Loading...
R-2017-4726 - 9/14/2017 RESOLUTION NO. R-2017-4726 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Cash Construction for the Southwest Downtown District Infrastructure Improvements Phase 513 Proj ect, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with Cash Construction for the Southwest Downtown District Infrastructure Improvements Phase 513 Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 14th day of September, 2017. A A/ CRAIGORGKoc Mayor City of Round , Texas ATTEST: (kw [,- SARA L. WHITE, City Clerk 0112.1704;00385080 LEXHIBIT Page I of 3 Contract Quantity Adjustment/Change Order f rev.W12 Department: Transportation Project Name: CORR SWDT Ph 5B Date: 8/9/17 City Project Change Order/Quantity ID Number SWDTS Adjustment No. i Justification Waterline service size upgrade(4"to 6"&6"to 8"),additional electric conduit needed,additional trench drain needed,and paving quantity added. Deducted items removed because they are not going to be used in the contract. Waterline B conflict with existing utilities not show in plans. New storm drain items added for additional drainage needs. SUMMARY Amount %Change Original Contract Price: $4,315,214.00 Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: $51,016.00 Total Quantity Adjustment(s): $51,016.00 Total Contract Price with Quantity Adjustment(s): $4,366,230.00 Previous Change Order(s): $0.00 00/0 This Change Order: $43,825.00 1% Total Change Order(s)To Date: $43,825.00 10/0 Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: $4,410,055.00 Difference between Original and Adjusted Contract Prices: $94,841.00 Original Contract Time: 360 Calendar Days Time Adjustment by previous Quan.Adj./Change Order: 0 Calendar Days Time Adjustment by this Quan.Adj./Change Order: 6 Calendar Days New Contract Time: 366 Calendar Days Submitted for Approval Prepared By: B.J.Cash Cash Construction CI Sig Lure Printed Name,Title,Company Date Approvals Contractor: S.J.Cash,Cash Construction City Project Signature Printed Name,Title,Company Date Manager: u Bill Stablein,Project Manager,CORR -q -17 Signature Printed Name,Title Date Mayor/City Manager Alan McGraw, Mayor CORR Signature Printed Name,Title Date Fate 2 of 3 Contract Quantity Adjustment/Change Order 08 u. Project Name: CORR SWDT Ph 5B Quan.Adj./Change Order No.: 1 Change Order Data Contract Time Adjustment Item# Item Description Unit Qty. Unit Price Amount Da s WL B Conflcit Station 3+44 to 4+20 LS 1 $15,545.00 $15,545.00 4 Time&Materials for Conduit Install Between Telecom Manholes LS 1 $5,780,00 $5,780.00 8"Storm PVC LF so $100.00 $5,000.00 1 18"x 18"Grate Inlet EA 1 $1,000.00 $1,000.00 1 Gate Vavle, 6"Dia EA 11 $1,500.00 $16,500.00 $0.00 $0.00 $0.00 $o,00 $0.00 $0.00 Page 3 of 3 Contract Quantity Adjustment/Change Order red,Q8I12 Project Name: CORR SWDT Ph 5B Quan.Adj./Change Order No.: 1 Quantity Adjustment Data Contract Time Adjustment Hid Item# Item Description Unit Q!ty. Unit Price Amount (Days) Contract Adds Pipe, Dia. PVC AWWA C-900 Class 200,or DI AWWA C-100 Min.Class 200 W(all depths), including 87 excavation and backfill LF 100 $90.00 $9,000.00 Pipe, Dia. PVC AWWA C-900 Class 200,or DI AWWA C-100 Min. Class 200 W(all depths), including 88 excavation and backfill LF 413 $85.00 $35,105.00 One tothree each-3 inch or smaller service e ectrica and/or communication conduits in one trench to 100 structure for service provider LF 345 $50.00 $17,250.00 50 Trench Drain per LF LF 9 $2,000.00 $18,000.00 96 Ductile Iron Fittings 4 inch through 12 inch Ton 1.25 $15,000.00 $18,750.00 Asphalt Stabilized Base:Hot Mix Asphaltic Concrete Base(10.5'!Thick),TXDOT Item 340,Type B(Black 37 Base)(Method A)under,and 1.5 feet behind roadway SY 759 $49.00 $37,191.00 $0.00 Contract Deducts $0.00 Pipe,4 Dia. PVC AWWA C-900 Class 200,or DI AWWA C-100 Min. Class 200 W(all depths), including 89 excavation and backfill LF -413 $60.00 -$24,780.00 Pipe, Dia. PVC AWWA C-900 Class 200,or-D-1-AWWA- C-100 rD AWWAC-100 Min. Class 200 W(all depths), including 88 excavation and backfill LF -100 $85.00 -$8,500.00 Jacking or Boring 18 Steel Encasement Pipe,ASTM A- 97 252,Grade 2, including grouting LF -60 $550.00 -$33,000.00 Stabilized Construction Entrance, maintained thoughout 20-506-6020 project per each EA -2 $3,000.00 -$6,000.00 94 Gate Vavle,4"Dia EA -10 $1,200.00 .-$12,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00