Loading...
CM-2014-637 - 12/5/2014City of Round Rock ao gssaoac Agenda Item Summary Agenda Number: Title: Consider executing an approval of Purchase Order for shot blast of existing concrete and application of Ardex MC Rapid Moisture remediation to the Clay Madsen Recreation Center. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 12/5/2014 Dept Director: Rick Atkins, Parks and Recreation Director Cost: $15,428.50 Indexes: Attachments: Rubber_Flooring_Systems_Purchase_Order.pdf Department: Parks and Recreation Department Text of Legislative File CM -2014-637 CXy of Rauntl Reck Page 1 Pnnled on 1L1912010 Change Order Request `'RFS al Rubber Roodng Systems 1r 375 Columbia Memorial Pkwy, Kemah, TX 77567-3187 Phone(281)334-6800 Fax(281)535-1959 Date: December 3, 2014 Project: Clay Madsen Rec Center Davidson Work Unit Price I Total Price• REQUEST: Moisture RFS, Inc. Katie Lamb Operations e,kk-aa,f - te3-I TOTAL THIS REQUEST: $ SSp28.50 Contractprice: $ Shot Blast existing concrete and Apply Ardex MC Rapid moisture Change by this request: 5,230 SF $ 2.95 $ 15,428.50 77,219.10 remediation RFS, Inc. Katie Lamb Operations e,kk-aa,f - te3-I TOTAL THIS REQUEST: $ SSp28.50 Contractprice: $ 61,790.60 Change by this request: $ 15,428.50 New contract amount: $ 77,219.10 Acceptance: Sara White From: Trish DeLaTorre Sent: Friday, December 05, 2014 3:09 PM To: Sara White Subject: FW: Moisture Attachments: COR#1- Clay Madsen Rec Center- REV120414.pdf From: Ron Hunter Sent: Thursday, December 04, 2014 2:22 PM To: Chad McDowell; David Buzzell; Pete Dominguez Cc: Ric Bowden; Jodi Rhodes; Michael Schurwon; Deborah Knutson; Rick Atkins; Reggie Davidson; Trish DeLaTorre; Lynn Olsen; Jodi Rhodes; Olivia Riley Subject: RE: Moisture Good afternoon. Reggie has itemized the quote for the $15,428.50. Trish, please prepare a POCN and reference Purchase Order 20141567. 1 spoke to Legal to verify and we can proceed with City Manager approval on this added $15,428.50, since the original Purchase Order was approved by City Council in the amount of $61,790.60. Trish/Mike, please ensure that documentation is included with the POCN to indicate that Ms. Hadley has approved this amendment. Lynn, we are good to go on the funding stream. Main Terms/Miscellaneous Depl/L6c 19002 GL effect ive date 00/21/2014 FiKal year 2014, Penod 11 PO number 20141567 General commodity 360 General desorption MS - FLOOR COVERING INSTALL - 09 Notes ud�Rccmvinp L'i Vendor 60460 Committed Name RUBBER FL0DR] NG SYSTFNIS PO mailing; 0 375 COLUMBIA MEMORIAL PKWY I Buyer Michael Schurwon Project accounts applied w Three way match required Inspection required Inspector Ship 10 19GEN LEMAH l ITX �. 77565 Reference GENERAL SERVICES 8CFM CRY OF ROUND ROCK. 2:7 ( JMMERCE BOULEVARD ROUND ROCK TX Line Ordered Amount Liquidated Balance 1st Project Account 1 61,79D.60 0.00 61,790.6D E FMAP -550-IMPV-PARD Looking at DPR 627 for the $1,000.00, it is being charged to 10023007 16121. 6121 is a Capital (Building and Improvement) Object Code and not listed in the Capital Outlay approved purchases. We will need clarification on this account (or a corrected account number). Olivia, this is the DPR that Deborah e-mailed you about yesterday afternoon. Reggie, do you have an itemized updated quote for the stripping of the two each 15 rung ladders and hash marks along the sides of the track? If so, please forward. 2 Dept/Loc 23007 PARD CLAY MADSEN REC CENTER Status Fiscal year 2015! Current... Next Needed Requisition number 627 Entero General Commodity 630 J ... PAINT, PROTECTIVE COATINGS, VARNISH, WAL General Description PAINT, PROTECTIVE COATINGS, VARNISH, I p'General Notes Vendor 60450, QjI Committed Ship To Name RUBBER FLOORING SYSTEMS Address PO Mailing 0�..- DelweryMethod - Print Fax '..✓ E -Mail E -Procurement Remd 1 (A3 RUBBER FLOORING SYSTEMS Ship To Email Address 375 COLUMBIA MEMORIAL PKWY Reference '.KEMAH_-- LTX 1 177565 IBVendor/Sourcing Notes I IQ;Vendor Quotes (0) 3 Fiscal year 2015. Numbe, . 627. Line 1 r Quantity 1.00 Commodity ..63066 (3 Description Striping - 2 - 15 rung ladder drills and hash marks '.along sides of track. Bid ;'Add'l Desc/Notes Requested by Employee Sell Ong Obi Project 01 10023007 Thank you, Ron 6121 0 Description Buildings & Improvements Unit pnce 1,000.0, UOM EACH GROSS L_ _ 1,0 Freight I__. Discount l._. .00 Credit L.. TOTAL I l,C Amount justification: Not Needed Amount GL Bud 1,000.00 D From: Chad McDowell Sent: Thursday, December 04, 2014 6:49 AM To: David Buzzell; Ron Hunter; Pete Dominguez Cc: Ric Bowden; Jodi Rhodes; Michael Schurwon; Deborah Knutson; Rick Atkins; Reggie Davidson; Trish DeLaTome Subject: RE: Moisture Morning all, 4 I approve! From: David Buzzell Sent: Wednesday, December 03, 2014 6:58 PM To: Ron Hunter Cc: Ric Bowden; Jodi Rhodes; Michael Schurwon; Deborah Knutson; Rick Atkins; Chad McDowell; Reggie Davidson; Trish DeLaTorre Subject: Re: Moisture First, thank you all for your assistance with this issuell Reggie has contacted the vendor to revise the proposal to just include the floor prep (—$15k). I spoke with Chad earlier and he approves of using his bucket funds for the CO (same fund used for the original PO). Chad, please confirm. Rick has contacted Laurie and, if she approves, we will submit it to be approved this Friday due to the time sensitivity of item. Rick to confirm once he hears back from Laurie. If approved on Friday, Reggie/Trish will work with Purchasing to amend the PO for this change. Please let us know if we need to do anything else. Thanks again, David Sent from my iPad On Dec 3, 2014, at 3:37 PM, "Ron Hunter"<ronhunter(olroundrocktexas.eov> wrote David, first off thanks for calling and checking on this. It is in my opinion that we get City Council to approve any changes to a contract original approved by City Council. I understand that we have some very sensitive time constraints and the remediation could not be forecasted, due to hidden repairs. For that reason, I agree that this approval may go to City Manager for approval. This CM approval is a cost savings determination that will ultimately save funds, due to the timing, closure of the facility and the immediate need. Once Ms. Hadley approves the added funds, please forward the approval to purchasing and we can amend the original PO, generate a change order and add the additional funds to the PO. I am copying Ric Bowden, Jodi Rhodes and Purchasing on this e-mail for fyi and to speed the process. Please keep me informed. Thank you, Ron From: David Buzzell Sent: Wednesday, December 03, 2014 3:03 PM To: Ron Hunter Subject: Fwd: Moisture See below. Sent from my iPhone Begin forwarded message From: Katie Lamb <katie@teamrfs.com> Date: December 3, 2014 at 8:12:17 AM CST To: 'Reggie Davidson'<rdavidson@roundrocktexas.eov>,'Dan Rudkin' <Dan@teamrfs.com> Cc: <david@teamrfs.com>,'David Buzzell' <dbuzzell@roundrocktexas.eov>, ."Mary Hemenes"' <mhemenes@roundrocktexas.zov>, <ionathan@teamrfs.com> Subject: RE: Moisture Reggie & Team, Attached is the change order request for the Moisture Remediation and the Striping that you said you want to add in. Please let me know if there are any questions or concerns. We will need a revised 130#20141567-00 or an additional PO to schedule this work Thank you, Katie From: Reggie Davidson rmailto:rdavidson@roundrocktexas.aovl Sent: Tuesday, December 02, 2014 5:46 PM To: Dan Rudkin Cc: david@teamrfs.com; Katie lamb; David Buaell; Mary Hemenes Subject: Re: Moisture Dan, This is something that's an unexpected expense. Please provide me with a goute as soon as possible. I will have to review it with the team to discuss options since this additional cost wasn't in our budgeted. I copied members from my team on this message. They will need to be included on any further correspondence. Reggie Reggie Davidson Recreation Manager ----- Reply message ----- From: "Dan Rudkin" <Dan@teamrfs.com> To: "Reggie Davidson" <rdavidsonProundrocktexas.eov> Cc: "david@teamrfs.com" <daviclPteamrfs.com>, "katie@teamrfs.com" <katie@teamrfs.com> Subject: Moisture Date: Tue, Dec 2, 2014 5:38 PM Reggie, We were out on Monday to do our moisture test on your slab and we have run into a higher moisture then required by Mondo's installation guidelines which is 85rh. Prior to any installation this is required to make sure that we will not have an issue with the installation. I know that you have a time crunch and we do not want to delay this installation. What we recommend is that we shot blast the slab and apply MC Rapid by Ardex to correct the high moisture in the slab. This process is a little under $3.00 per square foot, if you would like us to send you a formal quote I can have that to you tomorrow. W�Im Regional Sales Manager Rubber Flooring Systems, Inc. 402 Soren Dr. Murphy, TX75094 Office: 281-334-6800 Cell: 972-571-0712 danCdteamrfs.com <COR#1- Clay Madsen Ree Center- 120314.pdf> Sara White From: Trish DeLaTorre Sent: Friday, December 05, 2014 3:09 PM To: Sara White Subject: FW: Moisture This just came through... From: Ron Hunter Sent: Friday, December 05, 2014 3:08 PM To: Michael Schurwon; Trish DeLaTorre; Lynn Olsen Cc: Deborah Knutson Subject: RE: Moisture I spoke to Reggie in PARD. Reggie said Atkins was to have Ms. Hadley sign off on Monday of next week on the added $15,428.50 to the original Purchase Order 20141567 (listed below). Once approved, I asked Reggie to forward all paperwork to Trish, so she can prepare the POCN and we amend this original PO. We must have CM approval, prior to processing the POCN and amending the PO. Thank you, Ron From: Ron Hunter Sent: Thursday, December 04, 2014 2:22 PM To: Chad McDowell; David Buzzell; Pete Dominguez Cc: Ric Bowden; Jodi Rhodes; Michael Schurwon; Deborah Knutson; Rick Atkins; Reggie Davidson; Trish DeLaTorre; Lynn Olsen; Jodi Rhodes; Olivia Riley Subject: RE: Moisture Good afternoon. Reggie has itemized the quote for the $15,428.50. Trish, please prepare a POCN and reference Purchase Order 20141567. 1 spoke to Legal to verify and we can proceed with City Manager approval on this added $15,428.50, since the original Purchase Order was approved by City Council in the amount of $61,790.60. Trish/Mike, please ensure that documentation is included with the POCN to indicate that Ms. Hadley has approved this amendment. Lynn, we are good to go on the funding stream. Mann TermslMscallaneous Dept/Loc GL effective date Fiscal year PO number General commodity General description 19002 08/21/2014 2014 Period 11 20141567 1360 1 ,.FIS - FLOOR COVERING INSTALL - ggy Notes Ij &'Receiving I &Invoices Vendor 60460 Committed Name RUBBER FLOORING SYSTEMS PD mailing( 01 11375 COLUMBIA MEMORIAL PKWY I IKEMAH ITX 1 77565 Renvl i SI Line Ordered Amount �yLiquidated 1 61,790.60 Buyer ,Michael Schurwon Project accounts applied Three way match required Inspection required Inspector Ship to 19GEN GENERAL SERVICES BCFM CITY OF ROUND ROCK 212 COMMERCE BOULEVARD ROUND ROCK TX Reference Balance 1st Project Account 0.00 61,790.60 E FMAP-550-IMPV-PARD Looking at DPR 627 for the $1,000.00, it is being charged to 10023007 / 6121. 6121 is a Capital (Building and Improvement) Object Code and not listed in the Capital Outlay approved purchases. We will need clarification on this account (or a corrected account number). Olivia, this is the DPR that Deborah e-mailed you about yesterday afternoon. Reggie, do you have an itemized updated quote for the stripping of the two each 15 rung ladders and hash marks along the sides of the track? If so, please forward. 2 Dept/Loc Fiscal year Requisition number General Commodity General Description dGencral Notes Vendor Name PO Mailing Delivery Method Remit Address I pVendor/Sourcing Notes 23007 PARD CLAY MADSEN REC CENTER 2015; Current.- Next 627 630 PAINT, PROTECTIVE COATINGS, VARNISH, WAL PAINT, PROTECTIVE COATINGS, VARNISH, 60460 L'S '.. Committed Ship To RUBBER FLOORING SYSTEMS Address 0 Print Fax J E -Mail E-Proaurnment 11 _ ROBBER FLOORING SYSTEMS 375 COLUMBIA MEMORIAL PKWY __._—jII KEMAH _) IT, 177565 Vendor Quotes(0) 3 Ship To Email Reference Status Needed Entarec Fiscal year 2015, Nvmher, 627 Line I Quantity 1.00.. Commodity 163066 ... f3 Unit price 1,000.0 LOM (EACH Description Stnpmg 2- 15 rung ladder drills and hash marks • GROSS 1,C along sides of track. j r— ---- Freight I 'Add'I DesdNotes � Discount L--.00 Credit _ TOTAL Amount justification: Not Needed Bid 1j3 ,Requested by Employee 0 Seq Org Obj O1 10023007 6121 Thank you, Ron Project Description Amount GL Bud Buildings B Improvements 1,000.00 U From: Chad McDowell Sent: Thursday, December 04, 2014 6:49 AM To: David Buzzell; Ron Hunter; Pete Dominguez Cc: Ric Bowden; Jodi Rhodes; Michael Schurwon; Deborah Knutson; Rick Atkins; Reggie Davidson; Trish DeLaTorre Subject: RE: Moisture Morning all, 4 I approve! From: David Buuell Sent: Wednesday, December 03, 2014 6:58 PM To: Ron Hunter Ce: Ric Bowden; Jodi Rhodes; Michael Schuman; Deborah Knutson; Rick Atkins; Chad McDowell; Reggie Davidson; Trish DeLaTome Subject: Re: Moisture First, thank you all for your assistance with this issuel I Reggie has contacted the vendor to revise the proposal to just include the floor prep (`$15k). I spoke with Chad earlier and he approves of using his bucket funds for the CO (same fund used for the original PO). Chad, please confirm. Rick has contacted Laurie and, if she approves, we will submit it to be approved this Friday due to the time sensitivity of item. Rick to confirm once he hears back from Laurie. If approved on Friday, Reggie/Trish will work with Purchasing to amend the PO for this change. Please let us know if we need to do anything else. Thanks again, David Sent from my Wad On Dec 3, 2014, at 3:37 PM, "Ron Hunter" <ronhunterProundrockteuas.eov> wrote David, first off thanks for calling and checking on this. It is in my opinion that we get City Council to approve any changes to a contract original approved by City Council. I understand that we have some very sensitive time constraints and the remediation could not be forecasted, due to hidden repairs. For that reason, I agree that this approval may go to City Manager for approval. This CM approval is a cost savings determination that will ultimately save funds, due to the timing, closure of the facility and the immediate need. Once Ms. Hadley approves the added funds, please forward the approval to purchasing and we can amend the original PO, generate a change order and add the additional funds to the P0. I am copying Ric Bowden, Jodi Rhodes and Purchasing on this e-mail for fyi and to speed the process Please keep me informed. Thank you, Ron From: David Bunell Sent: Wednesday, December 03, 2014 3:03 PM To: Ron Hunter Subject: Fwd: Moisture See below. Sent from my iPhone Begin forwarded message From: Katie Lamb <katie@teamrfs.com> Date: December 3, 2014 at 8:12:17 AM CST To: 'Reggie Davidson' <rdavidson@roundrocktexas.eov>,'Dan Rudkin' <Dan@teamrfs.com> Cc: <david@teamrfs.com>,'David Buzzell' <dbuzzell@roundrocktexas.eov>, "Mary Hemenes"' <mhemenes@roundrocktexas.¢ov>, <lonathan@teamrfs.com> Subject: RE: Moisture Reggie & Team, Attached is the change order request for the Moisture Remediation and the Striping that you said you want to add in. Please let me know if there are any questions or concerns. We will need a revised POp20141567-00 or an additional PO to schedule this work Thank you, Katie From: Reggie Davidson [mailto:rdavidson@roundrocktexas gov] Sent: Tuesday, December 02, 2014 5:46 PM To: Dan Rudkin Cc: david@teamrfs.com; Katie Lamb; David Buaell; Mary Hemenes Subject: Re: Moisture Dan, This is something that's an unexpected expense. Please provide me with a qoute as soon as possible. I will have to review it with the team to discuss options since this additional cost wasn't in our budgeted. I copied members from my team on this message. They will need to be included on any further correspondence. Reggie Reggie Davidson Recreation Manager ----- Reply message ----- From: "Dan Rudkin" <Dan@teamrfs.com> To: "Reggie Davidson" <rdavidson@roundrocktexas.eov> Cc: "david@tearrrfs.com" <davidgteamrfs.com>, "katie@teamrfs.com" <katie0teamrfs.com> Subject: Moisture Date: Tue, Dec 2, 2014 5:38 PM Reggie, We were out on Monday to do our moisture test on your slab and we have run into a higher moisture then required by Mondo's installation guidelines which is 85rh. Prior to any installation this is required to make sure that we will not have an issue with the installation. I know that you have a time crunch and we do not want to delay this installation. What we recommend is that we shot blast the slab and apply MC Rapid by Ardex to correct the high moisture in the slab. This process is a little under $3.00 per square foot, if you would like us to send you a formal quote I can have that to you tomorrow. romwimin Regional Sales Manager Rubber Flooring Systems, Inc. 402 Soren Dr. Murphy, TX 75094 Office: 281-334-6800 Cell: 972-571-0712 danro'tteamrfs.com <COR#1- Clay Madsen Ree Center- 120314.pdfl F � 375 Columbia Memorial Pkwy, Kemah, TK 77565-3187 Phone(281)334-6800 Fax(281)535-1959 Date: July 14. 2014 TERRITORY TEX-50 pmew. TEXASBU}BOARD #391-12 jProjea:1 Clay Madsen Rec Center To: Reggie Davidson Phone: Email: rdavidsontDroundrocktexas o, Site Measured by Dan Rudkin Quantity units I Scopeof Work Unit Price Total Price* 4,980 SF Remove and Dispose of existing track surface around Basketball court $ 1.22 $ 6,075.60 5,230 SF Provide and Install Mondo 8mm Super X, Including painted sMpe of perimeter $ 10.50 $ 54,915.00 400 LF Standard 4" Cove Base $ 2.00 $ 800.00 0 LF Transitions $ 200 $ 0 EA SaloTax, EXEMPT $ $ 61,790.60 Sales: Dan Rudkin DanfflDteamrfs com Signature of Acceptance: Phone: (972) 571-0712 Service: Katie Lamb Katlehateamrfs (281)334-61500 Date: Exclusions, moisture remediation. Prep aodleve1ingofsuIumnebayond1/89n 10fee1. 16'.1otac0on ofworkafterinnallatlon.Pncels subleatochange should there be Prevailing wage or union wage requirements Terms; 50%due upon PO or signed quote arld remaining balance due upon completlon. All orders paidwlth a credit card will beassessed a 2.5% convenience fee atthe time of tmoicing. All accounts with a balance after30days from Invoke will be assessed 1.5%Interestevery 30days. Page 1 of 1