Loading...
R-08-11-13-12B1 - 11/13/2008RESOLUTION NO. R -08-11-13-12B1 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Austin Engineering Co., Inc. for the Bowman Road Drainage Improvements Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Contract Change Order No. 1 to the Contract with Austin Engineering Co., Inc. for the Bowman Road Drainage Improvements Project, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 13th day of November, 2008. MCGRAW, Mayor City of Round Rock, Texas ATTEST: /IA/A/ asAe SARA L. WHITE, City Secretary 0:\WDOX\RESOLUTI\R81113B1.DOC/rmc CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Engineering & Development Services PROJECT: Bowman Road Drainage Improvements ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: ITEM # DESCRIPTION OF CHANGES Bowman Road Waterline Lowering Remove and Replace 5' Sidewalk 20" Steel Casing w/ Spacers and End Seals 12" Ductile Iron Pipe 12" 45° Bends w/ Megalugs 10" Bolted Couplings 10"x12" Reducers $1,135,197.00 $0.00 $55,640.00 $55,640.00 CHANGE DATA UNIT QTY. PAGE 1 OF 3 DATE: 11/13/08 CHANGE ORDER NO: 1 JUSTIFICATION: Change Order No. 1 is needed for quantity and water line adjustments and tree removal. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING Concrete Restraint Blocks w/ Eye Bolts Disposal of Asbestos Pipe Additional Traffic Control LF LF LF EA EA EA EA LS LS 30 20 40 4 2 2 2 1 1 $30.00 $120.00 $45.00 $730.00 $440.00 $470.00 $650.00 $500.00 $825.00 SUBTOTAL: $900.00 $2,400.00 $1,800.00 $2,920.00 $880.00 $940.00 $1,300.00 $500.00 $825.00 Greenhill Drive Waterline Lowering Remove and Replace ADA Ramp Remove and Reset Existing Stop/Street Sign 20" Steel Casing w/ Spacers and End Seals 12" Ductile Iron Pipe 12" 45° Bends w/ Megalugs 12" Solid Sleeve $12,465.00 5 Concrete Restraint Blocks w/ Eye Bolts Disposal of Asbestos Pipe Additional Traffic Control EA EA LF LF EA EA EA LS LS 2 1 16 33 2 1 2 1 1 $1,350.00 $250.00 $120.00 $45.00 $730.00 $700.00 $650.00 $500.00 $375.00 SUBTOTAL: $2,700.00 $250.00 $1,920.00 $1,485.00 $1,460.00 $700.00 $1,300.00 $500.00 $375.00 a t EXHIBIT Ile $10,690.00 5 CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Engineering & Development Services PROJECT: Bowman Road Drainage Improvements ITEM # DESCRIPTION OF CHANGES Ameswood and North Bowman Culvert Revision Remove and Replace Exisiting Concrete Flume at Ameswood 6'x2' Flared Headwall at South End of Ameswood Culvert Rock Riprap Concrete Riprap Pedestrian Handrail CHANGE DATA UNIT QTY. PAGE2OF3 DATE: CHANGE ORDER NO: 1 UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING EA EA SY SY LF 1 1 15 50 35 $2,110.00 $3,250.00 $23.00 $80.00 $95.00 SUBTOTAL: $2,110.00 $3,250.00 $345.00 $4,000.00 $3,325.00 Greenhill Culvert Revision 6" Sawtooth Curb and Gutter 3/8" Thick Steel Diamond Plate 5'x3' Curb Inlets Cut 5'x3' Holes into 6'x2' Culvert Remove Detour and Restore Greenhill Access over Weekend $13,030.00 5 LF SF EA EA LS -20 -40 2 2 1 $30.00 $49.00 $2,930.00 $250.00 $4,500.00 SUBTOTAL: ($600.00) ($1,960.00) $5,860.00 $500.00 $4,500.00 Andover Channel Excavate and Regrade Andover Channel from Station 3+44 to 5+00 $8,300.00 5 LF 156 $5.00 SUBTOTAL: $780.00 Heathwood Channel and 30" HDPE Revisions 4-30" HDPE Pipes 10' Wide 4-30" HDPE Pipes 15' Wide w/ 12" Gravel Spacing $780.00 12'x4' Junction Box w/Grate Inlet Top 7'x4' Junction Box w/Grate Inlet Top 4-30" Headwalls 10' Wide 4-30" Headwalls 17' Wide LF LF EA EA EA EA -1100 1100 -1 1 -2 2 $208.00 $231.00 $7,000.00 $5,200.00 $5,000.00 $6,375.00 SUBTOTAL: ($228,800.00) $254,100.00 ($7,000.00) $5,200.00 ($10,000.00) $12,750.00 $26,250.00 5 CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Engineering & Development Services PROJECT: Bowman Road Drainage Improvements ITEM # DESCRIPTION OF CHANGES Incidental Construction Temporary 5 -Strand Barbed Wire Fence Allowance for Relocating Utilities Allowance for Relocating Utilities Miscellaneous Class "A" Concrete KS Green Tree Removal 18" RCP CHANGE DATA UNIT QTY. PAGE3OF3 DATE: CHANGE ORDER NO: 1 UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING LF LS LS CY LS LF $2.50 $6,000.00 $6,000.00 $570.00 $6,000.00 $50.00 SUBTOTAL: ($3,825.00) ($6,000.00) ($6,000.00) ($5,700.00) $6,000.00 NAME OF CONTRACTOR SIGNATURE: joU'A( PRINT NAME/TITLE: 6.44 ` �?>rQz� -O DATE APPROVED: CITY OF ROUND ROCK TOTAL: ($350.00) ($15,875.00) $55,640.00 5 30 PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: $55,640.00 PREVIOUS CHANGE ORDER: 0 TOTAL % CHANGE: 4.90% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $1,190,837.00 constco2/forms6/lk_ DATE: November 6, 2008 SUBJECT: City Council Meeting — November 13, 2008 ITEM: 1261. Consider a resolution authorizing the Mayor to execute Change Order No. 1 with Austin Engineering Co., Inc. for the Bowman Road Drainage Improvement Project. Department: Staff Person: Justification: Engineering and Development Services Danny Halden, P.E., City Engineer Change Order No. 1 is needed for unforeseen field circumstances and scope changes necessary to provide a final proper work product, including tree removal, water main and design adjustments, and to delete items as appropriate. Funding: Cost: $55,640.00 Source of funds: 2002 G.O. Bonds Amount % Change Original Contract $1,135,197.00 N/A Work Not Authorized To Date (Phase 3) ($192,181.00) N/A Net Contract Authorized To Date (Phases 1 & 2) $943,016.00 N/A Previous Change Orders $0.00 N/A Change Order # 1 $55,640.00 4.9% Revised Contract $1,190,837.00 4.9% Net Revised Contract $998,656.00 % of Change Relative to Net Contract to Date 5.9% Outside Resources: Austin Engineering Co., Inc. Kasberg, Patrick, and Associates Background Information: The City Council awarded the construction contract for Bowman Road Drainage Improvements to Austin Engineering Co., Inc., R -08-06-26-10C2, on June 26, 2008 for $1,135,197.00. This project will provide more efficient drainage, improve the appearance and appeal of the neighborhood, and facilitate the City's maintenance efforts. - CONTINUED ON NEXT PAGE - During construction, two water mains were found to be in conflict with the proposed improvements, the installation detail for the Heathwood Channel storm sewer was contrary to the installation requirements of the manufacturer, necessary changes in the project design in a few areas became apparent during construction, and a row of hackberry trees that previously had not been contemplated for removal in fact required removal to ensure proper installation of the improvements and to prevent possible future damage to the improvements or property in the vicinity, especially if the trees subsequently died. Items previously provided in the contract related to the scope changes are being eliminated in this order as appropriate. Public Comment: N/A EXECUTED DOCUMENT FOLLOWS CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Engineering & Development Services PROJECT: Bowman Road Drainage Improvements ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: $1,135,197.00 $0.00 $55,640.00 $55,640.00 PAGE 1 OF 3 DATE: 11/13/08 CHANGE ORDER NO: 1 JUSTIFICATION: Change Order No. 1 is needed for quantity and water Zine adjustments and tree removal. off -it - l -2,g1 ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING Bowman Road Waterline Lowering Remove and Replace 5' Sidewalk LF 30 $30.00 $900.00 20" Steel Casing w/ Spacers and End Seals LF 20 $120.00 $2,400.00 12" Ductile Iron Pipe LF 40 $45.00 $1,800.00 12" 45° Bends w/ Megalugs EA 4 $730.00 $2,920.00 10" Bolted Couplings EA 2 $440.00 $880.00 10"x12" Reducers EA 2 $470.00 $940.00 Concrete Restraint Blocks w/ Eye Bolts EA 2 $650.00 $1,300.00 Disposal of Asbestos Pipe LS 1 $500.00 $500.00 Additional Traffic Control LS 1 $825.00 $825.00 SUBTOTAL: $12,465.00 5 Greenhill Drive Waterline Lowering Remove and Replace ADA Ramp EA 2 $1,350.00 $2,700.00 Remove and Reset Existing Stop/Street Sign EA 1 $250.00 $250.00 20" Steel Casing w/ Spacers and End Seals LF 16 $120.00 $1,920.00 12" Ductile Iron Pipe LF 33 $45.00 $1,485.00 12" 45° Bends w/ Megalugs EA 2 $730.00 $1,460.00 12" Solid Sleeve EA 1 $700.00 $700.00 Concrete Restraint Blocks w/ Eye Bolts EA 2 $650.00 $1,300.00 Disposal of Asbestos Pipe LS 1 $500.00 $500.00 Additional Traffic Control LS 1 $375.00 $375.00 SUBTOTAL: $10,690.00 5 off -it - l -2,g1 CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Engineering & Development Services PROJECT: Bowman Road Drainage Improvements CHANGE PAGE2OF3 DATE: CHANGE ORDER NO: 1 ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING Ameswood and North Bowman Culvert Revision Remove and Replace Exisiting Concrete Flume at Ameswood EA 1 $2,110.00 $2,110.00 6'x2' Flared Headwall at South End of Ameswood Culvert EA 1 $3,250.00 $3,250.00 Rock Riprap SY 15 $23.00 $345.00 Concrete Riprap SY 50 $80.00 $4,000.00 Pedestrian Handrail LF 35 $95.00 $3,325.00 SUBTOTAL: $13,030.00 5 Greenhill Culvert Revision 6" Sawtooth Curb and Gutter LF -20 $30.00 ($600.00) 3/8" Thick Steel Diamond Plate SF -40 $49.00 ($1,960.00) 5'x3' Curb Inlets EA 2 $2,930.00 $5,860.00 Cut 5'x3' Holes into 6'x2' Culvert EA 2 $250.00 $500.00 Remove Detour and Restore Greenhill Access over Weekend LS 1 $4,500.00 $4,500.00 SUBTOTAL: $8,300.00 5 Andover Channel Excavate and Regrade Andover Channel from Station 3+44 to 5+00 LF 156 $5.00 $780.00 SUBTOTAL: $780.00 Heathwood Channel and 30" HDPE Revisions 4-30" HDPE Pipes 10' Wide LF -1100 $208.00 ($228,800.00) 4-30" HDPE Pipes 15' Wide w/ 12" Gravel Spacing LF 1100 $231.00 $254,100.00 12'x4' Junction Box w/Grate Inlet Top EA -1 $7,000.00 ($7,000.00) 7'x4' Junction Box w/Grate Inlet Top EA 1 $5,200.00 $5,200.00 4-30" Headwalls 10' Wide EA -2 $5,000.00 ($10,000.00) 4-30" Headwalls 17' Wide EA 2 $6,375.00 $12,750.00 SUBTOTAL: $26,250.00 5 CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Engineering & Development Services PROJECT: Bowman Road Drainage Improvements CHANGE DATA PAGE3OF3 DATE: CHANGE ORDER NO: 1 ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING Incidental Construction Temporary 5 -Strand Barbed Wire Fence LF -1530 $2.50 ($3,825.00) Allowance for Relocating Utilities LS -1 $6,000.00 ($6,000.00) Allowance for Relocating Utilities LS -1 $6,000.00 ($6,000.00) Miscellaneous Class "A" Concrete CY -10 $570.00 ($5,700.00) KS Green Tree Removal LS 1 $6,000.00 $6,000.00 18" RCP LF -7 $50.00 ($350.00) SUBTOTAL: ($15,875.00) 5 TOTAL: $55,640.00 30 PREPARED BY. ENGINEER AL, � lr/tt�fl�t (ice J �c - NAME/OF CONTRACTOR DATE SIGNATURE: _LPL)/ /l Pr )/' '`,-•"�— PRINT NAME/TITLE: 6/44 t/ie APPROVED: 0,114 PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: $55,640.00 PREVIOUS CHANGE ORDER: 0 TOTAL % CHANGE: 4.90% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $1,190,837.00 CITY OF ROUND ROCK constco2/forms6/Ik