R-08-06-26-10E10 - 6/26/2008RESOLUTION NO. R -08-06-26-10E10 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Cash Construction Company, Ltd. for the RM 1431 36 -Inch Water Line Improvements Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 2 to the Contract with Cash Construction Company, Ltd. for the RM 1431 36 -Inch Water Line Improvements Project, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 26th day of June, 200., ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Secretary O:\WDOX\RESOLUTER8626E 10.DOC/rmc Change Order No. 2 EXHIBIT Project Name: Cedar Park - Round Rock Interconnect 36 -inch Consultants Project No.: 0087 Water Transmission Main Project Owner. City of Round Rock 212 Commerce Cove, Round Rock, TX 78664 Date of Issuance: May 29, 2008 Project Contractor: Cash Construction 18607 Heatherwilde Blvd, Pflugerville, TX 78660 Date of Contract: December 20, 2007 Date of Notice to Proceed: January 7, 2008 Original Completion Date: June 9, 2008 Contract Period 154 Calendar Days It Is agreed to modify the contract reterrea to above as tonows: CPR # ITEM AND DESCRIPTION OF CHANGES CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME 2 See Attached Supplement $54,697.60 25 days Difference Net $54,697.60 25 days Summary: It is agreed to modify the Contract referred to above as follows: Contract Price prior to this Change Order Contract Time prior to this Change Order $ 2.104.601.00 Net increase *weasel) of this Change Order $ 54.697.60 154 days - June 9.2008 Net Increase (deerea59) of this Change Order 25 days Revised Contract Price with all approved Change Orders Revised Contract Time with all approved Change Orders 179 dans - July 4. 2008 $ $2.159.298.60 The changes included in this Change Order are to be accomplished in accordance with the terms, stipulations and conditions of the original Contract as though included therein. Acrep2ed for Contractor by: ;\C' Re mended for Approval by (K Frtese& Associates, Inc.): Jennifer N. Sullivan Approved for Owner by: }� n v--- - Date: i7a9/ 8 Date: 5129/06 Attest: Date: Approved: (Other - when required) Date: Distribution: 0 Owner ❑ Contractor 0 Office 0 Field 0 Other CITY OF ROUND ROCK CHANGE ORDER SUPPLEMENT CPR #2 CEDAR PARK - ROUND ROCK INTERCONNECT 36 -INCH WATER TRANSMISSION MAIN Item No. Description Quantity Unit Unit Price Amount 1 Additional Length of Bore 23 LF $650.00 $14,950.00 2 Additional Potholing 1 LS $2,500.00 $2,500.00 3 Estimated Cost to fix Sidewalk, Parking Lot 1 LS $3,500.00 $3,500.00 4 Concrete Retaining Wall 20 LF $66.00 $1,320.00 5 Concrete Curb 40 LF $20.00 $800.00 6 Base 45 CY $10.80 $486.00 7 HMAC 50 SY $54.00 $2,700.00 8 Striping 1 LS $480.00 $480.00 9 Testing 1 LS $780.00 $780.00 10 4' Sidewalk 100 LF $6.00 $600.00 11 Additional Cost to dig ditch on North side of water line 209 CY $122.40 $25,581.60 12 Additional Surveying 1 LS $1,000.00 $1,000.00 TOTAL $54,697.60 The items included above were changes required to avoid utility conflicts in the original alignment. 10E10. — SUBSTITUTE BLUE SHEET DATE: June 19, 2008 SUBJECT: City Council Meeting—June 26, 2008 ITEM: 10E10. Consider a resolution authorizing the Mayor to execute Change Order No. 2 to the construction contract with Cash Construction Company, Ltd. for the RM 1431 36 -Inch Water Line Improvements Project. Department: Staff Person: Justification: Water and Wastewater Utilities Michael D. Thane, P.E., Director of Utilities Change Order No. 2 is for additional work and materials required for unforeseen site conditions, due to the actual location of several existing utilities along the north side of R.M. 1431. This change order includes an additional 23 linear feet of boring length, additional depth for both the bore pit and receiving pit, and the repair and replacement of existing sidewalk, curb and retaining wall. All work under this Change Order No. 2 is required for the timely completion of the project. Funding: Cost: Original Contract Previous Change Orders Change Order No. 2 Revised Contract Source of funds: Outside Resources: Amount $1,984,642.00 $119,959.00 $54,697.60 Change N/A 6.04 2.60 $2,159,298.60 8.10 Capital Project Funds (Self -Financed Utility) Cash Construction Company, Ltd. K. Friese & Associates Background Information: This project is identified in the City's Water System Master Plan and is required to be completed by 2013 for the Lake Travis regional water to be delivered to the City of Round Rock. For the City to deliver 4.0 million gallons per day (mgd) of interim water to the City of Cedar Park by the summer of 2009 (per an inter -local agreement), this water line project, as well as two other water system improvement projects, are required. The other two projects are the RM 1431, 2.0 million gallon Elevated Water Storage Tank and a new 7.5 mgd High Service Pump at the Water Treatment Plant. In consideration for the City completing these projects sooner than was planned, the City of Cedar Park will pay the City of Round Rock a lump sum of $1,000,000. Public Comment: N/A Executed Document Follows Change Order No. 2 Project Name: Cedar Park - Round Rock Interconnect 36 -inch Consultants Project No.: 0087 Water Transmission Main Project Owner. City of Round Rock 212 Commerce Cove, Round Rock, TX 78664 Date of Issuance: May 29, 2008 Project Contractor: Cash Construction 18607 Heatherwilde Blvd, Pflugerville, TX 78660 Date of Contract: December 20, 2007 Date of Notice to Proceed: January 7, 2008 Original Completion Date: June 9, 2008 Contract Period 154 Calendar Days It Is agreed to modify the Contract referred to above as tonows: CPR # ITEM AND DESCRIPTION OF CHANGES CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME 2 See Attached Supplement $54,697.60 25 days Difference Net $54,697.60 25 days Summary: It is agreed to modify the Contract referred to above as follows: Contract Price prior to this Change Order Contract Time prior to this Change Order $ 2104.601.00 Net Increase (deereaca) of this Change Order $ 54,697.60 154 days — June 9.2008 Net Increase (cioeresee) of this Change Order 25 days Revised Contract Price with all approved Change Orders Revised Contract Time with all approved Change Orders $ $2.159.298.60 179 days - July 4.2008 The changes included in this Change Order are to be accomplished in accordance with the terms, stipulations and conditions of the original Contract as though included therein. for Contractor b Rec • ended for Approval by (K Frlese& Associates, Inc.): Jennifer N. Sullivan Approved je{ Owner by: V\ Cali. li. �---- Date: Date: S 29/06 Approved: (Other - when required) Date: Distribution: 0 Owner 0 Contractor 0 Office 0 Field 0 Other CITY OF ROUND ROCK CHANGE ORDER SUPPLEMENT CPR #2 CEDAR PARK - ROUND ROCK INTERCONNECT 36 -INCH WATER TRANSMISSION MAIN Item No. Description Quantity Unit Unit Price Amount 1 Additional Length of Bore 23 LF $650.00 $14,950.00 2 Additional Potholing 1 LS $2,500.00 $2,500.00 3 Estimated Cost to fix Sidewalk, Parking Lot 1 LS $3,500.00 $3,500.00 4 Concrete Retaining Wall 20 LF $66.00 $1,320.00 5 Concrete Curb 40 LF $20.00 $800.00 6 Base 45 CY $10.80 $486.00 7 HMAC 50 SY $54.00 $2,700.00 8 Striping 1 LS $480.00 $480.00 9 Testing 1 LS $780.00 $780.00 10 4' Sidewalk 100 LF $6.00 $600.00 11 Additional Cost to dig ditch on North side of water line 209 CY $122.40 $25,581.60 12 Additional Surveying 1 LS $1,000.00 $1,000.00 TOTAL 554,697.60 The items included above were changes required to avoid utility conflicts in the original alignment.