Loading...
R-03-11-25-12C1 - 11/25/2003RESOLUTION NO. R -03-11-25-12C1 WHEREAS, the City of Round Rock has previously entered into an Agreement for engineering services ("Agreement") with Rodriguez Transportation Group, Inc. to complete Phase I and provide inspection services for A.W. Grimes Boulevard, and to complete the design of Phase II for A.W. Grimes Boulevard, and WHEREAS, Rodriguez Transportation Group, Inc. has submitted Supplemental Agreement No. 3 to the Agreement for a change in the scope of services and to extend the contract date, and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 3 to the Agreement with Rodriguez Transportation Group, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 3 to the Agreement with Rodriguez Transportation Group, Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 25th day of November, 00 _ NYL 7 EL, Mayor ATTES'` : / / {�ity of Round Rock, Texas CHRISTINE R. MARTINEZ, City Secretar @PFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R31125C1.WPD/sc STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 3 TO AGREEMENT FOR ENGINEERING SERVICES FOR CONSTRUCTION INSPECTION SERVICES FOR A.W. GRIMES BLVD., AND FOR DESIGN OF PHASE II OF A.W. GRIMES BLVD., AND GATTIS SCHOOL ROAD This Amendment to the Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Rodriguez Transportation Group, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinaf- ter called the "Agreement", on the 14th of June, 2001 to provide construction inspection services for the A.W. Grimes Boulevard Phase I Project, and for the design of Phase II of A.W. Grimes Blvd., and Gattis School Road, and WHEREAS, the City and Engineer executed Supplemental Agreement No. 1 for Engineering Services on the 27th of June, 2002 to extend the termination date of the contract to December 31St, 2002, and WHEREAS, the City and Engineer executed Supplemental Agreement No. 2 for Engineering Services, on the 19th of December, 2002 to extend the termination date of the contract to Decem- ber 31st, 2003 to amend the scope of services and to increase the lump sum fee to $1,254,482.87, WHEREAS, ARTICLE 2, SCOPE OF SERVICES TO BE PROVIDED BY ENGINEER, describes those engineering services to be provided by the Engineer as a part of the Agreement, and WHEREAS, ARTICLE 3, AGREEMENT PERIOD, requires the termination of the Agree- ment on December 31St, 2003 unless the Agreement is extended, and WHEREAS, ARTICLE 4, COMPENSATION, establishes the maximum lump sum payable under this Agreement at $1,254,482.87, without modification of the Agreement, and WHEREAS, it has become necessary to amend the Agreement to provide for additional services for (1) miscellaneous roadway geometry revisions, (2) storm sewer design, (3) waterline design, (4) section 404 permit support, (5) miscellaneous field support, and WHEREAS, the Engineer has agreed to have the additional work performed for $231,520.19 increasing the lump sum fee for the Agreement to $1,486,003.06. NOW THEREFORE, premises considered, the City and the Engineer agree that said Agree- ment is amended as follows: Supplemental Agreement 57911 Page 1 of 3 Rev. 4/2/03 ARTICLE 3, AGREEMENT PERIOD, shall be amended to extend the Agreement period to De- cember 31St, 2004, and ARTICLE 4, COMPENSATION, shall be amended by increasing the lump sum amount payable under this Agreement to $1,486,003.06. EXHIBIT "B", Services to be Provided by the Engineer shall be amended as set forth in the at- tached ADDENDUM to EXHIBIT B. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agree- ment No. 3 in duplicate. RODRIGUEZ TRANSPORTATION GROUP, INC. By: Mark Rodrigo , President /1- 0 6-2 a'3 Date CITY OF ROUND ROCK By: Nyle Maxwell, Mayor Date Supplemental Agr Form.doc/specs master/contracts & forms — Revised 4/1/02 Supplemental Agreement Rev. 4/2/03 57911 Page 2 of 3 ADDENDUM TO EXHIBIT B SEE ATTACHMENTS Supplemental Agreement Rev. 4/2/03 57911 Page 3 of 3 EXHIBIT B Rodriguez Transportation Group. A.W. Grimes Blvd. Summary of Additional Costs to be Approved by The City of Round Rock RTG Design Phase I, Phase IIA, Phase IIB and Gattis School Rd. RTG Additional Engineering Services - Phase IIA RTG Additional Engineering Services - Gattis School Rd. RTG Additional Engineering Services - Phase IIB RTG Construction Inspection Services - Phase 1 (Jan - March) RTG Construction/Design Support Services - Phase IIA (March - August) RTG Construction Inspection Services - Phase IIA RTG Construction Inspection Services - Phase IIB Hicks & Co. S.A.M., Inc. Rabba Kistner - Brytest Consultants, Inc. Aguirre & Fields, LP Espey Consultants, Inc. Huggins/Seiler & Associates, LP Contract Balance Resolution No. R -01-06-14-16F3 $ 475,531.05 281,114.99 80,072.16 67,455.47 55,300.00 122,207.75 58,082.25 114,719.20 Additional Requested Services 22,202.54 5,037.98 41,606.21 30,612.75 50,247.75 69,615.00 9,987.96 2,210.00 Balance for new Contract $ 475,531.05 22,202.54 5,037.98 41,606.21 311,727.74 50,247.75 69,615.00 80,072.16 67,455.47 55,300.00 132,195.71 60,292.25 114,719.20 $ 1,254,482.87 $ 231,520.19 $ 1,486,003.06 Rodriguez Transportation Group, Inc. Additional Costs to be Approved by the City of Round Rock Rodriguez Transportation Group, Inc. The following are additional costs associated with A. W. Grimes Blvd. Current Contract (Resolution No. R -01-06-14-16F3) $ 756,646.04 RTG Additional Engineering Services - Phase IIA (See attached detail) Engineering and support services to extended A.W. Grimes Blvd. RTG Additional Engineering Services - Gattis School Rd. (See attached detail) Engineering and support services to revise construction documents RTG Additional Engineering Services - Phase IIB (See attached detail) Engineering and support services to revise construction documents RTG Construction Inspection Services - Phase 1 (See attached detail) Construction inspection services required to complete project RTG Construction/Design Support Services - Phase IIA SSee attached detail) Construction support services for A.W. Grimes Blvd. and Gattis School Rd. RTG Construction Inspection Services - Phase IIA (See attached detail) Construction inspection services as required RTG Construction Inspection Services - Phase IIB (See attached detail) Construction inspection services as required $ 22,202.54 $ 5,037.98 $ 41,606.21 $ 30,612.75 $ 50,247.75 $ 69,615.00 New Revised Total for Current Contract $ 975,968.27 Balance for Supplemental Agreement No. 3 $ 219,322.23 Rodriguez Transportation. Group, Inc. RTG Additional Phase I Services & Pond Spillway Estimate and Additional. Inspection Services OH Profit Reg Reg Labor Mult. Mult RTG Additional. Engineering Services - Phase IIA Hours Amount Cost 155% 12% Total 160: Roadway Design Brock Miller 40 1,840 $ 1,840.00 $ 2,852.00 $ 563.04 $ _ 5,255.04 161: Drainage 24 1,104 1,104.00 1,711.20 337.82 3,153.02 160: Roadway Design Greg Parrent 20 740 740.00 1,147.00 226.44 2,113.44 161: Drainage 20 740 740.00 1,147.00 226.44 2,113.44 160: Roadway Design Brian Nilson 40 1,550 1,550.00 2,402.50 474.30 4,426.80 163: Misc. Roadway Brent Zarosky 60 1,800 1,800.00 2,790.00 550.80 5,140.80 RTG Additional Engineering Services Gattis School Rd. 161: Drainage Gary Lilja 24 828 828.00 1,283.40 253.37 2,364.76 300: Waterline Design Steve Harris RTG Additional Engineering Services - Phase IIB 160: Roadway Design Brock Miller 161: Drainage 163: Misc. Roadway 160: Roadway Design Greg Parrent 161: Drainage 163: Misc. Roadway 160: Roadway Design Brian Nilson 161: Drainage 163: Misc. Roadway 160: Roadway Design Brent Zarosky 161: Drainage 163: Misc. Roadway 24 936 936.00 1,450.80 286.42 2,673.22 32 1,472 32 1,472 32 1,472 32 1,184 32 1,184 32 1,184 48 1,860 48 1,860 48 1,440 48 1,440 RTG Construction inspection Services Phase I (Jan -. March) Inspector 1,472.00 2,281.60 450.43 4,204.03 1,472.00 2,281.60 450.43 4,204.03 1,472.00 2,281.60 450.43 4,204.03 1,184.00 1,835.20 362.30 3,381.50 1,184.00 1,835.20 362.30 3,381.50 1,184.00 1,835.20 362.30 3,381.50 1,860.00 2,883.00 569.16 5,312.16 1,860.00 2,883.00 569.16 5,312.16 1,440.00 2,232.00 440.64 4,112.65 1,440.00 2,232.00 440.64 4,112.65 Hank Hampton 343 10,719 10,718.75 16,614.06 3,279.94 30,612.75 RTG Construction/Design Support Services - Phase IIA (March - August) Inspector Hank Hampton 563 17,594 17,593.75 27,270.31 5,383.69 50,247.75 RTG Construction Inspection Services - Phase IIA Inspector Hank Hampton 780 24,375 24,375.00 37,781.25 7,458.75 69,615.00 RTG Construction Inspection Services - Phase IIB Inspector Hank Hampton Total Cost 76,793.50 $ 119,029.92 $ 23,498.81 $ . 219,322.23 Rodriguez Transportation Group, Inc. Additional Costs to be Approved by the City of Round Rock Hicks & Company The following are additional costs associated with A. W. Grimes Blvd. Current Contract (Resolution No. R -01-06-14-16F3) $ 80,072.16 No Additonal Scope or Fee Required Rodriguez Transportation Group, Inc. Additional Costs to be Approved by the City of Round Rock Surveying and Mapping, Inc. The following are additional costs associated with A. W. Grimes Blvd. Current Contract (Resolution No. R -01-06-14-16F3) $ 67,455.47 No Additonal Scope or Fee Required Rodriguez Transportation Group, Inc. Additional Costs to be Approved by the City of Round Rock Raba-Kistner-Brytest Consultants, Inc. The following are additional costs associated with A. W. Grimes Blvd. Current Contract (Resolution No. R -01-06-14-16F3) $ 55,300.00 No Additonal Scope or Fee Required Rodriguez Transportation Group, Inc. Additional Costs to be Approved by the City of Round Rock Aguirre & Fields, LP The following are additional costs associated with A. W. Grimes Blvd. Current Contract (Resolution No. R -01-06-14-16F3) $ 122,207.75 Letter Dated February 6, 2003 from Aguirre & Fields, LP * Agreement for Additional Professional Services (See attached scope and fee) 1. Aguirre & Fields, LP will provide design and detail sheets for the hanging supports of the proposed 16" waterline across Lake Creek Bridge. Email from Aguirre & Fields, LP * Agreement for Additional Professional Services (See attached scope and fee) 1. Aguirre & Fields, LP will provide bridge design and detail revisions to accommodate a 16" waterline on the NB Brushy Creek Bridge. $ 3,000.00 $ 6,987.96 New Revised Total for Current Contract $ 132,195.71 Balance for Supplemental Agreement No. 3 $ 9,987.96 *- Additional work approved by City of Round Rock February 6, 2003 AGUIRRE & FIELDS i3 Mr. Mark Rodriguez, P.E. Rodriguez & Huggins, Inc. 11211 Taylor Draper Lane Suite 100 Austin, TX 78759 Transportation • Civil • Structural Engineers and Planners Re: Lake Creek Bridge Waterline Details Dear Mark: Aguirre & Fields, LP is pleased to submit this letter proposal to you for a change in :the design services for the above referenced project. The supplemental scope of services to provide a detail sheet for the hanging of the proposed 16" waterline across Lake Creek Bridge is attached. We propose to perform the outlined supplemental services for the lump sum price of $3,000.00. This changes the total amount of the contract from $226,000.00 to $229,000.00. If you find this proposal acceptable, please sign and date both copies and return one to AEC. Please do not hesitate to contact me if you have any questions. Signed: Aguirre & Fields, LP: Aguirre, LLC — General Partner Oscar R. Aguirre, P.E. President Name Title Rodriguez Transportation Group s-/7 4/tc. C i.o 4r(,, -&F Name Title -z/./;,/o3 62 -PS 1 Date Date Attachment 4800 Sugar Grove, Suite 625 • Stafford, TX 77477.281-340-8900 • 281-340-8909(fax) • www.aguirre-fields.corn Attachment "D" Scope of Services. Aguirre & Fields, LP FC 170 Design of structural supports for proposed 16" waterline crossing Lake Creek below the newly constructed bridge. Detail of back wall penetration for water line.. Deliverable will be a detail sheet tobe inserted intothe existing plan set. Attachment D A.W. Grimes Brushy Creek NB Bridge Changes for 16" Waterline Summary Scope of Work: Implement Changes for the Accomodation of the 16" Waterline on the NB. Brushy Creek Bridge Labor: Expenses: FC Description Hours Fee 170 Bridge 92 $6,987.96 Total Labor 92 $6,987.96 Total Expenses (Included in Overhead) $0.00 Total Supplemental #4 $6,987.96 Total Contract Fee $6,987.96 iO. r Cn 69 00 '4f 00 401 00 69 00 O\ 0 69 0 00 O\ 69 \a ON a 5!9"" 0 O 69 0 O 00 CA. O\ ON ON O O O O O O 0 'o ON 00 0 N h O O O N 0 to d s 00 N U 0 0 0 O O O az 0 Cn 69 0 69 M O 69 Ek TL' 1/40 N N N 10 .0N N N to R c0 Cn 0. C0 v O O O O CO et Included in overhead i. Task Description 04 '//ate� 00 it 0 00 CO CO3. Co) gin z 000 CO 10 i 0 0 E c N 0 0 SUBTOTAL NB Brushy Creek Bridge Sheets to Change SUBTOTAL FC 170 00 0 a r U O C0 0 0 U 0 0. a) 0. C9 SUBTOTAL 0- 0 ten O t� O o0 N 69 69 o ill O C` 00 — to 69 69 M O\ N 69 1/40 69 tn v 00 O\ 00 N N 00 69 69 v1 00 t- t- en O 69 69 Direct Labor Rates Labor Rates w/overhead and fixed fee Overhead Rate Fixed Fee Rate Rodriguez Transportation Group, Inc. Additional Costs to be Approved by the City of Round Rock Espey Consultants, Inc. The following are additional costs associated with A. W. Grimes Blvd. Current Contract (Resolution No. R -01-06-14-16F3) $ 58,082.25 Letter Dated August 4, 2003 from Espey Consultants, Inc. * Agreement for Additional Professional Services (See attached scope and fee) 1. EPC, Inc. will prepare preliminary design calculations and sketches for the proposed improvements to Dry Branch Creek Tributary No. 1. $ 2,210.00 New Revised Total for Current Contract $ 60,292.25 Balance for Supplemental Agreement No. 3 $ 2,210.00 *- Additional work approved by City of Round Rock August 4, 2003 Mark Rodriguez, P.E. Rodriguez Transportation Group 11211 Taylor Draper Lane Suite 100 Austin, Texas 78759 spey Consultants, I F,nvironimental F }.Oneei'i}.;,.�..,< 'fie r i^• t RE: Improvements to Dry Branch Tributary No. 1 downstream of AW Grimes Boulevard Section 404 Permit Application Support Proposal for Professional Engineering Services EC Proposal No. 03P075 Dear Mr. Halden: Espey Consultants, Inc. (EC) is pleased to present this proposal to prepare preliminary design calculations and sketches for the proposed improvements to Dry Branch Tributary No. 1 from AW Grimes Boulevard downstream for approximately 1,600 linear feet in support of a Section 404 Permit application being prepared by Rodriquez Transportation Group. The preliminary design described in the Preliminary Engineering Report for the South Creek Channel Improvement Project prepared by Espey Consultants, Inc., dated July 2003 (Final Draft) will be extended upstream to AW Grimes Boulevard. Espey Consultants, Inc. will coordinate the design with Gray / Jansing Associates, Inc., and submit the necessary design information (plan, profile and cross-section) to Rodriguez Transportation Group for submittal to the US Corps of Engineers. If the following scope of services and the terms of the attached consulting agreement meet with your approval, please counter sign in the space provided and return a copy for our files. SCOPE OF SERVICES The scope of services include the following three primary tasks: 1. Coordination and Review of Existing Survey and Plat Information — EC will coordinate to obtain existing design and/or cross-section survey data for the project limits, as well as plat and boundary information from Gray-Jansing Associates (GJA) and Rodriguez Transportation Group (RTG). EC will review the supplied data for integration into the existing South Creek Channel Improvements hydraulic model, prepared under prior authorization. 2. Limited Hydraulic Analysis and Design - EC will incorporate the survey data into the existing South Creek Channel Improvements hydraulic model, and develop a "proposed conditions" model to demonstrate conveyance. EC will review the existing topography to ensure that the proposed cross- section will fit within the proposed right-of-way. EC will determine flow line and top of bank elevations for the study reach. 3. Preparation of Exhibits — EC will prepare plan view, cross-section, and stream profile exhibits to accompany the submittal of the 404 Permit application prepared by RTG. Mark Rodriguez, P. E. Page 2 of 2 August 4, 2003 This scope does not include preparation, submittal, review fees, addressing comments for, or tracking of the 404 Permit Application (by others). BUDGET ESTIMATE A budget breakdown is included by task in the following table. The estimated cost of this work is $2,210. Man -Hour Estimate by Labor Classification Engineering Description Principal Proj. Man. Staff Technician Clerical 1 Coord/Review of Existing Survey/Plat Information 2 4 2 2 Limited Hydraulic Analysis and Design 1 8 3 Preparation of Exhibits 1 2 8 subtotals: 0 4 14 10 0 approximate billing rate: $ 130 $ 105 $ 80 $ 50 $ 45 subtotal by labor classification: $ - $ 420 5 1,120 $ 500 $ Subtotals Time Cost (hrs) ($) 8 $ 630 9 $ 745 11 $ 665 28 $ 2,040 mileage: $ 50 courier: $ 20 reproduction: $ 100 TOTAL: $ 2,210 If you have questions or comments, please don't hesitate to call. Sincerely, Brian K. Reis, P. E., C. F. M. Vice President Attachment M: lactive103P075 Round Rock 404 Support1030731MRodriguez.doc Espey Consultants, Inc. 8/18/2003 CONSULTING AGREEMENT AND AUTHORIZATION TO PROCEED 'This Agreement is between Espev Consultants, Inc. (EC) and Rodriguez Transportation Group (Client). SCOPE OF SERVICES EC agrees to perform services described in proposal dated August 4. 2003 (EC Proposal No. 03P075), including attaclunents and amendments ("SERVICES") for the project entitled: Improvements to Dry Branch Tributary No. 1— Section 404 Permit Application Support. COMPENSATION, BILLING AND PAYMENT EC is willing to perform the SERVICES in exchange for the following fee: _X_ CLIENT will pay on a time and material basis not -to -exceed the sum of $2,210 in accordance with our standard rate schedule. EC shall submit a monthly statement to CLIENT setting forth the appropriate billing information. Payment of the invoice is due within 30 days of receipt, and is not contingent upon payment from a third party. If CLIENT fails to pay any undisputed invoiced amounts within thirty (30) calendar days of the date of the invoice, EC may suspend its performance or terminate this Agreement without incurring any liability to CLIENT and without waiving any other claim against CLIENT. Outstanding balances in excess of 30 days may accrue interest at a rate of 1% in subsequent invoice periods, and project work will cease until payment is received. INDEMNITY / LIMITATIONS OF LIABILITY Subject to any limitations stated in this Agreement, EC will indemnify and hold harmless CLIENT, its officers, directors, employees, and subcontractors, from and against all claims and actions, including reasonable attorneys fees, arising out of damages or injuries to persons or tangible property to the extent they are caused by the willful misconduct, a professionally negligent act, error, or omission of EC or any of its agents, subcontractors, or employees in the performance of Services under this Agreement. EC will not be responsible for any loss, damage, or liability arising from any contributing negligent acts by CLIENT, its subcontractors, agents, staff, or consultants. Neither party will be responsible to the other for consequential damages including, but not limited to, loss of profit, loss of investment or business interruption. The CLIENT also agrees not to seek consequential damages including, but not limited to, loss of profit, loss of investment or business interruption. The CLIENT also agrees to seek recourse only against EC and not against its officers, employees, directors, or shareholders. TERMINATION Either party may terminate this agreement by rendering written notice thirty (30) days prior to the desired termination date. CLIENT shall pay for all fees and expenses consistent with this Agreement incurred prior to the tennination date. AUTHORIZATION CLIENT confirms reading this document in full. This Agreement when executed by Espey Consultants, Inc. is an offer to perform the services, open for acceptance within 30 days. This Agreement becomes effective on the date CLIENT signs below. Rodriguez Transportation Group (CLIENT) EC - Espey ConsultantsInc. By: By: ✓C5/(>l Name: I7 ,� E . ?., pec. G (.4c -e- Name: Title: ?KGs n _T Title: rian K. Reis, PE, CFM Vice President Date: e- 2J, 3 Date: 8/18/03 M: tactiveiO3P075 Round Rock 404 Supportistandcontract.doc Espey Consultants, Inc. Page 1 of 1 8/18/2003 Standard Rate Schedule (EC1) The following professional and support service rates have been established for Espey Consultants, Inc. (EC) in calendar year 2003. Classification Rates Principal $ 130.00 $ 150.00 Project Manager $ 100.00 $ 130.00 Engineer $ 85.00 - $ 100.00 Engineering Staff $ 60.00 $ 80.00 Technician / Designer $ 40.00 $ 60.00 Adminstrative Support $ 35.00 $ 50.00 Travel and Subsistence: All travel and subsistence expenses will be invoiced at actual cost. Cost of mileage for private and company vehicles is computed at the prevailing rate designated by the U.S. Internal Revenue Service. The current rate is $0.36 per mile. Purchased Services: All purchased services are invoiced at actual cost plus ten (10) percent. These include but are not limited to reproduction, rented or leased equipment, etc. Subconsultant Services: All subconsultant services (geotechnical, survey, landscape architecture, etc.) are invoiced at cost plus 6%. Terms: Invoices are submitted monthly for services rendered, and are due within 30 days of receipt (Net 30 days). Late payments will incur a late charge (1.5%) per month from the original date of invoice. EC reserves the right to stop work should invoices not be paid within 30 days. Espey Consultants, Inc. Page 1 of 1 EC1.xis Rodriguez Transportation Group, Inc. Additional Costs to be Approved by the City of Round Rock Huggins/Seiler & Associates, LP The following are additional costs associated with A. W. Grimes Blvd. Current Contract (Resolution No. R -01-06-14-16F3) $ 114,719.20 No Additonal Scope or Fee Required NOV-13-2003 15:5? CITY OF ROUND ROCK 51,22157097 P.01/01 CERTIFICATE OF LIABILITY INSURANCE PRODUCER USI Insurance Services of Texas 1946 S. IFS -35, Suite 301 Austin, Texas 78704 INSURED Rodriguez Transportation Group 11211 Taylor Draper Lane, Suite 100 Austin Rock, Texas 78759 Date; 11/10/2003 COMPANIES AFFORDING COVERAGE A Everest National Insurance Company B C THIS IS TO CERTIFY THAT the Insured named above is insured by the Companies listed above with respect to the business operations hereinafter described, for the types of insurance and in accordance with the provisions of the standard policies used by the companies, and further hereinafter described. Exceptions to the policies are noted below_ CO TYPE OF INSURANCE POLICY EFFECTIVE EXPIRATION LTR NUMBER DATE DATE LIMITS GENERAL LIABILITY GENERAL AGGREGATE $ PRODUCTS-COMP/OP AGG. $ PERSONAL & ADV. INJURY S EACH OCCURRENCE 5 FIRE DAMAGE (Any one Liffe) 500 MED. EXPENSE (Any one person) $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT 5 BODILY INJURY (Per person)' 5 BODILY INJURY (Per accident) 5 PROPERTY DAMAGE S EXCESS LIABILITY EACH OCCURRENCE a AGGREGATE S WORKERS' COMPENSATION AND EMPLOYERS' LIABILITY • STATUTORY LIMITS RAM AGlwIDE1 t1 ,....'� DISEASE' - POLICY LIMIT $ DISEASE - EACH EMPLOYEE $ A PROFESSIONAL LIABILITY 48AE001602031 07/22/03 07/22/04 Per Claim 52,000,000 Pcr Aggregate 52,000,000 DESCRIPTION OF OPERATIONS/LOCATIONSNEHIcLES/SPECIAL ITEMS/EXCEPTIONS Professional liability only: The aggregate limit is the total insurance available for clams presented within the policy period for all operations of insured. The limit will be reduced by payment of indemnity and expense. The City of Round Rock is named as additional insured with respect to all policies except Workers' Compensation. Employers' Liability and Professional Liability. Should any of the above described policies be cancelled or changed before the expiration date thereof, the issuing company will mail thirty (30) days written notice to the certificate holder named below. CR TIFICATE HOLDER: City Manager City of Round Rock 221 E. Main Street Round Rock, Texas 78664 cc: L aJ 1 COI RR USE : . SIGNATURE OF AUTHORIZED REPRESENTATIVE TOTAL P.01 DATE: November 20, 2003 SUBJECT: City Council Meeting - November 25, 2003 ITEM: *12.C.1. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 3 to the Agreement for Engineering Services with Rodriguez & Huggins, Inc. to complete Phase I and provide inspection services for A.W. Grimes Boulevard, and to complete the design of Phase II for A.W. Grimes Boulevard. Resource: Tom Word, Chief of Public Works Operations T. G. Martin, Director of Transportation Services Bill Stablein, Transportation Engineering Associate History: Approval request for Supplemental Agreement No. 3 will extend the contract until December 31, 2004, and provide for costs of $231,520.19 for additional work that includes: 1. miscellaneous roadway geometry revisions, 2. storm sewer design, 3. waterline design, 4. section 404 permit support, 5. miscellaneous field support, increasing the lump sum fee for the contract to $1,486,003.06. Funding: Cost: $231,520.19 Source of funds: 4B Funds Outside Resources: Rodriguez Transportation Group Impact/Benefit: This project will provide for a new Brushy Creek Road Crossing and will provide much needed north/south access east of downtown Round Rock. This roadway will greatly enhance mobility and safety. Public Comment: Public Hearing conducted July 11, 2000. Sponsor: N/A Executed Document Follows STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 3 TO AGREEMENT FOR ENGINEERING SERVICES FOR CONSTRUCTION INSPECTION SERVICES FOR A.W. GRIMES BLVD., AND FOR DESIGN OF PHASE II OF A.W. GRIMES BLVD., AND GATTIS SCHOOL ROAD This Amendment to the Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Rodriguez Transportation Group, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinaf- ter called the "Agreement", on the 14th of June, 2001 to provide construction inspection services for the A.W. Grimes Boulevard Phase I Project, and for the design of Phase II of A.W. Grimes Blvd., and Gattis School Road, and WHEREAS, the City and Engineer executed Supplemental Agreement No. 1 for Engineering Services on the 27th of June, 2002 to extend the termination date of the contract to December 31St, 2002, and WHEREAS, the City and Engineer executed Supplemental Agreement No. 2 for Engineering Services, on the 19th of December, 2002 to extend the termination date of the contract to Decem- ber 31st, 2003 to amend the scope of services and to increase the lump sum fee to $1,254,482.87, WHEREAS, ARTICLE 2, SCOPE OF SERVICES TO BE PROVIDED BY ENGINEER, describes those engineering services to be provided by the Engineer as a part of the Agreement, and WHEREAS, ARTICLE 3, AGREEMENT PERIOD, requires the termination of the Agree- ment on December 31st, 2003 unless the Agreement is extended, and WHEREAS, ARTICLE 4, COMPENSATION, establishes the maximum lump sum payable under this Agreement at $1,254,482.87, without modification of the Agreement, and WHEREAS, it has become necessary to amend the Agreement to provide for additional services for (1) miscellaneous roadway geometry revisions, (2) storm sewer design, (3) waterline design, (4) section 404 permit support, (5) miscellaneous field support, and WHEREAS, the Engineer has agreed to have the additional work performed for $231,520.19 increasing the lump sum fee for the Agreement to $1,486,003.06. NOW THEREFORE, premises considered, the City and the Engineer agree that said Agree- ment is amended as follows: Supplemental Agreement Rev. 4/2/03 57911 R -03 -11 -d5 -1a1 Page 1 of 3 ARTICLE 3, AGREEMENT PERIOD, shall be amended to extend the Agreement period to De- cember 31st, 2004, and ARTICLE 4, COMPENSATION, shall be amended by increasing the lump sum amount payable under this Agreement to $1,486,003.06. EXHIBIT "B", Services to be Provided by the Engineer shall be amended as set forth in the at- tached ADDENDUM to EXHIBIT B. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agree- ment No. 3 in duplicate. RODRIGUEZ TRANSPORTATION GROUP, INC. By: 44.1 E Mark Rodrigu, President 1/- 06-2 o'3 Date CITY OF R • UN R • , , i By: 40.4 Nyle Maxwell, ayor 11—a5 -o3 Date Supplemental Agr Form.doc/specs master/contracts & forms — Revised 4/1/02 Supplemental Agreement Rev. 4/2/03 57911 Page 2 of 3 Supplemental Agreement 57911 ADDENDUM TO EXHIBIT B SEE ATTACHMENTS Page 3 of 3 Rev. 4/2/03 EXHIBIT B Rodriguez Transportation Group. A.W. Grimes Blvd. Summary of Additional Costs to be Approved by The City of Round Rock RTG Design Phase I, Phase IIA, Phase IIB and Gattis School Rd. RTG Additional Engineering Services - Phase IIA RTG Additional Engineering Services - Gattis School Rd. RTG Additional Engineering Services - Phase IIB RTG Construction Inspection Services - Phase I (Jan - March) RTG Construction/Design Support Services - Phase IIA (March - August) RTG Construction Inspection Services - Phase IIA RTG Construction Inspection Services - Phase IIB Hicks & Co. S.A.M., Inc. Rabba Kistner - Brytest Consultants, Inc. Aguirre & Fields, LP Espey Consultants, Inc. Huggins/Seiler & Associates, LP Contract Balance Resolution No. R -01-06-14-16F3 $ 475,531.05 281,114.99 80,072.16 67,455.47 55, 300.00 122,207.75 58, 082.25 114, 719.20 Additional Balance Requested for new Services Contract $ - $ 475,531.05 22,202.54 22,202.54 5,037.98 5,037.98 41,606.21 41,606.21 30,612.75 311, 727.74 50,247.75 50,247.75 69,615.00 69,615.00 80,072.16 67,455.47 - 55,300.00 9,987.96 132,195.71 2,210.00 60,292.25 114, 719.20 $ 1,254,482.87 $ 231,520.19 $ 1,486,003.06 Rodriguez Transportation Group, Inc. Additional Costs to be Approved by the City of Round Rock Rodriguez Transportation Group, Inc. The following are additional costs associated with A. W. Grimes Blvd. Current Contract (Resolution No. R -01-06-14-16F3) $ 756,646.04 RTG Additional Engineering Services - Phase IIA (See attached detail) Engineering and support services to extended A.W. Grimes Blvd. RTG Additional Engineering Services - Gattis School Rd. (See attached detail) Engineering and support services to revise construction documents RTG Additional Engineering Services - Phase IIB (See attached detail) Engineering and support services to revise construction documents RTG Construction Inspection Services - Phase I (See attached detail) Construction inspection services required to complete project RTG Construction/Design Support Services - Phase IIA (See attached detail) Construction support services for A.W. Grimes Blvd. and Gattis School Rd. RTG Construction Inspection Services - Phase IIA (See attached detail) Construction inspection services as required RTG Construction Inspection Services - Phase IIB (See attached detail) Construction inspection services as required $ 22,202.54 $ 5,037.98 $ 41,606.21 $ 30,612.75 $ 50, 247.75 $ 69,615.00 $ New Revised Total for Current Contract $ 975,968.27 Balance for Supplemental Agreement No. 3 $ 219,322.23 Rodriguez Transportation Group, Inc. RTG Additional Phase I Services & Pond Spillway Estimate and Additional Inspection Services OH Profit Reg Reg Labor Mult. Mult. RTG Additional Engineering Services - Phase IIA Hours Amount Cost 155% 12% Total 160: Roadway Design Brock Miller 40 1,840 $ 1,840.00 $ 2,852.00 $ 563.04 $ 5,255.04 161: Drainage 24 1,104 1,104.00 1,711.20 337.82 3,153.02 160: Roadway Design Greg Parrent 20 740 740.00 1,147.00 226.44 2,113.44 161: Drainage 20 740 740.00 1,147.00 226.44 2,113.44 160: Roadway Design Brian Nilson 40 1,550 1,550.00 2,402.50 474.30 4,426.80 163: Misc. Roadway Brent Zarosky 60 1,800 1,800.00 2,790.00 550.80 5,140.80 RTG Additional Engineering Services - Gattis School Rd. 161: Drainage Gary Lilja 24 828 828.00 1,283.40 253.37 2,364.76 300: Waterline Design Steve Harris RTG Additional Engineering Services - Phase IIB 160: Roadway Design Brock Miller 161: Drainage 163: Misc. Roadway 160: Roadway Design Greg Parrent 161: Drainage 163: Misc. Roadway 160: Roadway Design Brian Nilson 161: Drainage 163: Misc. Roadway 160: Roadway Design Brent Zarosky 161: Drainage 163: Misc. Roadway 24 936 936.00 1,450.80 286.42 2,673.22 32 1,472 1,472.00 2,281.60 450.43 4,204.03 32 1,472 1,472.00 2,281.60 450.43 4,204.03 32 1,472 1,472.00 2,281.60 450.43 4,204.03 32 1,184 1,184.00 1,835.20 362.30 3,381.50 32 1,184 1,184.00 1,835.20 362.30 3,381.50 32 1,184 1,184.00 1,835.20 362.30 3,381.50 48 1,860 1,860.00 2,883.00 569.16 5,312.16 48 1,860 1,860.00 2,883.00 569.16 5,312.16 48 1,440 1,440.00 2,232.00 440.64 4,112.65 48 1,440 1,440.00 2,232.00 440.64 4,112.65 RTG Construction Inspection Services - Phase I (Jan - March) Inspector Hank Hampton 343 10,719 RTG Construction/Design Support Services - Phase IIA (March - August) Inspector Hank Hampton 563 17,594 RTG Construction Inspection Services - Phase IIA Inspector 10,718.75 16,614.06 3,279.94 30,612.75 17,593.75 27,270.31 5,383.69 50,247.75 Hank Hampton 780 24,375 24,375.00 37,781.25 7,458.75 69,615.00 RTG Construction Inspection Services - Phase IIB Inspector Hank Hampton Total Cost $ 76,793.50 $ 119,029.92 $ 23,498.81 $ 219,322.23 Rodriguez Transportation Group, Inc. Additional Costs to be Approved by the City of Round Rock Hicks & Company The following are additional costs associated with A. W. Grimes Blvd. Current Contract (Resolution No. R -01-06-14-16F3) $ 80,072.16 No Additonal Scope or Fee Required Rodriguez Transportation Group, Inc. Additional Costs to be Approved by the City of Round Rock Surveying and Mapping, Inc. The following are additional costs associated with A. W. Grimes Blvd. Current Contract (Resolution No. R -01-06-14-16F3) $ 67,455.47 No Additonal Scope or Fee Required Rodriguez Transportation Group, Inc. Additional Costs to be Approved by the City of Round Rock Raba-Kistner-Brytest Consultants, Inc. The following are additional costs associated with A. W. Grimes Blvd. Current Contract (Resolution No. R -01-06-14-16F3) $ 55,300.00 No Additonal Scope or Fee Required Rodriguez Transportation Group, Inc. Additional Costs to be Approved by the City of Round Rock Aguirre & Fields, LP The following are additional costs associated with A. W. Grimes Blvd. Current Contract (Resolution No. R -01-06-14-16F3) $ 122,207.75 Letter Dated February 6, 2003 from Aguirre & Fields, LP * Agreement for Additional Professional Services (See attached scope and fee) 1. Aguirre & Fields, LP will provide design and detail sheets for the hanging supports of the proposed 16" waterline across Lake Creek Bridge. Email from Aguirre & Fields, LP * Agreement for Additional Professional Services (See attached scope and fee) 1. Aguirre & Fields, LP will provide bridge design and detail revisions to accommodate a 16" waterline on the NB Brushy Creek Bridge. $ 3,000.00 $ 6,987.96 New Revised Total for Current Contract $ 132,195.71 Balance for Supplemental Agreement No. 3 $ 9,987.96 *- Additional work approved by City of Round Rock February 6, 2003 AGUIRRE & FIELDSw Mr. Mark Rodriguez, P.E. Rodriguez & Huggins, Inc. 11211 Taylor Draper Lane Suite 100 Austin, TX 78759 Transportation • Civil • Structural Engineers and Planners Re: Lake Creek Bridge Waterline Details Dear Mark: Aguirre & Fields, LP is pleased to submit this letter proposal to you for a change in the design services for the above referenced project. The supplemental scope of services to provide a detail sheet for the hanging of the proposed 16" waterline across Lake Creek Bridge is attached. We propose to perform the outlined supplemental services for the lump sum price of $3,000.00. This changes the total amount of the contract from $226,000.00 to $229,000.00. If you find this proposal acceptable, please sign and date both copies and return one to AEC. Please do not hesitate to contact me if you have any questions. Signed: Aguirre & Fields, LP: Rodriguez Transportation Group Aguirre, LLC — General Partner Oscar R. Aguirre, P.E. President Name Title Date Attachment ,/( rz/(-1, (4<-1/Ltx. C_ 7204(6-&--f Name Title Date 4800 Sugar Grove, Suite 625 • Stafford, TX 77477 • 281-340-8900 • 281-340-8909(fax) • www.aguirre-fields.com Attachment "D" Scope of Services. Aguirre & Fields, LP FC 170 Design of structural supports for proposed 16" waterline crossing Lake Creek below the newly constructed bridge. Detail of back wall penetration for water line. Deliverable will be a detail sheet tobe inserted into theexisting plan set. Attachment D A.W. Grimes Brushy Creek NB Bridge Changes for 16" Waterline Summary Scope of Work: Implement Changes for the Accomodation of the 16" Waterline on the NB Brushy Creek Bridge Labor: Expenses: FC Description Hours Fee 170 Bridge 92 $6,987.96 Total Labor 92 $6,987.96 Total Expenses (Included in Overhead) $0.00 Total Supplemental #4 $6,987.96 Total Contract Fee $6,987.96 VD 0 69 r Lel 69 00 to 00 b9 'O 00 N M b3 00 0 b9 00 b9 CS 00.' 0\ 69' O bH 00 0 N C\ O O 00 h N N 00 0) a) Cr) a) U ea w O Vl 69 O O 69 69 N N cO 0) a) 0) 7.3 C. c0 N re bo .9474 ct, 0, 0' O 00 rP N Included in overhead a): C .c 0 'G.a, 00 7 r. CJ CJ acr z ccs r-� a) 00 .0 • c0 N ❑ 0 a) E 0 a) CO O .0) 0 crl 00 a) .0 N V) cO 0. V) SUBTOTAL NB Brushy Creek Bridge Sheets to Change SUBTOTAL FC 170 0 0 V •0 O 0. a) 0 O a 00 0 0 0.. 0 a) U O 00 c0 0 0 U 0 0 0. a) 2 SUBTOTAL n O V') O t� O 0(3 - N 64 O V) O h 00 EA) 64 M C\ . N - VD 64 69 00 C% 00 N N 00 64 69 O (r, 00 N M O 64 69 c v) c*) 64 Direct Labor Rates Labor Rates wfoverhead and fixed fee Overhead Rate Fixed Fee Rate Rodriguez Transportation Group, Inc. Additional Costs to be Approved by the City of Round Rock Espey Consultants, Inc. The following are additional costs associated with A. W. Grimes Blvd. Current Contract (Resolution No. R -01-06-14-16F3) $ 58,082.25 Letter Dated August 4, 2003 from Espey Consultants, Inc. * Agreement for Additional Professional Services (See attached scope and fee) 1. EPC, Inc. will prepare preliminary design calculations and sketches for the proposed improvements to Dry Branch Creek Tributary No. 1. $ 2,210.00 New Revised Total for Current Contract $ 60,292.25 Balance for Supplemental Agreement No. 3 $ 2,210.00 *- Additional work approved by City of Round Rock August 4, 2003 Mark Rodriguez, P.E. Rodriguez Transportation Group 11211 Taylor Draper Lane Suite 100 Austin, Texas 78759 s ey Cn ua Ls,. Inc s ' n .•'3rtyi.1t1.£i£'.:#'n .a1. iso; .i::n.ineering• V RE: Improvements to Dry Branch Tributary No. 1 downstream of AW Grimes Boulevard Section 404 Permit Application Support Proposal for Professional Engineering Services EC Proposal No. 03P075 Dear Mr. Halden: Espey Consultants, Inc. (EC) is pleased to present this proposal to prepare preliminary design calculations and sketches for the proposed improvements to Dry Branch Tributary No. 1 from AW Grimes Boulevard downstream for approximately 1,600 linear feet in support of a Section 404 Permit application being prepared by Rodriquez Transportation Group. The preliminary design described in the Preliminary Engineering Report for the South Creek Channel Improvement Project prepared by Espey Consultants, Inc., dated July 2003 (Final Draft) will be extended upstream to AW Grimes Boulevard. Espey Consultants, Inc. will coordinate the design with Gray / Jansing Associates, Inc., and submit the necessary design information (plan, profile and cross-section) to Rodriguez Transportation Group for submittal to the US Corps of Engineers. If the following scope of services and the terms of the attached consulting agreement meet with your approval, please counter sign in the space provided and return a copy for our files. SCOPE OF SERVICES The scope of services include the following three primary tasks: 1. Coordination and Review of Existing Survey and Plat Information — EC will coordinate to obtain existing design and/or cross-section survey data for the project limits, as well as plat and boundary information from Gray-Jansing Associates (GJA) and Rodriguez Transportation Group (RTG). EC will review the supplied data for integration into the existing South Creek Channel Improvements hydraulic model, prepared under prior authorization. 2 Limited Hydraulic Analysis and Design - EC will incorporate the survey data into the existing South Creek Channel Improvements hydraulic model, and develop a "proposed conditions" model to demonstrate conveyance. EC will review the existing topography to ensure that the proposed cross- section will fit within the proposed right-of-way. EC will determine flow line and top of bank elevations for the study reach. 3. Preparation of Exhibits — EC will prepare plan view, cross-section, and stream profile exhibits to accompany the submittal of the 404 Permit application prepared by RTG. • Mark Rodriguez, P. E. Page 2 of 2 August 4, 2003 This scope does not include preparation, submittal, review fees, addressing comments for, or tracking of the 404 Pen -nit Application (by others). BUDGET ESTIMATE A budget breakdown is included by task in the following table. The estimated cost of this work is $2,210. Man -Hour Estimate by Labor Classification Subtotals Engineering Time Cost Description Principal Proj. Man. Staff Technician Clerical (hrs) ($) 1 Coord./Review of Existing Survey/Plat Information 2 4 2 8 5 630 2 Limited Hydraulic Analysis and Design 1 8 9 5 745 3 Preparation of Exhibits 1 2 8 11 5 665 subtotals: 0 4 14 10 0 28 5 2,040 approximate billing rate: 5 130 5 105 5 80 5 50 5 45 subtotal by labor classification: 5 5 420 $ 1.120 $ 500 $ mileage: $ 50 courier: $ 20 reproduction: 5 100 If you have questions or comments, please don't hesitate to call. Brian K. Reis, P. E., C. F. M. Vice President Attachment 11.1: lactivel03P075 Round Rock 404 Supportl030731111Rodriguez.cloc Espey Consultants, Inc. TOTAL: $ 2,210 8/18/2003 CONSULTING AGREEMENT AND AUTHORIZATION TO PROCEED This Agreement is between Espev Consultants. Inc. (EC) and Rodriguez Transportation Group (Client). SCOPE OF SERVICES EC agrees to perform services described in proposal dated August 4. 2003 (EC Proposal No. 03P075), including attachments and amendments ("SERVICES") for the project entitled: Improvements to Dry Branch Tributary No. 1- Section 404 Permit Application Support. COMPENSATION, BILLING AND PAYMENT EC is willing to perform the SERVICES in exchange for the following fee: _X CLIENT will pay on a time and material basis not -to -exceed the sum of $2,210 in accordance with our standard rate schedule. EC shall submit a monthly statement to CLIENT setting forth the appropriate billing information. Payment of the invoice is due within 30 days of receipt, and is not contingent upon payment from a third party. If CLIENT fails to pay any undisputed invoiced amounts within thirty (30) calendar days of the date of the invoice, EC may suspend its performance or terminate this Agreement without incurring any liability to CLIENT and without waiving any other claim against CLIENT. Outstanding balances in excess of 30 days may accrue interest at a rate of 1% in subsequent invoice periods, and project work will cease until payment is received. INDEMNITY / LIMITATIONS OF LIABILITY Subject to any limitations stated in this Agreement. EC will indemnify and hold harmless CLIENT, its officers. directors, employees, and subcontractors, from and against all claims and actions, including reasonable attorneys fees, arising out of damages or injuries to persons or tangible property to the extent they are caused by the willful misconduct, a professionally negligent act, error, or omission of EC or any of its agents, subcontractors, or employees in the performance of Services under this Agreement. EC will not be responsible for any loss. damage, or liability arising from any contributing negligent acts by CLIENT, its subcontractors. agents, staff, or consultants. Neither party will be responsible to the other for consequential damages including, but not limited to, loss of profit, loss of investment or business interruption. The CLIENT also agrees not to seek consequential damages including, but not limited to, loss of profit, loss of investment or business intemiption. The CLIENT also agrees to seek recourse only against EC and not against its officers. employees, directors, or shareholders. TERMINATION Either party may terminate this agreement by rendering written notice thirty (30) days prior to the desired termination date. CLIENT shall pay for all fees and expenses consistent with this Agreement incurred prior to the termination date. AUTHORIZATION CLIENT confines reading this document in full. This Agreement when executed by Espey Consultants, Inc. is an offer to perform the services, open for acceptance within 30 days. This Agreement becomes effective on the date CLIENT signs below. Rodriguez Trans sortation Group (CLIENT) EC - Espey Consultants Inc. By: By: Name: l7 44.0. E . fA F- f Name: : rian K. R(eis. PE. CFM Title: Gs, n c -T Title: Vice President Date: o- le- 2. 3 Date: 8/18/03 M: lacti eiO3P075 Round Rock 404 Supportistandcontract.doc Espey Consultants, Inc. Page 1 of 1 8/18/2003 Standard Rate Schedule (EC1) The following professional and support service rates have been established for Espey Consultants, Inc. (EC) in calendar year 2003. Classification Rates Principal $ 130.00 $ 150.00 Project Manager $ 100.00 - $ 130.00 Engineer $ 85.00 $ 100.00 Engineering Staff $ 60.00 - $ 80.00 Technician / Designer $ 40.00 - $ 60.00 Adminstrative Support $ 35.00 - $ 50.00 Travel and Subsistence: All travel and subsistence expenses will be invoiced at actual cost. Cost of mileage for private and company vehicles is computed at the prevailing rate designated by the U.S. Internal Revenue Service. The current rate is $0.36 per mile. Purchased Services: All purchased services are invoiced at actual cost plus ten (10) percent. These include but are not limited to reproduction, rented or leased equipment, etc. Subconsultant Services: All subconsultant services (geotechnical, survey, landscape architecture, etc.) are invoiced at cost plus 6%. Terms: Invoices are submitted monthly for services rendered, and are due within 30 days of receipt (Net 30 days). Late payments will incur a late charge (1.5%) per month from the original date of invoice. EC reserves the right to stop work should invoices not be paid within 30 days. Espey Consultants, Inc. Page 1 of 1 EC1.xls Rodriguez Transportation Group, Inc. Additional Costs to be Approved by the City of Round Rock Huggins/Seiler & Associates, LP The following are additional costs associated with A. W. Grimes Blvd. Current Contract (Resolution No. R -01-06-14-16F3) $ 114,719.20 No Additonal Scope or Fee Required .,NOV-13-2003 15:57 CITY OF ROUND ROCK 5122187097 P.01/01 CERTIFICATE OF LIABILITY INSURANCE PRODUCER USI Insurance Services of Texas 1946 S. ISI -35, Suite 301 Austin, Texas 78704 INSURED Rodriguez Transportation Group 11211 Taylor Draper Lane, Suite 100 Austin Rock, Texas 78759 Date; 11/10/2003 COMPANIES AFFORDING COVERAGE A Everest National Insurance Company B C D THIS IS TO CERTIFY THAT the Insured named above is insured by the Companies listed above with respect to the business operations hereinafter described, for the types of insurance and in accordance with the provisions of the standard policies used by the companies, and further hereinafter described. Exceptions to the policies are noted below_ CO TYPE OF INSURANCE POLICY EFFECTIVE EXPIRATION LTR NUMBER DATE DATE GENERAL LIABILITY LIMITS GENERAL AGGREGATE $ PRODUCTS-COMP/OP AGG. $ PERSONAL & ADV. INJURY S EACH OCCURRENCE 5 FIRE DAMAGE (Any one fire) $00 MED. EXPENSE (Any one person) $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ BODILY INJURY (Per person) 5 BODILY INJURY (Per accident) 5 PROPERTY DAMAGE S EXCESS LIABILITY WORKERS' COMPENSATION AND EMPLOYERS' LIABILITY EACH OCCURRENCE $ AGGREGATE $ STATUTORY LIMITS . RACI5 A�CIDEZ;I DISEASE:- POLICY I:IMIT $ DISEASE - EACH EMPLOYEE $ A PROFESSIONAL LIABILITY 48AE001602031 07/22/03 07/22/04 Per Claim $2,000,000 Por Aggregate 52,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/SPECIAL PTEMS/EXCEPTIONS Professional Iiability only: The aggregate limit is the total insurance available for claims presented within the policy period for all operations of insured. The limit will be reduced by payment of indemnity and expense. The City of Round Rock is named as additional insured with respect to all policies except Workers' Compensation, Employers' Liability and Professional Liability. Should any of the above described policies be cancelled or changed before the expiration date thereof, the issuing company will mail thirty (30) days written notice to the certificate bolder named below. CEIn tr iCATE HOLDER: City Manager City of Round Rock 221 E. Main Street Round Rock, Texas 78664 CLJJ , • COI RR USE • SIGNATURE OF AUTHORIZED REPRESENTATIVE TOTAL P.01