R-08-07-24-10B1 - 7/24/2008RESOLUTION NO. R -08-07-24-10B1 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with RGM Constructors, L.P. for the Gattis School Roadway Improvements Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 3, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Contract Change Order No. 3 to the Contract with RGM Constructors, L.P. for the Gattis School Roadway Improvements Project, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 24th day of July, 2008. ATTEST: ubtft SARA L. WHITE, City Secretary O:\WDOX\RESOLOTI\R80724B1.DOC/rmc ALAN MCGRAW, Mayor City of Round Rock, Texas CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER Page 1 of 2 DEPARTMENT: Transportation Services DATE: 6/5/2008 PROJECT: Gattis School Road CHANGE ORDER NO: 3 JUSTIFICATION: Reference page 2 of 2 ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDER: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: $2,741,843.54 $199,790.00 $70,134.00 $269,924.00 CHANGE DATA ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR DAYS 1 WET CONNECT, 2 -INCH X 16 -INCH EA 1 $2,500.00 $2,500.00 0 2 DELETE 36 -INCH RCP LF -469.20 $140.00 ($65,688.00) 3 ADD 30 -INCH RCP LF 469.20 $110.00 $51,612.00 4 DELETE 18 -INCH RCP LF -11 $85.00 ($935.00) 5 ADD27-INCH RCP LF 11 $100.00 $1,100.00 BARRICADES, SIGNS & TRAFFIC 6 HANDLING MO 5 $14,000.00 $70,000.00 7 DEMO CURB/GUTTER LF 60 $3.50 $210.00 8 CURB/GUTTER LF 60 $9.00 $540.00 9 DEMO SIDEWALK SF 150 $1.00 $150.00 10 SIDEWALK SF 150 $3.50 $525.00 11 STREET EXCAVATION CY 90 $14.00 $1,260.00 12 PLACE HMAC, TYPE B LEVEL UP TON 80 $95.00 $7,600.00 13 PLACE HMAC, TYPE C SURFACE TON 14 $90.00 $1,260.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ' $0.00 $0.00 $0.00 $0.00 TOTAL: $70,134.00 0 PREPARED BY: SIGNI4TURE (CONTRACTOR) PRINTED NAME: Martin Morello TITLE: Project Manager APPROVED: CITY OF ROUND ROCK DATE PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER.: $70,134.00 PREVIOUS CHANGE ORDER: $199,790.00 TOTAL % CHANGE ORDER: 9.84% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDER: $3,011,767.54 a a 9 EXHIBIT CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER Page 2 of 2 DEPARTMENT: Transportation Services DATE: 6/5/2008 PROJECT: Gattis School Road CHANGE ORDER NO: 3 JUSTIFICATION: 1 Provide a 2 -inch wet connection from the existing 2 -inch waterline from the Church to the proposed 16 -inch waterline. 2 In accordance with the revised contract drawings, change the RCP sizes from 36 -inch to 30 -inch and 18 -inch to 27 -inch on System One in order to avoid existing waterline conflicts. 3 Quantity adjustment for additional barricades, signage and traffic handling 4 Remove and replace existing pavement structure on Windy Park Drive 25FT south from the proposed match existing pavement line shown on Sheet 34. (Reference items 7 through 13) DATE: July 15, 2008 SUBJECT: City Council Meeting—July 24, 2008 ITEM: 1061. Consider a resolution authorizing the Mayor to execute Change Order No. 3 with RGM Constructors for the Gattis School Roadway Improvements Project. Department: Staff Person: Justification: Transportation Services Thomas G. Martin, P.E., Director Due to unforeseen circumstances, the contractor connected a 2 -inch water line to Grace Presbyterian Church, changed drainage line sizes to avoid existing and future waterline conflicts, and replaced existing pavement on Windy Park Drive requiring additional barricades, signage and traffic control. Funding: Cost: $70,134.00 Source of funds: 2002 GO Bonds Outside Resources: Background Information: N/A The City Council approved resolution # 07-08-09-8A1 authorizing RGM Contractors to perform the Gattis School Improvements. The project will widen the existing roadway from Dry Branch Creek Tributary to Dry Branch Creek; this project also includes widening improvements from Dixie Lane to 385 feet east of Surrey Drive and improvements at Via Sonoma Trail. Public Comment: N/A Amount % Change Original Contract $2,741,843.54 N/A Previous Change Orders 199,790.00 7.29% Change Order No.3 $ 70,134.00 2.55% Revised Contract $ 3,011,767.54 9.84% Outside Resources: Background Information: N/A The City Council approved resolution # 07-08-09-8A1 authorizing RGM Contractors to perform the Gattis School Improvements. The project will widen the existing roadway from Dry Branch Creek Tributary to Dry Branch Creek; this project also includes widening improvements from Dixie Lane to 385 feet east of Surrey Drive and improvements at Via Sonoma Trail. Public Comment: N/A Executed Document Follows CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER Page 1 of 2 DEPARTMENT: Transportation Services DATE: 6/5/2008 PROJECT: Gattis School Road CHANGE ORDER NO: 3 JUSTIFICATION: Reference page 2 of 2 ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDER: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: $2,741,843.54 $199,790.00 $70,134.00 $269,924.00 CHANGE DATA SIG UR tEN EER) , 4;1 h SI N TORE (C NTRACTOR) (, -%O-O$ DATE 6/5/2008 PRINTED NAME: Martin Morello TITLE: Project Manager DATE APPROVED: /9Th4/' 24.lO CITY OF ROUN OCK DATE PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER.: $70,134.00 PREVIOUS CHANGE ORDER: $199,790.00 TOTAL % CHANGE ORDER: 9.84% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDER: $3,011,767.54 ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR DAYS 1 WET CONNECT, 2 -INCH X 16 -INCH EA 1 $2,500.00 $2,500.00 0 2 DELETE 36 -INCH RCP LF -469.20 $140.00 ($65,688.00) 3 ADD 30 -INCH RCP LF 469.20 $110.00 $51,612.00 4 DELETE 18 -INCH RCP LF -11 $85.00 ($935.00) 5 ADD 27 -INCH RCP LF 11 $100.00 $1,100.00 BARRICADES, SIGNS & TRAFFIC 6 HANDLING MO 5 $14,000.00 $70,000.00 7 DEMO CURB/GUTTER LF 60 $3.50 $210.00 8 CURB/GUTTER LF 60 $9.00 $540.00 9 DEMO SIDEWALK SF 150 $1.00 $150.00 10 SIDEWALK SF 150 $3.50 $525.00 11 STREET EXCAVATION CY 90 $14.00 $1,260.00 12 PLACE HMAC, TYPE B LEVEL UP TON 80 $95.00 $7,600.00 13 PLACE HMAC, TYPE C SURFACE TON 14 $90.00 $1,260.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ° $0.00 $0.00 $0.00 $0.00 TOTAL: oornnrnrn Inst. $70,134.00 0 SIG UR tEN EER) , 4;1 h SI N TORE (C NTRACTOR) (, -%O-O$ DATE 6/5/2008 PRINTED NAME: Martin Morello TITLE: Project Manager DATE APPROVED: /9Th4/' 24.lO CITY OF ROUN OCK DATE PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER.: $70,134.00 PREVIOUS CHANGE ORDER: $199,790.00 TOTAL % CHANGE ORDER: 9.84% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDER: $3,011,767.54 CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER Page 2 of 2 DEPARTMENT: Transportation Services DATE: 6/5/2008 PROJECT: Gattis School Road CHANGE ORDER NO: 3 JUSTIFICATION: 1 Provide a 2 -inch wet connection from the existing 2 -inch waterline from the Church to the proposed 16 -inch waterline. 2 In accordance with the revised contract drawings, change the RCP sizes from 36 -inch to 30 -inch and 18 -inch to 27 -inch on System One in order to avoid existing waterline conflicts. 3 Quantity adjustment for additional barricades, signage and traffic handling 4 Remove and replace existing pavement structure on Windy Park Drive 25FT south from the proposed match existing pavement line shown on Sheet 34. (Reference items 7 through 13)