Contract - Capital Excavation Company - 4/6/2015
City of Round Rock, Texas Contract Forms Standard Form of Agreement: Section 00500 City of Round Rock, Texas Standard Form of Agreement between Owner and Contractor AGREEMENT made as of the �LILO (0 )day of in the year 201-5 14 BETWEEN the Owner: City of Round Rock,Texas(hereafter"Owner"or"City") 221 East Main Street Round Rock,Texas 78664 and the Contractor C)0Y4VQhQ-Y-1 CD ("Contractor") _e L -Burtal The Project is described as: Creek Bend Blvd Extension The Engineer is: ATKINS 6504 Bridge Point Pkwy,Suite 200 Austin,TX 78730 For and in consideration of the mutual terms, conditions and covenants of this Agreement and all accompanying documents between Owner and Contractor, the receipt and sufficiency of which are hereby acknowledged,Owner and Contractor agree as follows: ARTICLE I THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement; these form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications,appears in Article 7. ARTICLE 2 THE WORK OF THIS CONTRACT Contractor shall fully execute the Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others. 00500 8-2012 Page I of 5 Standard Form of Agreement 00196575 ARTICLE 3 DATE OF COMMENCEMENT;DATE OF SUBSTANTIAL COMPLETION;.DATE OF FINAL COMPLETION 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a Notice to Proceed issued by Owner. 3.2 The Contract Time shall be measured from the date delineated in the Notice to Proceed. 3.3 Contractor shall commence Work within ten ( 10 ) calendar days from the date delineated in the Notice to Proceed. %reement Il achieve Substantial Completion) items of Work listed on Attachment A to this Contractor sha ac e Su p no later than ( ) calendar days from issuance by Owner of Notice to Proceed, and Contractor shall achieve Substantial Completion of the entire Work no later than four hundred thirty five4( 35 ) calendar days from issuance by Owner of Notice to Proceed, subject to adjustments of this Contract Time as provided in the Contract Documents. 3.5 If Contractor fails to achieve Substantial Completion of the Work(or any portion thereof)on or before the date(s) specified for Substantia Completion in the Agreement, Contractor shall pay to Owner, as liquidated damages, the sum of one thousand one hundred twenty five and No/100 Dollars($ 1125.00 )for each calendar day that Substantial Completion is delayed after the date(s) specified for Substantial Completion. It is hereby agreed that the liquidated damages to which Owner is entitled hereunder are a reasonable forecast of just compensation for the harm that would be caused by Contractor's failure to achieve Substantial Completion of the Work(or any portion thereof)on or before the date(s)specified for Substantial Completion in the Agreement. It is agreed that the harm that would be caused by such failure, which includes loss of expected use of the Project areas, provision of alternative storage facilities and rescheduling of moving and occupancy dates, is one that is incapable or very difficult of accurate estimation. It is hereby agreed that if Substantial Completion of the Work(or any portion thereof)is not achieved on or before thirty(30)days after the date(s) specified for Substantial Completion in the Agreement, the Owner shall have the option to either collect liquidated damages as set forth herein or to thereafter rely on its remedies under the Contract Documents and at law and in equity, including without limitation, the recovery of actual damages. The date(s) specified for Substantial Completion of the Work(or any portion thereof)in the Agreement shall be subject to adjustment as provided in the Contract Documents. 3.6 Contractor shall achieve Final Completion of the entire Work no later than our hundred fifty 45( 0_)calendar days from issuance by Owner of Notice to Proceed. ARTICLE 4 CONTRACT SUM 4.1 Owner shall pay Contractor Contract Su i in curt funds for Contracto ' performance�f the Contract, The Con actSu shall be I`GJ�/1 � �NL�. � I (,Q o o ($ d •6 bject t an ditions deductions as provide in the ontract Documents. 4.2 The Contract Sum is based upon the following alternates which are described in the Contract Documents and are hereby accepted by Owner: ! � r Page 2 of 5 ARTICLE 5 PAYMENTS 5.1 PROGRESS PAYMENTS 5.1.1 Based upon Applications for Payment submitted to Engineer and Owner by Contractor, and.Certificates for Payment issued by Engineer and not disputed by Owner and/or Owner's lender, Owner shall make progress payments on account of the Contract Sum to Contractor as provided below,in Article 14 of the City of Round Rock General Conditions,and elsewhere in the Contract Documents. 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month. 5.1.3 Provided that an Application for Payment is received by Engineer and Owner, and Engineer issues a Certificate of Payment not later than the tenth(10th) day of a month, Owner shall make payment to Contractor not later than the tenth(10th)day of the next month. If an Application for Payment is received by Engineer and Owner after the application date fixed above,payment shall be made by Owner not later than one month after the Engineer issues a Certificate for Payment. 5.1.4 Each Application for Payment shall be based on the most recent ues submitted by Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as Engineer and Owner may require. This schedule, unless objected to by Engineer or Owner,shall be used as a basis for reviewing Contractor's Applications for Payment. 5.1.5 Applications for Payment shall warrant the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. 5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as provided in Article 14 of the City of Round Rock General Conditions. 5.1.7 Except with Owner's prior written approval, Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. 5.2 FINAL PAYMENT 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by Owner to Contractor when: .1 Contractor has fully performed the Contract except for Contractor's responsibility to correct Work,and to satisfy other requirements,if any,which extend beyond final payment;and .2 a final Certificate for Payment has been issued by Engineer. 5.2.2 Owner's final payment to Contractor shall be made no later than thirty (30) days after the issuance of Engineer's final Certificate for Payment. In no event shall final payment be required to be made prior to thirty(30) days after all Work on the Contract has been fully performed.Defects in the Work discovered prior to final payment shall be treated as non-conforming Work and shall be corrected by Contractor prior to final payment, and shall not be treated as warranty items. ARTICLE 6 TERMINATION OR SUSPENSION 6.1 The Contract may be terminated by Owner or Contractor as provided in Article 15 of the City of Round Rock General Conditions. Page 3 of 5 N III 6.2 The Work may p y as en be suspended b Owner provided in Article 15 of the City of Round Rock General Conditions. ARTICLE 7 ENUMERATION OF CONTRACT DOCUMENTS 7.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: 7.1.1 The Agreement is this executed version of the City of Round Rock, Texas Standard Form of Agreement between Owner and Contractor,as modified. 7.1.2 The General Conditions are the "City of Round Rock Contract Forms 00700," General Conditions, as modified. 7.1.3 The Supplementary, Special, and other Conditions of the Contract are those contained in the Project Manual dated January 20,2015 7.1.4 The Specifications are those contained in the Project Manual dated January 2Q 2015 _ 7.1.5 The Drawings,if any,are those contained in the Project Manual dated January 20 2015 7.16 The Insurance nstruction Bond Forms of the Contract are those contained in the Project Manual dated IL . an e c &C�� I� 7.1.7 The Notice to Bi,d$®rs,Instructions to Bidders, id Form and Addenda,if any,are those contained in the Project Manual dated 7.1.8 If this Agreement covers construction involving federal funds, thereby requiring inclusion of mandated contract clauses, such federally required clauses are those contained in the "City of Round Rock Contract Forms 03000,"Federally Required Contract Clauses,as modified. 7.1.9 Other doc ments,[ir orming part ofthe Co tract Do= ents as follows: ARTICLE 8 MISCELLANEOUS PROVISIONS 8.1 Where reference is made in this Agreement to a provision of any document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. 8.2 Owner's representative is: Leah Collier Project Manager City of Round Rock Transportation Department Te1:512-341-3318 leollier(ir)roundrocktexas.gov 8.3 Contractor's representative is: /MY 04 A3'i TIoL. �GAvn►'r�0�•1 yk o — 1-4-1 8.4 Neither Owner's nor Contractor's representative shall be changed without ten (10) days' written notice to the other party. 8.5 Waiver of any breach of this Agreement shall not constitute waiver of any subsequent breach. Page 4 of 5 8.6 Owner agrees to pay Contractor from available funds for satisfactory performance of this Agreement in accordance with the bid or proposal submitted therefor,subject to proper additions and deductions,all as provided in the General Conditions, Supplemental Conditions, and Special Conditions of this Agreement, and Owner agrees to make payments on account thereof as provided therein. Lack of funds shall render this Agreement null and void to the extent funds are not available. This Agreement is a commitment of City of Round Rock's current revenues only. 8.7 Although this Agreement is dramm by Owner, both parties hereto expressly agree and assert that; in the event of any dispute over its meaning or application, this Agreement shall be interpreted reasonably and fairly, and neither more strongly for nor against either party. 8.8 This Agreement shall be enforceable in Round Rock,Texas,and if legal action is necessary by either party with respect to the enforcement of any or all of the terms or conditions herein, exclusive venue for same shall lie in Williamson County, Texas. This Agreement shall be governed by and construed in accordance with the laws and court decisions of the State of Texas. 8.9 Both parties hereby expressly agree that no claims or disputes between the parties arising out of or relating to this Agreement or a breach thereof shall be decided by an arbitration proceeding, including without limitation, any proceeding under the Federal Arbitration Act(4 USC Section 1-14)or any applicable state arbitration statute. 8.10 The parties, by execution of this Agreement, bind themselves, their heirs, successors, assigns, and legal representatives for the full and faithful performance of the terms and provisions hereof. This Agreement is entered into as of the day and year first written above and is executed in at least three(3) original copies, of which one is to be delivered to Contractor, one to Engineer for use in the administration of the Contract,and the remainder to Owner. OWNER CONTRACTOR CITY F ROUND ROCK,TEXAS_. Printed Name: M ^h vv 4ritd Name: Title M(A N— Title: 'r= Date Signed: Date Signed: ATTEST: [AM* City Clerk FOR TY,APP OVE�AS TO FORM; City A rney I i I Page 5 of 5 I Executed in five (5) counterparts Bond#46BCSGZ8503 ® THE STATE OF TEXAS § ® § KNOW ALL BY THESE PRESENTS: COUNTY OF WILLIAMSON § That Capital Excavation Company of the City of Buda County of , Hays ; and State of Texas _ as Principal, and H r r Fire Iusurance Company authorized under the law of the State of Texas to act as surety on bonds for principals, are held an�d rmmand rmly bourt } to THE C OF RO O:IC,TE S, (Owner),in the penal sumo tlt4 'c of , ($ - p .6V) f r the payment whereof, All and truly to be made the id Principal and Surety ind themselves, and their heirs, administrators, executors, successors and assigns,jointly and severally,by these presents: WHEREAS, the Principal has entered into a certain written Agreement with the Owner dated the day of� L , 20(6to which the Agreement is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein consisting of: Creek Bend Blvd Extension (Name of the Project) NOW, THEREFORE, THE CONDITIONS OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform said Agreement and shall, in all respects, duly and faithfully observe and perform all and singular the covenants, conditions and agreements in and by said Agreement, agreed and covenanted by the Principal to be observed and performed, including but not limited to, the repair of any and all defects in said work occasioned by and resulting from defects in materials furnished by or workmanship of, the Principal in performing the Work ' covered by said Agreement and occurring within a period of twelve (12)months from the date of Final Completion and all other covenants and conditions, according to the true intent and meaning of said Agreement and the Plans and Specifications hereto annexed,then this obligation ' shall be void, otherwise to remain in full force and effect; PROVIDED, HOWEVER,that this bond is executed pursuant to the provisions of Chapter 2253, Texas Government code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter 2253 to the same extent as if it were copied at length herein. 1 Page 1 000090b56 00610 7-2009 Performance Bond f:. PERFORMANCE BOND (continued) Surety, for value received, stipulates and agrees that no change, ex#ension of time, alteration or addition to the term of the Agreement, or to the Work perfonned thereunder, or the Plans, Specifications, or drawings accompanying the same, shall in anywise affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement, or to the work to be performed thereunder. IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this day of 20 Ca talkExcavation Company Hartford Fire Insurance Company Principal Surety - $radle-y--�------ Kae Perdue Printed ame _--�_ Printed e 13y. ,e4 L Tit e: CEO Ey' �- � Title: it _ Address: 2967 Business Park Address: 3000 Internet Drive.,Suite 50_0 Buda, TeXaS Erisrn Texas 75034 Resident Agent of Surety: �—' Lature John D. Fulkerson,MHBT Inc. Printed Name _$144 Walnut Hill i anP Cnite 1600 Street Address Dallas_ Texas 731 City, State&Zip Code 1 OObIO 7-2009 Page 2 00090656 Pufonnance Bond Executed in five (5) counterparts Bond#46BCSGZ8503 FA ZNiT.2 PrT !-!'1"-JH THE STATE OF TEXAS § § KNOW ALL MEN BY THESE PRESENTS: COUNTY OF WILLIAMSON § That Capital Excavation Company , of the City of Buda County of Hays , and State of Texas as Principal, and Hartford Fire Insurance Company authorized cinder the laws of the State of Texas to act as Surety on Bonds for Principals, are held and firmly bound unto THE CITE.' CF ROUND ROCS, (OWNER), and all subcontractors, workers, laborers, mechanics and suppliers as their interest may appear, all of whom shall have fthn ipght• to �s�:e uppn this bo , in the a al1� �li E1 �'GInSA ='A r'a G� t ;�Do� t0l) � ,"cipal1(4�� for the payment whereof, well an true be made the said nd Surety bind themselves and their heirs, administrators, executors, successors, ' and assigns,jointly and severally,by these presents: WHEREAS, the Principal has entered into a certain written Agreement with the Owner, dated ' the . �' day of ,�Vl(� , 201%, to which Agreement is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein consisting of. ' Creek Bend Blvd Extension (Name of the Project) I� NOW, THEREFORE, THE CONDITION OF THIS OBLIGAT€ON IS SUCH, that if the said Principal shall well and truly pay all subcontractors, workers, laborers, mechanics,and suppliers, all monies to them owing by said Principals for subcontracts, work, labor, equipment, supplies and materials done and furnished for the construction of the improvements of said Agreement, then this obligation shall be and become nu.i and void; otherwise to remain in full force and effect. PROVIDED,HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253, Texas Government code, as amended; and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter 2253 to the same extent as if it were copied at length herein. I � I � .1 i 00620 7-2009 Page Payment Bond 00090656 f f PAYMENT BOND (continued) Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement, or to the Work ,performed thereunder, or the plans, specifications or drawings accompanying the same shall in anywise affect it, obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract, or to the work to be performed thereunder. IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this Instrument this_ day of 20 i _Capital Excavat�Qn Co�mnany Hartford Fire Insurance Company Principal Surety, ._ . dk,LKae Perdue Printed ne Printed - r me By: r' Ti CEO-- By: - Title: Attorney- -Eact Address: 2967 Business Park Address: Bud exa TT as 78610 ._.—_ Frisc Resident Agent of Surety: S' afore John D. Fulkerson,MHBT Inc. Printed Name -� 8144 Walnut Hill Lane,Suite 1600 Street Address -- Dallas,Texas 75231 � - r 06620 7.2009 Page 2 00090656 Payment Bond CERTIFICATE OF LIABILITY INSURANCEDATE(MM/DD/YYYY) 3/27/2015 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS ® CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT MHBT Inc. NAME: PHONE FAX 8144 Walnut Hill Lane, 16th Floor 72 770-1600 A/c No: 72)376-8117 Dallas TX 75231 E-MAIL ADDRESS: INSURERS AFFORDING COVERAGE NAIL# INSURER ALM In r n r r I n INSURED CAPITEXCI INSURERB:LIbertMutual Fire Insurance Com a 3035 Capital Excavation Company INSURER Insurance r r n PO Box 1301 4 Austin TX 78767 INSURER D:Starr Indemnity& Liabilit Com an 8318 INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER:1737905407 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR 71N SUBR LTR TYPE OF INSURANCWVD POLICY NUMBER MM/DD YLICY YYY MM/ CD/YYYY LIMITS A GENERAL LIABILITYTB5Z91462290024 /1/2014 /1/2015EACH OCCURRENCE $1,000,000 X COMMERCIAL GENERAL LIADAMAGE TO RENTEDPREMISES Ea occurrence $500,000 CLAIMS-MADE X MED EXP(Any one person) $5,000 PERSONAL&ADV INJURY $1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2,000,000 PRODUCTS-COMP/OP AGG $2,000,000 POLICY X PRO- LOC B AUTOMOBILE LIABILITY AS2Z91462290014 /1/2014 /1/2015 X Ea accident 1,000,000 Y AUTO ANL OWNEDBODILY INJURY(Per person) $ AUTOS SCHEDULED AUTOS BODILY INJURY(Per accident) $ x HIRED AUTOS X NON-OWNED AUTOS PROPERTY DAMAGE $ Per accident D UMBRELLA LIAB X OCCUR 1000020812 /1/2014 /1/2015 EACH OCCURRENCE $5,000,000 X EXCESS LIAB CLAIMS-MADE AGGREGATE $5,000,000 DED x RETENTION$10,OD0 C WORKERS COMPENSATION $ AND EMPLOYERS'LIABILITY WC7Z91462290034 /1/2014 /1/2015 X WC STATU- OTH- ANYPROPRIETOR/PARTNER/EXECUTIVE YIN I ER OFFICER/MEMBER EXCLUDED? N❑ N/A E.L.EACH ACCIDENT $1,000,000 (Mandatory in NH) If yes,describe under E.L.DISEASE-EA EMPLOYEE $1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (Attach ACORD 101,Additional Remarks Schedule,if more space is required) Additional Insured form#CG2010/CG2037 edition 07 04 applies to the General Liability policy Additional Insured form#CA2048 edition 10 13 applies to the Business Auto policy Waiver of subrogation form#LC0443 edition 05 12 applies to the General Liability Waiver of subrogation form#AC8407 edition 07 13 applies to the Business Auto olicy licy j Waiver of subrogation form#WC420304A applies to the Workers Compensation policy f Primary&Non-Contributory General Liability form#LC0443 edition 05 12 See Attached... CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE City of Round Rock THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Attn: Leah Collier; Transportation Dept. 221 East Main St. Round Rock TX 78664 AUTHORIZED REPRESENTATIVE `ACORD 25 2010/ ©1988-2010 ACORD CORPORATION. All rights reserved. ( 05) 9 The ACORD name and logo are registered marks of ACORD