Loading...
R-08-10-09-8B1 - 10/9/2008RESOLUTION NO. R -08-10-09-8B1 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with C.C. Carlton Industries Ltd. for the Ray Berglund Subdivision Improvements Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 2 to the Contract with C.C. Carlton Industries Ltd. for the Ray Berglund Subdivision Improvements Project, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 9th day of October, 2008. ATTEST: IkeakC, SARA L. WHITE, City Secretary 0:\WDOX\RESOLUTI\R81009B1.DOC/rmc ALAN MCGRAW, Mayor City of Round Rock, Texas CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Engineering & Development Services PROJECT: Ray Berglund Subdivision Improvements ORIGINAL CONTRACT PRICE: $680,231.00 PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: $4,382.50 $56,260.68 CHANGE ORDERS TO DATE: $60,643.18 ITEM # 1 2 3 4 5&6 7 9 bid 27 DESCRIPTION OF CHANGES Additional clear and grub/haul trees Install conrete driveway in lieu of asphalt Replace additional conrete driveway Reroute creek to protect utilities and fill Remove and replace additional fence Remove and replace speciality fence Hydromulch sidewalk remove and replace - not done additional rain days for March additional days for change order#1 CHANGE DATA UNIT LS LS LS LS LS LS SY SF QTY. 1 1 1 1 1 1 38300 -60 PAGE 1 OF 1 DATE: 9/1712008 CHANGE ORDER NO: 2 Jnn-'c.._ USTIIFFIICATION:, L,, f work G�rl! C�dlT.)0(seS-z-P-v}/L(NCv✓)b-64f D/c-Qk r"cv�� CES all- �A 4racf 74te_, 6u4 S€(eJe o or1;5jr1 brC0 ; , UNIT PRICE $1,764.68 $6,650.00 $1,440.00 $6,500.00 $3,354.00 $1,150.00 $0.94 $10.00 AMOUNT $1,764.68 $6,650.00 $1,440.00 $6,500.00 $3,354.00 $1,150.00 $36,002.00 ($600.00) ADDED DAYS CALENDAR/ WORKING 2 2 1 4 5 1 2 -1 3 4 PREPARED BY: ENGINEER C.C. all F , (kOt E O ONTRACTOR TOTAL % CHANGE: ORIGINAL CONTRACT PRICE � E PLUS r�1A .. cad,.1\06-6 � SIGNATURE: PRINT NAM E/TITLE: APPROVED: TOTAL: $56,260.68 23 PGPERCENT OF ORIGINAL CONTRACT PRICE DATE THIS CHANGE ORDER: ?WI PREVIOUS CHANGE ORDEF 0.06% CITY OF ROUIOCK CHANGE ORDERS: $740,874.18 EXHIBIT ''A't DATE: October 1, 2008 SUBJECT: City Council Meeting — October 9, 2008 ITEM: 8B1. Consider a resolution authorizing the Mayor to execute Change Order No. 2 with C.C. Carlton Ltd. for Ray Berglund Subdivision Improvements. Department: Staff Person: Justification: Engineering and Development Services Danny Halden, P.E., City Engineer Change Order No. 2 provides for revegetation of disturbed/exposed areas which should have been included in the original bid form, for additional work that arose during construction due to unforeseen circumstances or was not originally contemplated, for additional days to be added to the contract, and for the elimination of Bid Item 27 from the original contract. Funding: Cost: $56,260.68 Source of funds: 1998 & 2002 G.O. Bonds and Self -Financed Utility Funds Amount % Change Original Contract $680,231.00 N/A Previous Change Orders $4,382.50 0.06% Change Order No. 2 $56,260.68 8.27% Revised Contract $740,874.18 8.33% Outside Resources: C.C. Carlton Industries Ltd. S.D. Kallman, LP Background Information: On November 7, 2007, the City Council approved the initial construction contract with C.C. Carlton Industries Ltd., R -07-11-20-11D1, in the amount of $680,231.00. The Contract included installation of water, wastewater, street and drainage infrastructure. Change Order No. 1, CM - 08 -06-171, provided for additional eight inch (8") wastewater line with casing, additional eight inch (8") concrete trench cap, additional concrete to cover the casing in Dry Branch Creek, and rip rap to protect the wastewater line in Dry Branch Creek. Seventy feet (70') of four inch (4") concrete trench cap was deducted from the original contract. Public Comment: NA CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Engineering & Development Services PROJECT: Ray Berglund Subdivision Improvements ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: $680,231.00 $4,382.50 $56,260.68 CHANGE ORDERS TO DATE: $60,643.18 ITEM # 1 2 3 4 5&6 7 9 bid 27 DESCRIPTION OF CHANGES Additional clear and grub/haul trees Install conrete driveway in lieu of asphalt Replace additional conrete driveway Reroute creek to protect utilities and fill Remove and replace additional fence Remove and replace speciality fence Hydromulch sidewalk remove and replace - not done additional rain days for March additional days for change order #1 CHANGE DATA UNIT LS LS LS LS LS LS SY SF QTY. 38300 -60 PAGE 1 OF 1 DATE: 9117)2008 CHANGE ORDER NO: 2 JUSTIFICATION: ,4,;(1,Q,.-717°;ia,( y -k GG 5 to H Ccs Ci c c � •tic. C-Q,i4ra c P1 e-) CcJJ SQe_%ig— d ✓I o r��✓1czX UNIT PRICE $1,764.68 $6,650.00 $1,440.00 $6,500.00 $3,354.00 $1,150.00 $0.94 $10.00 AMOUNT $1,764.68 $6,650.00 $1,440.00 $6,500.00 $3,354.00 $1,150.00 $36,002.00 ($600 00) ADDED DAYS CALENDAR/ WORKING 2 2 4 5 2 3 4 PREPARED BY. - ; ENGINEER DATE cc cox SIGNATURE: PRINT NAME/TITLE: APPROVEQ E O ONT_RACTOR a4; - "fro-er ITY OF ROUN[rROCk i -v9 -to- a9� er3/ TOTAL: $56,260.68 23 PERCENT OF ORIGINAL CONTRACT PRICE �y THIS CHANGE ORDER: '�.2%/�s/ PREVIOUS CHANGE ORDEF 0.06% TOTAL % CHANGE: ff , 33% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $740,874.18