Loading...
R-04-09-09-11E2 - 9/9/2004 RESOLUTION NO. R-04-09-09-11E2 WHEREAS, the City of Round Rock has previously entered into a contract for engineering services ( "Contract" ) with Baker-Aicklen & Associates, Inc. for the reconstruction of Chisholm Trail from Chisholm Trail Hotel Centre to Wolle Lane, and WHEREAS, Baker-Aicklen & Associates, Inc. has submitted Supplemental Agreement No. 6 to the Agreement for Engineering Services for a change in the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 6 with Baker-Aicklen & Associates, Inc . , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 6 to the Agreement for Engineering Services with Baker-Aicklen & Associates, Inc . , a copy of same being attached hereto as Exhibit "A" and incorporated herein. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 9th day of September, 00 NY ELL, M yor ATTEST L City f Round Rock, Texas • J !(,��l`�_r,��f CHRISTINE R. MARTINEZ, City Secreta @PFDeSktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R40909E2.WPD/sc STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL AGREEMENT NO. 6 TO AGREEMENT FOR ENGINEERING SERVICES FIRM: Baker-Aicklen & Associates,Inc. ("Engineer") ADDRESS: 203 E. Main Street,Round Rock, TX 78664 PROJECT: Reconstruction of Chisholm Trail from Chisholm Trail Hotel Centre to Wolle Lane This Supplemental Agreement No. 6 to Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Baker-Aicklen & Associates, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract', dated the 27th day of April, 2000 for the Reconstruction of Chisholm Trail Project for a total compensation of$83,450.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 1 dated the 26th day of April, 2001 to change the scope of services, extend the termination date of the Agreement from June 30, 2001 to April 30, 2002 and to amend the compensation for a total of$87,450.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 2 dated the 25th day of April, 2002 to extend the termination date of the Agreement from April 30, 2002 to April 30, 2003; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 3 dated the 10th day of October, 2002 to change the scope of services and to amend the compensation for a total of $116,280.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 4 dated the 24th day of April, 2003 to change the scope of services, extend the termination date of the Agreement from April 30, 2003 to April 30, 2004 and to amend the compensation for a total of$123,995.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 5 dated the 25th day of March, 2004 to extend the termination date of the Agreement; and WHEREAS, it has become necessary to change the scope of services and to amend the compensation, Supplemental Agreement 71253 Rev.03/02/04 Page 1 of 4 EXHIBIT � nAn NOW THEREFORE, premises considered, the City and the Engineer agree that said Agreement is amended as follows: I. Article 2, Scone Of Services To Be Performed By Engineer and Exhibit B, Services To Be Performed By The Engineer shall be amended as set forth in the attached Addendum To Exhibit B. II. Article 4 Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $4,000.00 the lump sum amount payable under the Agreement for a total of $127,995.00, as shown by the attached Addendum to Exhibit D. III. Article 7,Notice to Proceed shall be amended to read as follows: The Engineer shall not proceed with any task listed on Exhibit B until the City has issued a written Notice to Proceed regarding such task. The City shall not be responsible for work performed or costs incurred by Engineer related to any task for which a Notice to Proceed has not been issued. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agreement in duplicate. BAKER-A KLEN &ASSOCIATES,INC. By: Date CITY OF ROUND ROCK By: Nyle Maxwell,Mayor Date Supplemental Agreement 71253 Rev.03/02/04 Page 2 of 4 EXHIBIT B WORK TASKS DESCRIPTION STORM WATER POLLUTION PREVENTION PLAN I. Assemble pertinent information. Client to furnish available information. 2. Complete all TCEQ Pollutant Discharge Elimination System (TPDES)permit forms for owner's and contactor's signature. 3. Supply all required construction plan attachments to be incorporated into the SWPPP. 4. Submit the Notice of Intent to the TCEQ. $3,500.00 ALLIANCE TRANSPORTATION GROUP, INC. 1. Change Order per the City of Round Rock $ 500.00 Traffic Control Plan TOTAL $4,000.00 0:\0601-2-059\SuppAgr#6 7/22/04 Revised.doc EXHIBIT D STANDARD RATE SCHEDULE Labor Rate Table 40 Effective October, 2003, the following rates are recommended for work performed on an hourly-charge basis. Rates include company overhead and profit for services accomplished during regular working hours. DIRECT LABOR OFFICE PERSONNEL SERVICES Classification Rates Project Manager ........... $120 per hour Project Engineer/Surveyor/Planner ............................................................................................. GIS Project Manager $115 per hour ................................................................................................................... $105 per hour Staff Engineer/Surveyor/Planner ................................................................................................. $100 per hour Project Designer/Coordinator ............ ....................................................... $ 95 per hour Engineering/Surveying/PlanningAssociate ....""' ................................................................................. $ 90 per hour Engineering Assistant/Surveying Assistant/GPS Processor ........................................................ $ 75 per hour GIS Analyst .............. ......... .. ................................................................................................. $ 70 per hour Engineering/Surveying CAD Technician/Field Representative .................................................. $ 65 per hour CADAdministrativeAssistant .............................................................................................................. $ 55 per hour Draftsman ........................................................................................................................... $ 50 per hour GIS Technician ................................ .. $ 40 per hour .............................................................................. Expert Witness/Testimony/Deposition Services .................................................................... Two Times Rates DepartmentHead ......................................................................................................................... $125 per hour Branch Manager ...................................................... $135 per hour ................................................................ Principal (as appropriate) ""' ..................................................................o.......................................... $150 per hour FIELD PARTY SERVICES Rates 21-Man Field Party ........................................................................................................................ $ 75 per hour -Man Field Party ........................................................................................................................ $100 per hour 3-Man Field Party ........................................................................................................................ $125 per hour 4-Man Field Party ..................... $150 per hour .......................................................................... GPS Field Unit with Operator(Note 5) .............."""""' ..................................................................... ......... $100 per hour GPS Field Unit without Operator(Note 5) ........' ................................................................................... $ 60 per hour DIRECT EXPENSES Transportation: By Firm's Passenger Vehicles(Note 1) ................................... $ 0.35 per mile ................................................. By Firm's Survey Trucks(Notes 1, 2, 3 &4) .......................................................................... $ 0.35 per mile Subsistence of out-of-city services .......................................................................................... Reproduction&Printing by Firm, $120.00 per day ........................................................................................... Prevailing Com- Survey Stakes,Lathes, Iron Rods ........................................................................................... mercial Rates Or andother Direct Expense ......................................................................................................... Cost,Plus 10% Notes: 1. A mileage charge will be billed for projects exceeding a 50-mile radius of the base office only. 2. Field Party rates include conventional equipment, supplies and survey vehicles. Abnormal use of stakes, lathes, etc., used such as during the construction phase of a project will be charged as indicated. 3. A minimum of two (2) hours field party time charge will be made for show-up time and return to office, resulting from inclement weather conditions, etc. 4. Field Party stand-by time will be charged for at the above-shown appropriate rates. 5. Rates apply to actual time GPS units are in use. All other time will be charged as appropriate normal field party rates. 6. The firm's professional liability is limited to the total amount of compensation under the Professional Services Agreement to a maximum of$50,000. BAKER-AICKLEN 6 ASSOCIATES,INC. ENGINEERS/SURVEYEIRS i M LW-Q E 0 _J Q O U) 2 U N f w E Chisholm Trail North J'-�OUNDR OCK.TEXAS S RPOS[P15510R PROSP[RITY DATE: September 3, 2004 SUB3ECT: City Council Meeting - September 9, 2004 ITEM: *11.E.2. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 6 to the Agreement for Engineering Services with Baker-Aicklen &Associates, Inc. for the reconstruction of Chisholm Trail from Chisholm Trail Hotel Centre to Wolle Lane. Department: Transportation Services Staff Person: Tom Martin, Director justification: Supplemental Agreement No. 6 will enable the City of Round Rock to retain the services of Baker-Aicklen &Associates, Inc., through the remainder of the construction of the project. Fun= Cost: $4,000.00 Source of funds: 98 GO Bonds Outside Resources: Baker-Aicklen &Associates, Inc. Background Information• The agreement with Baker-Aicklen & Associates, Inc., was originally executed by the City of Round Rock in April 2000. Since its execution, there have been a total of 5 other supplemental agreements to this professional services contract. Currently, the identified segment of Chisholm Trail is under construction by Fillip Construction. Public Comment: N/A Executed Document Follows ti STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL AGREEMENT NO. 6 TO AGREEMENT FOR ENGINEERING SERVICES FIRM: Baker-Aicklen &Associates, Inc. ("Engineer") ADDRESS: 203 E. Main Street, Round Rock, TX 78664 PROJECT: Reconstruction of Chisholm Trail from Chisholm Trail Hotel Centre to Wolle Lane This Supplemental Agreement No. 6 to Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Baker-Aicklen & Associates, Inc.,hereinafter called the"Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", dated the 27th day of April, 2000 for the Reconstruction of Chisholm Trail Project for a total compensation of$83,450.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 1 dated the 26th day of April, 2001 to change the scope of services, extend the termination date of the Agreement from June 30, 2001 to April 30, 2002 and to amend the compensation for a total of$87,450.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 2 dated the 25th day of April, 2002 to extend the termination date of the Agreement from April 30, 2002 to April 30, 2003; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 3 dated the 10th day of October, 2002 to change the scope of services and to amend the compensation for a total of $116,280.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 4 dated the 24th day of April, 2003 to change the scope of services, extend the termination date of the Agreement from April 30, 2003 to April 30, 2004 and to amend the compensation for a total of$123,995.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 5 dated the 25th day of March, 2004 to extend the termination date of the Agreement; and WHEREAS, it has become necessary to change the scope of services and to amend the compensation, -6*c y-oC1-1 I G.J Supplemental Agreement 71253 Rev.03/02/04 Page 1 of 4 NOW THEREFORE, premises considered, the City and the Engineer agree that said Agreement is amended as follows: I. Article 2, Scope Of Services To Be Performed By Engineer and Exhibit B, Services To Be Performed By The Engineer shall be amended as set forth in the attached Addendum To Exhibit B. II. Article 4 Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $4,000.00 the lump sum amount payable under the Agreement for a total of $127,995.00, as shown by the attached Addendum to Exhibit D. III. Article 7, Notice to Proceed shall be amended to read as follows: The Engineer shall not proceed with any task listed on Exhibit B until the City has issued a written Notice to Proceed regarding such task. The City shall not be responsible for work performed or costs incurred by Engineer related to any task for which a Notice to Proceed has not been issued. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agreement in duplicate. BAKER-A KLEN &ASSOCIATES, INC. By: 1 a4z�—� Date CI:;axwel UN R CK By: , /a�yor Date Supplemental Agreement 71253 Rev.03/02/04 Page 2 of 4 EXHIBIT B WORK TASKS DESCRIPTION STORM WATER POLLUTION PREVENTION PLAN 1. Assemble pertinent information. Client to furnish available information. 2. Complete all TCEQ Pollutant Discharge Elimination System (TPDES)permit forms for owner's and contactor's signature. 3. Supply all required construction plan attachments to be incorporated into the SWPPP. 4. Submit the Notice of Intent to the TCEQ. $3,500.00 ALLIANCE TRANSPORTATION GROUP, INC. 1. Change Order per the City of Round Rock $ 500.00 Traffic Control Plan TOTAL $4,000.00 0:\0601-2-059\SuppAgr#6 7/22/04 Revised.doc EXHIBIT D STANDARD RATE SCHEDULE Labor Rate Table 40 Effective October, 2003, the following rates are recommended for work performed on an hourly-charge basis. Rates include company overhead and profit for services accomplished during regular working hours. DIIZECT LABOR OFFICE PERSONNEL SERVICES Classification Project ManagerRates ................................................................. ".••... ............. $120 per hour Project Engineer/Surveyor/Planner ............................................................................................ $115 per hour GIS Project Manager................ ................................................................................... $105 per hour ................. Staff Engineer/Surveyor/Planner ................................................................................................. Project Designer/Coordinator $100 per hour ....................................................... $ 95 per hour Engineering/Surveying/Planning .............................................. Associate ............. Engineering Assistant/Surveying' $ 90 per hour ymg Assistant/GPS Processor ........................................................ $ 75 per hour GIS Analyst ............ ............................................. Engineering/Surveying ............tats........................................ $ 70 per hour e in CAD T ............... Y g Technician/Field Representative .................................................. $ 65 per hour CADAdministrative Assistant .............................................................................................................. $ 55 per hour Draftsman ............................ ........................................................................................ $ 50 per hour GIS Technician ............ ........... ..................................................... ......................................... ... $ 40 per hour Expert Witness/Testimony/Deposition Services .................................................................... Department Head Two Times Rates ........................................................................................................................ $125 per hour ............................... PBranch Manager ............. ............................................................................... $135 per hour rincipal(as appropriate) ............................................................................................................. $150 per hour FIELD PARTY SERVICES 1-Man Field Party Rates .................................................................................... $ 75 per hour 2-Man Field Party ................................... 3-Man Field Party ........................................................................................................................ $100 per hour 4-Man Field Party ......... ........... $125 per hour ............................................................... GPS Field Unit with Operator(Note 5)............................. ............. " """"""" $150 per hour .......................................................................... $100 per hour GPS Field Unit without Operator(Note 5)................................................................................... $ 60 per hour DIRECT EXPENSES Transportation: By Firm's Passenger Vehicles (Note 1) ........ $ 0.35 per mile By Firm's Survey Trucks (Notes 1,2, 3 &4) .......................................................................... $ 0.35 per mile Subsistence of out-of-city services .......................................................................................... Reproduction&Printing by Firm, $120.00 per day ........................................................................................... Prevailing Com- Survey Stakes,Lathes, Iron Rods ........................................................................................... mercial Rates Or and other Direct Expense ......................................................................................................... Cost,Plus 10% Notes: 1. A mileage charge will be billed for projects exceeding a 50-mile radius of the base office only. 2. Field Party rates include conventional equipment, supplies and survey vehicles. Abnormal use of stakes, lathes, etc.,used such as during the construction phase of a project will be charged as indicated. 3. A minimum of two (2) hours field party time charge will be made for show-up time and return to office, resulting from inclement weather conditions, etc. 4. Field Party stand-by time will be charged for at the above-shown appropriate rates. 5. Rates apply to actual time GPS units are in use. All other time will be charged as appropriate normal field party rates. 6. The firm's professional liability is limited to the total amount of compensation under the Professional Services Agreement to a maximum of$50,000. BAKER-AICKLEN 6 ASSOCIATES,INC. ENGINEERS/SURVEYORS