Loading...
Contract - TJR Construction - 9/14/2017 1 City of Round Rock, Texas Contract Forms Standard Form of Agreement: Section 00500 Competitive Sealed Proposal City of Round Rock, Texas Standard Form of Agreement between Owner and Contractor • AGREEMENT made as of the " t1l'tW(2ciof O( 1JI/g_4 in the year 20 17 . BETWEEN the Owner: City of Round Rock,Texas(hereafter"Owner"or"City") 221 East Main Street Round Rock,Texas 78664 and the Contractor TJR Construction Group,LLC ("Contractor") 909 Whitewing Drive Cedar Park,Texas 78613 The Project is described as: Round Rock Sports Center Office Remodel 2400 Chisholm Trail Round Rock,Texas 78681 The Engineer is: Shawn A.Bacon AIA Marmon Mok 700 North St.Mary's Suite 1600 San Antonio,Texas 78205 For and in consideration of the mutual terms, conditions and covenants of this Agreement and all accompanying documents between Owner and Contractor, the receipt and sufficiency of which are hereby acknowledged,Owner and Contractor agree as follows: F ARTICLE I THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement,Conditions of the Contract(General,Supplementary and other Conditions), Drawings, Specifications,Addenda issued prior to execution of this Agreement,other documents listed in this Agreement and Modifications issued after execution of this Agreement;these form the Contract,and are as fully a part of the Contract as if attached to this Agreement or repeated herein.The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations,representations or agreements, either written or oral.An enumeration of the Contract Documents,other than Modifications,appears in Article 7. ARTICLE 2 THE WORK OF THIS CONTRACT Contractor shall fully execute the Work described in the Contract Documents,except to the extent specifically indicated in the Contract Documents to be the responsibility of others. 00500 4-2016 Page 1 of 5 Standard Form of Agreement 41Z40. tiiiNse 411/401 ARTICLE 3 DATE OF COMMENCEMENT;DATE OF SUBSTANTIAL COMPLETION;DATE OF FINAL COMPLETION 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a Notice to Proceed issued by Owner. 3.2 The Contract Time shall be measured from the date delineated in the Notice to Proceed. 3.3 Contractor shall commence Work within ten ( 10 ) calendar days from the date delineated in the Notice to Proceed. 3.4 Contractor shall achieve Substantial Completion of the items of Work listed on Attachment A to this Agreement no later than thirty-five ( 35 )calendar days from issuance by Owner of Notice to Proceed, and Contractor shall achieve Substantial Completion of the entire Work no later than thirty-five ( 35 )calendar days from issuance by Owner of Notice to Proceed, subject to adjustments of this Contract Time as provided in the Contract Documents. 3.5 If Contractor fails to achieve Substantial Completion of the Work(or any portion thereof) on or before the date(s)specified for Substantial Completion in the Agreement,Contractor shall pay to Owner,as liquidated damages, the sum of One Hundred and No/100 Dollars($ 100.00 ) for each calendar day that Substantial Completion is delayed after the date(s) specified for Substantial Completion. It is hereby agreed that the liquidated damages to which Owner is entitled hereunder are a reasonable forecast of just compensation for the harm that would be caused by Contractor's failure to achieve Substantial Completion of the Work(or any portion thereof)on or before the date(s)specified for Substantial Completion in the Agreement.It is agreed that the harm that would be caused by such failure,which includes loss of expected use of the Project areas,provision of alternative storage facilities and rescheduling of moving and occupancy dates,is one that is incapable or very difficult of accurate estimation.It is hereby agreed that if Substantial Completion of the Work (or any portion thereof) is not achieved on or before thirty (30) days after the date(s) specified for Substantial Completion in the Agreement,the Owner shall have the option to either collect liquidated damages as set forth herein or to thereafter rely on its remedies under the Contract Documents and at law and in equity, including without limitation,the recovery of actual damages.The date(s)specified for Substantial Completion of the Work(or any portion thereof)in the Agreement shall be subject to adjustment as provided in the Contract Documents. 3.6 Contractor shall achieve Final Completion of the entire Work no later than forty ( 40 )calendar days from issuance by Owner of Notice to Proceed. ARTICLE 4 CONTRACT SUM 4.1 Owner shall pay Contractor the Contract Sum in current funds for Contractor's performance of the Contract. The Contract Sum shall be Forty-Seven Thousand Five Hundred Ninety and 20/100 Dollars ($47,590.20 ),subject to additions and deductions as provided in the Contract Documents. 4.2 Does the Contract Sum include alternates which are described in the Proposal Form? No X . Yes .If yes,please provide details below: N/A 00500 4-2016 Page 2 of 5 Standard Form of Agreement ARTICLE 5 PAYMENTS 5.1 PROGRESS PAYMENTS 5.1.1 Based upon Applications for Payment submitted to Engineer and Owner by Contractor,and Certificates for Payment issued by Engineer and not disputed by Owner and/or Owner's lender,Owner shall make progress payments on account of the Contract Sum to Contractor as provided below, in Article 14 of the City of Round Rock General Conditions,and elsewhere in the Contract Documents. 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month. 5.1.3 Provided that an Application for Payment is received by Engineer and Owner, and Engineer issues a Certificate of Payment not later than the tenth(10th) day of a month, Owner shall make payment to Contractor not later than the tenth(10th)day of the next month. If an Application for Payment is received by Engineer and Owner after the application date fixed above,payment shall be made by Owner not later than one month after the Engineer issues a Certificate for Payment. 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by Contractor in accordance with the Contract Documents.The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form and supported by such data to N substantiate its accuracy as Engineer and Owner may require.This schedule,unless objected to by Engineer or Owner, shall be used as a basis for reviewing Contractor's Applications for Payment. 5.1.5 Applications for Payment shall warrant the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. 5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be 111 computed as provided in Article 14 of the City of Round Rock General Conditions. 5.1.7 Except with Owner's prior written approval, Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. 5.2 FINAL PAYMENT 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by Owner to Contractor when: .1 Contractor has fully performed the Contract except for Contractor's responsibility to correct Work, and to satisfy other requirements,if any,which extend beyond final payment;and .2 a final Certificate for Payment has been issued by Engineer. 5.2.2 Owner's final payment to Contractor shall be made no later than thirty (30) days after the issuance of Engineer's final Certificate for Payment. In no event shall final payment be required to be made prior to thirty(30) days after all Work on the Contract has been fully performed. Defects in the Work discovered prior to final payment shall be treated as non-conforming Work and shall be corrected by Contractor prior to final payment,and shall not be treated as warranty items. ARTICLE 6 TERMINATION OR SUSPENSION 6.1 The Contract may be terminated by Owner or Contractor as provided in Article 15 of the City of Round Rock General Conditions. 00500 4-2016 Page 3 of 5 Standard Form of Agreement 6.2 The Work may be suspended by Owner as provided in Article 15 of the City of Round Rock General Conditions. ARTICLE 7 ENUMERATION OF CONTRACT DOCUMENTS 7.1 The Contract Documents,except for Modifications issued after execution of this Agreement,are enumerated as follows: 7.1.1 The Agreement is this executed version of the City of Round Rock, Texas Standard Form of Agreement between Owner and Contractor,as modified. 7.1.2 The General Conditions are the "City of Round Rock Contract Forms 00700," General Conditions, as modified. 7.1.3 The Supplementary, Special,and other Conditions of the Contract are those contained in the Project Manual dated September 14,2017 7.1.4 The Specifications are those contained in the Project Manual dated September 14,2017 7.1.5 The Drawings,if any,are those contained in the Project Manual dated September 14,2017 7.1.6 The Insurance&Construction Bond Forms of the Contract are those contained in the Project Manual dated September 14,2017 7.1.7 The Notice to Bidders,Instructions to Bidders,Proposal Form,and Addenda,if any,are those contained in the Project Manual dated September 14,2017 7.1.8 If this Agreement covers construction involving federal funds, thereby requiring inclusion of mandated contract clauses, such federally required clauses are those contained in the "City of Round Rock Contract Forms 03000,"Federally Required Contract Clauses,as modified. 7.1.9 Other documents,if any,forming part of the Contract Documents are as follows: N/A ARTICLE 8 MISCELLANEOUS PROVISIONS 8.1 Where reference is made in this Agreement to a provision of any document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. 8.2 Owner's representative is: Matthew Smith Superintendent Building Construction 221 East Main Street Round Rock,TX 78664 8.3 Contractor's representative is: Travis Rhoades TJR Construction Group,LLC 909 Whitewing Drive Cedar Park Texas 78613 8.4 Neither Owner's nor Contractor's representative shall be changed without ten(10)days'written notice to the other party. 8.5 Waiver of any breach of this Agreement shall not constitute waiver of any subsequent breach. 00500 4-2016 Page 4 of 5 Standard Form of Agreement 8.6 Owner agrees to pay Contractor from available funds for satisfactory performance of this Agreement in accordance with the proposal submitted therefor, subject to proper additions and deductions, all as provided in the General Conditions, Supplemental Conditions, and Special Conditions of this Agreement, and Owner agrees to make payments on account thereof as provided therein. Lack of funds shall render this Agreement null and void to the extent funds are not available. This Agreement is a commitment of City of Round Rock's current revenues only. 8.7 Although this Agreement is drawn by Owner,both parties hereto expressly agree and assert that,in the event of any dispute over its meaning or application,this Agreement shall be interpreted reasonably and fairly,and neither more strongly for nor against either party. 8.8 This Agreement shall be enforceable in Round Rock,Texas, and if legal action is necessary by either party with respect to the enforcement of any or all of the terms or conditions herein, exclusive venue for same shall lie in Williamson County, Texas. This Agreement shall be governed by and construed in accordance with the laws and court decisions of the State of Texas. 8.9 Both parties hereby expressly agree that no claims or disputes between the parties arising out of or relating to this Agreement or a breach thereof shall be decided by an arbitration proceeding,including without limitation,any proceeding under the Federal Arbitration Act(9 USC Section 1-14)or any applicable state arbitration statute. 8.10 The parties, by execution of this Agreement, bind themselves, their heirs, successors, assigns, and legal representatives for the full and faithful performance of the terms and provisions hereof. This Agreement is entered into as of the day and year first written above and is executed in at least three(3) original copies, of which one is to be delivered to Contractor, one to Engineer for use in the administration of the Contract,and the remainder to Owner. OWNER CONTRACTOR CITY OF 'OUND ROCK,TEXAS TJR CONSTRUCTION GROUP,LLC P__.. Printed Nam-: Craig Mo a._ Printed Name: Tra is ' oades Title Mayor Title: Date Signed: l . !ig ' Date Signed: g/2--9 ATT T: • tt_ City Clerk FOR , Y,APP'OVED • S TO FORM: City Atte ey • 00500 4-2016 Page 5 of 5 Standard Form of Agreement .‘ " Western Surety Company PAYMENT BOND Bond Number: 71945561 KNOW ALL PERSONS BY THESE PRESENTS, That we TJR Construction Group LLC of 909 Whitewing Dr, Cedar Park, TX 78613 , hereinafter referred to as the Principal, and Western Surety Company as Surety, are held and firmly bound unto city of Round Rock 11 of 221 E. Main, Round Rock, TX 78664 , hereinafter referred to as the Obligee, in the sum of Forty-seven Thousand Five Hundred Ninety and 00/100 Dollars ($47,590.00 ),for the payment of which we bind ourselves, our legal representatives, successors and assigns,jointly and severally,firmly by these presents. WHEREAS, Principal has entered into a contract with Obligee, dated �3 4- day of orehrge42,, ,for Remodel Tournament Room 202 Into Administration Offices 202.1 and 202.2 at The Round Rock Sports Center copy of which contract is by reference made a part hereof. NOW, THEREFORE, if Principal shall, in accordance with applicable Statutes, promptly make payment to all persons supplying labor and material in the prosecution of the work provided for in said contract, and any and all duly authorized modifications of said contract that may hereafter be made, notice of which modifications to Surety being waived, then this obligation to be void; otherwise to remain in full force and effect. No suit or action shall be commenced hereunder (a) After the expiration of one (1) year following the date on which Principal ceased work on said contract it being understood, however, that if any limitation embodied in this bond is prohibited by any law controlling the construction hereof such limitation shall be deemed to be amended so as to be equal to the minimum period of limitation permitted by such law. (b) Other than in a state court of competent jurisdiction in and for the county or other political subdivision of the state in which the project, or any part thereof, is situated, or in the United States District Court for the district in which the project, or any part thereof, is situated, and not elsewhere. The amount of this bond shall be reduced by and to the extent of any payment or payments made in good faith hereunder. SIGNED, SEALED AND DATED this 29th day of August , 2017 . TJR Construction Group LLC (Principal) By (Seal) Western Surety Company (Surety) By oiilla,et R Miller, 't&Pc _ Seal ( ) Attorney-in-Fact Western Surety Company PERFORMANCE BOND Bond Number: 71945561 KNOW ALL PERSONS BY THESE PRESENTS, That we TJR Construction Grou• LLC of 909 Whi tewing Dr, Cedar Park, TX 78613 , hereinafter referred to as the Principal, and Western Surety Company as Surety, are held and firmly bound unto City of Round Rock /11 of 221 E. Main, Round Rock. TX 78664 , hereinafter referred to as the Obligee, in the sum of Forty-Seven Thousand Five Hundred Ninety and 00/100 Dollars ($ 47,590.00 ),for the payment of which we bind ourselves, our legal representatives, successors and assigns,jointly and severally,firmly by these presents. has enteredcontract with Obligee, dated the -�r�'' dayof v� , WHEREAS, Principal into a g .."(alv ,for:-•••- • •.u-• :••u 1 • • :•u ' • ' ' •• • - 1 . •• 1 at The Round Rock Sports Center . NOW, THEREFORE, if the Principal shall faithfully perform such contract or shall indemnify and save harmless the Obligee from all cost and damage by reason of Principal's failure so to do, then this obligation shall be null and void; otherwise it shall remain in full force and effect. ANY PROCEEDING, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction in the location in which the work or part of the work is located and shall be instituted within two years after Contractor Default or within two years after the Contractor ceased working or within two years after the Surety refuses or fails to perform its obligations under this Bond, whichever occurs first. If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. NO RIGHT OF ACTION shall accrue on this Bond to or for the use of any person or corporation other than the Obligee named herein or the heirs, executors, administrators or successors of the Obligee. SIGNED, SEALED AND DATED this 29th day of August 2017 . TJR Construction Group LLC (Principal) By (Seal) Western Surety Company (Surety) By Oe R.Miller,Asst Sec. (Seal) Attorney-in-Fact Form F4597 Li, '7 AC DATE(MM/DDnrYYY) ,,,---. CERTIFICATE OF LIABILITY INSURANCE 08/04/2017 DD/Y THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on I this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: ALYCEN LUCY FAX ALYCEN LUCY INSURANCE AGENCY LLC PHONE Ext): 512-280-5977 No): 512-280-5976 DBAALYCEN LUCY AGENCY gooResS: ALUCY@FARMERSAGENT.COM 8700 MANCHACA RD#805 INSURER(S)AFFORDING COVERAGE NAIC# AUSTIN TX 78748 INSURER A: EVANSTON INSURANCE COMPANY INSURED INSURER B: FARMERS INSURANCE GROUP I TJR CONSTRUCTION GROUP LLC INSURER c: TEXAS MUTUAL INSURANCE COMPANY INSURER D: 909 WHITEWING DR INSURER E: CEDAR PARK TX 78613 INSURER F: 1 COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. II r r - AUULbUt3FF POLICY EFF POLICY EXP LTR TYPE OF INSURANCE INSD WVD POLICY NUMBER (MM/DD/YYYY) (MM/DD/YYYY) LIMITS CJI COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 — E. CLAIMS-MADE 171 OCCUR PREMISES(Ea occurrence) $ 100,000 ■ MED EXP(Any one person) $ 5,000 A !■ Y Y 3AA137627 06/14/2017 06/14/2018 PERSONAL&ADV INJURY $ 1,000,000 — GEN'LAGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 II N. POLICY®PRO ® LOC PRODUCTS-COMP/OPAGG_ $ 2,000,000 JECT OTHER: $ AUTOMOBILE LIABILITY CU(EaMdINtaccideUnt)S (.41.t LIMI I $ 1,000,000 ANY AUTO BODILY INJURY(Per person) $ II I OWNED SCHEDULED BODILY INJURY(Per accident) $ — B ■: AUTOS ONLY 7 AUTOS Y Y 606676474 07/12/2017 07/12/2018 ■ HIRED NON-OWNED HKUPER I Y DAMAGE $ , AUTOS ONLY AUTOS ONLY (Per accident) — $ 111 UMBRELLA LIAR OCCUR EACH OCCURRENCE $ 5,000,000 A EXCESS LIAB CLAIMS MADE Y Y EZXS1010294 06/14/2017 06/14/2018 AGGREGATE $ 5,000,000 DED RETENTION S $ WORKERS COMPENSATION ��I STATUTE I ERH AND EMPLOYERS'LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE Y/N E.L.EACH ACCIDENT $ 1,000,000 1,000,000 C OFFICER/MEMBER EXCLUDED? N/A Y 0002000559 07/18/2017 07/18/2018 (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE S If yes,describe under DESCRIPTION OF OPERATIONS below Et DISEASE-POLICY LIMIT $ 1,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may he attached if more space is required) 0 REMODLING CONTRACTOR,COMMERCIAL AND RESIDENTIAL BLANKET ADDITIONAL INSURED ENDORSEMENT/BLANKET WAIVER OF SUBROGATION/PRIMARY AND NONCONTRIBUTORY-OTHER INSURANCE CONDITION(BLANKET)/CONSTRUCTION PROJECTS PER PROJECT GENERAL AGGREGATE LIMIT(BLANKET) N ,CERTIFICATE HOLDER CANCELLATION MSHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City of Round Rock AUTHORIZED REPRESENTATIVE 221 East Main Street 4 ,..c...24-1,./.-17_ Round Rock TX 78664 III -----------L.-------------- ©1988-2015 ACORD CORPORATION. All rights reserved. ACRD 25(2016/03) The ACORD name and logo are registered marks of ACORD CERTIFICATE OF INTERESTED PARTIES FORM 129J 10f1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2017-258020 TJR Construction Group LLC Cedar Park,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 09/07/2017 being filed. City of Round Rock Date Acknowledged: g Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. 000000 Round Rock Sports Center-Addition of two offices to flex room off entryway. 4 Nature of interest Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary Rhoades,Travis Cedar Park,TX United States X Rhoades, Phyllis Cedar Park,TX United States X Rhoades,John Cedar Park,TX United States X Rhoades,Tara Cedar Park,TX United States X 5 Check only if there is NO Interested Party. 6 AFFIDAVIT • �� � I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. 3'�vj0 s�y;.;wmnr asrmsw (Y,,,P�S,. �m n -m .fig& r � arw .... °>.� ,•r�' 6 Vim' i� wa .,�`a�. c'. 0" Signature of au orized a ent of contr ng business entity AFFIX NOTAR>` x�(9T/1�1.117 SgEAL ABOVE Sworn to and subscribed before me,by the said V 1 /� ,this the day of 20 _,to certify which,witness my hand and seal of office. Sig ature of officer administering t Printed name of officer administering oa Title of officer a inistering oath Forms provided by Texas Ethics itryiimission www.ethics.state.tx.us Version V1.0.3337 CERTIFICATE OF INTERESTED PARTIES FORM 3.295 10f1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2017-258020 TJR Construction Group LLC Cedar Park,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 09/07/2017 being filed. City of Round Rock Date Acknowledged: 09/07/2017 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. 000000 Round Rock Sports Center-Addition of two offices to flex room off entryway. 4 Nature of interest Name of Interested Party City,State,Country(place of business) (check applicable) Controlling I Intermediary Rhoades,Travis Cedar Park,TX United States X Rhoades, Phyllis Cedar Park,TX United States X Rhoades,John Cedar Park,TX United States X Rhoades,Tara Cedar Park,TX United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP/SEAL ABOVE Sworn to and subscribed before me,by the said this the day of , 20 ,to certify which,witness my hand and seal of office. Signature of officer administering oath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.3337 f Competitive Sealed Proposal Ranking for: Sports Center Office Remodel ROU R(]iCKT ` AS W U _ Un (4 Q V1 a + O41 c0 3r, Contractor Name � Base Price Alternates Totals Total Cost a m °� a � a' ° z m° � N U o c o M -@ o E o Total Points a t a L d i N 'a O N H _3 0. �� Q �; Cr CaC CNC Q Q Q f6 Ql CL X `Z7 G i l.L p„ t6 Itl 'Q O O O 0. TJR Construction Group Y XI$rLo $47,590.20 $47,590.20 west Priced Proposol/Proposer'sPrice)X40= Price Score 40.00 17.00 17.00 13.50 0.00 87.50 #1 TexAm Construction Y X X $77,500.00 $77,500.00 (Lowest Priced Proposol/Proposer's Price)X40= Price Score 24.756536.00 18.00 18.00 -1.00 75.56 #2 ASD Consultants Y X X $97,777.00 $97,777.0p (Lowest Priced Proposai/Froposer's Price)X40= Price Scor 19.47 18.00 18.00 16.50 0.00 71.97 #3 Selection Committee: Chad McDowell, Richard Will, Matthew Smith Date: Friday,August 11,2017