Loading...
CM-2017-1478 - 9/22/2017'•H[NINUHfH:6.7F7(AS Contract Quantity Adjustment/Change Order M. 1/10 Department: Transportation Administration Project Traffic Signal - AVERY NELSON BLVD/CR 112 AND Name: AW GRIMES City Project ID Number: TRFSG-600-CON-AVGRM Justification Reflective Pavement Markings replaced. Not on original plans Record Final Quantity Adjustments for Over -runs SUMMARY Original Contract Price: Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Signature Page 1 of 3 Date: 9/1/2017 Change Order/Quantity Adjustment No. 2 Amount % Change $237,761.00 8 22 2017 $237,761.00 Signature $13,223.32 S.S6% $2,079.00 0.87% $15,302.32 6.44% $0.00 Signature $2,360.00 Date $2,360.00 $255,423.32 / /L�l �• G N/A N/A �.'.1 / N/A Signature Signatures and Approvals Collette Phillips, Asst Controller Austin Traffic Signal Printed Name, Title and Company Date 17 Approval: r ' Ed Schroeder Vice -Pres Austin Traffic Signal 8 22 2017 Signature Printed Name, Title and Company Date City Staff Approval: t 'LA �Cccbte L - P tr, cl' 14 `t Signature Printed Name and Title T Date City Official CtI / /L�l �• G Approval: N / a �.'.1 / Signature Printed Name i 1J Date C'itil� '�1-7-IL01 .9 Page 2 of 3 Contract Quantity Adjustment/ Change Order rev. 01/10 Chanae Order Data Bid Item# Item Description and Chane Unit Unit Price Amount Contract Time Adjustment (Days) 9002-0001 9002-0002 9002-0003 9002-0004 ELIMINATE EXISTING (MECHANICAL) REFLTV PAVMARKNG (TY 1-W)(ARW) REFLV PAVMARKNG (TY 1-W)(WORD) REFLV PVMRKNG (TY 1-W)(TRIANGLE) LF EA EA EA 53 $10.50 $556.50 4 $105.00, $420.00 4 $131.25 $525.00 11 $52.50 $577.50 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00, $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.001 TOTALS: $2079-00 0 .f Contract Quantity Adjustment/ Change Order rev. 01/10 Ouantitv Adiustment Data Page 3 of 3 TOTALS: $2,360.001 0 Bid Item# Item Description and Chane Unit Unit Price Amount Contract Time Adjustment (Days) 011-0636 0012-0636 PAVEMENT MARKINGS (12 IN) PAVEMENT MARKINGS (24 IN) LF LF 134 $5.00 $670.00 169 $10.00 1 690.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00, $0.00 0 $0.00, $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 10.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00, $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 0.00 0 $0.00 0.00 0 $0.00 0.00 TOTALS: $2,360.001 0 City of Round Rock "0 ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 2 with Austin Traffic Signal Construction Co., Inc. for the Signal Construction at Avery -Nelson Blvd./CR 112 and A.W. Grimes Blvd. (FM 1460) Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 9/22/2017 Dept Director: Gary D Hudder, Transportation Director Cost: $4,439.00 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: Partially executed Change Order #2 Department: Transportation Department Text of Legislative File CM -2017-1478 Consider executing Quantity Adjustment/Change Order No. 2 with Austin Traffic Signal Construction Co., Inc. for the Signal Construction at Avery -Nelson Blvd./CR 112 and A.W. Grimes Blvd. (FM 1460) Project. Due to increases in traffic flow on A. W. Grimes a traffic signal study was conducted and warrants were met for the installation of a traffic signal at the Avery Nelson/CR 112 and A. W. Grimes intersection. The signal was installed and is operational. This change order and quantity adjustment is for additional pavement markings and some elimination of existing markings that had not been shown on the plans set. The change order amount is $2079.00 and the quantity adjustment amount is $2,360.00. The total amount is $4,439.00. Cost: $4,439.00 Source of Funds: RR Transportation and Economic Development Corporation City o/ Round Rock Page 1 Printed on 9/21/2017