Loading...
R-04-07-08-9D1 - 7/8/2004 RESOLUTION NO. R-04-07-08-9D 1 WHEREAS, the City of Round Rock has duly advertised for bids for the Buck Egger Park (Phase I) Project, and WHEREAS, the Council has determined that all bids received should be rejected and the project should be re-bid, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That all bids received for the Buck Egger Park (Phase I) Project are hereby rejected and the project should be re-bid. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 8th day of July, 2004 . NYL ELL, Mayo City Round Rock, Texas ATTEST: CHRISTINE R. MARTINEZ, City Sec etary @PFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R40708D1.WPD/so THE CITY OF ROUND R0CK PARKS&RECREATION DEPARTMENT BIDS EXTENDED AND CHECKED 301 West Bagdad Round Rock, Texas. 78664 BY' DMB (51z)218-5540BID TABULATION SHEET 6/22/zooa OF 1 OF 1 CONTRACT: Buck Egger Park(Phase 1) LOCATION:City Hall Council Chambers Muniz Concrete& DATE: 6/22/2004 H.Deck Construction Hall-Bargainer Contracting Probable Cost Bid Bond?YesBid Bond? UNIT'.:.:._:................ on?Yes APPRO UNITJIT ...... ITEM UNIT TY. PRICE COST PRICE COST PRICE - o i�zaUon COST raffic ontro onstruction ntrance �t ence emo a isli,. rive emo ras ans emo A Barri r osts emo eta o at s Demo ater eter, a ves,... emo xstmg rngatton emo ui mg tructure emo x1stmg ign, ater ountam,.. uu $5,200.00 nc assi le ra mg 4'Sch.4 PVC Sleeve nst ater eter ou a ec a ve Water Connection c me ater ountam an rave ump rrigation ontro er am me c . emote a ve oncrete ur utter oncrete rlveway ype ee stop ar mg tnpmg an icap ign ost egu atory ign&Post oncrete ewa aygroun Ribbon ur aygroun ram Pipe aygroun ur acing GameTim: ayscape amehme ayscape U.00 I ame Mme wings ma ram op of acement ga. roup cover 2,268.0 ga. ru 6,111.00 - ca. a e ree U C0.00. e-ve etagon y romu c e-vegetation o i o emote Control ave op-up ea s op-up ea s am me c . ' 00 5.00 atera c . atera c . c TOTAL BASE BID(1.01-1.36): $170,366.00 $196,100.00 $106,966.85 TOTAL ALTERNATIVE BID(2.01-2.15): $37,242.75 $33,185.90 $16,763.80 Unit Price and/or Cost Do Not Meet Actual Calculated Cost DATE: July 2, 2004 SUBJECT: City Council Meeting - July 8, 2004 ITEM: 9.D.1. Consider a resolution rejecting all bids received for the Buck Egger Park (Phase I) Project. Department: Parks and Recreation Department Staff Person: Sharon Prete, Parks and Recreation Director Justification: The Buck Egger Park (Phase I) Project was competitively bid in June. Only two bids were received and both were over the project construction budget. Staff is uncomfortable with the number of bids and most of the prices that are in the bids. Staff is currently discussing options for completing the project. Funding: $113,377.00 Cost: None Source of funds: CDBG (Fund 790) Outside Resources: Hall/Bargainer, Inc. Background Information• The Buck Egger Park (Phase I) Project is a limited park redevelopment that will include a playground, parking, and various site amenities. The project is funded through the Community Development Block Grant Program (CDBG). Public Comment: N/A