Loading...
R-2017-4588 - 7/13/2017 RESOLUTION NO. R-2017-4588 WHEREAS, the City of Round Rock desires to retain professional architectural consulting services related to the relocation/restoration of the Stagecoach Inn, and WHEREAS, Architexas, Architecture Planning & Historic Preservation, Inc. has submitted an Agreement for Architectural Services ("Agreement") and Supplemental Agreement No. 1 to provide said services, and WHEREAS, the City Council desires to enter into said Agreement and Supplemental Agreement No. 1 with Architexas, Architecture Planning & Historic Preservation, Inc.,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City an Agreement for Architectural Services for Relocation/Restoration of Stagecoach Inn and Supplemental Agreement No. 1 with Architexas, Architecture Planning & Historic Preservation, Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 13th day of July, 2017. 4AI CRAIG MGAN, yor City of Ro nd Rock exas ATTEST: f)o / I SARA L. WHITE, City Clerk 0112.1704;00381189 EXHIBIT «A„ I City of Round Rock Agreement for Architectural Services for Relocation/Restoration of Stagecoach Inn with Architexas, Architecture Planning & Historic Preservation, Inc. AGREEMENT made as of the Thirteenth (13t") day of the month of July in the year Two Thousand Seventeen (2017). BETWEEN the Architect's client identified as the City or the Owner: City of Round Rock 221 East Main Street Round Rock,Williamson and Travis Counties,Texas 78664 and the Architect: Architexas—Architecture,Planning&Historic Preservation,Inc. 2900 South Congress Avenue, Suite 200 Austin,Texas 78704 For the following Project: Professional architectural services related to the relocation/restoration of the Stagecoach Inn. The Owner and the Architect agree as follows: Architect will provide full architectural consulting services as outlined in this Agreement and in conformance with the general project approach as described in the Round Rock Stagecoach Inn—Relocation Feasibility Study, dated December 5, 2016, by Architect. In addition, Architect shall perform delineated project management and historic preservation services as set forth herein and in the attached exhibits, incorporated herein by reference for all purposes. ARTICLE 1.1 INITIAL INFORMATION 1.1.1 This Agreement is based on the following information and assumptions. The Architect shall furnish the delineated services, including but not limited to meeting with the Owner's representatives and others designated by the Owner to determine needs and requirements; rendering professional consultation and advice; furnishing all necessary design and contract administration services for the referenced Project;and providing other specialized services. Architectural services shall include the submittal of plans for Texas Accessibility Standards(TAS)review, which is a requirement of federal law to comply with the ADA if the construction budget exceeds$50,000. Owner shall pay the fees related to the submittal of plans for TAS review. 1.1.2 PROJECT PARAMETERS 1.1.2.1 The objective or use is: The referenced Project consists of professional planning,design,and construction services related to the following: Relocation/Rebuilding of the Stagecoach Inn. 00353420/ss2 1.1.2.2 The physical parameters are: The Stagecoach is currently located on Round Rock Avenue in Round Rock,Texas and will be relocated to Bathing Beach Park on Chisholm Trail in Round Rock,Texas. 1.1.2.3 The Owner's Program is: The program of development shall include but not be limited to the following elements: Confirm Project Program and Space Requirements, Schematic Design Phase, Design Development Phase, Construction Documents Phase, Bidding Phase and Construction Administration Phase. The tasks performed as a part of each element shall be as stated in Exhibit "A" attached hereto and incorporated herein for all purposes. The parties agree that elements or portions thereof, may be omitted by the Owner for reasons including meeting the Project budget and Project requirements. Schedule: Initial proposed schedule for the Project is attached as Exhibit"C." The Architect will maintain a detailed project schedule in Microsoft Project or in an alternative format approved by the Owner throughout the duration of the Project which will be attached as Exhibit"D"and incorporated herein for all purposes. 1.1.2.4 The financial parameters are as follows: 1. The Fee Schedule relative to this Agreement is set forth in Exhibit "B," incorporated herein for all purposes,and is as follows: A. Professional Services In consideration for the professional services to be performed by the Architect,the Owner agrees to pay the Architect a total sum not to exceed Ninety-Eight Thousand Three Hundred and no/100 Dollars ($98,300.00). Said sum is a fixed not-to-exceed amount, and shall be paid as delineated in the attached Exhibit"B"which is incorporated herein by reference for all purposes. Such not-to-exceed sum includes amounts paid for Architect's services; for consultant fees for MEP engineers, structural engineers, civil engineers, and ADA consultants as needed; and for reimbursable expenses as set forth in Section B below. B. Reimbursable Expenses Allowance Payment for reimbursable expenses, including administrative charges and out-of pocket expenses, shall not exceed the maximum sum of Two Thousand and no/100 Dollars($2,500.00), and such amount is included in the not-to-exceed total fee of$98,300.00. C. Additional Services Additional services are defined as any services not included as part of the scope of work of the project including revisions to previously-approved plans that necessitate additional work for the Architect, substantive changes in Project scope, or additional work necessitated by unknown or reasonably unforeseen circumstances. Any additional services shall be performed under a supplemental agreement negotiated at a time subsequent to this Agreement. 1.1.2.5 The time parameters are: Services hereunder shall commence within ten(10) days upon receipt by the Architect of a Notice to Proceed from the Owner. Completion date shall be agreed upon by Owner and Architect and shall be incorporated in Exhibit"D." 2 Other time parameters madjustments mtime parameters may be determined atulater date bymutual agreement oy the parties. 1.\.o.6 The proposed procurement o,delivery method for the Project is: Tvbrdetermined. Professional services such uyarchitectural,engineering will b,engaged bxnegotiated contract. 1.1.3 PRWECT TEANm 1.1.3.1 The Owner's Designated Representatives are: Laurie Hadley,City Manager City ufRound Rock 221 East Main Street Round Rock,Texas 78664 Jnm||cJordan.A}CP Project Manager City ofRound Rock 30| vv. Bagdad Avenue Round Rock,Texas 78684 Telephone Number:(5|2)2|8'54zz Smui|Address: Jordan a-roualrocktexas.gov 1.1�.2 The Owner's consultants and contractors are: Architect o[Record/Prime Firm: x"coitexuo—Architecture,Planning&Historic Preservation,Inc. Consultants- To be submitted to Owner and approved by Owner. 1.1.3.3 The Architect's Designated Representative is: Stanley O.Graves,FA}A &ohkoxoy—Archimom,e,Planning 6L Historic Preservation. Inc. z0OOSouth Congress Avenue,Suite 20O Austin,Texas 78704 1./.3.4 The consultants retained at the Architect's expense shall be submitted to and approved by Owner. 1.1.4 Dudca, responsibilities and limitations o[autho,ity of the Architect shall no, be restricted, modified o, extended without written agreement ufm,OwneromdVe Architect. 1'/.5 /t |xexpressly understood and uu,ued by and between the parties hereto that any alteration in uchcdu|e.� compensation and Change in Services shall be effected only by Supplemental Agreement hereto. Any xuch Supplemental Agreement to this Agreement must beduly uuthorizcd byuppmp,iutcCi� Council o,City Manager, action.. ARTICLE 1.2 RESPONSIBILITIES OFTHE PARTIES 1.2.1 The Owner and the Architect shall fully cooperate with one another to 17^|0| all of their respective obligations required under this Agreement. Both pmuicx shall endeavor during the b/|[term hereof to maintain gond working relationships among all members o[the Project team. 3 »�.2 OWNER o.%:L, Unless otherwise provided under this Agreement, the O`me, yhuU provide full inR,nnadoo in o hmo!' manner regarding mquircmmumfb,undUm|tationoonthv9uUmct. x.z.%.o The Owner shall establish and periodically vpduu, the budget for the Project, including that portion allocated for the Cost oythe \Vo,k.the Owner's other coxm,and reasonable contingencies na|mnd to all costs. 1.2.2.3 The Onnor^o Designated Rcr,nacntodves identified in Paragraph |.\.l\ shall be authorized to act on the Owner's hchu|y with respect to the pn8cot. The Owner o, Owner's Designated Representatives xhuU n'ndc, decisions in otimely manner pertaining /odocuments Submitted by the Architect in order uoavoid un,coxnnnb(e delay inthe orderly and sequential progress o[the Architect's ocr,icea. 1.2.2,4 The Owner may furnish the m:micr, of consultants other than those designated in Paragraph |.|.lZ or authorize the Architect to furnish them as u Change in 8cnicru when such services aro requested b° the Architect � and are reasonably required by the scop* of the Project o, u change in the scope of the Project'. Any service furnished by the Architect urthe Owner's request must hcapproved bythe Owner. 1.2.2.e Unless otherwise provided in this Agreement,and if requested in writing, the Owner shall furnish o,pay for tests, inspections and reports required b� law orthe Documents,Docum�n� such as structural, merhunica|, and chemical tests,tests for air and water pollution,and tests for hazardous materials. 1.2.2.6 The Owner ahu1) fbm|oh all |egal, insurance and accounting services. including auditing services, whichmoyhr,om �� � reasonably necessary for m co� mcct the Owner's ncedoand interests. 1.2.2.7 Each party shall provide prompt written notice to/he other if either becomes aware of any fault ordefect in the Project,including any errors,omissions orinconsistencies in the Architect's Instruments o[Service. 1.2�1.8 The Owner will b^miah building permits without charge. Bcct,icu|,plumbing and other trade ncnniu will be the responsibility of the construction contractor. Any charges which may be assessed for tap fees will he paid by the Owner and are not to he included by the Architect in the specifications K,r the Project. /.2.2.9 Owner agrees to pay the actual costs of review fees associated with Texas Building Accessibility reviews, reviews by other authorities having jurisdiction,and any other required filing �x. 1.2.2.10 The Owner will provide the Architect with miscellaneous items xuch as the Project Facility Program, one digital copy of the City nFRound Rock General and Supp|cmcmm� Condihonm for Building Con�mchon' aQc Rates, Contract and Bond Forms,and such other information and materials as may hrnecessary and pomhcub- for the unJc,|' and expeditious progress of the work and /he mvun1ing oythe construction contract. To the c'/cnt practicable,these documents shall be utilized in the preparation of the construction documents. 1.2.2.11 The Owner will provide timely review and response to inquiries lnorder tn maintain unorderly progression. 1.2'2.12 Any in0nnnubun related to design standards and Owm,p8um(ohcd equipment npmuiOoudon, not provided pursuant to Section |.2.z.|Uabove and desired by the Architect from the Owner must be requested by the Architect inwriting during the initial Phase o[the Project, /.2.3 ARCHITECT 1.2.3.1 The services performed by the Architect,the Architect's employees and the Architect's consultants,hu|| be as enumerated in An|c{c 1.4 and as enumerated c|o:when, herein, in attached and accompanying documents, in supplemental documents,and inrelated documents. 1.2.3.2 The Architect's services shall be performed as expeditiously as is consistent with professional skill and care and the onjo!y progress o[the PnUeoc The Architect shall submit for the Owner's anpm,ul udotui/ed achcdv|u in Microsoft Project or an approved alternative format for the performance of the Architect's services which initially shall be consistent with the time periods established in Exhibit -C" and which may be adjusted, if necessary and approved by the Owner,as the Project proceeds.This schedule shall include allowances for periods of time required for the Owner's review, for the performance of the Owner's consultants, and for approval of submissions by authorities having jurisdiction over the Project. Time limits established by this schedule approved by the Owner shall not,except for reasonable cause,be exceeded by the Architect or the Owner. 1.2.3.3 The Architect's Designated Representative identified in Paragraph 1.1.3.3 shall be authorized to act on the .Architect's behalf with respect to the Project. 1.2.3.4 The Architect shall maintain the confidentiality of information specifically designated as confidential by the Owner, unless withholding such information would violate the lacy,create the risk of significant harm to the public or prevent the Architect from establishing a claim or defense in an adjudicatory proceeding. The Architect shall require of the Architect's consultants,similar agreements to maintain the confidentiality of information specifically designated as confidential by the Owner. 1.2.3.5 Except with the Owner's knowledge and written consent,the Architect shall not engage in any activity, or accept any employment, interest or contribution that would reasonably appear to compromise the Architect's professional judgment with respect to this Project or compromise the performance of the approved schedule for this Project. 1.2.3.6 The Architect shall review laws,codes,and regulations applicable to the Architect's services. The Architect shall respond in the design of the Project to requirements imposed by governmental authorities having jurisdiction over the Project. 1.2.3.7 The Architect shall be entitled to reasonably rely on the accuracy and completeness of services and information furnished by the Owner. Each party shall provide prompt written notice to the other if either becomes aware of any errors,omissions or inconsistencies in such services or information. ARTICLE 1.3 TERMS AND CONDITIONS 1.3.1 COST OF THE WORK 1.3.1.1 The Cost of'the Work shall be the total cost or,to the extent the Project is not completed,the estimated cost to the Owner of all elements of the Project designed by the Architect. 1.3.1,2 The Cost of the Work shall include the cost at reasonable current market rates of labor and materials furnished by the Owner and equipment designed, specified, selected or specially provided for by the Architect, including the costs of management or supervision of construction or installation provided by a separate construction manager or contractor, for the Contractor's overhead and profit. 1.3.1.3 The Cost of the Work does not include the compensation of the Architect and the Architect's consultants, the costs of the land,rights-of-way and financing or ether costs that are the responsibility of the Owner. 1.3.2 INSTRUMENTS OF SERVICE 1.3.2.1 Drawings, specifications and other documents, including those in electronic form, prepared by the Architect and the Architect's consultants are Instruments of Service for use solely by the Owner, All of the Architect's designs and work product under this Agreement, including but not limited to Tracings, Drawings, Estimates, Specifications, Investigations, Studies and other documents, shall be the property of the Owner, to be used as the Owner desires. by execution of this Agreement and in confirmation of the fee for services to be paid under this,Agreement, the Architect hereby conveys, transfers and assigns to the Owner all rights under the Federal Copyright Act of 1976 (or any successor copyright statute'), as amended, all common lav copyrights and all other intellectual property rights acknowledged by law in the Project designs and work product developed under this Agreement. Copies may be retained by the Architect. The Architect shall be liable to the Owner for any loss or 5 damage many Such documents while they are in the possession ofmwhile being worked upon� �� �m � hi anyone connected � d vj�he Architect, including agents,employees,cnnou mmmur�bonn�oc�r . AU documents so lost or damaged dm||be/rp|m:rd or restored b/the Architect without cost to the Owner. /.3.2.2 Dpnu execution of this *8rcomcnt. the Architect grants to the U"mc, permission to o:pmJucc the Architect's Instruments o[Service for purposes u[constructing, using and maintaining the Project, provided that the Owner shall comply with all obUgationa, including prompt payment of all sums when due, under this Agreement. The Architect shall obtain similar permission from the Architect's consultants consistent with this A&,ccmco- � Upon termination of the x� �mcn�. the Owner is permitted to authorize other similarly credentialed design professionals to reproduce and,where permitted by law-,to make changes,corrections or additions to the Instruments of Service for the purposes orcompleting,using and maintaining the Project oradditional projects,. 1.3.2.3 The Owner shall not ami8n, dc|eomc, uub|iceusc, pledge or otherwise transfer any permission granted herein to another party without the prior v«iuco agreement of the Architect. However,the Owner shall be permitted to authorize the Contractor, Subcontractors, Sub-subcontractors and mutc,iu| o, equipment suppliers to reproduce applicable portions of the Instruments of Service appropriate to and for use in d`d, czccudnn of the Vvod' Submission o,di�hbuhon of Instruments ofSemiccm meet official �gu|otonnquimmen�o,for similar purposes -- in connection with the Project is permitted. Any unauthorized use of the Instruments uyService shall boat -- 0wnu,^ysole risk and without|iubU � Architect 1.3.2.4 Prior to the Architect providing to the Owner any Instruments o[Service in electronic 5ann o,the Owner providing to the Architect uvy electronic data for incorporation into the Instruments orService, the Owner and the Architect oho|| by separate written agreement set Dznh the specific conditions governing the 0unnm of such Instruments of Service o, electronic data, including any special limitations not mhe,niac provided in this Agreement. 1.3.2.5 All plans and drawings will be p,cpun:d and xu6m|ucd digitally by/he Architect to the Owner for approval on uminimum 24-inch b/36-inch format, with all lettering processed |nink u,pencil and clearly legible when the sheets are reproduced and reduced mhalf size. 1.3.2.6 Upon completion of the construction of- the pnojco,. the Architect oho|(' within thirty (30) calendar days from receipt of final-as-built mark-ups from the contmctor,deliver to the Owner the reproducible Record Drawings and Record Specifications usdescribed yupp/nmonm|1yherein. /naddition,the Architect shall submit originals ofall documents listed under Section l.3.2.| modified to actual as-built conditions as provided by the Ocncm|Cnntmxo,^ 1.3.2.7 The Architect shall have no liability for changes made to the drawings. Any such change shall be sealed by the architect making that change and shall hcappropriately marked t"reflect what was changed ormodificd. To the extent permitted by |ow. the Owner agrees to indemnify, defend and hold ho,m|cy, the Architect for any claims, dumuQoo' suits and luau of every kind and nature for the unauthorized rc'uxc of the Architect's Instruments o Service. 1.3.3 CHANGE IN SERVICES /.3.3.1 Change in Services of the Architect, including services required of the Architect's onnsuhanu, may be accomplished after execution of this Agreement, without invalidating the Agreement, if Mutually uumod in writing. It is expressly understood and agreed by and hctn,rn &c parties hereto �thatany alteration in schedule. understoodcompensation and Change in Services shall be effected only bSupplemental Agreement hereto. Any such' Supplemental Agreement to this contract mum be duly authorized' by appropriate City Council or City Wumaaction. ",' /.3.4 MEDIATION 1.3.4./ Any claim,dispute or other matter in question arising out of or related to this Agreement shall be subject to mediation. If such matter rc|mex to o,is the subject o[u |ico arising out of the Architect's services, the Architect may proceed ioaccordance with applicable law tocomply with lien notice urfiling deadlines prior toresolution of 6 the matter by mediation. 1.3.4.2 'Che Owner and the Architect shall endeavor to resolve claims, disputes and other matters in question between them by mediation. Request for mediation shall be filed in writing with the other party to this Agreement, and mediation shall proceed in advance of legal or equitable proceedings, which shall be stayed pending mediation for a period ol'60 days from the date of filing, unless stayed for a longer period by agreement of the parties or court order. 1.3.4.3 The parties shall share the mediator's fee and any filing fees equally. The mediation shall be held in the place where the Project is located, unless another location is mutually agreed upon. Agreements reached in mediation shall be enforceable as settlement agreements in any court having jurisdiction thereof. 1.3.5 ARBITRATION 1.3.5.1. The Owner and the Architect hereby expressly agree that no claims or disputes between the Owner and the Architect arising out of or relating to the contract documents or a breach thereof shall be decided by any arbitration proceeding, including,without limitation,any proceeding under the Federal Arbitration Act(9 U.S.C.Section 1-14) or any applicable state arbitration statute, except that in the event that the Owner is subject to an arbitration proceeding related to the Project, the Architect consents to be joined in the arbitration proceeding if the Architect's presence is required or requested by the Owner for complete relief to be accorded in the arbitration proceeding. 1.3.6 CLAIMS FOR CONSEQUENTIAL DAMAGES 1.3.6.1 The Architect and the Owner waive consequential damages for claims,disputes or other matters in question arising out of or relating to this Agreement.This mutual waiver is applicable,without limitation,to all consequential damages due to either party's termination in accordance with Section 1.3.8. 1.3.7 MISCELLANEOUS PROVISIONS 1.3.7.1 This Agreement shall be governed by the laws of the state of Texas, and venue shalt lie in Williamson County,Texas. 1.3.7.2 Causes of action between the parties to this Agreement pertaining to acts or failures to act shall be deemed to have accrued and the applicable statutes of limitations shall commence to run not later than either the date of Substantial Completion for acts or failures to act occurring prior to Substantial Completion or the date of issuance of the final Certificate for Payment for acts or failures to act occurring after Substantial Completion. In no event shall such statutes of limitations commence to run any later than the date when the Architect's services are substantially completed. 1.3.7.3 To the extent damages are covered by property insurance during construction, the Owner and the Architect waive all rights against each other. The Owner, as appropriate,shall require of the contractors,consultants, agents and employees of any of them similar waivers in favor of the other parties enumerated herein. 1.3.7.4 Nothing contained in this Agreement shall create a contractual relationship with or a cause of action in favor of third party against either the Owner or the Architect. 1.3.7.5 Unless otherwise provided in this Agreement, the Architect and the Architect's consultants shall have no responsibility for the discovery, presence, handling, removal or disposal of or exposure of persons to hazardous materials or toxic substances in any form at the Project site. 1.3.7.6 The Architect shall have the right to include photographic or artistic representations of the design of the Project among the Architect's promotional and professional materials. The Architect shall be given reasonable access to the completed Project to make such representations. However, the.Architect's materials shall not include the Owner's confidential or proprietary information. 7 1.3.7.7 if the Owner requests the Architect to execute certificates,the proposed language of such certificates shall be submitted to the Architect for review at least seven (7) days prior to the requested dates of execution. The Architect shall not be required to execute certificates that would require knowledge, services or responsibilities beyond the scope of this Agreement. 1.3.7.8 The Owner and the Architect, respectively, bind themselves, their partners, successors,assigns and legal representatives to the other party to this Agreement and to the partners,successors,assigns and legal representatives of such other party with respect to all covenants of this Agreement.Neither the Owner nor the Architect shall assign this Agreement without the written consent of the other. 1.3.7.9 All Exhibits to the Contract are incorporated herein as a part of the Contract. Any inconsistencies or conflicts in Contract and Exhibits shall be resolved by giving preference to pages one(1)through nine(9)of the Contract. 1.3.8 TERMINATION OR SUSPENSION 1.3.8.1 If the Owner fails to make payments to the Architect in substantial compliance with this Agreement, such failure may be considered substantial nonperformance and cause for suspension of performance of services under this Agreement. If the Architect elects to suspend services, prior to suspension of services, the Architect shall give fifteen (15)days' written notice to the Owner. In the event of a suspension of services, the Architect shall have no liability to the Owner for delay or damage caused the Owner because of such suspension of services. Before resuming services, the Architect shall be paid all non-disputed sums due prior to suspension. The Architect's fees for the remaining services and the time schedules shall be equitably adjusted. 1.3.8.2 In connection with the work outlined in this Agreement, it is agreed and fully understood by the Architect that the Owner may cancel or indefinitely suspend further work hereunder or terminate this contract either for cause or for the convenience of the Owner, upon fifteen(15)days' written notice to the Architect, with the understanding that immediately upon receipt of said notice all work and labor being performed under this Agreement shall cease. The Architect shall invoice the Owner for all work satisfactorily completed and shall be compensated in accordance with the terms of this Agreement for all work accomplished prior to the receipt of said notice. No amount shall be due for lost or anticipated profits. All plans, field surveys, maps, cross sections and other data, designs and work related to the Project shall became the property of the Owner upon termination of this Agreement, and shall be promptly delivered to the Owner in a reasonably organized form without restriction on future use. Should the Owner subsequently contract with a new architect for continuation of services on the Project, the Architect shall cooperate in providing information. 1.3.8.3 Nothing contained in Section 1.3.8.2 immediately above shall require the Owner to pay for any work which is unsatisfactory as determined by the Owner's representative or which is not submitted in compliance with the terms of this Agreement. 1-he Owner shall not be required to make any payments to the Architect when the Architect is in default under this contract, nor shall this section constitute a waiver of any right,at law or at equity, which the Owner may have if the Architect is in default, including the right to bring legal action for damages or to force specific performance of this Agreement. 1.3.9 PAYMENTS TO ARCHITECT 1.3.9.1 Payments on account of services rendered shall be made monthly upon presentation of the Architect's statement of services. 1.3.9.2 Reimbursable Expenses, in an amount not to exceed $2,500.00, are incltided in the not-to-exceed sum for compensation for the Architect's services and include expenses incurred by the Architect and the Architect's employees and consultants directly related to the Project,as described in 1.1.2.4'.B. 1.3,9.3 Records of Reimbursable Expenses, of expenses pertaining to a Change in Services, and of services performed on the basis of hourly rates or a multiple of Direct Personnel Expense shall be promptly provided to the Owner or the Owner's authorized representatives. 8 1��.4 Direct Personnel Expense is defined as the direct aduHm of the Architect's personnel engaged on the Project and the portion o[the cost of their mandatory and customary contributions and benefits related thereto,such uanmplc0mcnt mus and other statutory employee benefits, insurance, u/ok }ouwe, holidays, ,ocuhuna employee retirement plans and similar contributions. ARTICLE1.4 SCOPE OF SERVICES AND OTHER SPECIAL TERMS AND CONDITIONS 1.4./ Enumeration of Parts of the Agreement. This Agreement nrpn`nonu the entire and integrated agreement between the Owner and the Architect and supersedes all prior oemohubono, representations or agreements, either written or oral. This Agreement may be amended only by written instrument signed by both the Owner and the Architect.This Agreement comprises the documents listed below. 1.4.1.1 Architectural Services Agreement between Owner and Architect. 1.4./.2 Other documents ua h,Uowa: Exhibit'v\-Scope o[Service. Exhibit^B'Compensation and Hourly Rate Schedule Exhibit^'C"Project Schedule Exhibit"orProject Schedule(to b:attached subsequent to execution) "Supplemental Agreement No. |^`supplementing Architectural Services Agreement between Owner and Architect. 1.*.2 Special Terms and Cooduiomv.Special terms and conditions that modify this Agreement are as follows- Americans with Diyobii{dco Act (ADA) and Texas Accessibility Standards(TAS) provide that it is u violation of AnA/rA8mm design and construct a kmiUtv for first occupancy later than January 26, 1993 that does not meet the ovooysiN|ixy and usability requirements of the /\O/uTx8 c,ccp/ where on entity can demonstrate that it is atmvtum||x impractical to meet such requirements. The Architect will use its best pmK,aa|onu| cMbnx to interpret and meet applicable ADA/TAS requirements and other federal, state and local |owx' m|ox, codes, ordinances and regulations usthey apply to the Project. ARTICLE 1.5 COMPENSATION 1.5./ Pu«mco/m for services shall be made n`onth|y, and where applicable, yhu|| be in proportion to aov(ceo pc,Da,mcd on the basis set forth in this Agreement and in ro,mutraqucumd by the Owner. l.S.% Payments are Jur and payable thirty(30)days from the date oCthe Architect's invoice, or not later than the time period required under the Texas Prompt Payment Act, whichever is later. Non-disputed amounts unpaid sixty (60)days uftm,the invoice date shall bear interest at the muu entered below,o,in the absence thereof at the|cgu/rate prevailing from time to time at the principal p|noeu[businnos ofthe Architect. Payments hereunder shall hcmade inaccordance with the Prompt Payment Act. This Agreement entered into ueoythe day and year first written above. [Signatures onthe following page] 9 OWNER ARCHITECT CITY OF ROUND ROCK,TEXAS ARCHITEXAS,IN By: By: Mayor,Craig Morgan Date: Date: :ATTEST: By: Sara L.White,City Clerk FOR CITY,APPROVED AS TO FORM: By: Stephan L.Sheets,City Attorney 10 SUPPLEMENTAL AGREEMENT NO. 1 CITY OF ROUND ROCK § STATE OF TEXAS § KNOW ALL BY THESE PRESENTS: COUNTY OF WILLIAMSON § COUNTY OF TRAVIS § This document is entitled Supplemental Agreement No. 1, and it supplements "City of Round Rock Agreement for Architectural Services for Rel ocation/Restoration of Stagecoach Inn with Architexas - Architecture Planning& Historic Preservation,Inc."for the following Project: Professional architectural services and design services related to the following: Relocating and rebuilding of the Stagecoach Inn in Round Rock, Texas. The project (hereinafter the"Project")will consist of three(3)construction phases. Professional services for this Project shall include, but not be limited to, Schematic Design, Design Development, Construction Documents, Bidding, and. Construction Observation. In addition, Architect shall perform delineated project management and historic preservation consulting services. Architect shall be the Architect of Record, and shall be in charge of coordination of consultants. This Supplemental Agreement No. 1 is made and entered into as of the same date of the Agreement it supplements,that being the 13)"day of July,2017,and likewise is by and between the same parties,those being the CITY OF ROUND ROCK, a home-rule municipal corporation of Williamson and Travis Counties, Texas (hereinafter referred to as "City" and'or "Owner") and ARCHITEXAS, INC., with offices located at 2900 South Congress Avenue,Suite 200,Austin,Texas 78704(hereinafter referred to as"Architect"). WITNESSETH : WHEREAS, as is recited in the Agreement this document supplements, City intends to provide services for the design, construction, and project management of the Project. Architect's services are desired for purposes including but not limited to being architect of record, coordinating consultants, planning, civil, architectural, design, structural, mechanicaG'electrical/plumbing engineering services, confirming project program and space requirements, document production, bidding-related services, and construction observation services related to the Project;and WHEREAS, total compensation for Architect's services under this Agreement shall not exceed the following:$98,300.00,including reimbursable expenses in an amount not to exceed$2,$00.00;and WHEREAS, City may, at its sole discretion, request consulting services related to historic preservation in an amount not to exceed 100 hours, which amount is included in the not-to-exceed total compensation of$98,300.00;and WHEREAS,City shall only be billed for the number of hours requested for historic preservation consulting services;and 00380081 ss2 WHEREAS, as is recited in the Agreement this document supplements, City desires to contract with Architect for the delineated professional services, and for the administration of the Construction Contract during construction of the Project, all as previously and hereinafter stipulated and within the limits the City has budgeted or will budget therefor;and WHEREAS, as is stipulated in the Agreement this document supplements, Architect has agreed to provide such professional services for the compensation delineated previously and herein; NOW, THEREFORE, City and Architect, in consideration of the terms, covenants and conditions contained in the Agreement this document supplements and herein,hereby agree as follows: ARTICLE I SCOPE OF SERVICES AND COMPENSATION 1.01 Scope. Architect, as an independent contractor and professional consultant in its relationship with the City, shall perform all professional services for the Project as set forth in the Agreement this document supplements and herein. 1.02 Compensation. City shall compensate Architect in accordance with the terms and conditions as recited in the Agreement this document supplements and herein. Architect's total compensation hereunder shall not exceed Ninety-Eight Thousand Three Hundred and no/100 Dollars ($98,300.00), rnchidirrg a not-to-exceed amount of Two Thousand Five Hundred and no/100 ($2,500.00) for approved Reimbursable Expenses. These amounts represent the absolute limit of City's liability to Architect under this Agreement, unless same shall be changed by additional Supplemental Agreement hereto. The times and further conditions of payment shall be as described in Article VI hereof. ARTICLE If ARCHITECT'S SERVICES 2.01 Basic Services. Architect's Basic Services consist generally of the phases described below, and include complete planning, civil, architectural, design, structural, rnechanical'electrical`plu€nbing engineering services, project program and space requirements, document production, bidding-related services, and construction observation services, and such other services as may be necessary to assist the City in the design and construction of the Project, within the limits the City has budgeted or will budget therefor, and in compliance with the Project Facility Program, which is hereby made a part of this Agreement for all purposes.Architect agrees that upon execution of this Agreement, it will submit to City within ten (10) days a list of all additional consultants it intends to utilize, not previously identified in Architect's proposal, delineating their respective tasks. All of Architect's consultants shall be subject to the approval of the City through its City Manager, and City reserves the right to reject any consultant. Architect shall perform all work hereunder in a manner satisfactory and acceptable to the City, represented by its City Manager or his designee, hereinafter referred to as "Director." A Performance Schedule in Microsoft Project or an alternative program approved by the City, shall be agreed upon by Architect and the City, and Architect agrees to use its best efforts to complete all services hereunder in accordance with such Performance Schedule. All services shall be performed to the acceptable and professional standard. 2.01.1 Specialty Historic Preservation Services. This Project is unique in that it will preserve a historical building. Certain donations may be received by the City in the form of labor and/or materials for this Project. Architect agrees to work with all donors of appropriate trades and materials for this Project. City shall inform Architect of any donations received so that said donations can be incorporated into the Project in a timely manner. This work.will be performed at the Architect's hourly rate. 2.02 Schematic Design Phase. Architect shall provide the following Schematic Design Phase Services: as delineated in the Agreement this document supplements. 2.03 Design Documents Phase. Architect shall provide the following Design Documents Phase Services: as delineated in the Agreement this document supplements and herein,and as follows: (1) Architect shall prepare Design Documents based on the approved Schematic Design Documents and updated budget for the Cost of the work, said Design Documents to include adequate specifications for elements of the Project for consideration and approval by the City. One(1)digital copy each of said documents shall be submitted to City,each consisting of drawings and other documents to fix and describe the size, cross sections and character of the Project as to architectural, structural, mechanical and electrical systems, materials, and such other essentials as may be necessary and appropriate. Said documents shall illustrate and describe the refinement of the design of the Project, establishing the scope, relationships, forms, size and appearance of the Project by means of plans, sections and elevations, typical construction details, and equipment layouts. Said documents shall include outline specifications that identify major materials and systems and establish in general their duality levels.The Design Document Phase shall be completed within the agreed Performance Schedule. 2.04 Construction Documents Phase. Architect shall provide the following Construction Documents Phase Services: as delineated in the Agreement this document supplements and herein,and as follows: (1) Architect shall prepare from the approved Design Development Documents and updated budget for the Cost of the Work, for consideration of and approval by the City, Construction Documents, which documents shall set forth in detail the requirements of the entire Project, including the necessary bidding information prepared in such a way to allow City, if it so desires, to advertise for the award of one or more contracts for the construction and completion of the entire Project, or any phase thereof, and Architect shall assist City in preparation of the Bidding Forms, shall utilize without modification City's standard General and Supplementary General Conditions, and shall draft all Special Conditions of the Contract. City's standard form of Contract between City and the Contractor shall also be utilized, along with City's form of Bid Bond, Performance Bond and Payment Bond. Architect shall also compile the Project Manual that includes the Conditions of the Contract for Construction and Specifications and may include bidding requirements and sample forms. (2) Architect shall provide the City a digital copy of complete set of proposed Construction Documents for review and official approval prior to the advertisement of bids for the construction of the Project, and within the agreed Performance Schedule following 3 approval of the Design Documents. (3) Architect shall be solely responsible for obtaining the prior approval of the Texas Department of Licensing and Regulation prior to submittal of all Construction Documents to City for approval. Any fees charged by the Department for this approval shall be paid by the City. 2.05 Bidding and/or Negotiation Phase. Architect shall provide the following Bidding/Negotiation Services: as delineated in the Agreement this document supplements and herein,and as follows: Following City's approval of the Construction Documents and of the latest Statement of Probable Construction Cost, Architect shall assist the City in awarding a construction contract following legal public bid requirements. Architect shall arrange for procuring the reproduction of Bidding Documents, distributing same to prospective bidders, and maintaining records. Bidders shall be responsible for payment for the costs of reproduction of such documents. During the bid process, Architect shall assist City as follows: (1) Conducting pre-bid conferences, including on-site visits as required, to endeavor to assure that bidders understand the Construction Documents, the various on-site conditions,and the coordination and scheduling requirements. (2) Preparing bid documents and responses to questions from prospective bidders, and providing clarifications and interpretations of the Bidding Documents to all prospective bidders in the required form of addenda to Contract Documents. (3) Assisting in the opening of bids, conducting tabulation and evaluation of bids received, and advising on award of the contract. (4) Conducting pre-award conferences where necessary. Architect's assistance to City shall include submitting written reviews and recommendations for awards based upon the acceptability of bids; and, if required by City, more detailed analyses of specific bids. Reviews shall also consider the responsiveness of bids and their conformity with Bid Documents. In addition to the tasks set forth in 2.05,Architect shall be responsible for all bid and proposal services set forth in Exhibit"A"of the Architectural Services Agreement. 2.06 Construction Observation Phase. Architect shall provide the following Construction Observation Phase Services: as delineated in the Agreement this document supplements and herein, and as follows: The Construction Phase will commence with the award of the first Construction Contract and will terminate following the final one-year warranty inspection of the completed Project, correction of all defects in Project materials and workmanship, and resolution of all Project-related claims and disputes. During the Construction Phase,Architect shall provide the following services: (l) Architect shall provide administration of the Construction Contract as set forth in the Construction Documents, specifically the General and Supplementary General Conditions. Architect's assigned authority thereunder will not be substantially modified without Architect's written consent. 4 ('} Architect shall review properly prepared,timely requests by the Contractor for additional information about the Contract Documents. A properly prepared request for additional information about the Contract Documents will be in a form prepared or approved by .Architect and will include a detailed written statement that indicates the specific Drawings or Specifications in need of clarification and the nature of the clarification requested. (3) If deemed appropriate by Architect, Architect will on Owner's behalf prepare, reproduce and distribute supplemental Drawings and Specifications in response to requests for information by the Contractor. (4) Interpretations and decisions of Architect will be consistent with the intent of and reasonably inferable from the Contract Documents and will be in writing or in the form of drawings. When making such interpretations and initial decisions, Architect will endeavor to secure faithful performance by both Owner and the Contractor,will not show partiality to either, and will not be liable for the results of interpretations or decisions so rendered in good faith. (5) Architect shall render initial decisions on claims, disputes or other matters ill question between Owner and the Contractor as provided in the Contract Documents. However, Architect's decisions on matters relating to aesthetic effect will be final only if consistent with the intent expressed in the Contract Documents. (6) Architect shall report to Owner all known and substantial deviations from the Contract Documents and most recent construction schedule submitted by the Contractor. However, Architect will not be responsible for the Contractor's failure to perform work in accordance with requirements of the Contract Documents. Architect will be responsible for Architect's negligent acts or omissions, but will not have control over or charge of and will not be responsible for acts or omissions of the Contractor, Subcontractors,or their agents or employees, or any other persons or entities performing portions of the work. (7) Architect will at all times have access to the work wherever it is in preparation or in progress. (8) Owner will endeavor to communicate with the Contractor through Architect about matters arising out of or relating to the Contract Documents. Communications by and with Architect's subconsultants will be through Architect. (9) Architect,as a representative of City,shall advise and consult with Director and will keep City informed in writing through him of the progress of the Project, including percent complete on a monthly basis, during the Construction Phase; and after issuance of the "work order"to proceed with the work,all of City's instructions to its Contractors will be issued through Architect. Architect will have authority to act on behalf of Owner only to the extent provided in this Agreement unless otherwise properly modified by written amendment. 5 (10) Architect shall provide,during construction,adequate and competent on-site construction observation, periodically visiting the site to the extent necessary to personally familiarize itself with the progress and quality of the work, and to determine if the work is proceeding in substantial accordance with the Contract Documents. Architect's site observations may be conducted with Owner's designated representative to check conformance of the work with the requirements of the Contract Documents and to verify the accuracy and completeness of the list submitted by the Contractor of work to be completed or corrected, Field Reports of each visit shall be prepared by Architect and submitted to City. Architect shall employ reasonable measures to safeguard City against defects and deficiencies in the work of the Contractor. Architect shall not be responsible for the construction means, methods, techniques, sequences of procedures, nor for the safety precautions and programs employed in connection with the work. However, Architect will immediately inform Director whenever defects and deficiencies in the work are observed, or when any observed actions or omissions are undertaken by the Contractor which are not in the best interests of City and the Project. (t 1) Based on such observations at the site and on the Contractor's Application and Certificate for Payment, Architect shall determine, monthly,the amount owing to the Contractor and shall certify and forward the Contractor's Application and Certificate for Payment to Director for approval and payment. These certifications shall constitute a representation by Architect to City, based on observations at the site and other data comprising the application for payment, that the work has progressed to the point indicated; that to the best of Architect's knowledge, information and belief, the quality of the work is in accordance with the Contract Documents (subject to an evaluation of the work as a functioning whole upon substantial completion, to the results of any subsequent tests required by the Contract Documents, to minor deviations from the Contract Documents correctable prior to Project completion, and to any specific qualifications stated in the Certificate);and that the Contractor is entitled to payment in the amount certified. (1 2) Architect shall have authority to reject work which does not conform to the Contract Documents. Whenever Architect considers it necessary or advisable, Architect will have authority to require inspection or testing of the work in accordance with the provisions of the Contract Documents, whether or not such work is fabricated, installed or completed. However, neither this authority of Architect nor a decision made in good faith either to exercise or not exercise such authority shall give rise to a duty or responsibility of Architect to the Contractor, Subcontractors, material and equipment suppliers, their agents or employees or other persons or entities performing portions of the work. (13) Architect shall make recommendations on all claims and disputes of City or the Contractor relating to the execution and progress of the work or the interpretation of the Contract Documents, based upon such review and analysis by Architect as may reasonably be required. In the event of litigation, where Architect is named as an additional party with the City, such assistance will include the availability of knowledgeable witnesses in the employ of Architect for expert testimony. (14) Architect shall use its best efforts to promptly review and approve, reject, or take other appropriate action with shop drawings, product data and samples and other submissions of the Contractor for conformance only with the design concept of the Project and with the information given in the Contract Documents.Architect shall establish and implement 6 precise procedures, to be approved by City's Director, for expediting the processing and approval of these submissions without delay. Prompt review by Architect of submissions is of prime importance to City and an absolute necessity under the time constraints of the Project. (15) Architect shall prepare Change Orders and`or Construction Change Directives to the construction contract, in six (6) copies, after review and approval by City. Each Change Order shall be specific and final as to prices and extensions of time, with no reservations or other provisions allowing for future additional money or time as a result of the particular changes identified and fully compensated in the Change Order. (16) Architect shall conduct inspections to determine the dates of substantial completion and final completion, shall receive written guarantees and related documents assembled by Contractor for submittal with the final Certificate of Payment, and shall prepare and present final Certificate for Payment to Director for City's approval and payment. In addition,Architect shall make inspection of the Project at least thirty(30)days before the expiration of the one(1)year warranty contained in the Contractor's Performance Bond. (17) Architect shall conduct regularly scheduled progress meetings with City, the Contractor and major Subcontractors. Minutes of same shall be prepared by Architect with copies submitted to City's Director. (18) Architect shall have authority to order minor changes in the construction work,consistent with the Contract Documents, and not involving an adjustment in the Contractor's bid price or an extension of the Project Schedule. Such changes shall be accomplished by Field Order. In addition, Architect may issue written Field Orders which interpret the Plans and Specifications,with copies submitted to City's Director. (19) Architect shall assemble and deliver to City a set of reproducible Record Construction Drawings showing significant changes in the work during the construction process and final location of mechanical and electrical service lines and outlets, based upon marked- up prints of drawings and other data furnished by the Contractor to Architect. Architect shall provide Record Construction Specifications which will identify the changes in the specifications on a sheet, which sheet will be inserted at the beginning of each section to which they pertain. (20) Architect shall obtain from the Contractor and forward to Owner the following; (1) consent of surety or sureties, if any, of reduction in or partial release of retainage or the making of final payment; and (2) affidavits, receipts, releases and waivers of liens or bonds inden-mifying Owner against liens. 2.07 'Warranty Phase. Architect shall assist Owner in scheduling corrections to be made by the Contractor during the warranty period. During the eleventh month following completion of the prime general contract,Architect will arrange for a warranty inspection tour of the entire Project by authorized representatives of City, the Subconsultants and of each prime contractor engaged on the Project. Architect shall then prepare a list of work which needs to be done by each prime contractor to satisfy that prime contractor's warranty obligations to City. For any non-warranty involvement of Architect, payments shall be made based upon the Dourly Rate Schedule contained in this Agreement. 7 2.08 Project Representation Beyond Basic Services. In the event that circumstances should develop whereby continuous. full-time representation at the Project site is required, the conditions under which such representation shall be furnished and the Project Representatives selected, employed and directed shall be governed by an additional written Supplemental Agreement between City and Architect. ARTICLE III CITV'S RESPONSIBILITIES 3.01 Full information.City shall provide full information regarding requirements for the Project. 3.02 Designate representatives. City shall designate, when necessary, representatives authorized to act in its behalf. City shall examine documents submitted by Architect and render decisions pertaining thereto promptly to avoid unreasonable delay in the orderly progress of Architect's work. 3.03 Tests and inspections. City shall furnish, or pay for structural, mechanical, chemical, soil mechanics, and other laboratory tests, reports and inspections as required by law or the Contract Documents. 3.04 Permits. City will furnish the building permit without charge. Electrical, plumbing and other trade permits will be the responsibility of the construction contractor.Any charges which may be assessed for tap fees will be paid by City and are not to be included by Architect in the Specifications for the Project. 3.05 Fees. City shall pay for fees required for Architect's submittal and approval of documents as set forth in the.Agreement this document supplements. 3.06 Miscellaneous items. City will also provide Architect with City of Round Rock General and Supplementary General Conditions for Building Construction, Wage Rates, Contract and Bond Norms, and such other information and materials as may be necessary and practicable for the orderly and expeditious process of the work and the awarding of the Construction Contract.To the extent practicable, these documents shall be utilized in the preparation of the Construction Documents. ARTICLE IV FIXED LIMIT OF TOTAL BUDGETED CONSTRUCTION COST 4.01 Budgeted Construction Costs. The fixed limit of total Budgeted Construction Cost for this Project has not been fully ascertained as of the date of making of these Contract Documents. Architect,in consultation with City, shall determine what materials, equipment, component systems and types of construction are to be included in the Contract Documents, and will make reasonable adjustments in the scope of the Project to bring it within the limits when faxed. With City approval, Architect may also include in the Contract Documents alternate bids to adjust the construction cost to the fixed limit. if the lowest responsible bid is within the fixed limit of total Budgeted Construction Cost for the Project is still less then the fixed limit of total Budgeted Construction Cost for the Project, City shall pay Architect fees for Basic Services in accordance with this Agreement. 4.02 Procedures if Bid(s) Exceed Budgeted Construction Costs. If the lowest responsible bid exceeds its portion of the fixed limit of total Budgeted Construction Cost for the Project,City at its option may either (1) give written approval of an increase in such fixed limit, with no obligation to increase 8 Architect's fee, or (2) authorize rebidding within a reasonable time, or (3) cooperate in revising the Project scope and quality as required to reduce the Probable Construction Cost. In the case of(3), if the lowest responsible bid exceeds the Budgeted Construction Cost by more than ten (109'o), Architect, without additional charge, shall immediately modify the Drawings and Specifications as necessary to bring the Project cost within the budgeted fixed limit, or within any higher fixed limit subsequently authorized by City. Providing this service shall be the limit of Architect's responsibility in this regard, and having done so, Architect shall be entitled to his fees in accordance with this Agreement. if the lowest responsible bid is within ten percent(10°o)of the Budgeted Construction Cost,the Architect shall, upon the City's request and as an Additional Service, make revisions to Drawings and Specifications to reduce the Probable Construction Cost. However, when the excess is due to changes initiated by Architect in scope, basic systems or the kinds and quality of materials, finishes or equipment, Architect shall make revisions at no additional cost to City. ARTICLE V REIMBURSABLE EXPENSES 5.01 Reimbursable Expenses. Reimbursable Expenses are included in the total not-to-exceed fee delineated in the Agreement this document supplements and herein, and include the actual expenditures and actual costs set forth in the Agreement this document supplements. ARTICLE VI PAVMENTS TO THE ARCHITECT 6.01 Basic Services. Payments on account of Architect's Basic Services shall be made monthly in proportion to the degree of cornpletion of each phase, as delineated in the Agreement this document supplements and herein. As to the Construction Observation Phase fee apportionment, Architect shall invoice for equal monthly payments based upon the contractually-stipulated Construction Period. 6.02 Reimbursable Expenses. Payments for authorized Reimbursable Expenses for Architect, as hereinbefore referred to and in an amount not to exceed$2,500.00,shall be made following presentation, review and approval of Architect's detailed invoice in triplicate. 6.03 Deductions. No deductions shall be made from Architect's compensation on account of penalty, liquidated damages or other sums withheld from payments to Contractors. 6.04 Additions. No additions shall be made to Architect's compensation based upon Project construction claims,whether paid by City or denied. 6.05 Abandonment. If any work designed or specified by Architect during any phase or subphase is abandoned or suspended, in whole or in part, Architect is to be paid for the services performed on account of it prior to receipt of written notice from City through its Director of such abandonment or suspension. 6.06 .Invoices. Architect's invoices to City shall provide complete information and documentation to substantiate Architect's charges, and shall be in a form to be specified by Director. All payments to Architect shall be made on the basis of the invoices submitted by Architect and approved by Director. Such invoices shall conform to the schedule of services and costs in connection therewith set out hereinabove, All Reimbursable Expenses shall be clearly shown. Should additional backup material be 9 requested by Director, Architect shall comply promptly with such request. In this regard, should Director determine it necessary, Architect shall make all records and books relating to this Agreement available to City for inspection and auditing purposes. 6.07 .Payment of Invoices. City reserves the right to correct any error that may be discovered in any invoice that may have been paid to Architect and to adjust the same to meet the requirements of the Agreement. Following approval of invoices, City will endeavor to pay Architect promptly, but not later than the time period required under the Texas Prompt Payment Act; however, under no circumstances shall Architect be entitled to receive interest on payments which are late because of a good faith dispute between Architect and City or because of amounts which City has a right to withhold under this Agreement or state law. 6.08 Offsets.City may,at its option,offset any amounts due and payable under this Agreement against any debt (including taxes) lawfully due to City from Architect, regardless of whether the amount due arises pursuant to the terms of this Agreement or otherwise and regardless of whether or not the debt due to City has been reduced to judgment by a court. ARTICLE VII ARCHITECT'S ACCOUNTING RECORDS 7.01 Accounting Records. Records of Architect's Consultant and Reimbursable Expenses pertaining to the Project,and records of accounts between City and Architect shall be kept on a generally recognized accounting basis and shall be available to City or its authorized representatives at mutually convenient times. ARTICLE Vlll TERMINATION AND DEFAULT 8.01 Termination. In connection with the work outlined in this Agreement, it is agreed and fully understood by Architect that Director may cancel or indefinitely suspend further work hereunder or terminate this Agreement either for cause or for the convenience of City, upon fifteen(15) days' written notice to Architect,with the understanding that immediately upon receipt of said notice all work and labor being performed under this Agreement shall cease. Architect shall invoice City for all work satisfactorily completed and shall be compensated in accordance with the terms of this Agreement for all work accomplished prior to the receipt of said notice.No amount shall be due for lost or anticipated profits.All plans, field surveys, maps, cross sections and other data, designs and work related to the Project shall become the property of City upon termination of this Agreement,and shall be promptly delivered to City in a reasonably organized form without restriction on future use.Should City subsequently contract with a new architect for continuation of services on the Project, Architect shall cooperate in providing information. 8.02 Default.Nothing contained in Section 8.01 above shall require City to pay for any work which is unsatisfactory as determined by Director or which is not submitted in compliance with the terms of this Agreement. City shall not be required to make any payments to Architect when Architect is in default under this Agreement, nor shall this Article constitute a waiver of any right, at law and at equity, which City may have if Architect is in default, including the right to bring legal action for damages or to force specific performance of this Agreement. 10 ARTICLE IX GENERAL SUPPLEMENTARY AND SPECIAL CONDITIONS• CONTRACT ADMINISTRATION 9.01 General, Supplementary and Special Conditions. City of Round Rock — "Supplementary General Conditions"' and "General Conditions of the Contract for Construction', are to be used by Architect without modification; however,City may, upon prior consultation,approve of any changes that may be necessary for specific cases or instances. Any special conditions pertaining to the Project that are approved by City will be included under the Special Conditions portion of the Construction Documents, 9.02 Contract Administration. This Agreement shall be administered on behalf of City by its City Manager, and Architect shall fully comply with any and all instructions from Director. Any dispute arising hereunder shall be submitted to Director,whose decision in the matter shall be final and binding. ARTICLE X RESPONSIBILITY FOR WORK INDEMNIFICATION AND INSURANCE 10.01 Architect's Responsibility for Work. Approval by City shall not constitute nor be deemed a release of the responsibility and liability of Architect, its employees, subcontractors, agents and consultants for the accuracy and competency of their Designs, Working Drawings, Specifications or other documents and work; nor shall such approval be deemed to be an assumption of such responsibility by City for any defect, error or omission in the Designs, Working Drawings, and Specifications or other documents prepared by Architect,his employees,subcontractors,agents and consultants. 10.02 indemnification (Damage Claims). Architect agrees to indemnify and hold City, its officers, and employees, harmless against claims, lawsuits, judgments, costs and expenses for personal injury (including death), property damage or other harm for which recovery of damages is sought, suffered by any person or persons,to the extent that may arise out of or be occasioned by Architect's negligent breach of any of the terms or provisions of this.Agreement, or by any negligent act or omission of Architect, his officers, agents, associates, employees or subconsultants, in the performance of this Agreement; except that the indemnity provided for in this paragraph shall not apply to any liability resulting from the negligence of City, its officers, agents, employees or separate contractors, and in the event of joint and concurrent negligence of both Architect and City, responsibility and indemnity, if any, shall be apportioned comparatively in accordance with the laws of the State of Texas, without, however, waiving any governmental immunity available to City under Texas law and without waiving any defenses of the parties tinder Texas law. The provisions of this paragraph are solely for the benefit of the parties hereto and not intended to create or grant any rights,contractual or otherwise,to any other person or entity. 10.03 Indemnification(Patent and Copyright Claims).Architect agrees to completely indemnify and hold harmless City, its officers, and employees, against a claim that any of the Designs, Plans or Specifications prepared by Architect, its employees, associates or subconsultants, pursuant to this Agreement infringe a U.S. patent or copyright directly, indirectly. Architect will pay resulting costs, damages and reasonable attorney's fees finally awarded, but only to the extent cause by its negligence, and provided that. (1) City promptly notifies Architect in writing of the claim;and (2) Architect has control of settlement negotiations. 11 (a) The City Attorney of City shall be kept informed of settlement negotiations, and shall execute any settlement agreement reached by Architect on City's behalf. (b) Architect's indemnification under this section is conditioned on City's agreement that if any of the designs, plans or specifications, become, or in Architect's opinion are likely to become, the subject of such a claim, City will permit Architect, at Architect's option and expense, either to procure the right for City to continue using the designs, plans or specifications or to replace or modify the same so that they become non-infringing; and if neither of the foregoing alternatives is available on terms which are reasonable in Architect's judgment, City,to the extent City is legally able to do so,will cease using the designs,plans or specifications on written request of Architect, in which instance City has the sole option to either require Architect to perform new design work at Architect's sole expense,or to terminate this Agreement. (c) Architect has no liability under this section for any claim of infringement based upon the modification or alteration of the designs, plans or specifications prepared under this Agreement subsequent to the Project by City, or by any engineering consultant subsequently employed by City. (d) The foregoing states the entire obligation of Architect with respect to infringement of patents and copyrights. 10.04 Insurance.Architect, at Architect's sole cost,shall purchase and maintain during the term of this Agreement the minimum professional liability insurance coverage in the amount of One Million Dollars ($1,000.000.00) tcom a company authorized to do insurance business in Texas and otherwise acceptable to City. failure to maintain the minimum insurance coverage during the term of this Agreement shall be considered a material breach of this Agreement. 14.05 subconsultant Insurance. Without limiting any of the other obligations or liabilities of Architect, Architect shall require each subconsultant performing work under this Agreement to maintain during the term of the Contract, at the subconsultant's own expense, the same stipulated minimum insurance required in Section 10.04 above, including the required provisions and additional policy conditions as shown below in Section 10.05,unless specifically waived by the City Manager. Architect shall obtain and monitor the certificates of insurance from each subconsultant in order to assure compliance with the insurance requirements. Architect must retain the certificates of insurance for the duration of this Agreement, and shall have the responsibility of enforcing these insurance requirements among its subconsultants. City shall be entitled, upon request and without expense, to receive copies of these certificates of insurance. 10.06 Insurance Policy Endorsements. Each insurance policy under paragraph 10.04 shall include the following conditions by endorsement to the policy: (1) Each policy shall require that thirty(30)days prior to the expiration,cancellation,or non- renewal,a notice thereof shall be given to City by certified mail to: 12 City Manager,City of Round Rock 221 East Main Street Round Rock,Texas 78664 Architect shall also notify City, within 24 hours of receipt, of any notices of expiration, cancellation,or non-renewal it receives from its insurer. (2) Companies issuing the insurance policies shall have no recourse against City for payment of any premiums or assessments for any deductibles which all are at the sole responsibility and risk of Architect. (3) The Term "City" or "City of Round Rock" shall include all authorities, Boards, Commissions, Departments,and officers of City and the individual members, employees and agents thereof in their official capacities, and'or while acting on behalf of the City of Round Rock. (4) The policy clause"Other Insurance" shall not apply to any insurance coverage currently held by City, to any such future coverage, or to City's Self-Insured Retentions of whatever nature. 10.07 Cost of Insurance. The cost of all insurance required herein to be secured and maintained by Architect shall be borne solely by Architect, with certificates of insurance evidencing such minimum coverage in force to be filed with the City. ARTICLE XI COMPLIANCE WITH LAWS CHARTER AND ORDINANCES ETC. 11.01 Compliance with Laws. Architect, its consultants, agents, employees and subcontractors shall comply with all applicable Federal and State Laws, the Charter and Ordinances of the City of Round Rock, as amended, and with all applicable rules and regulations promulgated by all local, State and National boards, bureaus and agencies in effect at the time of this Agreement. Architect shall further obtain all permits and licenses required in the performance of the professional services contracted for herein. 11.02 Taxes. Architect will pay all taxes, if any, required by law arising by virtue of the services performed hereunder.City is qualified for exemption pursuant to the provisions of Section 151.309 of the Texas Limited Sales, Excise,and Use Tax Act. ARTICLE.X11 TERM 12.01 Term. Unless sooner terminated in accordance with the applicable provisions hereof,or extended by mutual agreement approved by City's Director, the term of this Agreement shall be from the date hereof until final completion of the Project and all architectural`engineering and construction administration services in connection therewith, including the final one(1) year warranty inspection,and resolution of any outstanding Project-related claims or disputes. 12.02 Project Performance Schedule. Architect understands that the Project Performance Schedule is of critical importance, and agrees to undertake all necessary efforts to expedite the performance of 13 services required herein, so that construction of the Project will be commenced as scheduled. In this regard, Architect shall proceed with sufficient qualified personnel and consultants necessary to fully and timely accomplish all services required under this Agreement in the highest professional manner. ARTICLE XIII FINANCIAL INTEREST PROHIBITED,CONFIDENTIALITY 13.01 Financial Interest Prohibited. Architect covenants and represents that Architect, its officers, employees,agents,consultants and subcontractors will have no financial interest,direct or indirect, in the purchase or sale of any product, materials or equipment that will be recommended or required for the construction of the Project. 13.02 Confidentiality. Architect's reports, evaluations, designs, drawings, data, and all other documentation and work developed by Architect hereunder shall be kept confidential, and shall not be disclosed to any third parties without the prior written consent and approval of City's Director. ARTICLE XIV GENERAL PROVISIONS 14.01 Time is of the Essence.Architect understands and agrees that time is of the essence and that any failure of Architect to complete the services for each phase of this Agreement within the agreed Project Performance Schedule will constitute a material breach of this Agreement. Architect shall be fully responsible for its delays or for failures to use his best efforts in accordance with the terms of this Contract. Where damage is caused to City due to Architect's failure to perform in these circumstances, City may withhold, to the extent of such damage,Architect's payments hereunder without waiver of any of City's additional legal rights or remedies. 14.02 Force Majeure.Neither City nor Architect shall be deemed in violation of this Agreement if it is prevented from performing any of its obligations hereunder by reasons for which it is not responsible or circumstances beyond its control. However, notice of such impediment or delay in performance must be timely given,and all reasonable efforts undertaken to mitigate its effects. 14.03 Assignment. The parties each hereby bind themselves, their successors, assigns and legal representatives to each other with respect to the terms of this Agreement.Architect shall not assign,sublet or transfer any interest in this Agreement without prior written authorization of City's Director. 14.04 Amendments. This Agreement, representing the entire agreement between the pal-ties, may only be amended or supplemented by mutual agreement of the parties hereto in writing. 14.05 Enforcement and Venue. This Agreement shall be enforceable in Round Rock, Williamson County, Texas, and if legal action is necessary by either party with respect to the enforcement of any or all of the terms or conditions herein, exclusive venue for same shall lie in Williamson County, Texas. This Contract shall be governed by and construed in accordance with the laws and court decisions of the State of Texas. 14.06 Notices. All notices and correspondence to City by Architect shall be mailed or delivered as follows: 14 City Manager,City of Round Rock Stephan L. Sheets,City Attorney 221 East Main Street and to: 309 East Main Street Round Rock,Texas 78564 Round Rock,Texas 78664 All notices and correspondence from City to Architect shall be mailed or delivered to the Architect as follows: Architexas,Inc. 2900 South Congress Avenue Suite 200 Austin,Texas 78704 IN WITNESS WHEREOF, the City of Round Rock has caused this Contract to be signed in its corporate name by its Mayor, duly authorized to execute the same in its behalf by Resolution No. approved by the City Council on July 13,2017, and Architexas Inc. signing by and through its duly authorized representative, thereby binding the parties hereto, their successors, assigns and representatives for the faithful and full performance of the terms and provisions of this Contract. CITY OF ROUND ROCK,TEXAS ARCHITEXAS, INC. By _ _ ._ _._._.. By ....._._.__. ._.. __.... Craig Morgan,Mayor Date: Date: .......................... _. t ..._... _..., w._ ATTEST: By: Sara L. White,City Clerk FOR.CITY,APPROVED AS TO FORM: By: Stephan L.Sheets,City Attorney THE TEXAS BOARD OF ARCHITECTURAL EXAMINERS, P.O. BOX. 12337, AUSTIN, TEXAS 78711-2337 OR 333 +GUADALUPE, SUITE 2-350, AUSTIN,TEXAS 78701-3942, TELEPHONE(512) 305-9000, HAS JURISDICTION OVER INDIVIDUALS LICENSED UNDER THE ARCHITECTS' REGIS'rR.ATION LAW,TEXAS CIVIL STATUTES,ARTICLE 249a. 15 . Arch texas EXHIBIT CITY OF ROUND ROCK STAGECOACH UNMJ RELOCATION The City of Round Rock(CoRR)commissioned a Round Rock Stagecoach Inn Relocation Feasibility Study that was completed by ARCH|TEXAG in December of 2010. Relocation of the historic portion of the Stagecoach Inn to the'Park"site was proposed to be accomplished in four phases. The first three phases of that Feasibility Study iathe basis for this proposal and scope. The estimated cost ofPhases 1'3ofthe Stagecoach Inn relocation io$5O5.327. Assumptions: 1. CuRR will make available any relevant reports, toote, surveys or documents related tuthe`Park" site and the Architect will beable torely upon the accuracy ofthe material. 2. CoRR will pnzWda any required Environmental Assessment orCultural Resource Investigation of the"Park"site. CoRR does not anticipate there will be a required Assessment or Investigation. 3. Due to the limited time frame and scope of this project: The Architect will submit only 5096 and 069&review sets of Construction Documents for CoRR review. 4. All utilities required for the project are available at the"Park"site and no design will be provided for any and all offsite utility infnaatructura, modm, utreate, drives, drainage and amenities. Theme are specifically excluded from this proposal. 5, Bidding Phase services will be limited to preparing bid documents, leading a Pre-bid meeting, responding tuRF|oand preparing Addendumssnneeded. S. The General Contractor selected to construct the improvements will be responsible for obtaining o Building Permit and for bringing plans through the permit process. 7. The"Park"site is considered to be the footprint of the relocated historic Stagecoach Inn and 20'-0" out|nall directions. SCOPE OF SERVICES ARCH|TEXAGproposes the following Scope ofServices: 1. PRE-DESIGN SERVICES/DESIGN SERVICES 1.1 Kickoff and Orientation Meeting The Consultant will conduct an orientation/kick-off meeting for all of the key stakeholders toexplain the process and how each entity can participate most effectively. The objects of this meeting are to: ° Identify Key decision makers and lines ofAuthority " Confirm the calendar for the project identifying mi|emtones, key dates and requirements for attending public meetings ° Confirm the Project Program � Confirm the Project Schedule ° Confirm the Project Budget Dallas|Austin /907w"mla st, 2900S Congress Ave °==."rcm'"=".com Second Floor Suite 200 Dallas,Texas 75z z x"iti" Texas 78nw p 214,748^561 p 512.444 4220 Architexas 12 Tour Site and Obtain Reports, Documents and Data Pertaining to Round Rock Stagecoach |nn(RRS|) The Consultant will tour existing and new RRSI site to become familiar with sites and to gain understanding oYissues tobaaddressed inthe relocation. The Consultant will obtain the following Documents,Reports and Data related to the RRS1 project: ° Topographic and Boundary Survey ofthe proposed project site " Geotechnical/Subsurface Engineering Report with Recommendations � Permits for Water Quality, Environmental Assessment and Cultural Romoun000 indicating the site ioapproved for the proposed future development 1.3 Schematic/Design Development Combined(5O96Submittal)7Weeks A. Schematic Design Drawings The Consultant will prepare drawings to illustrate the design concepts required for the relocation of the RRSI from its existing site to its new site, including foundation plans and electrical plans. B. Estimate of Probable Cost The Consultant will prepare an estimate of probable cost based on the Schematic/ Design Development drawings. The estimate will bedelivered tothe CoRRProject Manager two(2)weeks after the completion ofthe 5O96Schematic/Design Development submittal. 1A Contract Documents(S596Submittal)GWeeks) A. Based upon approved 5896 drawings of Schematic/Design Development and incorporating any changes from CuRR Project Manager, the Consultant will prepare complete Contract Documents. The intent ofthe Contract Documents io to include necessary items for a Design/Bid/Build project delivery method. B. EoUmnbs of Probable Cost The Consultant will prepare a cost mmdimabs based on the completed 95Y6 Construction Documents. The eeUmoby will be delivered to the CoRR Project Manager two (2) weeks after completion of the 9596 Construction Document submiffa|. Deliverables: ~ &596Contract Construction Documents ° Q596Technical Specifications ° Division / Technical Specifications (prepared by Consultant and CoRR Project Manager) � Division 2— /0Technical Specifications ° Estimate ofProbable Construction Cost Page mo/7 � ��&_^ %�� / �u^_ cexas 1.5 Invitation for Bid Documents (1DO96Submittal)2Weeks A. Based upon 959& Construction Documents which have been reviewed and accepted by the CoRR and the incorporation of any changes or adjustments directed by the CoRR Project Monagor, the Consultant will prepare Invitation for Bid (|FB) Documents in compliance with CoRR standards and subject to CoRR approval, The intent ofthe|FBDocuments iatoinclude all items and final changes necessary for the proper execution and completion of the construction work based on a Design/Bid/Build project delivery method. 1.6 Bid Document Distribution A. The Consultant will be responsible for printing the Bid Documents or distributing them tobidders and proposers and CoRR designated plan rooms in accordance with instructions and approval from the CoRR Project Manager. Cost for printing documents will bethe responsibility ofthe bidders and proposers. 2. BID AND PROPOSAL EVALUATION—Five(5)Weeks 2.1 Interpretation ofBid Documents A. During the bid period,bidders may request, inwriting, clarificaUonorinteqpnatation of any apparent inconsistencies between different provisions of the contract documents orany other point inthe bid documents. The Consultant will issue all interpretations as addenda in a timely manner in consultation with CoRR and will distribute such addenda to prospective bidders or proposers, plan holders and code agencies|naccordance with instructions and approval from the CoRR Project Manager. 22 Pre-Bid/Proposal Meeting and Site Visits A. The Consultant will be represented at pre-bid,pre-proposal meetings and site visits to respond to inquiries and requests for interpretations by prospective bidders and proposers unless directed otherwise by CoRR, The Consultant will also prepare written responses to questions and will forward these responses to CoRR for review and acceptance.Answers to questions that do not change the Contractor's scope ofwork will not beissued aeaddenda. 2.3 Bid Opening A. If requested by CoRR. the Consultant will be present at Bid opmning, otherwise, the CoRR will transmit to Consultant one digital copy of each pmpneo| for Consultant review of Bids and recommendation of the Apparent Low Bidder. The Consultant will not duplicate in any form the Bid documents,and will return the Bid documents iuCoRR oncompletion ofthe Consultant review, 2.4 Bid and Proposal Evaluation A. The Consultant will assist CoRR in reviovv|ng, checking, and evaluating hide and propoae|a, preparing bid tabulations and making written recommendations tothe Page uofr Architexas 0ORR Project Manager for the award of contract during the five(5)calendar days following obid orproposal opening. 2.5 Conformed Documents(incorporation ofAddenda) A. An directed and approved by the CoRR Project K8mnegar. the Consultant will incorporate all Addenda in the Contract Documents. Only changes made in formally issued addenda may bmincorporated into the documents. 2.8 pny'OonobuctionK4eedng A. Consultant will attend a Pre-Construction Meeting before mobilization at the site. 3. CONSTRUCTION SUPPORT SERVICES—Six to Eight(6-8) Month or as needed to complete The Consultant will provide Construction Support Services in support ofOoRR Project Manager' The Construction Phase begins with the Issue of Notice to Proceed (NTP)to the Contractor. The Consultant will provide the following services during Construction Administration: ° Attend construction meetings every other week oranneeded = Chair the Construction Progress K«emtmgn, pnapono and distribute meeting agenda, minutes and updates toschedule and budget = Visit project site etappropriate intervals; complete observation reports ° Review and pmueum submittals, adhere to standard procedures established by the CoRR Project Manager regarding stamping and filing submittals. ° Interpret contract documents ° Review and evaluate contract documents | ° A&E will prepare and submit to GC a calendar, outlining milestone dates for Key Submittals', 0C will comment on schedule and A&E shall revise and A&E. CORR. and QC shall formally accept calendar during negotiation with QC a A&E will reoeivo, review and respond to all GC RF|o and Submittals and will report the status bzCoRR ° A&E will prepare and negotiate Change Requests/Change Orders for authorization by CORR Project Manager ° Assist CoRRProject Manager infinal acceptance review 3.1 Construction Meetings A. The Consultant will attend and conduct the pre-construction conference for general review with the Contractor ofall the Contract requirements. The meeting Agenda and Schedule will be set by the A&E with input from the CORR Project Manager. 3.2 Bi'VVeeklyMaetinQs A. The Consultant will attend bi-weekly construction meetings and such other construction meetings,which the CORR Project Manager notifies the Consultant is needed to maintain construction schedules and quality. Page*nrr Architexas 3.3 Review of Submittals A. Based on the list of required submittals and approved submittal schedule as required by the Contract Documents, the Consultant will review and accept Contractor submittals for conformance with the design concept of the project and the Contract Documents. Returned submittals will include the Consultant's comments and any corrections or revisions, which are required to obtain its acceptance. Submittals shall be processed within fourteen (14)days or as quickly as feasible. 3.4 Requests for Information(RFI) A. The Contractor will submit any Requests for Information (RFI) or clarification of drawings and specifications to the A&E for review, response and approval. The Consultant will communicate status to CoRR. RFIs shall be responded to within three(3)days of receipt or as quickly as feasible. 3.5 Changes in the Work A. The Consultant, when requested by the CoRR Project Manager, will assist the CoRR Project Manager in a timely manner to review, evaluate, prepare and process all Construction contract changes (Change Notices, Change Directives and Change Orders). When directed by the CoRR Project Manager, the Consultant will prepare a Change Request including but not limited to the following; Cost Estimate consistent with Standard Cost Estimate format • Evaluation of Schedule impact stated in days of duration and specifying Contractor activities impacted Document Preparation. The Consultant will prepare specifications and construction drawings to depict the change proposed. Prepare appropriate revisions to the contract drawings and specifications for the project required by the change and provide the number of copies of these documents as required in the Consultant's"Issue for Construction"submittal requirements 3.6 Contractor Substitutions A. The Consultant will in a timely manner review, evaluate and make recommendations on all contractor requests for the use of "or equals" and substitutions. If the Consultant does not recommend acceptance of a substitution or an"or equal",it will provide specific and detailed reasons for its denial in writing. 3.7 Construction Observation A. Site Visits The Consultant will conduct the site visits with the CoRR Project Manager or its designated representative and, prior to leaving the site, will verbally discuss with the CoRR Project Manager or his authorized representative any observed defects, deficiencies and other problems and possible solutions to those problems. Consultant will not be required to make exhaustive or continuous site visits to check quality or progress of the work and will follow-up with a written report. Page 5 of 7 Architexas During the visits to the site. the Consultant will review the GC's Field Set Documents to ensure the GC and subcontractors are providing notations in red ink orbyoverlay dotaU^ describing any variation between the ^mo dnswm^ and "as constructed" uonditionm, and observe work to monitor compliance with Contract Documents. B Observation Reports If Consultant is called upon to observe the work of the Contractor(s) for the detection of defects or deficiencies in such m/ork. Consultant will not bear any responsibility or liability for such defects or deficiencies or for the failure to so detect. Consultant shall not make inspections nrreviews ofthe safety programs or procedures of the construction oontnaotor(a),and shall not review their work for the purpose of ensuring their compliance with safety standards. If Consultant is called upon toreview submittals from construction contractors, Consultant shall review and approve or take other appropriate action upon construction contrector(o)' submittals such oe shop drawings, product data and ammp|ea, but only for the limited purpose of checking for conformance with information given and the design concept expressed inthe contract documents. The Consultants' action shall be taken with such reasonable promptness as to cause no delay in the work vvhUa allowing sufficient time in the Consultants' professional judgment to permit adequate review, Review ofsuch submittals will not baconducted for the purpose of determining the accuracy and completeness ofother details such as dimensions and quantities. Consultant shall not assume any responsibility or liability for performance of the construction services or for the safety of persons and property during construction or for compliance with hadena/, state and {uoa| statutes,rules,regulations and codes applicable to the conduct of the construction mmmioea. Consultant mheU have no influence over the construction means, methods,techniques, sequences orprocedures. Construction safety shall remain the sole responsibility ofthe construction montnontor(n). C. Punch Lists Upon receipt of Notice of Substantial Completion from the GC. the Consultant will arrange to visually review the facility for purposes of preparing o punch Liot, outlining items to be corrected,touched up,replaced or finished before the project ieready for occupancy. The Consultant will lead afinal walk-through ofthe facility to verify that the contractor has completed the work identified on the punch list in unacceptable manner and that the facility imready tobaturned over tothe CoRR, 38 Project Close-Out A. The Consultant will participate with the CoRR Project Manager in the preparation ofany final inspection certificates and documents required to close out affected contracts and bofacilitate final payment bythe CnRR Project Manager, 3.8 VVornanUem A. Review and determine the acceptability of any written warranties and guaranties required by the Contract Documents for the project'which the contractor submits Page aorr Architexas to the CoRR Project Manager prior to the CoRR Project Manager acceptance of final payment CmnmtnxcdonPhesmServ|oea—Clmhficmtion. !fthe Consultant|acalled upon oo observe the work ofconstruction oonbactor(e)for the detection ofdefects or deficiencies in such work,the Consultant will not bear any responsibility or liability for such defects ordeficiencies orfor the failure tnaodetect. The Consultant shall not make inspections orreviews ofthe safety programs orprocedures ofthe construction contractor(s), and shall not review their work for the purpose of ensuring their compliance with safety standards.The Consultant shall have no influence over construction means, methods,techniques, sequences or procedures. Nofault ornegligence shall bmattributed tothe Consultant based upon the acts or omissions of any construction contractors. Construction safety shall remain the sole responsibility ofthe construction cnn<rmotor(a). Construction Support Defivenab6es: � Construction Observation Reports ° Meeting Minutes � Punch Lists ° Submittal Reviews ° RF/Responses = Final Inspection and Certifications 4 As part of the Project Close-out and after the Certificate of Occupancy has been issued, the General Contractor shall compile all superintendent and subcontractor redlines to the Field Set of Construction Documents and edit the electronic fi|aa to reflect the nadUnmm, and transmit the"As-Built"documents, un-stamped to the A&E for review and comment as needed, The consultant will meet with representatives ofthe CoRRtoreview and comment nnthe content and intent ofthe Contractor's"Am-Bui|tDooumenba^ The consultant will not be responsible for making changes to the IFC drawings.This is a coordinated effort between GC and A&E with A&E overseeing the process.When finalized,the documents will be issued to the CoRR in BIM (or CAD is acceptable to the CoRR Project Manager)and PDF format.The A&E will also ensure the GC completes the Close-out documentation morequired byCoRR. 5. HISTORIC PRESERVATION SPECIALTY CONSULTATION(TBD) This proposal includes up to 100 hours of additional consultation related to the unique nature and requirements of this historic preservation project. This time will be directed at the CoRR'm request but could include public meetings, interactions with local non-profit historic preservation organizations, interaction with City staff performingproject work or other consultations, These hours shall beused atthe sole request ofCoRRand CoRR shall only becharged for the number ofhours requested. Page,ofr Architexas EXHIBIT B COMPENSATION and HOURLY RATE SCHEDULE PROFESSIONAL SERVICES In consideration for the professional services to be performed bythe Architect, the City of Round Rock agrees tnpay the Architect atotal sum ofNINETY EIGHT THOUSAND THREE HUNDRED DOLLARS ($98.300). The said sum is ofixed not-to-exceed emount, and ohoU be paid as delineated anfollows and includes amounts paid for Architects, Engineers and Planners, BASIC SCOPE Pre-Design/Schematic Design $11.370 Design Development $16'1e0 Construction Documents $26,630 ommnQ $ 3.790 Construction Phase Services $118,950 FEE BASIC A&E SCOPE with Record Drawings mre'nno SPECIALTY HISTORIC PRESERVATION SERVICES(as needed) $22,500 REIMBURSABLE EXPENSES Payment for reimbursable expenses,including administrative charges and out-of-pocket expense,shall not exceed TWO THOUSAND FIVE HUNDRED DOLLARS ($2.500) and are included in the not-to-exceed total fee recited herein. HISTORIC PRESERVATION SPECIALTY CONSULTATION Based upon CoRR na4uesi. Consultant has included up to 100 hours of additional consultation related to the unique nature of this historic preservation project. This time may be utilized at the discretion of the CoRR to meet with city workers for self-performance activities, attend public meetings,presentations,etc. ADDITIONAL SERVICES Additional Services are defined as any service not listed as a basic service including revisions to previously approved plans that necessitate additional work for the Architect,oubatantiveohanQoainthePnojoct800po. or additional work necessitated by unknown or reasonably unforeseen circumstances. The parties oxpn*em|y agree that such additional aarv|maa xvnu|d be performed under o supplemental agreement negotiated ototime subsequent hzthis proposal, Compensation for approved Additional Services shall ba computed based onthe following Schedule ofHourly Rates: Senior Principal $2OO.O0hr Principal $ 165.00/hr Architect/Designer/Project Manager $ 12O.O0hr Architectural|nbam/CAD Technician $ 85.00/hr Historic Preservation Specialist $ 85.00hr Administrative/Clerical $ 6500/hr Dallas|Austin 1907m"m/"s^ zvouy.Congress Ave. =°°.°rcmte=,,c"rn Second Floor Suite 200 Dallas,Texas/sznz ^""^n,Texas 78704 Architexas EXHIBIT C PROJECT SCHEDULE Pre-Design Services 2 Weeks Schematic/Design Development T Weeks Cost Estimate (SD,DD) 2 Weeks Contract Documents 6 Weeks Cost Estimate(CD) 2 Weeks Invitation for Bid 2 Weeks Bid and Proposal Evaluation 6 Weeks Construction Support 6-8 Months(or as needed) As-Built Documents 3 Weeks Note: Schedule is an estimate of time required for the various phases of project delivery. Adequate Owner supplied documentation and Owner review times may impact the overall schedule. Dallas I Austin 1907 b?ari(la St 2904 S.Congress Ave.. v<ww.architexas.coan Second Floor Suite 200 Dallas,Texas 752071 Austin,Texas 78704 p 211 748.4551 p 512 444.4220