Loading...
CM-2017-1446 - 7/21/2017STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HAGOOD ENGINEERING ASSOCIATES, INC. ("Engineer") ADDRESS: 900 East Main Street, Round Rock, TX 78664 PROJECT: Old Settlers Park Bond Improvements This Supplemental Contract No. I to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Hagood Engineering Associates, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 18th day of December, 2014 for the Old Settlers Park Bond Improvements Project in the amount of $127,500.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $5,500.00 to a total of $133,000.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. I1. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $5,500.00 the lump sum amount payable under the Contract for a total of $133,000.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] Supplemental Contract 0199.1458; 00381921 OW - 2 vi -7 -- /e-� Rev.0616 84275 HAGOOD ENGINEERING ASSOCIATES, INC. By: �--- L4K AJ- l Date Supplemental Contract Rev.06r 16 0199.1458, 00381921 84275 CITY OF RO D ROCK By: a�� U�:z Craig Morgan, Mayor Date Supplemental Contract 0199.1458, 00381921 APP ED TO ORM: rul Stepha L. Sheets, City Attorney Rev.06. 16 84275 ADDENDUM TO EXHIBIT B Engineering Services Attached Behind This Page EXHIBIT B Engineering Services PROJECT DESCRIPTION: Hagood Engineering Services shall provide to the City Parks and Recreation design, permitting, bidding and construction observation services for the site development for ADA, parking, and trail improvements located at Old Settlers and Lake Creek Parks. SCOPE OF WORK: The scope of work for this project has been divided into the following tasks: (1) Civil Engineering Services: • Design Development Phase • Construction Documents Phase • Regulatory Permitting Phase • Bidding Phase • Construction Phase (2) Surveying Services (3) Geological Investigation Services Detailed Scope of Services (attachment to Exhibit B) ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page � 4�1�p HAGOOD ENGINEERING ASSOCIATES Professional Services Supplemental Agreement Scope of Work Joann Land Playground Old Settlers Park Engineer to provide necessary civil engineering services for revisions to the Old Settler Park Improvements Construction Plans for the expansion of the existing Joann Land playground area. Expansion consists of curbing and grading to provide for additional playground equipment fall zone. Engineer to provide design and construction observation services. Additional plans and/or revisions to existing plans include: Dimensional Control Plan (of proposed improvements) Grading Plan Sections and Details Lump Sum Fee: $4,300.00 In addition this supplemental agreement for the reimbursement of Upper- Brushy Creek Water Control and Improvement District (UBCWCID) plan review fee. This plan review fee is for the Old Settlers Park Improvements Project related to the UBCWCID inundation easement encompassing the Lakeview Trail. Plan Review Fee Reimbursement:.$1,200.00 TOTAL FEE: $5,500.00 900 East Main St. • Round Rock, Texas 78664 • P: 512.244.1546 • www.heueng.com • Registration No. F-12709 February 10, 2016 Raquel, Upper Bruslty Creek Water Control and Improvement District 1850 Round Rock Avenue, Suite 100 Rowed Rock, Tx 78681 Phone(512) 284-7685 Fax (512)284-7745 %Yww.uooerbrushvcreekweid ore Please find the receipt for Check #4130 in the amount of $1,200 for the Design Phase Application for Project Old Settlers Park at Dam #17/Project #14-025-AR-WCID. If you need anything further, please feel free to contact us. Sincerely, Lisa Moravitz District Secretary RECEIPT FOR CHECK #4089 NO. 2016-02 Hagood Engineering Associates, Inc. One Chisholm Trail, Suite 5200 Round Rock, Texas 78681 Upper Brushy Creek WCID DATE DESCRIPTION AMOUNT 2/10/16 Design Phase Application for the project at Old Settlers Park/Dam #17/Project #14-025-AR-WCID $1,200.00 SUBTOTAL $1,200.00 TOTAL $1,200.00 Upper Brushy Creek WCID 2/9/2016 }*1,200.00 One Thousand Two Hundred and 00/100{*#}##*#}k#*###*t*{tk##*}*t#k*##k**i*##r*#t#**##*;##;#;{;}**#}*#}*#{;{{{##{##{{#tf City of Round Rock J�ROUND ROCK Agenda Item Summary S EXA Agenda Number: Title: Consider executing Supplemental Contract No. 1 with Hagood Engineering Associates, Inc. for the Old Settlers Park Bond Improvement Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 7/21/2017 Dept Director: Rick Atkins, Director Cost: $5,500.00 Indexes: 2014 General Obligation Bonds Attachments: LAF - SC#1 w- Hagood Engineering Associates, Inc. - Old Settlers Park Bond Improvements Projects (00382006xA08F8).pdf, SC#1 with Hagood Engineering Associates - Old Settlers Park Bond Improvements (00382015xA08F8).pdf Department: Parks and Recreation Department Text of Legislative File CM -2017-1446 Consider executing Supplemental Contract No. 1 with Hagood Engineering Associates, Inc. for the Old Settlers Park Bond Improvement Project. This supplemental contract with Hagood Engineering covers costs associated with the engineering and WCID permitting of the Joanne Land Playground project. Since a portion of the playground is located in the WCID inundation easement, it was required to be permitted through WCID. After working with Hagood Engineering and WCID, it was determined to be the best value for the City to combine this project with the open permit for the Old Settlers Park Bond Project. By utilizing the same permit, it saved the City both time and money. This project includes rehabilitation and expansion of the existing Lakeside Trail at Old Settlers Park. It also addresses several ADA concerns throughout the park, specifically high use areas around the park pavilions. Drainage issues along the Creekside Loop trail and the parking lot adjacent to Salt Lick will also be addressed during this project. Additionally, this project will include ADA and parking improvements at Lake Creek Park, as well as a trail extension and road realignment. Currently, the park road near Lake Creek Pole makes an uncomfortable jog around electrical poles. As part of this City o/Round Rock Page 1 Printed on 7120/2017 Agenda Item Summary Continued (CM -2017-1448) project, Oncor will be consolidating their poles allowing for a more direct route and safer driving alignment. Cost: $5,500.00 Source of Funds: 2014 General Obligations Bonds City of Round Rock Page 2 Printed on 712012017