R-10-08-12-9E3 - 8/12/2010RESOLUTION NO. R -10-08-12-9E3 WHEREAS, the City of Round Rock has previously entered into an Advanced Funding Agreement ("Agreement") with the Texas Department of Transportation ("TxDOT") for the FM 1460 Expansion Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Agreement in accordance with the attached Construction Contract Change Order No. 6, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Construction Contract Change Order No. 6 to the Agreement with TxDOT for the FM 1460 Expansion Project, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 12th day of August, 2010. SARA L. WHITE, City Secretary 0:\wdox\SCC1nts\0112\1005\MONICIPAL\00199139.DOC/rmc Cr YY1 ALAN MCGRAW, Mayor City of Round Rock, Texas TEXAS DEPARTMENT OF TRANSPORTATION CONSTRUCTION CONTRACT CHANGE ORDER NUMBER: 06 Third Party Funding Notication Sheet This form is used when the subject change order involves funding by a source other than TxDOT/U.S. DOT, and involves third parties who are providing funding under an Advance Funding Agreement or Donation Agreement. 1. Outside funding provided by: City of Round Rock (Outside Entity's Legal Name) 2. Type of outside funding agreement for this change: ✓ Existing Q Amended [ Check one E New 3. Indicate the type and amount of funding: ✓ Fixed Price (Lump Sum) (Estimated Amount $78,392.16 j ✓ Actual Cost (a) Contract Items (Bid Items): $78,392.16 (b) E&C*: (a) x 0 = 0 enter % (c) Indirect Cost**: (a + b) x 0 = 0 enter % TOTAL $ 7 8s 39t2, 14 CCSJ: 2211-02-021 Project: STP 2009(866)ES Highway: FM 1460 County: Williamson District: Austin Contract Number. 08093008 Use as needed: I hereby acknowledge notification of the modifications covered by this Change Order. Date By Typed/Printed Name Typed/Printed Tide • The percentage (%) for E&C (Engineering and Contingendes) charges varies from project to project depending on the contract amount of the project. Projects with a higher contract amount will have a lower rate of E&C charge. Fora spedfic project, E&C rate (%) can be derived from the cost of"Engineering and Contingencies" in the "Estimated Cost" of the project. '"' Use the statewide district rate as established by Finance Division each year. This line 3(c) is for Service Project only, unless otherwise specified in the Advance Funding Agreement. See Stand Alone Manual Notice 98-2 for instructions. Funding for this Change Order has been arranged: TxDOT Representative Date Typed/Printed Name: TXDOT Form 2146-AFA (Rev. 7/2007) Page 1 of 1 EXHIBIT 0 0 REPORT DATE: a 0 =m< egg' u. li 0 O 0000 C _ m 3g a WrJ0P y. MO❑❑ 0: O m < Q a J J -c V, 00 LL Y o O CHANGE ORDER NBR. a c m .o om c z13 u. ur V WW O m U co D w TA TO 8 W G M c0 E m u 8 a 1t 0 W "aCi 8 0 `� m CI In V W G N ' 0 v N al 0 O J m -! CC 8 c 2 C W O C a Ere m Q >. v A o y S w v U 44 . 1 m LI! rg Ili Z 0 } C o z z $ e 0 sg a� c� d o. ° E 0 m _3 8 �p z > 'C (6 l0 m o ,c m £ w v_, c o 1 m m 0 2 W� _i P z w is, m a 0 c -.- II c4 c 'UW a c OOsb 4W m co g V 0W -0 2 m Derc1 M Ozz Z w O�`C NON `O" Op�WWNW � 0a Y, 'G m �a OoC C i O9a°PS 4w0D. o0 Q 00 r2 6.1 m Q 3 0 Z v m c W N m 0) 301 _ a tz i z ` y v Z 8o 0 z S 0 ru O w e ,cis j i' 0 0 ix C1 ce Q I >t S m t of a o V Q F.. U a V t? 111 ID1A1 1 ® p c W o 6a6<a I °-g N . .0 •S L o oo 0 d 0< a 0 0 0o 1 a01 1= ~@ ~ a ;° o FS- m ce coc zm C O -j '6 1- .cm Sti co DISTRICT ENGINEER: 0 DIRECTOR, CONSTRUCTION DIVISION: 1- 0 0 AED For Eng. Operations: TYPED/PRINTED TITLE: M ; U O a h V cooQ co. CHANGE ORDER NBR. w o— z z • n 2 DESCRIPTION m O▪ l 2 J 0 0 a m 0 2 ac U 92 O F• o cs 0 in J O ii— • le 0 2 0 CHANGE ORDER AMOUNT ID CHANGE ORDERNBR. CO N O CONTRACT ID FUNDING SOURCES CO CO Work Category: 1. Work Program: LEWIS CONTRACTORS, INC. Project: Tx DOT - FM 1460 Casing Location: Cedar Park, Texas Date: April 20, 2010 Engineer. City of Round Rock To: Hunter Industries, Ltd. Attn: Gary Tadcert Phone: 512-6654501 1 1 We propose to provide equipment, labor and material tQ perform the following operations. Our proposal is to include these items as specifically .luted, all other work items or materials are excluded. This quote is void after sbdy days from proposal date. i 54" Steel Cas Item r Description i Quantity Unit Price Extension 1 install 54" Casing 3/8 Walt.Move in #1 E 80 Lf. $ 462230 $ 36,960.00 2 Install 54" Casing 3/8 Wall. Move in #2 ( 80 1f . $ 462.00 $ 36,980.00 Exclusions: -Inspection Fees - General building permit - Impact, tap or connection fees - Engineering control/Layout and Survey of work - Meter fees and/or deposits - Conduits or sleeves for other trades - Landscaping, seeding or sod - Tree removal or replacement - Locate Of Private Utilities - Traffic Control/Barricades/Barriers Additional Qualifications; Subtotal For 54" Steel Casing : $ Grand Total : - Construction Material Testing - Geotech Testing - Adjustment Of Existing Utilities - Removal Or Replacement Of Paving - Erosion Control - Intet protection (stage two) - Import Of Select Material For Backlit - Construction Water - Payment and Performance bonds are Included. Can b ( deducted If not needed. Hauloff of spoils is included. Pricing Includes two move in's. ' Casing is bib with bedding 6" under pipe and 12" over to of pipe. Flowfin able Fill is induded only for al two feet from subg de down. The reainder fill is bid as gravel from top of pipe to tlowable fiIL (Bid as requested by Jeff Bell- ity mof Round Rods) Steel End caps are included to be tack welded to ends of casing. Casing has 4' of cover from lkxwline of ditch outside of nxiadway. Deeper depths expected under roadway. 73,920.00 73,920.00 IA/ �,7 re + -.2g131a.1c. Vice President Lewis Contractors inc. 4/27/2010) David Boone - RE_ FW: Pricing for 54" Casing _....__..__...__.__Page 1_ From: Jeff Bell <jbell@round-rock.tx.us> To: David Boone <DBOONE@dot.state.tx.us> CC: Bill Stablein <bstablein@round-rock.tx.us>, Michael Thane <mthane@round-... Date: 4/22/201012:22 PM Subject RE: FW: Pricing for 54" Casing David, The City of Round Rock would like to accept the proposal for installing the 54" Casing Pipe 0 $78,392.00. Please move forward. Let me know If you need anything else from us. Jeff Bell ----Original Message --- From: David Boone [mailto:DBOONEOdotstate.bius] Sent: Wednesday, April 21, 2010 9:15 AM To: Jeff Bell Cc: Bill Stablein Subject: RE: FW: Pricing for 54" Casing Please note that the actual cost with the Prime Contractors' allowable profit and bond will be $78,392.00. Let me know if this is still OK. if it's finalized with the City, I will have District do an AFA amendment. David A. Boone Engineering Specialist Texas Dept. of Transportation Georgetown Area Office (512) 930-5402 »> Jeff Bell <jbell@round-rock.tx.us> 4/21/2010 8:51 AM »> David, Yes It is. I hope to be able to give a go ahead tomorrow. Thanks for your additional time and consideration. Jeff ----Original Message --- From: David Boone [maitto:DBOONE0dot.state.tx.us] Sent: Tuesday, April 20, 20101:19 PM To: Jeff Beq Cc: BM Stablein Subject: Fwd: FW: Pricing for 54" Casing Jeff, See attached. Is it more to your liking? David A. Boone Engineering Specialist Texas Dept of Transportation Georgetown Area Office (512) 930-5402 Please use caution when driving through work zones. Find more information about work zone safety at www.bcdoLgov/safety/tips/work_zones.htm Please use caution when driving through work zones. Find more infomtation about work zone safety at 15. - V ao " a 4k ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. Agenda Item No. 9E3. City Council Agenda Summary Sheet Consider a resolution authorizing the Mayor to execute Construction Contract Change Order Agenda Caption: No. 6 with the Texas Department of Transportation for the FM 1460 Expansion Project. Meeting Date: August 12, 2010 Department: INFRASTRUCTURE DEVELOPMENT AND CONSTRUCTION MANAGEMENT Staff Person making presentation: Michael Thane Director of Infrastructure Management Item Summary: This Change Order adds 160 linear feet of 54 -inch steel casing for a future waterline to be installed across A.W. Grimes Boulevard.The City requested this work during the roadway construction widening of A.W. Grimes in order to eliminate the need for a large boring operation under A.W. Grimes in the future. This Change Order is 3rd Party funded by the City of Round Rock and is covered by the Advanced Funding Agreement. Strategic Plan Relevance: Goal 27.0 "Ensure there is an adequate, affordable and safe water supply." Cost: $78,392.16 Source of Funds: Self -Finance Water Construction Fund Date of Public Hearing (if required): N/A Recommended Action: Approval of the change order EXECUTED DOCUMENT FOLLOWS TEXAS DEPARTMENT OF TRANSPORTATION CONSTRUCTION CONTRACT CHANGE ORDER NUMBER: 06 Third Party Funding Notification Sheet This form is used when the subject change order involves funding by a source other than TxDOT/U.S. DOT, and involves third parties who are providing funding under an Advance Funding Agreement or Donation Agreement. 1. Outside funding provided by: City of Round Rock (Outside Entity's legal Name) 2. Type of outside funding agreement for this change: ✓ Existing (Z Amended [ Check one I- New 3. Indicate the type and amount of funding: E Fixed Price (Lump Sum) (Estimated Amount $78,392.16 ) R. Actual Cost (a) Contract Items (Bid Items): $78,392.16 (b) E&C*: (a) x 0 = 0 enter % (c) Indirect Cost": (a + b) x 0 = 0 enter % TOTAL $78,3997.14 CCSJ: 2211-02-021 Project: STP 2009(866)ES Highway: FM 1460 County: Williamson District: Austin Contract Number. 08093008 Use as needed: I hereby acknowledge notification oldie modifications covered by this Change Order. Date By ✓ 1 Typed/Printed Name ataiI I/l C6 ('A) Typed/Printed Tide4��� "The percentage (%) for E&C (Engineering and Contingencies) charges varies from project to project depending on the contract amount of the project. Projects with a higher contract amount will have a lower rate of E&C charge. Fora specific project, E&C rate (96) can be derived from the cost of "Engineering and Contingencies" in the "Estimated Cost" of the project. `* Use the statewide district rate as established by Finance Division each year. This line 3(c) is for Service Project only, unless otherwise specified in the Advance Funding Agreement. See Stand Alone Manual Notice 98-2 for instructions. Funding for this Change Order has been arranged: TxDOT Representative Date Typed/Printed Name: L TXDOT Forrn 2146-AFA (Rev. 7/2007) Page 1 of 1 REPORT DATE: N E g a g 22 la. Ir.0 Om DDDD C 2 2 m E l l'ID D D ce 0 0 C 0z z.E o IgF t E m .G O2 m a v L- W V W o ti E m -6 , Zw w 0 8 '5 i CL y 0 .19 ti p 0 Ti uia a. ti r -• z H a a c � m >_ g_ ar c o 2 m A -v z Q :a . 0 {3 3 c = M m co 3 -- 0 tan v 0 0 u- E J 0 r2 z c i 8 u. °W O 0 •c l m ir S m 1 Ts a C W W W ��. 0 to V Z ca 0 x g a? a 1-.: z D R z o tztl ca E m W 2 O ``° . zSc°i°d El re W m c vg a .a .o `i m V c w H E W Z C"iTi 03 03 � E CC H 3 c • c t m c co a a« x r 16 m ifiT U O W _0u. mei Zi Z w CA N J H _C22a l � gyC m. , W05 D N g 4 W cj o OJ LL• V C O O m U) II- 0 O ! ,/,- E Q� m m <D N N= W m2m w 0 '6N 0 C W co (O co co. a C 27.4-W O `p' h q) co yrys�` z C S 3 C �ppif{ �I spy qO o p3 r,•,, W iV foVf W 0 N 'c J3 C O N h- t�7 - P7 = J c 0 § i Z 1- 1- • M W e� 6 HSS Ntn4O 0 cco Ucji g g qLL 1 Clw c m m �= F W -U z S z 7--b- a `8 C ami s O CHANGE ORDER NBR. i(S): IC z 0 W 0 = -� " fl c tj Opp l-u'iCU C w c wad 0v+ • >fl� a p U W Q' J m .0 C W fii; W � W a> V 3 !2 co O w-trQ. �0 0 0 Z C i`'0 1- ;o o F. 03 av< an n�,a CC DISTRICT ENGINEER: a 0 DIRECTOR, CONSTRUCTION DIVISION: uJ O AED For Eng. Operations: TYPED/PRINTED TITLE: F 0 0 AREA ENGINEER: o m to O O W m CO 0 ,' h w I.- m Vt m a CHANGE ORDER NBR. w a + w O a re0 W 1- z 2 • d z DESCRIPTION O 0 • . w w 6ci W aa ca N N y Z co O N N 0 0 a T P 0 N W VO N N O h Ce W a o FZ S -t o U W• ? O C• 01 a. O Z o CHANGE ORDER AMOUNT ID CHANGE ORDER NBR. CONTRACT ID FUNDING SOURCES w C E Work Category: U 0 1. Work Program: LEWIS CONTRACTORS, INC. Project: TxDOT - FM 1460 Casing Location: Cedar Park, Texas Date: April 20, 2010 Engineer City of Round Rock To: Hunter Industries, Ltd. Attn: Gary Tacked Phone: 512-6654501 We propose to provide equipment, labor and material t6 perform the following operations. Our proposal is to indude these items as specifically !kited, ail other work items or materials are excluded. This quote is void after sixty days from proposal date. 1 54" Steel Casin .. Item Description 1 Quantity Unit Price Extension 1 install 54" Casing 3/8 Walt. Move in #1 fi 801 if. $ 462.00 $ 36,960.60 2 Install 54" Casing 3/8 Wall. Move in #2 1 80 If . $ 462.00 $ 36,960.00 Exclusions: - inspection Fees - General building permit - Impact, tap or connection fees - Engineering control/Layout and Survey of work - Meter fees and/or deposits - Conduits or sleeves for other trades - Landscaping, seeding or sod - Tree removal or replacement - locate Of Private Utilities - Traffic ControUBarricades/Barriers if ubtotal For 54" Steel Casing $ Grand Total : $ - Construction Material Testing - Geotech Testing - Adjustment Of Existing Utilities - Removal Or Replacement Of Paving - Erosion Control - Inlet protection (stage two) - Import Of Select Material For Backfill - Construction Water Additional Qualifications; i - Payment and Performance bonds are included. Can be deducted If not needed. Hauloff of spoils is included. Pricing includes two move in's. Casing is bid with bedding 6" under pipe and 12" over to'l of pipe. Flowable Alt is included only for final two feet from subgrade down. The remainder till is bid as gravel from top of pipe to flowable fill. (Bid as requested by Jeff Bell -City of Round Rock) Steel End caps are included to be tack welded to ends of casing. Casing has 4' of cover from Bowline of ditch outside of roadway. Deeper depths expected under roadway. Sincerely, S \r \ , �Qkic.) '1'O rMAW tPui6 Matthew 73,920.00 73,920.00 /.5- °�s + i % Vice President Lewis Contractors Inc. (4/27/2010) David Boone RE FW Pricing for 54" Casing From: Jeff Bell <jbell@rouid-rock.tx.us> To: David Boone <DBOONE@dot.state.tx.us> CC: Bill Stablain <bstablein®round-rock.tx.us>, Michael Thane <mthane@round-... Date: 4/22/2010 12:22 PM Subject: RE: FW: Pricing for 54" Casing David, The City of Round Rock would like to accept the proposal for installing the 54" Casing Pipe 0 $78,392.00. Please move forward. Let me know If you need anything else from us. Jeff Bell ----Original Message --- From: David Boone [mailto:DBOONE@dot.state.tx.us] Sent: Wednesday, April 21, 2010 9:15 AM To: Jeff Bell Cc: Bill Stableln Subject RE: FW: Pricing for 54` Casing Please note that the actual cost with the Prime Contractors' allowable profit and bond will be $78,392.00. Let me know if this is still OK. 1f it's finalized with the City, I will have District do an AFA amendment. David A. Boone Engineering Specialist Texas Dept. of Transportation Georgetown Area Office (512) 930-5402 »> Jeff Bell <jbell®round-rock.txus> 4/21/2010 8:51 AM »> David, Yes It is. I hope to be able to give a go ahead tomorrow. Thanks for your additional time and consideration. Jeff ----Original Message ----- From: David Boone [maiito:DBOONE0dot.state.tx.us] Sent: Tuesday, April 20, 2010 1:19 PM To: Jeff Bell Cc: Bill Stablein Subject: Fwd: FW: Pricing for 54" Casing Jeff, See attached. Is it more to your liking? David A. Boone Engineering Specialist Texas Dept. of Transportation Georgetown Area Office (512) 930-5402 Please use use caution when driving through work zones. And more information about work zone safety at www.txdot.gov/safety/tips/work_zones.htm Please use caution when driving through work zones. And more information about work zone safety at _ Page 0 0 5 W 3