Loading...
R-08-12-18-7E2 - 12/18/2008RESOLUTION NO. R -08-12-18-7E2 WHEREAS, the City of Round Rock has previously Agreement for Engineering Services with MWM Design Group (Formerly known as Martinez Wright & Mendez, Inc.) for Phase 2 of the redesign of Sam Bass Road from Meadows Drive to IH -35, and WHEREAS, MWM Design Group has submitted Supplemental Agreement No. 4 to the Agreement for Engineering Services for a change in the scope of services, and WHEREAS, the City Council desires entered into an to enter into said Supplemental Agreement No. 4 with MWM Design Group, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and behalf of the City Supplemental Agreement No. Engineering Services with MWM Design Gro attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares directed to execute on 4 to the Agreement for up, a copy of same being that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 18th day of December, 2008. ATTEST: SitAw„ SARA L. WHITE, City Secretary 0:\WDOX\RESOLUTI\R8121BE2.DOC/rmc ALAN MCGRAW, Mayor City of Round Rock, Texas STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 4 TO AGREEMENT FOR ENGINEERING SERVICES FIRM: MWM Design Group ("Engineer") ADDRESS: 7700 Chevy Chase Drive, Suite 100, Austin, TX 78752 PROJECT: Redesign of Sam Bass Road from Meadows Drive to IH -35 This Supplemental Agreement No. 4 to Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and (Formerly Martinez Wright & Mendez, Inc.), hereinafter called the "Engineer". Design Group WHEREAS, the City and Engineer executed an A t for EngineerinServices, hereinafter called the "Agreement", on the 8th day of May, 2003 norr the Redesign of Sam Bass Road from Meadows Drive to IFI -35 in the amount of $66,271.00; and WHEREAS, the City and Engineer executed Supplemental Agreement 2003 to amend the scope of services and to increase the compensaatiiby $16,305.00 to a otalberlof $82,576.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 2 on September 23, 2004 to extend the contract date; and WHEREAS, the City and Engineer executed Supplemental Agreement 2005 to amend the scope of services and to increase the compenssttion by $67,862 00 to a to February $150,438.00; and WHEREAS, it has become necessary to amend the Agreement scope of services and to modify the compensation by $51, .00 to a total t$202,278 provisions e NOW THEREFORE, premises considered, the City and the Engineer a ee that s Agreement is amended as follows: & aid I. Article 2 Scone Of Services To 13e Performed By En 'neer Servicesbit B Performed By The En neer shall be amended as set forth in the tta attached Addendum To Exhibit B. Exhibit C Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. Supplemental Agreement 0127.0302/147677 1 EXHIBIT ''An Rev.10/08 64836 II. Article 4Compensation and Exhibit D Fee Schedule shall be amended by increasing by $51,840.00 the lump sum amount payable under the Agreement for a total of $202,278.00, as shown by the attached Addendum to Exhibit D. Agreement in duplicate. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental MWM DESIGN GROUP (f/n/a MARTINEZ, WRIGHT & MENDEZ, INC.) By: 1— et50 Date CITY OF ROUND ROCK By: Man McGraw, Mayor Date Supplemental Agreement 0127.0302/147677 2 APPROVED AS TO FORM: Stephan L. Sheets, City Attorney Rev.10/08 64836 ADDENDUM TO EXHIBIT "B" Services to be performed by the Engineer The Engineer shall provide the following engineering services for the construction plans, specifications and cost opinion preparation of the Services) for Supplemental Amendment #4: p (Professional Surveying &Engineering Item 1 • Design of Railroad Crossing along Sam Bass Road, includes adjacent street intersections. • Attend design coordination meetings with City and Union Pacific • Conduct site visits; representatives; • Coordinate design iterations with City and Union Pacific representatives Item 2 • Design revisions to proposed roadway and utility improvements changed existing conditions due to recent propertydevelopments. to accommodate for • Adjust roadways and sidewalk breaks for new driveways; • Revise water and wastewater utility service connections for newer property developments and to meet new City code requirements; • Revise water and wastewater utility mains to meet newCity code requirements. Item 3 • Revise proposed water line alignment, storm drainage edroadway plans accordinglalong Galloping as pern wdirec directives City Department. Item 4 • Conduct continued coordination with private utilities and provide continued representation at the regular Utility coordination meetings. Item 5 • Revise proposed pavement designsections as per new vehicular traffic count analysis, under directives from the City Transportation Department. Item 6 • Assist with TCEQ Water Pollution Abatement Plan (WPAp processing. ) permit application and Item 7 • Assist with TCEQ Sewage Collection S stem Y (SCS) permit application and processing. Item 8 • Complete design plans with updated City specifications and details, with construction cost opinion for construction bid package submittal post permitting phase. Item 9 • Assist with and attend public involvement/awareness meetings related to the project. ADDENDUM TO EXIIIBIT "C" Work Schedule Attached Behind This Document 0 1 III iiii I CUM i nil 12111111111 0111111111 en 11111101 119111111111 MIMI UM MIMI EC1111111 CUMIN MIMI EMI= CHUM =: 11 II � QCI ICI II• ammomumswummumimam10111111111IMMOMUMNUM111111111111IMMONM ■ 1111111 •111110MNII IIII I11111111 IR MEP NEM 111101111111111 111101111111111 111111111111111 111111111011111 111011111111110 11111111111 MOM 111111111 MIN MI ■ NM 1011 111011 11111111111 1111111111111111 1111111111111 1111111111111111 11111111111111111 11111011111111111 1011111111111110 111111111110111111 1111111111111111 1111111111111111111 111111101111 ADDENDUM TO EXHIBIT "D" FEESC$EDULE Item 1. Design of Railroad Crossing along Sam Bass & misc. Item 2. Design revisions to accommodate changed conditions $10,686.00 Item 3. Utility design revisionsin $ 2,520.00 Item 4. Utility Coordination Galloping road $ 5,880.00 Item 5. Pavement design$ 8,366.00 revisions Item 6. Assist with TCEQ WPAP $ 2,728.00 permit application Item 7. Assist with TCEQ SCS permit application $ 5,058.00 Item 8. Final construction bid document package $ 3,858.00 Item 9. Assist with public involvement $ 9,872.00 2 872 00 Total Supplemental Amount: 51 840 00 DATE: December 11, 2008 SUBJECT: City Council Meeting — December 18, 2008 ITEM: 7E2. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 4 with MWM Design Group for the Redesign of Sam Bass Road from Meadows Drive to IH -35. Deoartment• Transportation Services Staff Person: Tom Martin, P.E., Director of Transportation Services Justification: Additional Engineering services are required for the upting of specifications and cost estimate, for the design of the Railroad cross ng on amtBa tion plans, adjacent streets in accordance with UPRR requirements, coordination with ss Roadoand permits for the Water Pollution Abatement Plan (WPAP) and the Sewage Collection for the (SCS) and other associated work. n System Funding• Cost: $51,840 Source of funds: 2001 GO Bond Issue Outside Resources: N/A Bac round Information: These proposed roadway improvements are part of the overall Sam Bass Road began in July 1999 with Council approving resolution R -99-07-22-10C1 for the construction nhof the Sam Bass Road curve realignment between Brandi Lane and Clark Street. In a construction of curve realignment project, the City contracted with MWM Design for engineeringservices addition to the the Redesign of Sam Bass Road Project. The first portion consisted of constructing for along Sam Bass Road in the amount of $24,290. Supplemental Agreement 1 to cting sidewalks contract, dated May 8, 2003, provided for services relating to the portion of Sam Bae MWM between Meadows Drive and IH -35 totaling $16,305. Supplemental Agreement ss Road ment I; 2, in the amount of $41,955, amended the contract to provide for additional surveying and en i services to up-to-date utilities, railroad coordination and additional costs to explore subsurface material and underground water conditions. Supplemental Agreement g neering t geologic, the amount of $67,862, provided for the engineering, design, bidding and construction ��n administration of a Water & Wastewater Rehabilitation element of the project. 1 Public Comment: N/A EXECUTED DOCUMENT FOLLOWS STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 4 TO AGREEMENT FOR ENGINEERING SERVICES FIRM: MWM Design Group ("Engineer") ADDRESS: 7700 Chevy Chase Drive, Suite 100, Austin, TX 78752 PROJECT: Redesign of Sam Bass Road from Meadows Drive to IH -35 This Supplemental Agreement No. 4 to Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and MWM Design Group (Formerly Martinez Wright & Mendez, Inc.), hereinafter called the "Engineer". WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinafter called the "Agreement", on the 8th day of May, 2003 for the Redesign of Sam Bass Road from Meadows Drive to IH -35 in the amount of $66,271.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 1 on September 11, 2003 to amend the scope of services and to increase the compensation by $16,305.00 to a total of $82,576.00; and • WHEREAS, the City and Engineer executed Supplernental Agreement No. 2 on September 23, 2004 to extend the contract date; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 3 on February 10, 2005 to amend the scope of services and to increase the compensation by $67,862.00 to a total of $150,438.00; and WHEREAS, it has become necessary to amend the Agreement to modify the provisions for the scope of services and to modify the compensation by $51,840.00 to a total of $202,278.00, and NOW THEREFORE, premises considered, the City and the Engineer agree that said Agreement is amended as follows: I. Article 2. Scope Of Services To Be Performed By Engineer and Exhibit B. Services To Be Performed By The Engineer shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C. Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. Supplemental Agreement 0127.0302/147677 1 ra-OS-f2-(2- ,2- Rev.10/08 64836 II. Article 4, Compensation and Exhibit D. Fee Schedule shall be amended by increasing by $51,840.00 the lump sum amount payable under the Agreement for a total of $202,278.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agreement in duplicate. MWM DESIGN GROUP (f/n/a MARTINEZ, WRIGHT & MENDEZ, INC.) By: Re beer/ 0, 1/14/^7/17 eZ Nov. 9 .loci Date CITY OF UND ROCK APP O ED AS T FORM: By: Alan McGraw, Mayor ML=, -(n7. V '1 ZOVeb Date Supplemental Agreement 0127.0302/147677 2 Steph =' L. Sheets, City Attorney Rev.10/08 64836 ADDENDUM TO EXHIBIT "B" Services to be performed by the Engineer The Engineer shall provide the following engineering services for the preparation of the construction plans, specifications and cost opinion (Professional Surveying & Engineering Services) for Supplemental Amendment #4: Item 1 • Design of Railroad Crossing along Sam Bass Road, includes adjacent street intersections. • Attend design coordination meetings with City and Union Pacific representatives; • Conduct site visits; • Coordinate design iterations with City and Union Pacific representatives Item 2 • Design revisions to proposed roadway and utility improvements to accommodate for changed existing conditions due to recent property developments. • Adjust roadways and sidewalk breaks for new driveways; • Revise water and wastewater utility service connections for newer property developments and to meet new City code requirements; • Revise water and wastewater utility mains to meet new City code requirements. Item 3 • Revise proposed water line alignment, storm drainage profile, and match roadway improvement plans accordingly along Galloping Road as per new directives from the City Utility Department. Item 4 • Conduct continued coordination with private utilities and provide continued representation at the regular Utility coordination meetings. Item 5 • Revise proposed pavement design sections as per new vehicular traffic count analysis, under directives from the City Transportation Department. Item 6 • Assist with TCEQ Water Pollution Abatement Plan (V/PAP) permit application and processing. Item 7 • Assist with TCEQ Sewage Collection System (SCS) permit application and processing. Item 8 • Complete design plans with updated City specifications and details, with construction cost opinion for construction bid package submittal post permitting phase. Item 9 • Assist with and attend public involvement/awareness meetings related to the project. ADDENDUM TO EXHIBIT "C" Work Schedule Attached Behind This Document Mar. 2009 Apr. 2009 May. 2009 12341234123412314 Assist w/ ublic involvement7 CONSTRUCTION PHASE (10 Months est.) 16 Yermtt Yhase Assist w/ TCEQpermit process Assist w/ relocation/realignment of private utilities Design submittal review and feedback (City) Construction plans & bid documents package Design Phase 95% Design submittal Bidding and Construction Phase Advertise for Bids (City) Assist w/ Pre -Bid MtgJQuestions ea .5 i ADDENDUM TO EXHIBIT "D" FEE SCHEDULE Item 1. Design of Railroad Crossing along Sam Bass & misc. $10,686.00 Item 2. Design revisions to accommodate changed conditions $ 2,520.00 Item 3. Utility design revisions in Galloping road $ 5,880.00 Item 4. Utility Coordination $ 8,366.00 Item 5. Pavement design revisions $ 2,728.00 Item 6. Assist with TCEQ WPAP permit application $ 5,058.00 Item 7. Assist with TCEQ SCS permit application $ 3,858.00 Item 8. Final construction bid document package $ 9,872.00 Item 9. Assist with public involvement $ 2.872.00 Total Supplemental Amount: $51.840.00