R-04-09-09-11D2 - 9/9/2004 RESOLUTION NO. R-04-09-09-11D2 WHEREAS, the City of Round Rock has previously entered into a contract for engineering services ( "Contract" ) with Baker-Aicklen & Associates, Inc . for the design of the East Water Transmission Line, Phase 3A (Redbud Lane) , and WHEREAS, Baker-Aicklen & Associates, Inc . has submitted Supplemental Agreement No. 1 to the Contract for Engineering Services for a change in the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 1 with Baker-Aicklen & Associates, Inc . , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 1 to the Contract for Engineering Services with Baker-Aicklen & Associates, Inc. , a copy of same being attached hereto as Exhibit "A" and incorporated herein. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 9th day of September, 2004 . NYL ELL, yor Ci y Round Rock, Texas ATTES : 1' b U l loll} CHRISTINE R. MARTINEZ, City Secret Iry @PMesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R40909D2.WPD/Sc STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL AGREEMENT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: Baker-Aicklen &Associates,Inc. ("Engineer") ADDRESS: 203 E. Main Street, Ste.201 PROJECT: East Water Transmission Line,Phase 3A(CR 122) This Supplemental Agreement No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Baker-Aicklen & Associates, Inc.,hereinafter called the"Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract', dated the 10`h day of June, 2004 for the East Water Transmission Line, Phase 3A (CR 122) for a total compensation of$99,280.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and modify the compensation; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2 Sc- e Of Services To Be Performed By Engineer and Exhibit B Services To Be Performed By The Engineer shall be amended asset forth in the attachedAddendum To Exhibit B. II. Article 4 Compensation and Exhibit D Fee Schedule shall be amended by increasing by $17,350.00 the lump sum amount payable under the Agreement for a total of$116,630.00 as shown by the attached Addendum to Exhibit D. III. Article 7 Notice to Proceed shall be amended to read as follows: The Engineer shall not proceed with any task listed on Exhibit B until the City has issued a written Notice to Proceed regarding such task. The City shall not be responsible for work performed or costs incurred by Engineer related to any task for which a Notice to Proceed has not been issued. Supplemental Agreement 71367 Rev.03/02/04 Page 1 of 4 [EXHIBITnAll IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agreement in duplicate. BAKER-AI KL N&ASSOCIATES,INC. By: Date CITY OF ROUND ROCK By: Nyle Maxwell,Mayor Date APPROVED AS TO FORM: STEPHAN L. SHEETS, CITY ATTORNEY Supplemental Agreement 71367 Rev.03/02/04 Page 2 of 4 EXHIBIT B CR 122 Water Transmission Main Construction Phase Services Professional Engr/Survey Engineer Designer Technician Secreta 1 Attend Office Pre-Construciton meeting 2 Attend environmental and pre-construction 2 2 meeting Review and return submittals, schedules, 2 2 3 etc. 4 Respond to RFI's 4 4 2 5 Consult, advise and transmit instructions. 48 4 6 Perform periodic site visits 8 4 2 2 Attend weekly construction meetings 4 12 through the duration of the construction 7 project. Provide input on proposed Change 8 16 8 8 Proposal Requests and Change Orders. Perform inspections at the end of 16 16 8 9 construction. 10 Review record drawings. 4 4 8 12 16 Verify completion and issue Certificate of 11 Completion. 4 4 4 Total 64 84 18 28 Budget $ 115.00 $ 90.00 $ 65.00 $ 45.00 $ 7,360.00 $ 7,560.00 $ 1,170.00 $ 1,260.00 $17,350.00 OA0601-2-0581Supple Agr\East WaterlSuppl#1 8-04 EXHIBIT b STANDARD RATE SCHEDULE Labor Rate Table 40 Effective October, 2003, the following rates are recommended for work performed on an hourly-charge basis. Rates include company overhead and profit for services accomplished during regular working hours. DIRECT LABOR OFFICE PERSONNEL SERVICES Classification Project Manager................. Rates Project Engineer/Surveyor/planner $120 per hour .......................................................................................................$115 per hour GIS Project Manager ......... ............................................................................................................ $105 per hour Staff Engineer/Surveyor/Planner............................ Project Desi ........................................................................ $100 per hour J finer/Coordinator ........ .....................................................................$ 95 per hour ................................ Engineering/Surveying/Planning Associate ................................. Engineering Assistant/Surve """""""""'•••••••••••••••••••••••••••••.......... $ 90 per hour ging Assistant/GPS Processor ................................................................... GIS Analyst................... $ 75 per hour ..................................... Engineering/SurveyingCAD T ............................................................................ ••••.. $ 70 per hour Technician/Field Representative .............................. Administrative Assistant ................................................. $ 65 per hour CAD Draftsman $ 55 per hour GIS Technician $ 50 per hour .................... $ 40 Expert Witness/Testimony/Deposition Services .......... Two Times hour Department Head ................................... � Rates Branch Manager $125 per hour ..riat........................................................................................................................... $135 per hour Principal(as appropriate) ............................................................................................................ FIELD PARTY SERVICES $150 per hour 1-Man Field Party ........................................................ Rates 2-Man Field Party .......................................................................... $ 75 per hour ........................................................ ......................................................... $100 per hour 3-Man Field Party """""'•••••• .................................................................................................................................. $125 per hour 4-Man Field Party ....rat ................. $150 per hour ........................................... GPS Field Unit with Operator(Note 5)........................ GPS Field Unit without Operator(Note 5) ............................... $100 per hour ...................................................... ...................................... $ 60 per hour DIRECT EXPENSES Transportation: By Firm's Passenger Vehicles(Note 1) ................................... B Firm's S $ 0.35 per mile Y Survey Trucks(Notes 1,2,3&4 ""•••••••••••• Subsistence of out-of-city services ) ..................................................................................... 0. ................. ........................................................................................... $ 35 per mile Reproduction&Printing by Firm, .....,,.,..•,•,•... $120.00 per day Survey Stakes,Lathes,Iron Rods Prevailing............ g Com- and other Direct Expense .............. mercial Rates Or ..................................................................................................... Cost,Plus 10% Notes: 1.A mileage charge will be billed for projects exceeding a 50-mile radius of the base office only. 2.Field Party rates include conventional equipment, supplies and survey vehicles. Abnormal use of stakes, lathes, etc., used such as during the construction phase of a project will be charged as indicated. 3.A minimum of two(2)hours field party time charge will be made for show-up time and return to office,resulting from inclement weather conditions,etc. 4.Field Party stand-by time will be charged for at the above-shown appropriate rates. 5.Rates apply to actual time GPS units are in use. All other time will be charged as appropriate normal field party 6.The firm's professional liability is limited to the total amount of compensation under the Professional Services Agreement to a maximum of$50,000. 6AKER•AICKLEN 6 ASSOCIATES,INC. ENGINEERS/SURVEYORS 79 123 79 East Waterline Phase 3A W C v r EST R N �- I w E NOT TO SCALE EAST WATER TRANSMISSION LINE - PHASE 3AK � ROI�N!)R(xK.TEXAS M.Fivl hc<.�,��PFfrtrrp.IlY S:\Graphics\Council Agenda Items\En9ineerin9\2004\Wafer Utility\EAST_WATER_TRANSM_LINE\E_TRNSMISSION_LINE 3-A.mzd DATE: September 3, 2004 SUBJECT: City Council Meeting - September 9, 2004 ITEM: *11.D.2. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 1 Contract for Engineering Services with Baker- Aicklen &Associates, Inc. for the East Water Transmission Line, Phase 3-A (Redbud Lane). Department: Water and Wastewater Utilities Staff Person: Tom Clark, Director Justification: This supplemental agreement will allow Baker-Aicklen & Associates to perform the construction phase service for the 16" East Water Transmission Line, Phase 3-A in the CR 122 right-of-way. With this supplemental agreement the total fee for services will increase by $17,350.00 for a total fee of $116,630.00. Funding: Cost: $17,350.00 Source of funds: Capital Project Funds (Self-Financed Utility) Outside Resources: Bake r-Aicklen &Associates, Inc. Background Inform The recent Water Distribution Master Plan calls for this line to be installed from US 79 to Forest Creek Drive in order to meet water demands in the south east portion of the City. In the previous Master Plan, the line was not required until 2012 but is needed because of the accelerated growth experienced in the southeast part of town. Baker Aicklen was selected to perform the work because they have done surveying and design for Redbud Lane roadway improvements. Using Baker-Aicklen will allow for a shorter construction schedule, close coordination of the pipeline and roadway projects and cost savings by preventing redundant work. Because of the impending roadway construction, the water line needs to be installed prior to the roadway. This will improve the water distribution system capacity, fire protection and reliability in the area. Public Comment: N/A Executed Document Follows STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL AGREEMENT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: Baker-Aicklen &Associates, Inc. ("Engineer") ADDRESS: 203 E. Main Street, Ste. 201 PROJECT: East Water Transmission Line,Phase 3A(CR 122) This Supplemental Agreement No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Baker-Aicklen & Associates, Inc.,hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", dated the 10th day of June, 2004 for the East Water Transmission Line, Phase 3A(CR 122) for a total compensation of$99,280.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and modify the compensation; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Scope Of Services To Be Performed By Engineer and Exhibit B, Services To Be Performed By The Engineer shall be amended as set forth in the attached Addendum To Exhibit B. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $17,350.00 the lump sum amount payable under the Agreement for a total of $116,630.00, as shown by the attached Addendum to Exhibit D. III. Article 7,Notice to Proceed shall be amended to read as follows: The Engineer shall not proceed with any task listed on Exhibit B until the City has issued a written Notice to Proceed regarding such task. The City shall not be responsible for work performed or costs incurred by Engineer related to any task for which a Notice to Proceed has not been issued. Supplemental Agreement Rev.03/02/04 71367 e-Cy-6"%-o-/ll),- Page 1 of IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agreement in duplicate. BAKER-AI KL N & ASSOCIATES, INC. By: Date CITY OF U R By: ayxwel , aor q-9- Date *APPOVED AS TO F RM: . SHEETS, CITY ATTORNEY Supplemental Agreement 71367 Rev.03/02/04 Page 2 of 4 EXHIBIT B CR 122 Water Transmission Main Construction Phase Services Professional Engr/Survey — Engineer Designer Technician Secreta -1 Attend Office Pre-Construciton meeting 2 _ -- --- 2 _JAttend environmental and p and re coconstruction --- meeting i ------ 7Review and return submittals, schedules, 2 I 2 3 L --- _jetc. -i------ 4-1 Respo—ndto RFPs --- 4 4 —5 '�sult, advise and transmit instructions. T 4--- 4 8 6 1 Perform periodic site visits - - 2 6 ------- 8 i ,Attend weekly construction meetings through the duration of the construction 7 project. j Provide input on proposed Change —� $--- — 6_— _-8 'Proposal Requests and Change Orders. — 8 �_ 16 Perform inspection ttas he end of 1 16 g 9i construction. I - 10 1 Review record drawings. �4 I-- 4 12 — 1 16 — Verify completion and issue Certificate of 11 Completion. — --�— 4 4 Total 4 64 84 18 Budget $ 115.00 $ 90.00 2a $ 7,360.00 $ 7,560.00 $ 65.00 $ 45.00 $ 1,170.00 $ 1,260.00 $17,350.00 0:10601-2-0581Supple Agr\East Water\suppl#1 8-04 EXHIBIT p STANDARD RATE SCHEDULE Labor Rate Table 40 Effective October, 2003, the following rates are recommended for work performed on an hourly_charge basis. Rates include company overhead and profit for services accomplished during regular working hours. DIRECT LABOR OFFICE PERSONNEL SERVICES Class>I--tion Project Manager.................................... Project Engineer/Surveyor/Planner Rates ............................................. GIS Project Manager ........... $120 per hour ............................................................................................................... $105 per hour Staff Engineer/Surveyor/Planner......................................................... Project Designer/Coordinator .......... .. .. .. ................................................. Engineering/Surve ............I...... $100 per hour ymg/Planning Associate ........ Engineering Assistant/Surveying Assistant/GPS Processor $ 95 per hour ................................................ $ 90 per hour GIS Analyst.............................. CAD Technician/Field Representative ........ ..................................................................................... $ 75 per hour $ 70 per hour Administrative Assistant ............... $ 65 per hour CAD Draftsman ................................ GIS Technician ...................................................................................................................................... $ 55 per hour $ 50 per hour Expert Witness/Testimony/Deposition iony/Deposition Services ........ ..... $ 40 per hour Department Head ................. Two Times Rates ................................................................................... Branch Manager......... ............................................................................. ........ Principal(as appropriate) .................................................................................................................. $125 per hour $135 per hour FIELD PARTY SERVICES $150 per hour 1-Man Field Party .,••,•.•.•• ................................................................. Rates 2-Man Field Party .............. .................. $ 75 per hour ...................................................................... -Man Field Party .............. ...................................... $100 per hour ................................................................................................................. -Man Field Party •• ... $125 per hour GPS Field Unit with Operator(Note 5) GPS Field Unit without Operator(Note 5)........ .......................................................... " $150 per hour 00 per hour ..................................................................................... $1 DIRECT EXPENSES 60 per hour Transportation: By Firm's Passenger Vehicles(Note 1) By Firm's Survey Trucks(Notes 1,2,3 &4) •���•���•�••••�•��•�•""""""" .••......• $ 0.35 per mile ubsistence of out-of-city services .............. Reproduction&Printing by Firm, """""""•�• $ 0.35 per mile .............................................................. . ""'•'•• $120.00 per day Survey Stakes,Lathes,Iron Rods Prevailing Com- ..................................................................................................... mercial Rates Or and other Direct Expense .....................................................................................................I............. Cost,Plus 10% Notes: 1.A mileage charge will be billed for projects exceeding a 50-mile radius of the base office on 2.Field Party rates include conventional equipment, supplies and survey vehicles. Abnormal used such as during the construction phase of a project will be charged as indicated. ly 3.A minimum of two(2)hours field a use of stakes, lathes, etc., inclement weather conditions,etc. time charge will be made for show-up time and return to office,resulting from 4.Field Party stand-by time will be charged for at the above-shown appropriate rates. 5.Rates apply to actual time GPS units are in use. All other time will be charged as appropriate 6.The firm's professional liability is limited to the total amount of compensation under Agreement to a maximum of$50,000. normal field party rates. the Professional Services BAKER-AICKLEN &ASSOCIATES,INC. ENGINEERS/S LIR VEYORS