum allowable impact fee and agrees that the calculations reasonably reflect the maximum permitted fee in accordance with the requirements of Chapter 395 of the Texas Local Government Code. 6. Considering the above the Committee recommends the adoption of the following water and wastewater impact fees. A. Water Impact Fee $4296.00 per LUE B. Wastewater Impact Fee $1306.00 per LUE We respectfully submit these comments and include a copy of the Report on which they are based. Sincerely,/ Al Kosik Chairman, Capital Improvements Advisory Committee DATE: September 3, 2004 SUB]ECT: City Council Meeting - September 9, 2004 ITEM: 11.D.1. Consider a resolution setting a Public Hearing on October 14, 2004 to consider updates to the land use assumptions and capital improvements plan, and amendments to the current impact fees. Department: Water and Wastewater Utilities Staff Person: Tom Clark, Director ]ustification: Water and wastewater impact fees are charged to offset the cost of constructing infrastructure to keep up with development and allow for growth to pay for itself rather than being paid for by ratepayers. Funding: Cost: N/A Source of funds: N/A Outside Resources: Tony Bagwell, HDR Engineering Background Information: At least every five years, the City's land use assumptions, capital improvement plan and water and wastewater impact fees are reviewed for possible amendment to reflect the cost of constructing infrastructure within the City. Impact fees assist the City in paying for the infrastructure needed by development rather than being subsidized by ratepayers. Current fees are $2,910 for water and $1,059 for wastewater per LUE. Over the last 18 months, the land use projections and the Water and Wastewater Master Plans have been reviewed and updated, and maximum potential impact fees have been calculated. A report detailing such updates and advising the City of such maximum potential fees is presented for consideration by the City Council and an Advisory Committee comprised of the Planning and Zoning Commission, a member from Williamson County and a non-voting member of the Home Builders Association of Austin. The Advisory Committee met on July 7, July 27, August 4, and August 11, 2004 to review the impact fees and make written comments to the Council. A Public Hearing is recommended for October 14, 2004 to allow the Council to receive input from the public. Thereafter, the Council may agree to update the land use assumptions and the Master Plans, as well as set the actual impact fees. Public Comment: The Public will be asked to comment at the October 14, 2004 Public Hearing.