CM-2017-1426 - 7/5/2017Page 1 of 3 Contract Quantity Adjustment/ Change Order JtIKMMIL— rev, Owls Department: Transportation Project Name: Creek Bend Blvd Extension Date: 6/21/17 City Project Change Order/Quantity ID Number ST33CBDR Adjustment No. 6 Justification Quantity Adjustment/Change Order No. 6 for the amount of $19,083.11 is for the addition of the following items. 18" rock Riprap and flowable fill to stabilize channel erosion on the west side of the Creek Bend bridge along Hairy Man Rd. This erosion work was added to increase the protection to the Hairy Man Rd. bridge wing. SUMMARY Amount % Change Original Contract Price: $8,089,168.50 Previous Quantity Adjustment(s): $168,929.27 This Quantity Adjustment: $427.22 Total Quantity Adjustment(s): $169,356.49 Total Contract Price with Quantity Adjustment(s): $8,258,524.99 Previous Change Order(s): $333,201.03 0.04 This Change Order: $19,083.11 0.00 Total Change Order(s) To Date: $352,284.14 0.04 Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: $8,610,809.131. Difference between Original and Adjusted Contract Prices: $521,640.63 Original Contract Time: 435 Time Adjustment by previous Quan. Adj./Change Order: 140 Time Adjustment by this Quan. Adj./Change Order: 6 New Contract Time: 581 Submitted -for Appw"lla Prepared By: _Randy Crum, Project Manager, City of Round Rock 6121/17 Signature Printed Name, Title, Company Date Approvals Contractor: City Project 5i ature Printed NAme, Title, Company Date Manager: Randy Crum, Project Manager, City of Round Rock 6/21/17 Signature Printed Name, Title Date Mayor/City 6Y,2,07, 142-fe / Contract Quantity Adjustment/Change Order Project Name: Creek Bend Blvd Extension Quan. Adj./Change Order No.: Channe firdpr nata Page 2 of 3 Item # Item Description Unit Vii- Unit Price Amount Contract Time Adjustment (Davs) = _ 1 18" Riprap TN 20 $65.00 $1,300.00 2 Labor MH 250 $27.98 $6,993.90 3 Equipment HR 90 $62.33 $5,610.00 4 Re -mobilization LS 1 $2,485.71 $2,485.71 5 Flowable Fill CY 20 $134.68 $2,693.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 i r Page 3 of 3 Contract Quantity Adjustment/Change Order t ROCIf TlT,h."s Toy, * r s Project name: Creek Bend Blvd Extension Quan. Adj./Change Order No,: Quantity Adjustment Data Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment 164-6023 Hydro Seeding SY 1271.5 $0.34 $427.22 $0.00 $0.00 $0.00 _ $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 X0.00 $0.00 $0.00 $0.00 $0.00 427.22 0 City of Round Rock d ROLtN�AOCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 6 with Capital Excavation for the Creek Bend Boulevard Extension Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 6/30/2017 Dept Director: Gary D Hudder, Transportation Director Cost: $19,510.33 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: Change Order #6 Department: Transportation Department Text of Legislative Fife CM -2017-1426 Consider executing Quantity Adjustment/Change Order No. 6 with Capital Excavation for the Creek Bend Boulevard Extension Project, The Creek Bend Boulevard Extension will extend the existing four -lane divided roadway from Creek Bend Circle across Brushy Creek and Hairy Man Road to connect with Brightwater Boulevard at Wyoming Springs Drive. The purpose of the proposed project is to improve safety and enhance mobility in the project area. Improvements consist of grading, asphalt pavement, drainage, utilities, water quality, traffic signalization, signing, pavement markings, illumination, raised medians, landscaping, sidewalks and bicycle accommodations. A bridge will also be constructed over Brushy Creek and Hairy Man Road. In addition to new construction, the project includes corridor enhancements along existing Creek Bend Boulevard south of Sam Bass Road. Landscaping and irrigation will be added to the medians, street lighting will be extended to Sam Bass Road, and the existing fences along the right of way from Creek Bend Circle to Sam Bass Road will be replaced with "rock -look" precast concrete fence. Creek Bend Boulevard will be milled and overlayed from Pena Cove to Sam Bass Road with only minor utility adjustments expected. Right-of-way acquisition for this project is complete. This project will provide north -south connection over Brushy Creek, thus increasing connectivity and reducing the reliance on IH 35 for north -south movements on the west side of Round Rock. Completion of this project will also alleviate some of the traffic on City o/ Round Rock Page i Pdnfed on &2912017 Agenda Item Summmy Continued CM -2017-142e Sam Bass Road and RM 620 and will make construction of future projects on these two east -west routes more feasible by providing an alternate route. On April 2, 2015 a construction contract for $8,089,168.50 with Capital Excavation Company was approved by the City Council. Quantity Adjustment/Change Order No. 1 was approved by City Council on December 17, 2015 for $97,270.27 for replacement of existing A1C waterline for a total contract amount of $8,186,438.77. Quantity Adjustment/Change Order No. 2 for the amount of $47,592.25 is for third -party foundation vibration monitoring as required by the Temporary Construction Easement (TCE) obtained for Parcel 7E as well as storm sewer revisions due to differing site conditions and unforeseen underground utility conflicts. The adjusted contract price is $8,234,031.02. City Manager approved this change order on 3/25/2016. Quantity Adjustment/Change Order No. 3 In the course of construction, it became necessary to restrain the existing 16 -inch and 30 -inch waterlines of Round Rock's and the 24 -inch waterline belonging to Fern Bluff prior to the designed tie-ins. The total cost of this task was $32,091.20. The City Manager approved this change order on 411512016, for the amount of $32,091.20, raising the amended Contract amount to $8,266,122.22. Quantity Adjustment/Change Order No. 4 for the amount of $96,555.80 is for the closure of voids 4,5, and 6 that were discovered during trenching for the storm sewer lines. The closure of these voids consisted of demolishing the tops, removal of debris, placing of 318" pea gravel, and an 18" thick flowable fill cap as required by TCEQ. the transportation staff recommends the Mayor execute CO/QA No. 4 for the amount of $96,555.80, increasing the amended contract amount to $8,362,678.02. Quantity Adjustment/Change Order No. 5 for the amount of $220,239.08 is for the addition of the following items. Surface milling and placement of 2" asphalt overlay on Creek Bend Blvd. from Sam Bass Rd. to FM 3406. The closure of voids 7, 8 and 9 as approved by TCEQ. An increase in block sod installation for lawn restoration, addition of precast concrete corridor fencing, addition of Hydro Seeding, addition of anti -graffiti coating for bridge structure and the addition of an 8" rock rip rap layer for erosion control. The transportation staff recommends approval of this QA/CO for the total price of: $228,620.78 which increases the amended contract amount to $8,591,298.80. Quantity Adjustment/Change Order No. 6 for the amount of $19,083.11 is for the addition of the following items. 18" rock Riprap and flowable fill to stabilize channel erosion on the west side of the Creek Bend bridge along Hairy Man Rd. This erosion work was added to increase the protection to the Hairy Man Rd. bridge wing. There is an additional Quantity Adjustment of $427.22 for hydro seeding associated with revegetation from the channel stabilization work preformed. For a total QAICO amount of $19,510.33 City of Round Rock Page 2 Printed on 8/29/2017 Agenda item Summary Continued CM•2017-1426 Cost. $19,510.33 Source of Funds: RR Transportation and Economic Development Corporation Cfty of Round Rock Page 3 Printed on 6/29801 7