R-10-07-22-10D4 - 7/22/2010RESOLUTION NO. R -10-07-22-10D4 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with SKE Construction, LLC for the Greenslopes A/C Water Line Replacement Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with SKE Construction, LLC for the Greenslopes A/C Water Line Replacement Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 22nd day of July, 2010. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Secretary O:\wdox\SCC1nts\0112\1005\MUNICIPAL\00197367.DOC/rmc rev. 1/10 Department: Utility Administration Contract Quantity Adjustment/Change Order Project Name: Greenslopes A/C Waterline Replacement Project City Project ID Number: wl02abgslp Justification Date: Page 1 of 3 7/6/2010 Change Order/Quantity Adjustment No. 1 & Final Additional Tenth of waterline replacement and additional Corpstops plus final quantity adjustments SUMMARY Original Contract Price: Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Prepared by: MPS, natu - Contract • Approval:, - 4? gnatu �1) 1141 Signa r City Staff Approval: City Official Approval: Amount $772,338.25 $901,782.00 $0.00 $75,100.00 $75,100.00 $0.00 $54,343.75 $54,343.75 $901,782.00 120 0/0 Change 0.00% 8.33% 8.33% 120 120 V- Li. D• KKUMArW L.7/7)'e Printed Name, Title and Company Date (c -c9 S7(e axipel42-? -74.fi Printed Name, Title and Copany Date t.ct.‘r Co Printed Name and Title lbh Signature Printed Name and Tide EXHIBIT Date rev. 01/10 Bid Item# 6 Contract Quantity Adjustment/Change Order Item Description and Change Perform prechlorinated pipe bursting of existing 8" asbestos cement water line, replace with 8" HDPE DR13 water line Furnish and install 1 1/2" Ford, or 14 approved equal, brass corporation stop Furnish and install 1" Ford, or approved equal, locking brass angle meter or curb 19 stop Change Order Data Unit LF EA EA Qty. Unit Price 500 $71.00 $400.00 $300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: 105 -8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Page 2 of 3 Amount $35,500.00 $42,000.00 -$2,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Contract Time Adjustment (Days) $75,100.00 0 Page 3 of 3 rev. 01/10 Bid Item# 1 2 3 4 5 7 8 9 10 11 12 13 15 16 17 Contract Quantity Adjustment/Change Order Quantity Adju Item Description and Change Mobilization Perform prechlorinated pipe bursting of existing 16" ductile iron water line, replace with 16" HDPE DR13 water line Furnish and install 16" ductile iron gate valve Furnish and install 16" x 6" ductile iron fire hydrant saddle and complete fire hydrant assembly Furnish, install and maintain silt fence Perform prechlorinated pipe bursting of existing 6" asbestos cement water line, replace with 6" HDPE DR13 water line Remove and replace fire hydrant AC pipe lead- replace with 6" ductile iron pipe, minimal class 150 Remove and replace existing 8" in-line gare valve with Clow, or approved equal Remove and replace existing 6" in-line gare valve with Clow, or approved equal Remove and replace existing 6" in-line ductile iron fittings, including Mega Lug restraints Remove and replace existing 8" in-line ductile iron fittings, including Mega Lug restraints Triangular filter dikes for existing 10 ft curb inlets Furnish and install 1" Ford, or approved equal, brass corporation stop Furnish and install 1 1/2" polyethylene water service tubing Furnish and install 1" polyethylene water service tubing Unit LS LF EA EA LF LF EA EA EA TON TON EA EA LF LF Page 4 of 3 ....I11. Loa Qty. 0 axe Unit Price $35,000.00 Amount $0.00 -27 $250.00 -$6,750.00 -1 $6,000.00 -$6,000.00 0 $7,000.00 $0.00 -74 $10.00 -$740.00 -1283 $76.00 -$97,508.00 -10 $1,500.00 -$15,000.00 7 $1,200.00 $8,400.00 6 $900.00 $5,400.00 -3.5 $1.00 -$3.50 -4.75 $1.00 -$4.75 -43 $50.00 -$2,150.00 1 $300.00 $300.00 2765 $5.00 $13,825.00 173 $4.00 $692.00 Contract Time Adjustment (Days) Furnish and install 1 1/2" locking brass 18 angle meter or curb stop 20 21 22 23 24 25 26 27 28 29 30 31 32 33 Furnish and install 3/4" bronze non -rising stem gate valve, box and lid (property owner's cut off valve outside meter box) Install plastic double meter box Install plastic single meter box Furnish and install 8" x 6" ductile iron Clow fire -hydrant, or approved equal, including lead and FH valve Furnish and install 8" x 6" ductile iron fire hydrant tee Furnish and install 6" ductile iron pipe fire hydrant lead piping Furnish and install cast iron adjustable valve box with lid and concrete collar Furnish and install 6" SDR 26 PVC sewer service piping Furnish and install 6" wastewater clean- out assembly (non -paved surface) Perform concrete sidewalk or concrete driveway repairs Perform type "C" hot mix asphaltic cement (HMAC) road repair using approved mechanized HMAC layout machinery Perform cedar plank or chain Zink fencing repair and/or replacement Traffic Control Trench safety systems EA EA EA EA EA EA EA EA LF EA SF TON LF LS LF 70 $400.00 Pa $28,000.00 -10 $200.00 -$2,000.00 - 1 $500.00 - $500.00 - 1 $400.00 - $400.00 2 $4,000.00 $8,000.00 11 $500.00 $5,500.00 - 3 $600.00 - $1,800.00 - 1 $500.00 -$500.00 - 200 $10.00 - $2,000.00 - 5 $400.00 - $2,000.00 2710 $10.00 $27,100.00 52.2 $100.00 $5,220.00 - 200 $0.00 - 1 $3,000.00 -$3,000.00 - 50 $5.00 - $250.00 6 Perform prechlorinated pipe bursting of existing 8" asbestos cement water line, replace with 8" HDPE DR13 water line LF 1303 $71.00 $92,513.00 e 5 of 3 TOTALS: $54,343.75 0 ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. Agenda Item No. 10D4. City Council Agenda Summary Sheet Agenda Caption: Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 1 with SKE Construction, LLC for the Greenslopes A/C Water Line Replacement Project. Meeting Date: July 22, 2010 Department: Infrastructure Development and Construction Management Staff Person making presentation: Michael Thane, P.E. Director of Infrastructure Management Item Summary: Change Order No. 1 is for quantity adjustments and change order items necessary in order to complete the waterline replacement project as outlined in the project requirements. Line items that required additional work (change order items) to the original construction plans included the addition of two additional segments of asbestos -cement waterlines not originally identified in the construction plans, as well as replacement of all of the corporation stops and u -branches or angle stops. It was originally anticipated that only the corporation stops and u - branches or angle stops that needed replacing would be replaced under the contract. Once construction started it was determined that all of these needed to be replaced to limit the city from having to go in at a later date and replace the worn out stops as needed. Quantity Adjustments became necessary when actual field conditions proved different from the original plans that were based on information which was acquired off of previously constructed as -built drawings and field measurements. Original Contract Change Order/ Quantity Adjustment No. 1 Change Order Quantity Adjustment Revised Contract Amount % Change $ 772,338.25 N/A $ 105,500.00 $ 23,943.75 $ 901,782.00 13.25% N/A 13.25% Strategic Plan Relevance: Goal 28.0 "Protect public health and protect the environment through proper waste disposal." Cost: Source of Funds: $ 129,443.75 Self -Financed Water Construction Date of Public Hearing (if required): N/A Recommended Action: Approval EXECUTED DOCUMENT FOLLOWS rev. 1/10 Department: Utility Administration Contract Quantity Adjustment/Change Order Project Name: Greenslopes A/C Waterline Replacement Project City Project ID Number: w102abgslp Justification Date: Page 1 of 3 7/6/2010 Change Order/Quantity Adjustment No. 1 & Final Additional lenth of waterline replacement and additional Corpstops plus final quantity adjustments SUMMARY Original Contract Price: Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Prepared by: Contract Approval: City Staff Approval: City Official Approval: Si natu ignatu Sign Amount % Change $772,338.25 $901,782.00 $0.00 $75,100.00 $75,100.00 $0.00 $54,343.75 $54,343.75 0.00% 8.33% 8.33% 120 120 LATra---r Y--- FW1 6. P. KotliArIAA4 120 Printed Name, Title and Company Date ,e4,(L-ir (—ea Printed Name, Title an Co pany )51-1— t‘r\ Printed Name and Title Sig . ure �= Ykk CO /e 69,Kirk-,43, Date 7/7) Cb \‘'(e (W7.- Vaolr Printed Name and Title J Date rev. 01/10 Bid Item# Contract Quantity Adjustment/Change Order Item Description and Change Change Order Data Unit Qty. Page 2 of 3 Unit Price Amount Contract Time Adjustment (Days) 6 Perform prechlorinated pipe bursting of existing 8" asbestos cement water line, replace with 8" HDPE DR13 water line Furnish and install 1 1/2" Ford, or 14 approved equal, brass corporation stop Furnish and install 1" Ford, or approved equal, locking brass angle meter or curb 19 stop LF EA EA 500 $71.00 $400.00 $300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: 105 -8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $35,500.00 $42,000.00 -$2,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $75,100.00 0 Page 3 of 3 rev. 01/10 Contract Quantity Adjustment/Change Order Quantity Adjustment Data Page 4 of 3 Bid Item# Item Description and Change Unit Price Amount Contract Time Adjustment (Days) Mobilization $35,000.00 $0.00 Perform prechlorinated pipe bursting of existing 16" ductile iron water line, replace with 16" HDPE DR13 water line LF Furnish and install 16" ductile iron gate valve EA Furnish and install 16" x 6" ductile iron fire hydrant saddle and complete fire hydrant assembly EA Furnish, install and maintain silt fence LF - 27 $250.00 -$6,750.00 -1 $6,000.00 -$6,000.00 0 $7,000.00 $0.00 - 74 $10.00 -$740.00 Perform prechlorinated pipe bursting of existing 6" asbestos cement water line, 7 replace with 6" HDPE DR13 water line Remove and replace fire hydrant AC pipe lead- replace with 6" ductile iron pipe, minimal class 150 Remove and replace existing 8" in-line 9 gare valve with Clow, or approved equal EA LF EA - 1283 $76.00 -$97,508.00 -10 $1,500.00 -$15,000.00 7 $1,200.00 $8,400.00 Remove and replace existing 6" in-line 10 gare valve with Clow, or approved equal EA Remove and replace existing 6" in-line ductile iron fittings, including Mega Lug 11 restraints TON Remove and replace existing 8" in-line ductile iron fittings, including Mega Lug 12 restraints TON Triangular filter dikes for existing 10 ft 13 curb inlets EA $900.00 $5,400.00 Furnish and install 1" Ford, or approved 15 equal, brass corporation stop EA Furnish and install 1 1/2" polyethylene - 3.5 $1.00 -$3.50 - 4.75 $1.00 -$4.75 - 43 $50.00 -$2,150.00 1 $300.00 $300.00 16 water service tubing LF 2765 $5.00 $13,825.00 Furnish and install 1" polyethylene water 17 service tubing LF 173 $4.00 $692.00 • 18 20 21 22 23 24 25 26 27 28 29 30 31 32 33 6 Furnish and install 1 1/2" locking brass angle meter or curb stop Furnish and install 3/4" bronze non -rising stem gate valve, box and lid (property owner's cut off valve outside meter box) Install plastic double meter box Install plastic single meter box Furnish and install 8" x 6" ductile iron Clow fire -hydrant, or approved equal, including lead and FH valve Furnish and install 8" x 6" ductile iron fire hydrant tee Furnish and install 6" ductile iron pipe fire hydrant lead piping Furnish and install cast iron adjustable valve box with lid and concrete collar Furnish and install 6" SDR 26 PVC sewer service piping Furnish and install 6" wastewater clean- out assembly (non -paved surface) Perform concrete sidewalk or concrete driveway repairs Perform type "C" hot mix asphaltic cement (HMAC) road repair using approved mechanized HMAC layout machinery Perform cedar plank or chain link fencing repair and/or replacement Traffic Control Trench safety systems Perform prechlorinated pipe bursting of existing 8" asbestos cement water line, replace with 8" HDPE DR13 water line EA EA EA EA EA EA EA EA LF EA SF TON LF LS LF LF 70 $400.00 Pa $28,000.00 -10 $200.00 -$2,000.00 -1 - 1 $500.00 $400.00 - $500.00 - $400.00 2 $4,000.00 11 - 3 $500.00 $600.00 $8,000.00 $5,500.00 - $1,800.00 - 1 $500.00 - $500.00 -200 $10.00 - $2,000.00 - 5 $400.00 - $2,000.00 2710 $10.00 $27,100.00 52.2 $100.00 $5,220.00 -200 $0.00 - 1 $3,000.00 - $3,000.00 -50 $5.00 - $250.00 1303 TOTALS: $54,343.75