R-03-10-09-13G1 - 10/9/2003RESOLUTION NO. R -03-10-09-13G1 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Martin K. Eby Construction Co., Inc. for the construction of the Water Treatment Plant Expansion, Phase V, and WHEREAS, the Council has determined that it is necessary to make changes to the plans or specifications of the Contract due to unforeseen circumstances, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 3, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 3 to the Contract with Martin K. Eby Construction Co . , Inc., a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at alltimes during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 9th day of October, 2003. NY : P WE Mayor City of Round Rock, Texas CHRISTINE R. MARTINEZ, City Secret @PFDesktop\::ODMA/WORLDOX/0:/WDOX/RESOLVTI/R31009G1.WPD/sc CITY OF ROUND ROCK Date: 9/19/2003 Page: 1 of 1 CONTRACT CHANGE ORDER NO. 3 Contract: Water Treatment Plant Expansion, Phase V Owner: City of Round Rock, 221 East Main Street, Round Rock Texas 78664 To: Martin K. Eby Construction Co., Inc. 5316 Hwy 290 West, Suite 480 Austin, TX 78735 (Contractor) You are hereby requested to comply with the following changes from the Contract Plans and Specifications: Description of Changes 1.0 Re-route 6" PW at Ductbank 2.0 Extend HMI to Utility Support Building 3.0 Addition of Lighting Contactor at Chlorine Building 4.0 Addition of Isolated Grounds at RIO Cabinets 5.0 Modifications of Process Sturcutre Door No. 222 6.0 Additional Bollards and Painting 7.0 New Electrical Feeder to Laboratory Building 8.0 Additional Storage at Stairwell No. 2 9.0 Relocate Air Release Valves at Recycle Pump Station 10.0 Relocate Fire Hydrant at Road "E" 11.0 Delete Valve Casings 12.0 Change Window Blinds 13.0 Repair Chlorine Piping 14.0 Washwater Recovery Tank Weir Box Modification 15.0 Addition of Power to Chlorine Building Door B101 16.0 Addition of Panel Liner at High Service Pump Station 17.0 Addition of Concrete at Vehicle Storage Facility 18.0 Delete Power Door Operators at Door 104 19.0 Addition of Vent at Existing Filter Control Box 20.0 Front End Processor Upgrade 21.0 Addition of Landscape Irrigation Sleeves 22.0 Addition of taps for Landscape Irrigation 23.0 Modification to 30" Outlet Pipe at Transfer Pump Station 24.0 Layout for South End of Plant Entry Road 25.0 Addition of Diffusers at Disinfection Basin 26.0 Plant Entry Road 27.0 Modification to Maintenance Storage Facility Roof 28.0 Change in Metal Studs at Grid Line D 29.0 Entry Sign Modifications 30.0 Changes to Door OP 101 and OP 106 31.0 Additions to Chlorine Facility 32.0 Door 218 and 219 Hardware Changes 33.0 Additional CMU at Process Structure JUSTIFICATION: Items identified during course of construction and represent changes in response to conditions found in the field. $5,093.00 $1,803.00 $690.00 $1,355.00 $2,218.00 $4,175.00 $4,905.00 $503.00 $5,173.00 $287.00 $707.00 $1,354.00 $1,063.00 $945.00 $3,053.00 $2,170.00 $6,132.00 $19,233.00 $12,735.00 $4,467.00 $398.00 $3,293.00 $229,435.00 $6,852.00 $3,066.00 $1,353.00 $3,022.00 $480.00 $1,802.00 ADDED TIME DAYS ORIGINAL CONTRACT AMOUNT: CONTRACT AMENDMENT (C.A.) AMOUNTS: THIS CHANGE ORDER (C.O.) AMOUNT: PREVIOUS CHANGE ORDER AMOUNT: Dollars:$ $19,944.00 CHANGE ORDERS TO -DATE AMOUNT: Dollars:$ $344,087.00 TOTAL CONTRACT PLUS C.O.S AND C.A. Dollars:$ $15,573,639.50 TOTAL PERCENT CHANGE: Dollars: $ Dollars:$ $15,229,552.50 $0.00 Dollars:$ $324,143.00 PERCENT: This d ument will become a supplement to the contract and all provisions will apply hereto: CDM Engineer Martin K. Eby Construction Co., Inc. City of Round Rock ChangeOrder No. 3.xts EXHIBIT 2.26% %/a3/03 Date: 9/2303 Date: Date: WTP PHASE V EXPANSION ROUND) ROCK,TEXAS DATE: SUBJECT: ITEM: Resource: History: October 3, 2003 City Council Meeting - October 9, 2003 13.G.1. Consider a resolution authorizing the Mayor to execute Change Order No. 3 with Martin K. Eby Construction Company, Inc. for the construction of the Water Treatment Plant Expansion, Phase V. Tom Word, Chief of P.W. Operations Toni Clark, Director of Utilities Martin K. Eby Construction Company is currently under contract with the City to construct a 24 -MGD expansion to the City's Water Treatment Plant, including an additional high service pumping capacity, and a new chlorine storage and feed facility. This will be the third Change Order to the contract and is due to unforeseen conditions, value-added additions and modifications and entry road improvements that were a condition of the additional land agreement between the City and Texas Crushed Stone. The cost of the roadway improvements required under the Texas Crushed Stone agreement is $143,699.00. Other substantial costs associated with this change order include $85,736 for needed drainage improvements, $3,022 for additional breathing apparatus in the new Chlorine Facility for safety purposes and $503.00 to relocate an air release valve. CDM prepared and reviewed the proposed Change Order to Martin K. Eby Construction Company Inc. contract with the City and recommends approval. Staff concurs and recommends Council approval of this resolution in the amount of $324,143.00. With this Change Order No. 3 and Change Orders No. 1 and 2 the original contract amount of $15,229,552.50 will be increased by 2.26% or $344,087.00, which is well under the 9.0% budgeted amount for project contingencies. Funding: Cost: $324,143.00 Source of funds: Capital Project Funds (Self -Financed Utility) Outside Resources: Martin K. Eby Construction Company Inc. Engineer - CDM Impact/ Benefit: To maintain the integrity and reliability of our Water Treatment Plant to deliver the City's peak water demands. Public Comment: N/A Sponsor: N/A Executed Document Follows CITY OF ROUND ROCK Date: 9/19/2003 Page: 1 of 1 CONTRACT CHANGE ORDER NO. 3 Contract: Water Treatment Plant Expansion, Phase V Owner: City of Round Rock, 221 East Main Street, Round Rock Texas 78664 To: Martin K. Eby Construction Co., Inc. 5316 Hwy 290 West, Suite 480 Austin, TX 78735 (Contractor) You are hereby requested to comply with the following changes from the Contract Plans and Specifications: Description of Changes 1.0 Re-route 6" PW at Ductbank 2.0 Extend HMI to Utility Support Building 3.0 Addition of Lighting Contactor at Chlorine Building 4.0 Addition of Isolated Grounds at RIO Cabinets 5.0 Modifications of Process Sturcutre Door No. 222 6,0 Additional Bollards and Painting 7.0 New Electrical Feeder to Laboratory Building 8.0 Additional Storage at Stairwell No. 2 9.0 Relocate Air Release Valves at Recycle Pump Station 10.0 Relocate Fire Hydrant at Road "E" 11.0 Delete Valve Casings 12.0 Change Window Blinds 13.0 Repair Chlorine Piping 14.0 Washwater Recovery Tank Weir Box Modification 15.0 Addition of Power to Chlorine Building Door B101 16.0 Addition of Panel Liner at High Service Pump Station 17.0 Addition of Concrete at Vehicle Storage Facility 18.0 Delete Power Door Operators at Door 104 19.0 Addition of Vent at Existing Filter Control Box 20.0 Front End Processor Upgrade 21.0 Addition of Landscape Irrigation Sleeves 22.0 Addition of taps for Landscape Irrigation 23.0 Modification to 30" Outlet Pipe at Transfer Pump Station 24.0 Layout for South End of Plant Entry Road 25.0 Addition of Diffusers at Disinfection Basin 26.0 Plant Entry Road 27.0 Modification to Maintenance Storage Facility Roof 28.0 Change in Metal Studs at Grid Line D 29.0 Entry Sign Modifications 30.0 Changes to Door OP 101 and OP 106 31.0 Additions to Chlorine Facility 32.0 Door 218 and 219 Hardware Changes 33.0 Additional CMU at Process Structure JUSTIFICATION: $5,093.00 $1,803.00 $690.00 $1,355.00 $2,218.00 $4,175.00 $4,905.00 $503.00 $5,173.00 $287.00 $707.00 $1,354.00 $1,063.00 $945.00 $3,053.00 $2,170.00 $6,132.00 $19,233.00 $12,735.00 $4,467.00 $398.00 $3,293.00 $229,435.00 $6,852.00 $3,066.00 $1,353.00 $3,022.00 $480.00 $1,802.00 ADDED TIME DAYS Items identified during course of construction and represent changes in response to conditions found in the field. ORIGINAL CONTRACT AMOUNT: CONTRACT AMENDMENT (C.A.) AMOUNTS: THIS CHANGE ORDER (C.O.) AMOUNT: PREVIOUS CHANGE ORDER AMOUNT: CHANGE ORDERS TO -DATE AMOUNT: TOTAL CONTRACT PLUS C.O.S AND C.A. TOTAL PERCENT CHANGE: Dollars:$ Dollars:$ $15,229,552 50 $0.00 Dollars:$ $324,143.00 Dollars:$ Dollars: $ Dollars:$ PERCENT: $19,944.00 $344,087.00 $15,573,639 50 This d cument will become a supplement to the contract and all provisions will apply hereto: Engineer Date: 2.26% ChangeOrder No. 3.xls -C 3 --/C -0'- %3a/