Loading...
R-04-09-09-11E1 - 9/9/2004 RESOLUTION NO. R-04-09-09-11E1 WHEREAS, the City of Round Rock has previously entered into an Agreement for Engineering Services ( "Agreement") with Gray-Jansing & Associates, Inc. for design work on the Doublecreek Drive and Forest Creek Drive Project, and WHEREAS, Gray-Jansing & Associates, Inc . has submitted Supplemental Agreement No. 2 to the Agreement for a change in the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 2 with Gray-Jansing & Associates, Inc . , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 2 to the Agreement with Gray-Jansing & Associates, Inc . , a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the Public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 9th day of September, 00 N WELL, Mayor ATTES " Cit of Round Rock, Texas ' � �r � CHRISTINE R. MARTINEZ, City Secretary @PFDesktop\::ODMA./WORLDOX/O:/WDOX/RESOLUTI/R40909E1.WPD/Sc STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL AGREEMENT NO. 2 TO AGREEMENT FOR ENGINEERING SERVICES FIRM: Gray-Jansing&Associates,Inc.("Engineer") ADDRESS: 8217 Shoal Creek Blvd., Suite 200,Austin,TX 78757 PROJECT: Doublecreek Drive and Forest Creek Blvd. This Supplemental Agreement No. 2 to Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Gray-Jansing & Associates,Inc.,hereinafter called the "Engineer". WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinafter called the "Agreement", on the 24th day of July, 2003 for the Doublecreek Drive and Forest Creek Blvd Project in the amount of$94,155.90 and WHEREAS, the City and Engineer executed Supplemental Agreement No. 1 on January 8, 2004, to modify the provisions for the scope of services, to modify the Term of the Agreement, and to increase the compensation to$109,630.90; and WHEREAS, it has become necessary to amend the Agreement to modify the provisions for the scope of services, to increase the compensation to $125,130.90, and to modify the provision for notices to proceed; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Agreement is amended as follows: I. Article 2, Scone Of Services To Be Performed By Engineer and Exhibit B, Services To Be Performed By The Engineer shall be amended as set forth in the attached Addendum To Exhibit B. II. Article 4 Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $15,500.00 the lump sum amount payable under the Agreement for a total of$125,130.90, as shown by the attached Addendum to Exhibit D. Supplemental Agreement 71920 Rev.03/02/04 l EXHIBIT lr D a "An III. Article 7 Notice to Proceed shall be amended to read as follows: The Engineer shall not proceed with any task listed on Exhibit B until the City has issued a written Notice to Proceed regarding such task. The City shall not be responsible for work performed or costs incurred by Engineer related to any task for which a Notice to Proceed has not been issued. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agreement in duplicate. GRAY—JANSING&ASSOCIATES, INC. By: August 2-50 2004 Date CITY OF ROUND ROCK APPROVED AS TO FORM: By: Nyle Maxwell,Mayor Stephan L. Sheets,City Attorney Date Supplemental Agreement 71920 Rev.03/02/04 2 ADDENDUM TO EXHIBIT B Services to be Performed by the Engineer The changes to the scope of this project are as follows: Supplemental Agreement 71920 Rev.03/02/04 ATTACHMENT B SERVICES TO BE PROVIDED BY THE ENGINEER The scope of work to be performed under this supplemental agreement shall be in accordance with the general terms and conditions as outlined in the original agreement dated July 24, 2003. The additional scope of work to be performed by the Engineer will include the following: Item 1 Update existing bid documents to include all revisions to Forest Creek Drive design plans and include Doublecreek Drive Phase B construction plans. Coordinate with CORR staff to advertise the project for bid. Coordinate and conduct pre-bid meeting. Provide responses to questions from prospective bidders during the bid period. Conduct the bid opening and prepare bid tabulations. Review qualified bidders and bid tabulations with City staff. Prepare a letter of recommendation for award to City staff. Reimbursable expenses to produce bids sets of the plans and specifications, and any clarification memorandums. Note: Cost of bid advertisement is not included and will be paid directly by the City of Round Rock. Item 2 Update street lighting plans for Doublecreek Drive and Forest Creek Blvd. Modify power drop locations as installed by Oncor, revise the technical specs, provide detailed specifications to contractors. Address other items raised during construction of Doublecreek,Phase 1. Item 3 Add four new driveways at the intersection of Doublecreek Drive and Gattis School Road. Perform design surveys, reduce survey data to fit into existing project coordinate system and base drawing. Design work to include layout and spot elevations for the four Type Il driveways. Prepare two additional plan sheets with details. Prepare contract change order. ADDENDUM TO EXHIBIT D Fee Schedule The changes to the fee schedule for this project are as follows: Supplemental Agreement 71920 Rev.03/02/04 Exhibit D Fee Schedule The breakdown of costs for each task item for this Supplemental Agreement No. 2 for the Doublecreek Drive and Forest Creek Drive Project is: 1. Task 1 —re-bidding Forest Creek Drive and Doublecreek $5,500 2. Task 2—update street lighting plans $2,500 3. Task 3 - add driveways to Doublecreek Drive $15,500 Iam p0►•�`:';0 ♦�����♦�°������■ ', .�,.�■ - �-��\1111111111 � .. ��_� � � ♦ ♦ ♦ ♦�i� OW mg ga K11 aw", MCA ---.0_- :1111►� � � ♦�•,II �1�1 � � 1 � � v�-:=:�.r � =-.11►►-. .� ♦� � ♦♦�' ���� • •moi X1111 ♦����,��:=:.�.►111► ��� ✓,;: I�j�� ��,♦ ♦ . ��. �♦♦� �`� ♦ .�'�' - �111111►�,���`��,���� � ��1� �� �■��� .�1■ �;�,����=i �i111u1►f7♦.�.�/t►► rI __ .�- . �►•1111111111� ■■11111► �1�;�►� �j��I� 1 /'�. �r►r .. • ► ��� 1►���►111111■11111- 1��+�-♦�I� ♦♦ ���� ► . ■■■■• •�� M I I, ��, ���+ x•1111111111 ::�►%r'l11���♦�♦`/I C +♦��\i�� �II� \111111111-�IN■ IM ■• � 1► ��I, .��.�►111 ►►►��i�O`O�♦ ��1►�Q���/111111111\��WWI i� 1■1111111111111,►r,,�,.��1. ', , • � % �■1/11■IIA/���7� I'I•1• ��i:..� �1111111111 1/ 1h _�``i�I�rtll ii- � .ft��,�� ���� �1��/�I ��.��� �•�.� ����.. ..�U►111 11111- .111.-I�t , - ♦♦,'11111�I Nei �i /111 ,i■11\�� �� .� 1111oil 11111111111� %i 111111�� aag; C��� �111tr II - �� �� G f ��.- �•r � ���� i i.►111/ 11111111111111 G ♦♦ �j/��I �� �.►�� ��i�/1■ ■�, �. •••■1■�i . .. � . I►=__ �+ /I/ �/Ij i � �=moo-- •���. -X11■■II� 1/I � :::IUB -1111- 1r•` �- --1 ��i �•G ----- •♦ -�► � ►i111 Ii�1■�.;� ::r/= ��•�'1���►�/� 11►`` 1-- 1'i� //i�i� === = •�I�:�:■1111■ .� IIi1■111'� . .. �� -� D��il►u_ur 1�1Q ;gm o II Ir /1/ �i�♦% p_��-- �i� �/ ..■1111■� �• •� _- I��;���►►►♦�`' �� N��//� -��,j11 ►�/11111■ �.�. 1 %/11111111 1II��i��=� / _ �I� X11■1111111111 � -. • �: �►►III�I,�1■■11■� ��i.1111►I -��� 1111111 � I� 1- �- � •1 � •.�.■111�� 1 nllpppl III/� _ -�p -�I� X11111111111 11 ��� - � 1 ���� i.i.■111 yuunuu► Ih�i�=e ��-� 111_► ♦ 11►�� I��� 111� ELI /AI11511►� . •- •• ♦ .�.� ���� �_ ■:��♦��• ` i iii�� , P\1 111►1111►111►IU ��`�` ��♦11111 . _I♦ ♦ �� ♦1• 1111►�- 1►►►►1►1►1� �- -� ��►•� ♦ ♦♦ ♦I • 1111111■IIIIIri. ►►Wuu�Wu► �� p =I� +p •♦ ♦ INS •` 11111111■11111/I llllllstop �I ►��I,�Q •��••P,,��I �� 111111111 Sam �� '� ��11111►� +�, �••�' �� :•r�111111111� p 1 ��X11111►I� j�,��11� ��►� j�►rr//111111 i 11►L � _���i � �► 1, �� .��1111 �;rr►11/11111� ►�`�� � ■ ���� `iwuuw nmull� ��//` Not►1111 �,���IIIIIIIII\�� ��U 1 ��IIIOuu uuulu_ ♦ �� � 11111 19FAAFf LN ��11� '-�� ■,,, p:%uuuun mumu. I',� �'. . . � ' pogo o .�1 G� 1/111111/+ ►�i���►����� _ � 111111111_���►�►►►11:,� �►1�I Asia ap 0_0 IIIIIIII, r ,\ _- ► llllllllll� i11�,1� �4pt�� /111111111•I� ��p� `� � ' __,��;���///111. ���I�`����i111:►��� ' �����11111 /►����j1 ����` �I ��III/I.0�� Double Drive/Forest • Drive DATE: September 3, 2004 SUBJECT: City Council Meeting - September 9, 2004 ITEM: *11.E.1. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 2 to the Agreement for Engineering Services with Gray-Jansing &Associates, Inc. for design work on the Doublecreek Drive and Forest Creek Drive Project. Department: Transportation Services Staff Person: Tom Martin, Director Justification: This agreement provides for additional engineering services for the bidding of the Forest Creek Drive/Doublecreek Drive Improvement projects as well as updating the street illumination plan for Forest Creek Drive and providing for additional driveways on Doublecreek Drive. Funding: Cost: $15,500.00 (Forest Creek Dr. - $5,250, Doublecreek Dr. - $10,250) Source of funds: Round Rock Transportation System Development Corporation Outside Resources: Gray-Jansing &Associates Inc. Background Information: These two projects are included in the Round Rock Transportation System Development Corporation Transportation Capital Improvements Program. Both projects will provide necessary arterial roadways for the east side of the City of Round Rock. Public Comment: N/A Executed Document Follows STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL AGREEMENT NO. 2 TO AGREEMENT FOR ENGINEERING SERVICES FIRM: Gray-Jansing&Associates,Inc.("Engineer") ADDRESS: 8217 Shoal Creek Blvd., Suite 200,Austin,TX 78757 PROJECT: Doublecreek Drive and Forest Creek Blvd. This Supplemental Agreement No. 2 to Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Gray-Jansing & Associates, Inc.,hereinafter called the"Engineer". WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinafter called the "Agreement", on the 24th day of July, 2003 for the Doublecreek Drive and Forest Creek Blvd Project in the amount of$94,155.90 and WHEREAS, the City and Engineer executed Supplemental Agreement No. 1 on January 8, 2004, to modify the provisions for the scope of services, to modify the Term of the Agreement, and to increase the compensation to$109,630.90; and WHEREAS, it has become necessary to amend the Agreement to modify the provisions for the scope of services, to increase the compensation to $125,130.90, and to modify the provision for notices to proceed; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Agreement is amended as follows: I. Article 2, Scone Of Services To Be Performed By Engineer and Exhibit B, Services To Be Performed By The Engineer shall be amended as set forth in the attached Addendum To Exhibit B. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $15,500.00 the lump sum amount payable under the Agreement for a total of$125,130.90, as shown by the attached Addendum to Exhibit D. t0q-09-0 -PE'l Supplemental Agreement 71920 Rev.03/02/04 1 III. Article 7, Notice to Proceed shall be amended to read as follows: The Engineer shall not proceed with any task listed on Exhibit B until the City has issued a written Notice to Proceed regarding such task. The City shall not be responsible for work performed or costs incurred by Engineer related to any task for which a Notice to Proceed has not been issued. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agreement in duplicate. GRAY—JANSING& ASSOCIATES,INC. By: augna-st 250 2004 Date CITY OF U AP VED AS O FORM: By: I Aa e axwell,Mayor Steph in L. Sheets, City Attorney 0- q - 0L] Date Supplemental Agreement 71920 Rev.03/02/04 2 ADDENDUM TO EXHIBIT B Services to be Performed by the Engineer The changes to the scope of this project are as follows: Supplemental Agreement Rev.03/02/04 71920 ATTACHMENT B SERVICES TO BE PROVIDED BY THE ENGINEER The scope of work to be performed under this supplemental agreement shall be in accordance with the general terms and conditions as outlined in the original agreement dated July 24, 2003. The additional scope of work to be performed by the Engineer will include the following: Item 1 Update existing bid documents to include all revisions to Forest Creek Drive design plans and include Doublecreek Drive Phase B construction plans. Coordinate with CORR staff to advertise the project for bid. Coordinate and conduct pre-bid meeting. Provide responses to questions from prospective bidders during the bid period. Conduct the bid opening and prepare bid tabulations. Review qualified bidders and bid tabulations with City staff. Prepare a letter of recommendation for award to City staff. Reimbursable expenses to produce bids sets of the plans and specifications, and any clarification memorandums. Note: Cost of bid advertisement is not included and will be paid directly by the City of Round Rock. Item 2 Update street lighting plans for Doublecreek Drive and Forest Creek Blvd. Modify power drop locations as installed by Oncor, revise the technical specs, provide detailed specifications to contractors. Address other items raised during construction of Doublecreek,Phase 1. Item 3 Add four new driveways at the intersection of Doublecreek Drive and Gattis School Road. Perform design surveys, reduce survey data to fit into existing project coordinate system and base drawing. Design work to include layout and spot elevations for the four Type II driveways. Prepare two additional plan sheets with details. Prepare contract change order. ADDENDUM TO EXHIBIT D Fee Schedule The changes to the fee schedule for this project are as follows: Supplemental Agreement 71920 Rev.03/02/04 Exhibit D Fee Schedule The breakdown of costs for each task item for this Supplemental Agreement No. 2 for the Doublecreek Drive and Forest Creek Drive Project is: 1. Task 1 —re-bidding Forest Creek Drive and Doublecreek $5,500 2. Task 2—update street lighting plans $2,500 3. Task 3 - add driveways to Doublecreek Drive �Z $15,500