R-04-08-12-13F3 - 8/12/2004 RESOLUTION NO. R-04-08-12-13F3 WHEREAS, the City of Round Rock has duly advertised for bids for the relocation of a raw water line at State Highway 29 and County Road 265, and WHEREAS, Lewis Contractors, Inc. has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Lewis Contractors, Inc. , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Lewis Contractors, Inc. for the relocation of a raw water line at State Highway 29 and County Road 265 . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 12th day of August, 2004 . W , AST: City of Round Rock, Texas CHRISTINE R. MARTINEZ, City Secret ry @PFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R40812F3.WPD/SC CDM 12357-A Riata Trace Parkway,Suite 210 Austin,Texas 78727 tel: 512 346-1100 fax: 512 345-1483 July 27,2004 Mr. Don M. Rundell,P.E. Chief Utility Engineer City of Round Rock 212 Commerce Cove Round Rock, TX 78664 RE: City of Round Rock Relocation of Raw Water Line at S.H. 29 and C.R. 265 Recommendation of Award Dear Mr. Rundell: On July 27,2004,at 10:00 a.m. at the City of Round Rock's City Hall Council chambers, bids were received and opened for the Relocation of Raw Water Line at S.H. 29 and C.R. 265. The project includes the installation of 5,650 linear feet of 42-inch raw water line and the removal of 5,300 linear feet of 30-inch raw water line which is in conflict with the expansion of S.H. 29. Six bids were received as shown in the summary tabulation below. A detailed tabulation of the unit price items is attached to this letter. Company Name Alternate Bid Amount Lewis Contractors, Ltd. $1,921,913.00 McLean Construction, Ltd $2,372,252.20 Cash Construction Co. Ltd. $2,457140.00 S. J. Louis Construction of Texas, Ltd, LLP $2,536,571.10 Austin Engineering Co., Inc. $2,876,796.00* KAT Excavation $2,983,956.00 *Incorrect quantity The low bidder was Lewis Contractors,Ltd. of Austin,Texas. They have recently satisfactorily completed similar projects in the Round Rock area. We believe they are qualified to perform the work included in the Plans and Specifications within the conditions of the Contract. Therefore,Camp Dresser&McKee recommends that the City of Round Rock award the Relocation of Raw Water Line at S.H. 29 and C.R. 265 contract to Lewis Contractors, Ltd. for the Alternate Bid in the amount of$1,921,913.00. 7-27-04-R U N DELLA W AR D.DOC consulting•engineering•construction-operations (=M Mr. Don Rundell,P.E. July 27,2004 Page 2 If you need additional information regarding this recommendation of award, or have any questions regarding the bids,please call. Sincerely, CAMP DRESSER&McKEE INC. William T. Reynolds,P.E. Engineer WR:lml ENCLOSURE 7-27-04-RUNDELLAW ARD.DOC CITY OF ROUND ROCK Relocation of Raw Water Line at S.H. 29 and C.R. 266 Match Bid Jul 26,2004 Lewis Contractors,Inc. McLean Construction,Ltd]Cash Construction Co.,Ltd. Tex soLtd.,LLPuis truction ofAustin Engineering Co.,Inc. KAT Excavation 13716A McNeil/Merrilltown P.O.Box 10759 1806 Heatherwilde Blvd. 9862 Lorene,Suite 104 P.O.Box 342349 1256 Armidillion Dr. Austin,TX 78727 Killeen,TX 76547 Pflugerville,TX 78660 San Antonio,TX 78216 Austin,TX 78734-2349 Waco,TX Item No. Descri tion Quantity Unit Unit Price Total Amt. Unit Price Total AmUnit Price Total Amt. Unit Price Total Amt. Unit Price Total Amt. Unit Price Total Amt. 101-C Preparing Right-of-Way 1 L.S. $10,500.00 $10,500.00 $75,000.00 $75,000.00 $30,000.00 $30,000.00 $6,500.00 $6,500.00 $10,000.00 $10,000.00 $28,611.00 501 Jacking or Boring 54-Inch Steel Casing Pipe, $28,611.00 0.650 inches Thick 192 L.F. $655.00 $125,760.00 $674.00 $129,408.00 $800.00 $153,600.00 $660.00 $126,720.00 New Manhole(Access)Construction,5-foot Diameter $640.00 $122,880.00 $850.00 $163,200.00 506-MW-5 3 Ea. $7,250.00 $21,750.00 $13,514.00 $40,542.00 $10,00^.00 130,000.00 $9,400.00 $28,200.00 $23,000.00 $69,000.00 $4,000.00 $12,000.00 509 Trench Safety Plan 11,170 L.F. $1.00 $11,170.00 $1.60 $17,872.00 $1.00 $11,170.00 $0.01 $111.70 $1.00 $11,170.00 $1.00 $11,170.00 510-A-42 Pipe,42-inch Diameter,Ductile Iron,Class 150 6,020 L.F. $221.00 $1,330,420.00 $205.00 $1,234,100.00 $268.00 $1,613,360.00 $257.00 $1,547,140.00 $318.00 $1,914,360.00 510-A-30 Pipe,42-inch Diameter,Ductile Iron,Class $266.00 $1,601,320.00 150 10 L.F. $210.00 $2,100.00 $247.20 $2,472.00 $450.00 $4,500.00 $210.00E $360.00 $3,600.00 $200.00 $2,000.00 510-H Concrete Trench Cap,5-foot Width 900 L.F. $15.00 $13,500.00 $89.90 $80,910.00 $40.00 $36,000.00 $110.00Wet Connection,42"DIP x 30"SCCP,Station $32.00 $28,800.00 $16.00 $14,400.00 510-V-30A p+O- 1 Ea. $19,500.00 $19,500.00 $10,687.00 $10,687.00 $5,000.00 $5,000.00 $5,300.00 $16,000.00 $1600000 $12,000.00 $12,000.00 510-V-306 Wet Connection,42"DIP x 30"SCCP,Station58+20 1 Ea. $19,750.00 $19,750.00 $10,687.00 $10,687.00 $5,000.00 $5,000.00 $5,300.00 $1600000 $1600000 $11,000.00 $11,000.00 510-RC-30F 30-Inch DIP Repair Clamp,Furnish 1 Ea. $5,250.00 $5,250.00 $2,056.00 $2,056.00 $5,000.00510-RC-301 0-Inch Reair Clamp,Install $5,000.00 $5,800.00 $5,500.00 $5,500.00 $5,000.00 $5,000.00 1 Ea. $1,120.00 $1,125.00 $4,091.00 $4,091.00 $1,500.00 $1,500.^- $2,300.00 $2,300.00 $1,200.00 $1,200.00 $3,500.00 510-SSC-30F 30-Inch Solid Sleeve Coupling,Furnish 1 Ea. $3,025.00 $3,025.00 $3,856.00 $3,500.00 $3,856.00 $1,500.00 $1,501 $2,600.00 $2,600.00 $3,000.00 $3,000.00 $2,500.00 $2,500.00 510-SSC-301 30-Inch Solid Sleeve Coupling,Install 1 Ea. $1,000.00 $1,000.00 $10,227.00 $10,227.00 $1,500.00 $1,500.00 $2,300.00 $2,300.00 $4,000.00 $4,000.00 $3,500.00 $3,500.00 511-A-42BF Valves,Butterfly Type,42-Inch Diameter 2 Ea. $20,250.00 $40,500.00 $16,346.00 $32,692.00 $28,000.00 $56,000.00 $26,000.00 $52,000.00 $26,800.00 $53,600.00 $16,-00.00 $32,-00.00 51 511-EBF Valves,Butterfly Type,30-Inch Diameter 1 Ea. $13,250.00 $13,250.00 $9,906.00 $9,906.00 $17,000.00 $17,000.00 $17,000.00 $17,000.00 $15,200.00 $15,200.00 $11,000.00 $11,000.00 511-E Drain Valve Assembly 1 Ea. $2,500.00 $2,500.00 $6,321.00 $6,321.00 $5,000.00 $5,000.00 $3,900.00 $3,900.00 $7,000.00 $7,000.00 511-B-4 Automatic AirNacuum Release Valve,4" 2 Ea. $2,000.00 $2,000.00 $8,200.00 $16,400.00 $6,145.00 $16,290.00 $17,000.00 $34,000.00 $13,600.00 $27,200.00 $14,000.00 $28,000.00" $8,000.00 604-A Seeding for Erosion Control,Method B,Fiber $16,000.00 Mulch,New Pipe Installation 1 L.S. $2,940.00 $2,940.00 $22,582.00 $22,582.00 $10,000.00 604- Seeding for Erosion Control,Method B,Fiber $10,000.00 $2,000.00 $2,000.00 $12,000.00 $12,000.00 $4,000.00 $4,000.00 B Mulch,Pie Removal 1 L.S. $9,300.00 $9,300.00 $42,503.00 $42,503.00 $7,000.00 $7,000.00 $5,000.00 $5,000.00 $1,000.00 $1,0-0.00 610-AS Safety Fencing Type A,Chain Link 1,350 L.F. $6,000.00 $6,000.00 $2.00 $2,700.00 $2.00 $2,700.00 $3.00 $4,050.00 $3.00 $4,050.00 $1.60 $2,160.00 642 Silt Fence for Erosion Control 3,304 L.F. $6.00 $8,100.00 $1.50 $4,956.00 $2.30 $7,599.20 $2.00 $6,608.00 $1.35 $4,460.40 $2.00 $6,608.00 702-G Remove and Relocating Existing,3 Strand $2.00 $6,608.00 Barbed with 4 x 4 Goat Wire Fence 100 L.F. $9.00 $900.00 $4.10 $410.00 $7.00 Remove and Relocating Existing,Wrought $700.00 $7.00 $700.00 $10.00 $1,000.00 $3.00 $300.00 702-I Iron Fence 40 L.F. $25.00 $1,000.00 $25.60 $1,024.00 $25.00 $1,000.00 703 Safety Fencing $25.00 $1,000.00 $45.00 $1,800.00 $10.00 $400.00 720 L.F. $1.25 $900.00 $1.90 $1,368.00 $2.00 $1,440.00 $1.20 803-M Barricades,Signs and Traffic Control $864.00 $2.00 $1,440.00 $1.00 $720.00 5 Months $2,200.00 $11,000.00 $2,645.00 $13,225.00 $14,000.00 $70,000.00 $750.00 $3,750.00 $4,500.00 1001 Pavement Removal and Replacement,14' $22,500.00 $2,000.00 $10,000.00 Roadway3,717 L.F. $24.50 $91,066.50 $109.10 $405,524.70 $38.00 $141,246.00 $70.00 $260,190.00 $26.00 $96,642.00 $23.00 $85,491.00 1002 Remove and Dispose Existing 30"SCC Pipe 5,300 L.F. $29.00 $153,700.00 $33.40 $177,020.00 $40.00 $212,000.00 $57.00 $302,100.00 608 Planting,1--Gallon Live Oak Trees $74.00 $392,200.00 $170.00 $901,OOD.00 5 $400.00 $80.00 $400.00 $80.00 $400.00 $80.00 $400.00 $80.00 $400.00 $80.00 $400.00 TOTAL BASE BID $1,916,337.50 §2,361,472.90 §2,464,574.00 §2,517,986.10 §2,847,060.00 §2,954,220.00 ALTERNATE BID 1001 Pavement Removal and Replacement,18' Roadway 3,717 L.F. $26.001 $96,642.00 $112.00 $416,304.00 $36.00 $133,612.00 $75.00 §278,775.00 $34.001 $126,378.001 1 $31.0- §115,227.00 TOTAL ALTERNATE B/D §1,921,913.00 §2,372,252.20 Incorrect quantity. §2,457,140.00 §2,536,571.10 §2,876,796.00 $2,983,956.00 07-27-04Tab Page 1 000�00� PROPOSED 42" RAW WATERLINE moaooaoo 000e000D m0omaoo0 �0 00000000F] C� "foo°o°o 00ElEdoo OO �0 000000 Pe 000000 0 am o°ami] o � �aoo� m SIMON8� Oa ❑ PROJECT I( n��p I El A 01:3 off �Uf � � o �ER g �RAVER a � Q P � Q K SOU Do 00 I LEAS LL a o D N RELOCATION OF W* E NOT TOS 30" RAW WATERLINE 'Haino ka_k rFzas S DATE: August 6, 2004 SUBJECT: City Council Meeting - August 12, 2004 ITEM: 13.F.3. Consider a resolution authorizing the Mayor to execute a contract with Lewis Contractors, Inc. for the Relocation of a Raw Waterline at State Highway 29 and County Road 265. Department: Water and Wastewater Utilities Staff Person: Tom Clark, Director of Utilities Justification: On July 27, 2004 we received six bids for the Relocation of the Raw Water Line at SH 29 & CR 265 Improvements Project and the low bid of $1,921,913 was from Lewis Contractors, Inc., with an average bid amount of $2,522,438.05. Based upon the review of the bids by staff and CDM Engineering, Inc. staff recommends awarding the bid to Lewis Contractors, Inc. in the amount of $1,921,913.00. Funding• Cost: $1,921,913.00. Source of funds: Capital Improvement Project (Self-Financed Utility) Outside Resources: Lewis Contractors, Inc. Background Information• TxDot is proposing to widen State Highway 29 in Georgetown and the City will be required to relocate its Raw Water Line currently located on the north side of the highway. Under this contract, approximately 5,400 linear feet of a 42-inch water line will be installed and the existing 30" pipeline will be removed. Total cost of the project including Engineering, Surveying and Right of Way Acquisition is $ 2,638,090.00. Public Comment: N/A