Loading...
R-04-07-08-9E1 - 7/8/2004 RESOLUTION NO. R-04-07-08-9E1 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract" ) with Fillip Construction Company, Inc . for the Chisholm Trail Reconstruction Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 1 to the Contract with Fillip Construction Company, Inc . for the Chisholm Trail Reconstruction Project, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 8th day of July, 2004 . NYLE L, ayor ATTESTCity o ound Rock, Texas : bi�� /�• V / ) . CHRISTINE R. MARTINEZ, City Secreta CPMesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R40708E1.WPD/SC CHANGE OWNER Ell ORDER ARCHITECT px CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: Chisholm Trail Street Reconstruction CHANGE ORDER NUMBER: 1 DATE: 6/14/2004 CONTRACTOR: Fillip Construction Company ARCHITECT'S PROJECT NO: P.O. Box 656 CONTRACT DATE: Hutto,Tx 78634 CONTRACT FOR: The Contract is changed as follows: Item Description QTY UNIT UNIT PRICE Add/Deduct Water 100 8"Concrete Retaining Wall 613 SF $ 3.60 $ 2,206.80 200 8"Concrete Retaining Wall 43 SF $ 35.00 $ 1,505.00 300 Additional Traffic Control 3 MO $ 6,450.00 $ 19,350.00-- (Barrier wall&Virtical Pannals) $ - $ 400 ADA Ramp 1 EA $ 750.00 $ 750.00 500 Manholes Changes from 24"to32" 5 EA $ 985.00 $ 4,925.00 TOTAL THIS CHANGE ORDER $ 28,736.80 Not valid until signed by the Owner and Contractor. The original(Contract sum)(Guaranteed Maximum Price)was $ 538,282.20 Net change by previously authorized Change Orders $ The(Contract sum)(Guaranteed Maximum Price)prior to this Change Order was $ rte . 5 bb I Z S2.2 p The(Contract Sum)(Guaranteed Maximum Price)will be(increased)(decreased) (unchanged)by this Change Order in the amount of $ 28,736.80✓ The new(Contract Sum)(Guaranteed Maximum Price)including this Change Order will be ---58$� ,4g • S(o7 1`T,0 O The Contract Time will be(increased) by 60)days. ✓ The date of Substantial Completion as of the date of this Change Order therefore is ( Note: This summary does not reflect changes in the Contract Sum,Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive. Baker Alckien&Ass.Inc Fillip Construction Company City of Round Rock Engineer Contractor Owner P.O.Box 656 Hutto,Tx 78634 BY BY BY DATE 12 DATE DATE EXHIBIT a nAn 3 / Q M Pv�GE FM 3406 La s = N N T � co / �9 O � 9 N Chisholm Trail North HOUND ROCK.TEXAS Sk tt�� N(�(•t M'll DATE: July 2, 2004 SUBJECT: City Council Meeting - July 8, 2004 ITEM: *9.E.1. Consider a resolution authorizing the Mayor to execute Change Order No. 1 with Fillip Construction Company, Inc. for the Chisholm Trail North Project. Department: Transportation Services Staff Person: Tom Martin, Director of Transportation Services Justification: This change order is for quantity overruns and for additional traffic control. Funding: Cost: $ 28,736.80 Source of funds: 98 GO Bonds Outside Resources: Fillip Construction Company Background Information• The quantity overruns are due to a change is design of the retaining wall, one additional ADA ramp, upgrading the wastewater manholes, and additional traffic control for safety, during the construction of the south end of the project. Public Comment: N/A Executed Document Follows CHANGE OWNER O ORDER ARCHITECT ❑x CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: Chisholm Trail Street Reconstruction CHANGE ORDER NUMBER: 1 DATE: 6/14/2004 CONTRACTOR: Fillip Construction Company ARCHITECT'S PROJECT NO: P.O. Box 656 CONTRACT DATE: Hutto,Tx 78634 CONTRACT FOR: The Contract is changed as follows: Item Description QTY UNIT UNIT PRICE Add/Deduct Water 100 8"Concrete Retaining Wall 613 SF $ 3.60 $ 2,206.80 200 8"Concrete Retaining Wall 43 SF $ 35.00 $ 1,505.00 300 Additional Traffic Control 3 MO $ 6,450.00 $ 19,350.00--- ( Barrier wall&Virtical Pannals) $ - $ - 400 ADA Ramp 1 EA $ 750.00 $ 750.00 500 Manholes Changes from 24"to32" 5 EA $ 985.00 $ 4,925.00 TOTAL THIS CHANGE ORDER $ 28,736.80 ' Not valid until signed by the Owner and Contractor. The original(Contract sum)(Guaranteed Maximum Price)was $ 538,282.20 Net change by previously authorized Change Orders $ 2-2,020.. -$� = The(Contract sum)(Guaranteed Maximum Price)prior to this Change Order was $ 2 X2.2 C The(Contract Sum)(Guaranteed Maximum Price)will be(increased)(decreased) (unchanged)by this Change Order in the amount of $ 28,736.80✓ The new(Contract Sum)(Guaranteed Maximum Price)including this Change Order will be I I.G G The Contract Time will be(increased) by ( 60)days. The date of Substantial Completion as of the date of this Change Order therefore is N/A Note: This summary does not reflect changes in the Contract Sum,Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive. Baker Alckien&Ass.Inc Fillip Construction Company City of Round Rock Engineer Contractor Owner N)/LZ MX}1CWELt, P.O.Box 656 MASOk/ a 2/ 5-MA/AJ 6T,eE Hutto,Tx 78634 RCYA 7x BY AZ BY / BY DATE DATE ((/� "�� DATE