R-2017-4693 - 8/24/2017 RESOLUTION NO. R-2017-4693 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with Atkins North America, Inc. for the E. Bagdad Avenue Extension Project, and WHEREAS, Atkins North America, Inc. has submitted Supplemental Contract No. 4 to the Contract to modify the provisions for the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 4 with Atkins North America, Inc.,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 4 to the Contract with Atkins North America, Inc., a copy of same being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 24th day of August, 2017. -/Z� CRAIOR , Mayor City o Roun ock, Texas ATTEST: Im. " SARA L. WHITE, City Clerk 0112.1704;00383885 EXHIBIT „A„ STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 4 TO CONTRACT FOR ENGINEERING SERVICES FIRM: ATKINS NORTH AMERICA,INC. ("Engineer") ADDRESS: 1_1801 Domain Boulevard, Suite 500, Austin, TX 78758 PROJECT: E. Bagdad Avenue Extension This Supplemental Contract No. 4 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Atkins North America, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 24th day of September, 2015 for the E. Bagdad Avenue Extension Project in the amount of$104,700.41; and WHEREAS,the City and Engineer executed Supplemental Contract No. 1 on March 10, 2016 to amend the scope of services and to increase the compensation by $326,360.94 to a total of $431,061.35; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on September 8, 2016 to amend the scope of services and to increase the compensation by$85,675.85 to a total of $516,737.20; and WHEREAS, the City and Engineer executed Supplemental Contract No. 3 on April 3, 2017 to amend the work schedule; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by$199,281.31 to a total of$716,018.51; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Supplemental Contract Rev.06/16 0199.1539;00383246 84275 1 II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $199,281.31 the lump sum amount payable under the Contract for a total of $716,018.51, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] Supplemental Contract Rev.06/16 0199.1539;00383246 84275 2 ATKINS NORTH AMERICA, INC. By: Date Supplemental Contract Rev.06/16 0199.1539;00383246 84275 3 CITY OF ROUND ROCK APPROVED AS TO FORM: By: Craig Morgan, Mayor Stephan L. Sheets, City Attorney Date Supplemental Contract Rev.06/16 0199.1539;00383246 84275 4 ADDENDUM TO EXHIBIT B Engineering Services PROJECT DESCRIPTION The proposed project will include a new location 3-lane extension of McNeil Rd between Mays St and S Black St as well as the widening of S Georgetown St to 3-lanes between S Black St and E Main St. Lampasas St will be extended from its current termini at Bagdad Ave to the new McNeil Rd extension. Lewis St and Stone St will also be extended to connect to McNeil Rd. The approximate length of the project is 0.54 miles. This supplemental removes the Sheppard St extension from the project and separates the project into two phases. The first phase will include all the improvements west of and including the intersection at Burnet St. The second phase will include the proposed improvements east of Burnet St. TASK 1: PROJECT MANAGEMENT 1. Prepare monthly project status updates and invoices. 2. Manage sub-consultants. TASK 2: SURVEYING No changes with this supplemental. TASK 3: ENVIRONMENTAL STUDIES No changes with this supplemental. Previously completed. TASK 4: PRELIMINARY DESIGN/30% PLANS No changes with this supplemental. Previously completed. TASK 5: DIRECT EXPENSES 1. TCEQ WPAP Application fee TASK 6: GEOTECHNICAL DESIGN 1. Test borrow material from the City of Round Rock stockpile to verify it meets the requirements of class A material. All the field sampling and laboratory tests will be performed according to typical geotechnical standards, where applicable, or with other well established procedures. HVJ will test the material as required for Atterberg Limits (ASTM D4318), gradation(ASTM D422), and compaction properties (ASTM D698). 2. Provide an alternate pavement design for Phase 2. This design will include a combination of LTS and removal and replacement with select fill. The LTS layer will be set as 8", and the resulting depth of removal and replacement will be calculated to minimize PVR. The design will be based on design traffic loads as defined in HVFs final design report for the project as well as geotechnical borings and lab testing results. Page 1 of 4 TASK 7: 60% PLANS No changes with this supplemental. Previously completed. TASK 8: 95% PLANS (Replace previous scope for Task 8 with the following) All Disciplines 1. Address comments from the City of Round Rock 60%review. 2. Remove the Sheppard St extension from the project. 3. Revise the Lampasas St typical section to include in each direction of travel an 11' lane, an 8' wide parallel parking area, 2' curb and gutter, 5' sidewalk and 2' buffer. The Lampasas St alignment between McNeil Rd and Bagdad Ave will also be revised to accommodate the needs of The Depot Townhomes. The resulting alignment includes one horizontal curve that does not meet 30 mph, so a design exception will be prepared. 4. Remove landscaping, irrigation and sidewalk along the south side of McNeil between station 17+00 and Burnet St. 5. Develop 95% plans for phase 1 which includes work west of and including the Burnet St intersection. Develop 95% plans for phase 2 which includes work east of Burnet St. An interim design will be included at Burnet St to accommodate the temporary condition created upon the completion of Phase 1 before Phase 2 is constructed. The ultimate design at Burnet St will be included in Phase 2. The interim condition will reflect temporary signing, striping and drainage improvements. The existing ditch east of Burnet St will need to be regraded to accommodate the interim design. 6. Complete redesign of water and wastewater improvements to accommodate The Depot Townhomes design. 7. Partial redesign of storm water system to accommodate changes in the water and wastewater design. 8. Update drainage report to document phasing of project and address previous comments. 9. Add roadway lighting east of Burnet St(Phase 2). 10. Revise design speed from 25 mph to 30 mph and develop necessary design exception requests. There are two horizontal curves on McNeil Rd and one horizontal curve on Lampasas St (See note#3)that will not meet a 30 mph design speed. 11. Continue development and detailing of sheets. 12. Prepare construction cost estimate, specifications, and general notes. 13. Atkins will provide Storm Water Pollution Prevention Plans (SWPPP) to minimize sediment discharge from the project area during construction in accordance with best management practices. TASK 9: 100% PLANS/FINAL SUBMITTAL (Replace previous scope for Task 9 with the following) All Disciplines 1. Address comments from the City of Round Rock 95%review of the phase 1 and 2 plans. Page 2 of 4 2. Prepare construction cost and construction time estimates. 3. Prepare specifications and general notes. 4. Prepare bid packages for Phase 1 and Phase 2. TASK 10: WATER QUALITY PLANS AND WATER POLLUTION ABATEMENT PLANS (WPAP) No changes with this supplemental. TASK 11: LANDSCAPING AND IRRIGATION PLANS 1. Landscaping and irrigation will be removed from the project TASK 12: BARRIER WITH FENCE 1. If necessary, Atkins will prepare a detail, special specification and design for a proposed barrier with a fence on top along the railroad ROW from Mays Street to Burnet Street. The details of this barrier and fence are to be determined, so an assumed level of effort is included in this supplemental. Atkins will only invoice for work under this task based on the actual effort required to prepare the fence design, details and specifications. Any budget remaining will not be invoiced. If the assumed budget is insufficient, a supplemental will be necessary. NOT INCLUDED WITHIIN THIS SCOPE The following items are not included with this scope. These items, if necessary, would be added to the scope through a supplemental agreement. 1. The project team assumes the project will be constructed using local funding sources and will not require any federal permitting. 2. TxDOT environmental document 3. Environmental permitting or agency coordination other than TCEQ coordination for WPAP approval 4. Concrete fence plans 5. Public involvement 6. Storm water detention design or associated plans DELIVERABLES Project Management No changes with this supplemental. 95% Submittal 1. Electronic submittal and two 11"X 17" plan sets to include all revised plan sheets and cross sections. Separate submittals will be made for the phase 1 and phase 2 projects. 2. Revised drainage report submitted with each project phase. 3. 95% construction cost estimate for phase 1 and phase 2 projects Page 3 of 4 4. A list of Specifications, Special Provisions and General Notes 100% Submittal 1. Electronic submittal and two final signed and sealed sets of 11"X 17" full-scale paper drawings for the phase 1 and phase 2 projects. Specifications and special provisions will be complete and suitable for bidding and award of a construction contract. 2. One electronic file of drawings, cross sections and supporting data 3. 100% cost estimate for each phase 4. Construction time estimate for each phase 5. Bid packages for each phase Water Ouality No changes with this supplemental. Landscaping and Irrigation No changes with this supplemental. Page 4 of 4 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page E BAGDAD AVE EXTENSION SUPPLEMENTAL#4 ID Task Name Start Finish 2015 2016 2017 1 NTP _ ....... .. __...__. ........... ___ Q3_ Q4 ._. Ql. ..... QZ... ... Q3.... Q4 ....... Ql...... Q2............ ... .._.....A3 ............44.......... Ql...... Tue 9/29/15 Tue 9/29/15 2 :Anticipated NTP Supplemental#1 Wed 9/30/15 Wed 9/30/15 1` 3 Anticipated NTP Supplemental#2 Mon 9/12/16 Mon 9/12/16 "IT 4 Anticipated NTP Supplemental#4 Thu 8/24/17 Thu 8/24/17 g.. 5 Survey Wed 9/30/15 Fri 5/6/16 6 Environmental Tech Memo Thu 10/1/15 Mon 5/9/16 i 7 Prepare 30%Plans Thu 10/1/15 Tue 7/5/16 8 Roadway&Drainage Design Thu 10/1/15 Fri 6/3/16 9 QA/QC Mon 6/6/16 Fri 6/10/16 10 Submit 30%Plans and Environmental Tech Memo Mon 6/13/16 Mon 6/13/16 11 City Review 30%Plans and Environmental Tech Memo Tue 6/14/16 Fri 7/1/16 12 Meet with City to Review 30%Plans and Environmental Tue 7/5/16 Tue 7/5/16 "' 13 Geotech Pavement Design Mon 3/21/16 Fri 7/1/16 14 Prepare 60%Plans Tue 9/13/16 Fri 12/9/16 15 Roadway,Traffic,Utility&Drainage Design Tue 9/13/16 Wed 10/19/16 16 QA/QC Thu 10/20/16 Wed 10/26/16 17 Submit 60%Plans Thu 10/27/16 Thu 10/27/16 18 City Review 60%Plans Fri 10/28/16 Thu 12/8/16 19 Meet with City to Review 60%Plans Fri 12/9/16 Fri 12/9/16 20 Prepare 95%Plans Phase 1 Mon 12/12/16 Fri 5/5/17 21 Roadway,Traffic,Utility&Drainage Design Mon 12/12/16 Fri 4/7/17 " 22 QA/QC Mon 4/10/17 Thu 4/13/17 23 Submit 95%Plans Fri 4/14/17 Fri 4/14/17 24 City Review 95%Plans Mon 4/17/17 Fri 5/5/17 25 Prepare 100%Plans Phase 1 Fri 5/19/17 Fri 9/22/17 ---+-1 26 Roadway,Traffic,Utility&Drainage Design Fri 5/19/17 Thu 9/14/17 27 QA/QC Fri 9/15/17 Thu 9/21/17 28 Submit 100%Plans Fri 9/22/17 Fri 9/22/17 y, 29 Water Pollution Abatement Plan Tue 9/13/16 Mon 11/6/17 - - - --- - Mon Tue 11/7/17 M12/11/17 30 Bid Phase Services 31 Prepare 95%Plans Phase 2 Fri 8/25/17 Mon 11/20/17 r---y 32 Roadway,Traffic,Utility&Drainage Design Fri 8/25/17 Fri 10/20/17 33 QA/QC Mon 10/23/17 Fri 10/27/17 a 34 Submit 95%Plans Mon 10/30/17 Mon 10/30/17 35 City Review 95%Plans Tue 10/31/17 Mon 11/20/17 36 :Prepare 100%Plans Phase 2 Tue 11/21/17 Wed 3/7/18 37 Roadway,Traffic,Utility&Drainage Design Tue 11/21/17 Mon 1/15/18 38 QA/QC Tue 1/16/18 Tue 1/30/18 39 Submit 100%Plans Wed 1/31/18 Wed 1/31/18 ®' 40 Bid Phase Services Thu 2/1/18 Wed 3/7/18 �' ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page E BAGDAD AVE EXTENSION SUPPLEMENTAL#4 EXHIBIT D Project Name: E Bagdad Ave Extension Total Total Other TOTALS Task Labor Hours Loaded Labor Cost Direct Costs Subconsultants Task 1: Project Management 38.0 $6,714.73 $6,714.73 Task 5: Direct Expenses $4,000.00 $4,000.00 Task 6: Geotechnical Design $5,700.00 $5,700.00 Task 8: 95% Plans 929.0 $113,358.93 $113,358.93 Task 9: 100% Plans/Final Submittal 434.0 $53,401.521 $53,401.52 Task 12: Barrier with Fence 133.0 $16,106.13 $16,106.13 GRAND TOTAL: 1534 $189,581.31 $4,000.00 $5,700.00 $199,281.31 Overhead Rate= 157.53% Atkins Raw Labor= $ 65,727.89 Profit Rate= 12% Atkins Overhead= $ 103,541.15 Atkins Profit= $ 20,312.27 Atkins Total Labor= $ 189,581.31 Page 1 E BAGDAD AVE EXTENSION SUPPLEMENTAL#4 EXHIBIT D Task 1: Project Management Task Description Project Design Design CADD GIS Admin/ Total Manager Engineer EIT Operator Graphics Clerical Hours Rates $ 75.00 $ 43.27 $ 32.50 $ 25.74 $ 25.00 $ 31.50 A. Project Management 1. Prepare monthly project status updates and invoices 18 6 24 2. Manage sub-consultants 8 6 14 Totals 26 12 38 Raw Labor $1,950.00 $ - $ - $ - $ - $ 378.00 $ 2,328.00 Multiplier 2.88 2.88 2.88 2.88 2.88 2.88 $ 5,624 $ - $ - $ - $ - $ 1.090 $ 6,714.73 Page 2 E BAGDAD AVE EXTENSION SUPPLEMENTAL#2 EXHIBIT D Task 5: Direct Expenses Direct Cost Unit Quantity Unit Price Total Site Visits&Meetings Mileage Mile $0.575 $0.00 Permits/Fees TCEO W PAP Application fee EA 1 $4,000.00 $4,000.00 Printing Exhibits Color on Bond SF $5.00 $0.00 Photocopies B/W 8.5 X 11 EA $0.05 $0.00 Photocopies B/W 11 X 17 EA $0.10 $0.00 Mylar Plots 11 X 17 EA $2.50 $0.00 Overnight Mail-letter size EA $17.50 $0.00 Overnight Mail-oversized box EA $35.00 _ $0.00 Courier Services EA $37.501 $0.00 Total Direct Expenses $4,000.00 Page 3 E BAGDAD AVE EXTENSION SUPPLEMENTAL#4 EXHIBIT D TASK 8:95%PLANS Senior Senior Senior Task Description Project I Engineer Senior Design Design Eng CADD CADD GIS Admin/ Total Manager 1 (QAQC) Engineer Engineer EIT Tech Operator I Operator Graphics Clerical Hours Rates $ 75.00 $ 62.10 $ 51.53 $ 43.27 $ 32.50 $ 43.23 $ 43.26 $ 25.74 $ 25.00 $ 31.50 A. Roadwa 1. Remove Sheppard St extension 2 2 4.0 2. Separate plans into 2 phases and develop additional sheets a.Cover 1 2 2 5.0 b.Index 4 4 8.0 c.General notes 1 2 8 11.0 d.Project layout 2 4 6.0 e.Typical sections 1 4 4 9.0 f. Quantities 8 8 16.0 g.Construction sequence/TCP 2 1 16 16 35.0 h.Roadway P&P 6 sheets 4 12 12 24 52.0 1.Cross Sections 1 20 21.0 j.Standards 2 2 4.0 k.Cost estimate 4 16 20.0 3. Revise design speed to 30 mph 2 4 4 10.0 4. Prepare separate submittal packages for each phase cost estimate&spec lists 4 2 8 16 30.0 5. QA/QC 2 16 16 16 50.0 B. Drainage 1. Remove Sheppard St extension 2 2.0 2. Separate plans into 2 phases and develop additional sheets a.Quantities 8 8.0 b.Drainage P&P sheets 40 26 66.0 c.Interim/Ultimate outfall and ditch design 5 26 31.0 d.SWPPP and erosion control plans 6 6.0 3. Storm water redesign to accommodate water/wastewater redesign required for The De of 40 40.0 4. Revise drainage report to address phasing of project 20 20.0 5. Prepare separate submittal packages for each phase cost estimate&spec lists 2 2.0 6. QA/QC 12 10 22.0 C.Utilities 1. Redesign water and wastewater improvements to accommodate The Depot 37 43 62 142.0 2. Separate plans into 2 phases and develop additional sheets a.Quantities 8 8.0 b.Water/wastewater P&P sheets 21 39 45 105.0 3. Continue utility coordination 16 5 4 25.0 4. Continue developer coordination 8 4 5 17.0 5. QA/QC 16 4 20.0 D. Traffic 1. Remove Sheppard St extension 2 8 10.0 2. Separate plans into 2 phases and develop additional sheets a.Quantities 8 8.0 b.Signing&Pavement Marking sheets 4 36 40.0 3. Add roadway lighting east of Bumet St 1 16 52 68.0 4. QA/QC 8 8.0 Totals 17.0 52.0 255.0 112.0 309.0 116.0 1 68.0 929.0 Raw Labor $1,275.00 $3,229.20 $13,140.15 $ 4,846.24 $10,042.50 $ - $5,018.16 $1,750.32 $ - $ - $ 39,301.57 Multiplier 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 $ 3,678 $ 9,31-1 $ '37.901 S 13.978 28.966 S Sm 1.1,474 5.0,19 S ;b 113 35F's.93 Page 4 E BAGDAD AVE EXTENSION SUPPLEMENTAL#4 EXHIBIT D TASK 9:100%PLANS Project Senior Senior Design gn Design Senior Senior CADD GIS Admin/ Total Task Description Engineer Eng CADD Manager ginee Engineer Engineer EIT Tech Operator Operator Graphics Clerical Hours Rates $ 75.00 $ 62.10 $ 51.53 $ 43.27 $ 32.50 $ 43.23 $ 43.26 $ 25.74 $ 25.00 $ 31.50 A. 111""ay 1. Address comments on new phase 2 sheets a.Cover 1 2 3.0 b.Index 1 3 4.0 c.General notes 1 4 5.0 d.Project layout 1 2 3.0 e.Typical sections 1 2 3.0 f. Quantities 1 8 10 19.0 g.Constructions uencefl-CP 2 1 4 8 15.0 h.Roadway P&P 4 1 2 4 11.0 L Cross Sections 8 8.0 j.Standards k.Cost estimate 1 8 9.0 2. Prepare separate submittal packages for each phase cost estimate&spec lists 4 8 8 20.0 3. Prepare bid packages for phases 1 and 2 8 20 40 68.0 4. Prepare construction time estimate for phase 2 2 24 26.0 5• QA/QC 2 12 8 8 30.0 B.Drainage 1. Address comments on new phase 2 sheets a.Quantities 4 1 4.0 b.Drainage P&P sheets 8 16 24.0 c.Interim/Ultimate outfall and ditch design 4 8 12.0 d.SWPPP and erosion control plans 8 8 1 16.0 2. Prepare separate submittal packages for each phase cost estimate&spec lists 2 2.0 3. QA/QC 12 8 20.0 C.Utilities 1. Address comments on new phase 2 sheets a.Quantities 3 3.0 b.Water/wastewater P&P sheets 7 25 9 41.0 2. Continue utilitycoordination 4 4.0 3. QA/QC 8 2 1 10.0 D.Traffic 1. Address comments on new phase 2 sheets a.Quantities 6 6.0 b.Signing&Pavement Marking sheets 2 28 30.0 d.Roadway lighting east of Burnet St 4 28 32.0 2. QA/QC 6 6.0 Totals 27.0 38.0 82.0 64.0 183.0 9.0 31.0 434.0 Raw Labor $2,025.00 $2,359.80 $ 4,225.46 $ 2,769.28 $ 5,947.50 $ - $ 389.34 $797.94 $ - $ - $ 18,514.32 Multiplier 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 5.841 $ 6,906 $ 12.188 $ 7,988 $ 17.155 $ $ 1,12' S 2.302 $ - $ 53.40`52 Page 5 E BAGDAD AVE EXTENSION SUPPLEMENTAL#4 EXHIBIT D TASK 12:BARRIER WITH FENCE Senior Senior Senior Task Description Project Engineer Senior Design Design Eng CADD CADD GIS Admin/ Total Manager (QAQC) Engineer Engineer EIT Tech Operator Operator Graphics Clerical Hours Rates $ 75.00 $ 62.10 $ 51.53 $ 43.27 $ 32.50 $ 43.23 $ 43.26 $ 25.74 $ 25.00 $ 31.50 A.Barrier with Fence 1. Prepare fence details 2 16 16 32 66.0 2. Prepare fencespecification 2 8 16 26.0 3. Add fence to plans and quantifies 8 16 24.0 4. QA/QC 1 4 4 8 17.0 Totals 5.0 4.0 24.0 44.0 56.0 1 133.0 Raw Labor $ 375.00 $ 248.40 $ 1,236.72 $ 1,903.88 $ 1,820.00 $ - $ - $ - $ - $ - $ 5,584.00 Multiplier 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 $ 1,082 $ 716 $ 3 i67 $ 5,491 $ 5.-'4-i ti $ - z $ 16.106.13 Page b