Loading...
Contract - Austin Engineering - 7/27/2017 I Cityof Round Contract Forms Rock, Texas Standard Form of Agreement: Section 00500 City of Round Rock, Texas Standard Form of Agreement between Owner and Contractor AGREEMENT made as of the vv)�day of A4-' in the year 20 BETWEEN the Owner: City of Round Rock,Texas(hereafter"Owner"or"City") 221 East Main Street Round Rock,Texas 78664 and the Contractor Austin Engineering Co., Inc. ("Contractor") 111 3317 Ranch Road 620 North P.O.Box 342349 Austin,TX 78734-2349 The Project is described as: Brushy Creek Phase 5 Wastewater Line p The Engineer is: Walker Partners 111 804 Las Cimas Parkway Suite 150 Austin,Texas 78746 111 of the mutual terms, conditions and covenants of this Agreement and in considerationgreement and all accompanying documents between Owner and Contractor, the receipt and sufficiency of which are hereby acknowledged,Owner and Contractor agree as follows: 111 ARTICLE I THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement,Conditions of the Contract(General,Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement;these form the Contract,and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations,representations or agreements, either written or oral.An enumeration of the Contract Documents,other than Modifications,appears in Article 7. ARTICLE 2 THE WORK OF THIS CONTRACT Contractor shall fully execute the Work described in the Contract Documents,except to the extent specifically indicated in the Contract Documents to be the responsibility of others. 00500 4-2016 Page 1 of 5 Standard Form of Agreement 111 00307791 rt. Alen I ARTICLE 3 DATE OF COMMENCEMENT; DATE OF SUBSTANTIAL COMPLETION;DATE OF FINAL COMPLETION 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a Notice to Proceed issued by Owner. 3.2 The Contract Time shall be measured from the date delineated in the Notice to Proceed. 3.3 Contractor shall commence Work within ten ( 10 ) calendar days from the date delineated in the Notice to Proceed. 3.4 Contractor shall achieve Substantial Completion of the items of Work listed on Attachment A to this Agreement no later than N/A ( N/A )calendar days from issuance by Owner of Notice to Proceed, and Contractor shall achieve Substantial Completion of the entire Work no later than Ninety ( 90 )calendar days from issuance by Owner of Notice to Proceed, subject to adjustments of this Contract Time as provided in the Contract Documents. 3.5 If Contractor fails to achieve Substantial Completion of the Work(or any portion thereof) on or before the date(s)specified for Substantial Completion in the Agreement,Contractor shall pay to Owner,as liquidated damages, the sum of five-hundred and No/100 Dollars($500.00 ) for each calendar day that Substantial Completion is delayed after the date(s) specified for Substantial Completion. It is hereby agreed that the liquidated damages to which Owner is entitled hereunder are a reasonable forecast of just compensation for the harm that would be caused by Contractor's failure to achieve Substantial Completion of the Work(or any portion thereof)on or before the date(s)specified for Substantial Completion in the Agreement. It is agreed that the harm that would be caused by such failure,which includes loss of expected use of the Project areas,provision of alternative storage facilities and rescheduling of moving and occupancy dates,is one that is incapable or very difficult of accurate estimation.It is hereby agreed that if Substantial Completion of the Work (or any portion thereof) is not achieved on or before thirty (30) days after the date(s) specified for Substantial Completion in the Agreement,the Owner shall have the option to either collect liquidated damages as set forth herein or to thereafter rely on its remedies under the Contract Documents and at law and in equity, including without limitation,the recovery of actual damages.The date(s)specified for Substantial Completion of the Work(or any portion thereof)in the Agreement shall be subject to adjustment as provided in the Contract Documents. 3.6 Contractor shall achieve Final Completion of the entire Work no later than One Hundred Twenty ( 120 )calendar days from issuance by Owner of Notice to Proceed. ARTICLE 4 CONTRACT SUM 4.1 Owner shall pay Contractor the Contract Sum in current funds for Contractor's performance of the Contract. The Contract Sum shall be one hundred fourty-four thousand six hundred eighteen and zero cents. ($ 144,618.00 ),subject to additions and deductions as provided in the Contract Documents. 4.2 Does the Contract Sum include alternates which are described in the Bid Form? No X . Yes .If yes,please provide details below: N/A N/A 00500 4-2016 Page 2 of 5 Standard Form of Agreement 00307791 ARTICLE 5 PAYMENTS 5.1 PROGRESS PAYMENTS 5.1.1 Based upon Applications for Payment submitted to Engineer and Owner by Contractor,and Certificates for Payment issued by Engineer and not disputed by Owner and/or Owner's lender,Owner shall make progress payments on account of the Contract Sum to Contractor as provided below, in Article 14 of the City of Round Rock General Conditions,and elsewhere in the Contract Documents. 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month. 5.1.3 Provided that an Application for Payment is received by Engineer and Owner, and Engineer issues a Certificate of Payment not later than the tenth (10th) day of a month, Owner shall make payment to Contractor not later than the tenth (10th) day of the next month. If an Application for Payment is received by Engineer and Owner after the application date fixed above,payment shall be made by Owner not later than one month after the Engineer issues a Certificate for Payment. 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as Engineer and Owner may require.This schedule,unless objected to by Engineer or Owner, shall be used as a basis for reviewing Contractor's Applications for Payment. 5.1.5 Applications for Payment shall warrant the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. 5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as provided in Article 14 of the City of Round Rock General Conditions. 5.1.7 Except with Owner's prior written approval, Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. 5.2 FINAL PAYMENT 1 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by Owner to Contractor when: .1 Contractor has fully performed the Contract except for Contractor's responsibility to correct Work, 1 and to satisfy other requirements,if any,which extend beyond final payment;and .2 a final Certificate for Payment has been issued by Engineer. 5.2.2 Owner's final payment to Contractor shall be made no later than thirty (30) days after the issuance of Engineer's final Certificate for Payment. In no event shall final payment be required to be made prior to thirty(30) days after all Work on the Contract has been fully performed.Defects in the Work discovered prior to final payment shall be treated as non-conforming Work and shall be corrected by Contractor prior to final payment,and shall not be treated as warranty items. 1 ARTICLE 6 TERMINATION OR SUSPENSION 6.1 The Contract may be terminated by Owner or Contractor as provided in Article 15 of the City of Round Rock General Conditions. 00500 4-2016 Page 3 of 5 Standard Form of Agreement 00307791 6.2 The Work may be suspended by Owner as provided in Article 15 of the City of Round Rock General Conditions. ARTICLE 7 ENUMERATION OF CONTRACT DOCUMENTS 7.1 The Contract Documents,except for Modifications issued after execution of this Agreement,are enumerated as follows: 7.1.1 The Agreement is this executed version of the City of Round Rock, Texas Standard Form of Agreement between Owner and Contractor,as modified. 7.1.2 The General Conditions are the "City of Round Rock Contract Forms 00700," General Conditions, as modified. 7.1.3 The Supplementary, Special,and other Conditions of the Contract are those contained in the Project Manual dated May 2017 7.1.4 The Specifications are those contained in the Project Manual dated May 2017 7.1.5 The Drawings, if any,are those contained in the Project Manual dated May 2017 7.1.6 The Insurance&Construction Bond Forms of the Contract are those contained in the Project Manual dated May2017 7.1.7 The Notice to Bidders,Instructions to Bidders,Bid Form, and Addenda,if any,are those contained in the Project Manual dated May 2017 7.1.8 If this Agreement covers construction involving federal funds, thereby requiring inclusion of mandated contract clauses, such federally required clauses are those contained in the "City of Round Rock Contract Forms 03000,"Federally Required Contract Clauses,as modified. 7.1.9 Other documents, if any, forming part of the Contract Documents are as follows: N/A ARTICLE 8 MISCELLANEOUS PROVISIONS 8.1 Where reference is made in this Agreement to a provision of any document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. 8.2 Owner's representative is: Eddie Zapata, Senior Project Manager City of Round Rock 2008 Enterprise Drive Round Rock,TX 78664 8.3 Contractor's representative is: Travis W.Keller,Vice President Austin Engineering Co.,Inc. 3317 Ranch Road 620 North P.O. Box 342349 Austin,TX 78734-2349 ' Contractor's Neither Owner's nor Contractor s representative shall be changed without ten(10)days'written notice to the other party. 8.5 Waiver of any breach of this Agreement shall not constitute waiver of any subsequent breach. 00500 4-2016 Page 4 of 5 Standard Form of Agreement 00307791 1 I I 8.6 Owner agrees to pay Contractor from available funds for satisfactory performance of this Agreement in accordance with the bid or proposal submitted therefor, subject to proper additions and deductions,all as provided in the General Conditions, Supplemental Conditions, and Special Conditions of this Agreement, and Owner agrees to make payments on account thereof as provided therein. Lack of funds shall render this Agreement null and void to the extent funds are not available. This Agreement is a commitment of City of Round Rock's current revenues only. 8.7 Although this Agreement is drawn by Owner,both parties hereto expressly agree and assert that,in the event of any dispute over its meaning or application,this Agreement shall be interpreted reasonably and fairly, and neither more strongly for nor against either party. 8.8 This Agreement shall be enforceable in Round Rock, Texas, and if legal action is necessary by either party with respect to the enforcement of any or all of the terms or conditions herein, exclusive venue for same shall lie in Williamson County, Texas. This Agreement shall be governed by and construed in accordance with the laws and court decisions of the State of Texas. 8.9 Both parties hereby expressly agree that no claims or disputes between the parties arising out of or relating to this Agreement or a breach thereof shall be decided by an arbitration proceeding, including without limitation, any proceeding under the Federal Arbitration Act(9 USC Section 1-14)or any applicable state arbitration statute. 8.10 The parties, by execution of this Agreement, bind themselves, their heirs, successors, assigns, and legal representatives for the full and faithful performance of the terms and provisions hereof. This Agreement is entered into as of the day and year first written above and is executed in at least three(3) original copies, of which one is to be delivered to Contractor, one to Engineer for use in the administration of the Contract,and the remainder to Owner. 111 OWNER CONTRACTOR CITY OF OUND ROCK, EXAS Austin Engineering Co.,Inc. I ;.... I fj��/� Travis W. Keller Printed •ame: �,�i.� J 11/��� A ►'VV ) Printed Name: �`� Vice President Title (1Title: Date Signed: '[7�" Date Signed: g g ATTEST: ' 9MttA.• y V►►p�. City Clerk FOR T ,APPR I VED AS TO FORM: .-:/.l1- (" 1- City Atte ey 00500 4-2016 Page 5 of 5 Standard Form of Agreement 00307791 I I I PERFORMANCE BOND Bond No.4413347 THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF WILLIAMSON § That Austin Engineering Co., Inc. of the City of Austin County of Travis , and State of Texas , as Principal, and Suretec Insurance Company authorized tinder the law of the State of Texas to act as surety on bonds for principals, are held and firmly bound unto THE CITY OF ROUND ROCK, TEXAS,(Owner),in the penal sum of One Hundred Forty Four Thousand Six Hundred Eighteen and 00/100's Dollars ($ 144,618.00 ) for the payment whereof, well and truly to be made the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns,jointly and severally, by these presents: WHEREAS the Principal has entered in o a certain written Agreement with the Owner dated the t dayto which the of �� 20 17 Agreement is hereby referred to and made a part hereof a ully and to the same extent as if copied at length herein consisting of: Brushy Creek Phase 5 Wastewater Line (Name of the Project) NOW, THEREFORE, THE CONDITIONS OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform said Agreement and shall, in all respects, duly and faithfully observe and perform all and singular the covenants, conditions and agreements in and by said Agreement, agreed and covenanted by the Principal to be observed and performed, including but not limited to, the repair of any and all defects in said work occasioned by and resulting from defects in materials furnished by or workmanship of, the Principal in performing the Work covered by said Agreement and occurring within a period of twelve (12)months from the date of Final Completion and all other covenants and conditions, according to the true intent and meaning of said Agreement and the Plans and Specifications hereto annexed,then this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER,that this bond is executed pursuant to the provisions of Chapter 2253, Texas Government code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter 2253 to the same extent as if it were copied at length herein. 111 Page l 00610 7-2009 Performance Bond 00090656 I I PERFORMANCE BOND (continued) Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the term of the Agreement, or to the Work performed thereunder, or the Plans, Specifications, or drawings accompanying the same, shall in anywise affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement, or to the work to be performed thereunder. IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this 31st day of July , 20 17 . Austin Engineering Co., Inc. Suretec Insurance Company Principal Surety -rro'IS 1,3 •Ka\Cir David S. Ballew Printed Name Printed Name By: � By: Title: 1 ie Title: Attorney-In-Fact Address: P.C . Box 342349 Address: 1330 Post Oak Blvd., Ste 1100 Austin, Texas 78734 Houston, Texas 77056 Resident Agent of Surety: _ jam. �--v Signature David S. Ballew Printed Name 3802 Manchaca Road Street Address Austin, Texas 78704 City, State &Zip Code I Page 2 00610 7-2009 Performance Bond 00090656 I I I PAYMENT BOND I THE STATE OF TEXAS § KNOW ALL MEN § BY THESE PRESENTS: COUNTY OF WILLIAMSON § IThat Austin Engineering Co., Inc. , of the City of Austin , County of Travis , and State of Texas as Principal, and Suretec Insurance Company Iauthorized under the laws of the State of Texas to act as Surety on Bonds for Principals, are held and firmly bound unto THE CITY OF ROUND ROCK, (OWNER), and all subcontractors, workers, laborers, mechanics and suppliers as their interest may appear, all of whom shall have the right to sue upon this bond, in the penal sum of One Hundred Forty Four Thousand Six Hundred Eighteen and 00/100's Dollars ($ 144,618.00 ) for the payment whereof, well and truly be made the said Principal and Surety bind themselves and their heirs, administrators, executors, successors, and assigns,jointly and severally,by these presents: WHEREAS, the Principal has entered into a certain written Agreement with the Owner, dated IIthe ( day of -hi7/(, + , 2017 , to which Agreement is hereby referred to and made a part hereof as f ly and to the same extent as if copied at length herein consisting of: Brushy Creek Phase 5 Wastewater Line 1 (Name of the Project) 11 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall well and truly pay all subcontractors, workers, laborers, mechanics, and suppliers, all monies to them owing by said Principals for subcontracts, work, labor, equipment, supplies 1 and materials done and furnished for the construction of the improvements of said Agreement, then this obligation shall be and become null and void; otherwise to remain in full force and effect. 111 PROVIDED, HOWEVER,that this bond is executed pursuant to the provisions of Chapter 2253, Texas Government code, as amended, and all liabilities on this bond shall be determined in 111 accordance with the provisions of said Chapter 2253 to the same extent as if it were copied at length herein. N III I Page 1 00620 7-2009 Payment Bond 00090656 I I PAYMENT BOND(continued) Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement, or to the Work performed thereunder, or the plans, specifications or drawings accompanying the same shall in anywise affect it's obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract, or to the work to be performed thereunder. IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this Instrument this 31st day of July , 2017 Austin Engineering Co., Inc. Suretec Insurance Company Principal Surety 1� ,us5iA .l David S. Ballew Printed Name Printed Name �etttat�,iii E r c \\`� ER! �vcr (4,‘"• Tit _41T i t- i 1 . Title: Attorney-In-Fact s '•.drt•s:P.O. Box 342349 Address: 1330 Post Oak Blvd., Ste 1100 d• � © Austin,Texas 78734 Houston,Texas 77056 o o Oet .0'I,,, 1 �1 Rtsn1ent Agent of Surety: c,. r Signature David S. Ballew Printed Name 3802 Manchaca Road Street Address Austin, Texas 78704 I I I I Page 2 00620 7-2009 00090656 Payment Bond ACCP DATE(MM/DD/YYYY) II `,�,. CERTIFICATE OF LIABILITY INSURANCE 07/28/2017 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS Il CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and con litions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). CONTACT PRODUCER Service Insurance Group,Inc. NAME: Hope Sifuentez PO Box 5753 PH(A CNo,Est)• (979)774-3900 ;AC,Na):(979)774-3955 3840 Corporate Center Dr ADDRESS: hope.sifuentez@sigbcs.com B an TX 77805-5753 INSURERS AFFORDING COVERAGE NAIC# INSURER A:United Fire&Casualty 19496 INSURED INSURER B:Service Lloyds Insurance 43389 Austin Engineering Co.,Inc. INSURER C: PO Box 342349 INSURER D: Austin TX 78734- INSURER E: II INSURER F: COVERAGES CERTIFICATE NUMBER:2017-2018 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY EFF POLICY EXP LIMITS LTR INSn wvn POLICY NUMBER (MMD/Y /DYYY� (MMLDDIYYYYJ A X COMMERCIAL GENERAL LIABILITY X X 85322286 07/01/201707/01/2018 EACH OCCURRENCE $ 1,000,000 DAMAGE TO RENTED CLAIMS MADE X OCCUR PREMISES(Ea occurrence) $ 100,000 X Blkt Addl Insd MED EXP(Any one person) $ 5,000 X Blkt Waiver of Sub PERSONAL&ADV INJURY $ 1,000,000 IGE 'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY X 78, LOC PRODUCTS-COMP/OP AGG $ 2,000,000 X oTHER:Jobsite Pollution Jobsite Pollution $ 1,000,000 A AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 85322286 07/01/201707/01/2018 CO accident) X ANY AUTO X X BODILY INJURY(Per person) $ ALL OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS AUTOS — NON-OWNED PROPERTY DAMAGE $ X HIRED AUTOS X AUTOS (Per accident) X MCS90 $ A X UMBRELLA LIAR X OCCUR X X 85322286 07/01/201707/01/2018 EACH OCCURRENCE $ 5,000,000 EXCESS LIAB CLAIMS-MADE AGGREGATE $ 5,000,000 11 BED X RETENTION$ -0- $ B WORKERS COMPENSATION X WC0030138-2017A 07/01/201707/01/2018 X ATUTF •RH ST AND EMPLOYERS'LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE LN E.L.EACH ACCIDENT $ 1,000,000 RN OFFICER/MEMBER EXCLUDED? N L A (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 1,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Project:Brushy Creek Phase 5 Wastewater Line The General Liability&Automobile policy contains a""Blanket Additional Insured""provision that establishes the scope of Additional Insured coverage granted to the Certificate Holder. Where permitted by state law,the Insurer waives its right to subrogate against the Certificate Holder by reason of payments made under the General Liability,Automobile&Workers Compensation policy,but only under the circumstances stated in the policy. _CERTIFICATE HOLDER CANCELLATION AI 014462 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN City of Round Rock ACCORDANCE WITH THE POLICY PROVISIONS. 221 East Main St. Round Rock TX 78664- AUTHORIZED REPRESENTATIVE __\---14A-0 Fax:( ) - ©1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014/01) The ACORD name and logo are registered marks of ACORD THE CITY OF ROUND ROCK Utilities & Environmental Services 2008 Enterprise Drive Round Rock, Texas 78664 SHEET: 1 of 1 BID OPENING PROJECT NAME : Brush Creek Phase 5 Wastewater Line LOCATION : 2008 Enterprise Drive BID DATE : 6/8/2017 TIME: 10:00am Contractor's Name Addendum(s) Statement of Bid Bond Base Bid Add Alternate Bid Total Safety AUSTIN ENGINEERING CO. - YES YES $144,618.00 - $144,618.00 COYOTE CONSTRUCTION - YES YES $249,911.00 - $249,911.00 JKB CONSTRUCTION - YES YES $320,346.00 - $320,346.00 PATIN CONSTRUCTION - YES YES $197,486.00 - $197,486.00 WHITESTONE CIVIL CONST. - YES YES $177,496.00 - $177,496.00 Awalker Partners engineers * surveyors 804 Las Cimas Parkway,Suite 150 Austin,Texas 78746 June 14, 2017 Mr. David Freireich, P.E. Chief Utility Engineer City of Round Rock 2008 Enterprise Drive Round Rock, Texas 78665 Re: Brushy Creek Phase 5 Wastewater Line Project Recommendation forAward of Construction Contract Dear Mr, Freireich, On June 8, 2017 Walker Partners assisted the City of Round Rock in opening bids for the above referenced project. Bids were received from five contractors, on time, and considered to be complete. The five bids were tabulated and checked for accuracy. Austin Engineering Company, Inc. of Austin, Texas is the low bidder, with a total base bid of$144,618.00. Evaluation of Austin Engineering Company, Inc. included a review of their technical qualifications and experience on projects of similar scope and size. Listed references were called and confirmed that Austin Engineering Co. performed quality and on-time work on previous projects. Austin Engineering Co. is using Suretec Insurance Company for bonding. Suretec is rated "A" (Excellent) by A.M. Best Rating Services. Based on the base bid being low, and the company evaluation, Walker Partners recommends award of the construction contract to Austin Engineering Company, Inc. Sincerely, Walker Partners Akk � - 6"'t Nicholas G. Kehl, P.E. Project Manager Cc: Eddie Zapata John H. Lindner, P.E. Project File www.WalkerPartners.com TBPE Registration No.8053 1 TBPLS Registration No.10032500 CERTIFICATE OF INTERESTED PARTIES FORM1295 lofl Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2017-232968 AUSTIN ENGINEERING CO., INC. AUSTIN,TX United States Date Filed: 2 Name of governmental entity or state agency that is a parry to the contract for which the form is 07/06/2017 being filed. CITY OF ROUND ROCK Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. BRUSHY CREEK PHASE 5 WASTEWATER LINE CONSTRUCTION 4 Nature of interest Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary 5 Check only if there is NO Interested Party. X 6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. ANGELA F. WALTON =t' Notary Public,State of Texas My Commission Expires/ ' ffjj(FF November 17 2019 �llll/111 Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP/SEAL ABOVE Sworn to and subscribed before me,by the said . r 'r r this the -- day of , 20 to certify which,witness my hand and seal of office. Signatureld officer administering oath Printed name of officer administering oath Title of offi er administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.883 CERTIFICATE OF INTERESTED PARTIES FORM 3.295 10f1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2017-232968 AUSTIN ENGINEERING CO., INC. AUSTIN,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 07/06/2017 being filed. CITY OF ROUND ROCK Date Acknowledged: 07/17/2017 g Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. BRUSHY CREEK PHASE 5 WASTEWATER LINE CONSTRUCTION 4 Nature of interest Name of Interested Party City,State,Country(place of business) (check applicable) Controlling I Intermediary 5 Check only if there is NO Interested Party. X 6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP/SEAL ABOVE Sworn to and subscribed before me,by the said this the day of 20 ,to certify which,witness my hand and seal of office. Signature of officer administering oath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.883