Loading...
CM-2015-724 - 3/27/2015City of Round Rock ROUNOROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 2 with Prota Construction, Inc. for the Reuse Water Transmission Main - Phase 2 Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 3/27/2015 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $5,020.50 Indexes: Self -Financed Water Construction Attachments: QA-CO#2 Prota ReuseWaterPh2 CM3.27.15 Department: Utilities and Environmental Services Text of Legislative File CM -2015-724 On January 23, 2014, Prota Construction, Inc. was awarded a construction contract for the Reuse Water Transmission Main - Phase 2 Project in the amount of $1,584,007.40. This project continues the City's efforts to provide Reuse Water to the developing Northeast area of Round Rock. This project consists of 13,295 feet of 24 -inch waterline. This waterline connects two existing lines, which include the Phase 1 Reuse Water line in Old Settlers Park and Phase 3 Reuse Water line near the intersection of A.W. Grimes and County Road 112. Due to the required steel encasement of the Reuse water line crossing Oncor's easement and the placement of an additional filling station, a Quantity Adjustment/Change Order (QA/CO) No. 1 in the amount of $38,600 was requested and approved on January 2, 2015. During construction, it became necessary to remove an existing fence on the permanent easement line and within the confines of the Temporary Construction Easement. As a result, this fence now needs to be replaced. In addition, a meter and backflow preventer were requested by the City's Utilities and Environmental Services Department in order to track usage at the reuse filling station located at the Parks and Recreation Department's maintenance facility in Old Settlers Park. This QA/CO No. 2 for $5,020.50 will increase the total adjusted contract amount to $1,627,627.90. The City has received federal grants from the Bureau of Reclamation that funds 25% of this City o1 Round Rock Page 1 Printed on 312612015 Agenda Item Summary Continued (CM -2015-724) projects total cost. Staff recommends approval. Cityo/ Round Rock Page 2 Printed on 3/2612015 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for SUI)IIIISS1011 of ALL City Council and City Manager Items Department Name: Utilities & Environmental Services Project Mgr/Resource: den Bell Council Action: ORDINANCE Agenda Wording City Manager Approval Project Name: Reuse Water Transnisslon Main - Phase 2 ContractorNendor Prota Conslruclion, Inc. RESOLUTION CMA Wording Consider executing quantity Adjustment/Change Order No. 2 with Prola Construction, Inc. for the Reuse Water Transmission Main - Phase 2 Project. Attorney Approval OAltorney DateL12ZI J� O:\wdox\SCClnts\0199\1409\MISC\00331075.XLS Updated 6/3/08 Contract Quantity Adjustment/ Change Order rev, 6.12 Department: Utilities & Environmental Services Project Name: City Project ID Number Justification 24" Reuse Water Transmission Main - Phase 2 Project PHS2 Pagel of 3 Date: 2/24/15 Change Order/Quantity Adjustment No. 2 )roperty owner requested additional changes to the Barb Wire Fence. City directed contractor to add 1 additional WM and BFP. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: 180 180 180 0 180 Antonio A. Prete, President, Waeltz & Prete Printed Name, Tide, Company $14,820.00 0.01 $4,780.50 0.00 $19,600.50 0.01 $1,627,627.90 $43,620.50 Contractor: P3 v L14ZS l L D l l of se Ll Signature Printed Name, Tittle, Company Date City Project Manager: Jeff Bell / Project Manager 3.0115 tur Printed Name, Title Date Mayor/City Manager: �•�� Signature Printed Name, Tide Date CM-0(315--1ay Page 2 oC j 150— Contract Quantity Adjustment/Change Order Project Name: 24" Reuse Water Transmission Main - Phase 2 Project Quan. Adj./Change Order No.: Page 3 of 3 Contract Quantity Adjustment/Change Order yen CbAE Project Name: 24" Reuse Water Transmission Main - Phase 2 Project Quan. Adj./Change Order No.: 2 J SETA NK AM AIV 9201 H%VV 183 SO.*AUSTIN, TEXAS 78747 II) 2d129nn * rrr � c n am ems w c. v ., Re Use Transmission Phase 2 Date: 213/2015 Metalink is to furnish all materials and equipment to furnisltilnstall 6 strand Barbwim Fencing R H Braces. Specifications: 2 318" Schedule 40 Pipe H Brace Green T Posts # 133 LB @ 10 LF 5 Bar Field Gates Scope of Work FumishAnstail 626 LF of 6 Strand Barbwire Fence 6 Strand Barbwire Fence @ $ 3.75 per LF T Schedule 40 Pipe Intimate Posts 4 pt. 12'/° Ga. Galy. Barbwire Add: 2" Intermediate Posts to existing 610 LF of fence every 50 LF Remove T Posts & Add 2" Intermediate Posts Fumishllnstall 1 qty. Single H Brace Furnish/Install2 qty. 12 LF Single Field Gate (5 Bar) Includes 2 qty. Single H Braces ea. 12 LF Gate @ $ 625.00 ea. (446 $ 2,3.00 Z� 3 c(7 • S D $ 978.00 $ 205.00 $1,250.00 Tota(: $.4,791:90 14 t 7 90, S- 0 Please Note: Excludes Clearing, grading, surveying, sleeves, core drilling and slecin'cal grounding. Please Nola that sales taxes are not reflected above and would apply if applicable. Metallnk Is a WBEIDBEIHUD Certified Company Submitted by: Toni Dietrich Matelink Corporation Y&/JNL.METALINKTX.CQM. Thank you for the Opportunityl Quote Valid for 30 days