R-2017-4655 - 8/10/2017 RESOLUTION NO. R-2017-4655 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with HDR Engineering, Inc. for the Mays at Gattis School Road Intersection Improvements Project, and WHEREAS, HDR Engineering, Inc. has submitted Supplemental Contract No. 1 to the Contract to modify the provisions for the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 1 with HDR Engineering, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 1 to the Contract with HDR Engineering, Inc., a copy of same being attached hereto as Exhibit"A"and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 10th day of August, 2017. 1",01 1A Z, CRAIGORGA , ayor City of ound R , Texas ATTEST: SARA L. WHITE, City Clerk 0112.1704.00392977 EXHIBIT "A» STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HDR ENGINEERING,INC. (�°Engineer") ADDRESS: 810 Hesters Crossing, Suite 120, Round Rock.TX 78681 PROJECT: Mays at Gattis School Road Intersection Improvements This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and HDR Engineering Inc., hereinafter called the"Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 20th day of November, 2012 for the Mays at Gattis School Road Intersection Improvements Project in the amount of$599,904.80; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by$91,160.00 to a total of$691,064.80 as set forth herein; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended by adding additional tasks set forth in the attached Addendum to Exhibit B. II. Article 4, Compensation and Exhibit D Fee Schedule shall be amended by increasing by $91,160.00 the total amount payable under the Contract for a total of$691,064.80 and as shown by the attached Addendum to Exhibit D and as set forth below: A. The lump sum amount payable under the Contract shall be increased by$60,878.00. B. An hourly amount shall be added to the Contract for Construction Phase Services described in the attached Addendum to Exhibit B in an amount not-to-exceed $30,282.00. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Rev.06'16 0199.1285;00382027 84275 1 HDR ENGINEERING,INC. By: Date Supplemental Contract Rev.O&16 0199.1285;00382027 84275 CITY OF ROUND ROCK APPROVED AS TO FORM: By: Craig Morgan, Mayor Stephan L. Sheets, City Attorney Date Supplemental Contract Rev.06/16 0199.1285;00382027 84275 ADDENDUM TO EXHIBIT B Engineering Services Attached Behind This Page EXHIBIT B The Lump Sum work to be performed by HDR Engineering, Inc. (ENGINEER) for this work shall consist of providing engineering services for the updated plans and traffic control sheets, a waterline relocation, project management, and bid phase services. I. FINALIZE PS&E PACKAGE FOR RIGHT TURN LANE AND TRAFFIC CONTROL PLAN UPDATESADJUSTMENT OF WATERLINE A. Update details for the final plans and for the Traffic Control Plans for Gattis School Rd. Right Turn Lane. II. PREPARE PS&E FOR ADJUSTMENT OF WATERLINE A. Prepare details for the water line relocation to facilitate the Gattis School Rd. Right Turn Lane. III. BID PHASE SERVICES (ONE PS&E) PACKAGE A. Prepare an advertisement for two local newspapers. B. Maintain a plan holders list, attend the pre-bid conference and bid opening. C. Distribute Contract documents to potential bidders. D. Respond to bidder's questions and prepare Addenda as necessary. E. Tabulate the qualified bids. F. Prepare an award recommendation. G. Prepare conformed Contract documents once an award has been made by the CITY. H. Attend Pre-construction meeting. The CITY shall provide the latest version of bidding documents for use in preparing the Project Manual. IV. PROJECT MANAGEMENT A. Perform general Project Management during the course of the project to include coordination with the City, preparing invoices, and management of subconsultants. B. Preparation of project correspondence including reports, record keeping, and letters as necessary. C. Perform QA/QC of deliverables prior to submittal to the CITY. Implement a documented QA/QC program in accordance with the ENGINEER's established procedures. D. Attend monthly project progress and coordination meetings with the CITY as required during project development. City of Round Rock Page 1 of 2 Gattis School Rd Turn Lane The hourly work to be performed by HDR Engineering, Inc. (ENGINEER) for this work shall consist of providing construction phase services. V. CONSTRUCTION PHASE SERVICES A. Review RFI's and provide responses. B. Provide clarifications to questions. C. Review Pay estimates. D. Attend up to 4 periodic field meetings when requested. E. Perform final project walkthrough. F. Attend up to 4 periodic project progress and coordination meetings with the CITY during construction. G. Preparation of project correspondence including reports, record keeping, and letters as necessary. Deliverables Required of the ENGINEER The ENGINEER will be required to provide the following deliverable items: A. Provide PDF of final plans and project manual B. Provide a set of electronic and printed conformed documents to the City C. Provide written responses to BFI's. City of Round Rock Page 2 of 2 Gattis School Rd Turn Lane ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page CD C) 0 0 0 0000 00 6 c6 6 c6 N c" m CO co co co It qt co C14 C'4 Ld (d (d C4 6 CVI') 0 r r r r (Y) 40 U>6%).V> 6% 604 0 0 CD 0 0 Cl 0 61> 61W 6 ci U) w U) 0 0 0 0 0 0 C) 0 0 0 C) C) 40 0 Q CA U) C: 0 L) C) 0 0 0 Olo 0 0 0 a 0 0 M 6 c6 (6 o6 N O E— m Cl) to co co 00) 0 (0 0It 'It (D 04 04 C1 r (d (d C'4- 0 LU 4) ce) 0) 0 04 46 0 x 0 CY) co co Nr 0) 0 b. C) 0 a Lr) 0 — — — r LO CD m 0) m m -J, O 0 U m c H bD UJ > 40 C CC Ln 0 c a) uLJ w -C _j 0 > OD CL N z " mCt a) 0 V) C:M o 0 -C 0) (U u C V) u Ln N u fa :E 4� =3 a Z MA V) C m 0 m wl E E D F m tA > :�-— = H Z 0. — > E Ln tn LA LA 0= Ln 0 0 Exhibit D Project Name: Gattis School Fd Right Turn Lane Consultant: HDR Engineering,Inc. Totalcw��mn�u�nvu� Hours Project Principal O Project Manager 120 Senior Engineer. 160 Design Engineer so Engineer-in-Training 47 Sr.Design Technician 8 CADDToohn/cion rn Clerical/Steno 46 Total Hours 519 Cost Component,Dollars Billing Totals Rate Project Principal $280 *0.00 Project Manager $256 $30.720.00 Senior Engineer $215 $34.400.00 Design Engineer $155 $9.610.00 Engineer-in-Training $110 $5.170.00 Sr.Design Technician $120 $9e0u0 CADDTonhnician $Ou $7.448.00 C|ohou|XStemo $62 $2.852.00 Labor Dollars $91,160.00 Cost Component,Direct Expenses Total Travel Expenses(Mileage billed atIRS Standard Rate) $O Traffic Counts $0 Printing $ TOTAL DIRECT EXPENSES $0.00 PROJECT FEE SUMMARY Total HDR Direct Labor Costs $31,695.04 HDR Indirect Labor Costs $49,697.82 HDR Direct Expenses $0.00 HDR Profit@12% 12% $9,767.14 TOTAL FEE $91,160.00 Lump Sum Fee $60,878.00 Hourly Fee $30,282.00 TOTAL FEE $91,160.00 Page uofo