Loading...
R-09-01-08-8B2 - 1/8/2009RESOLUTION NO. R -09-01-08-8B2 WHEREAS, the City of Round Rock has duly advertised for bids for the Phase 1B Southwest Area Downtown Infrastructure Project, and WHEREAS, BRH Garver Construction has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of BRH Garver Construction, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with BRH Garver Construction for the Phase 1B Southwest Area Downtown Infrastructure Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 8th day of January, 2009. ALAN MCGRAW, Mayor City of Round Rock, Texas SARA L. WHITE, City Secretary 0:\WDOX\RESOLUTI\R90108B2.DOC/rmc DATE: December 31, 2008 SUBJECT: City Council Meeting —January 8, 2009 ITEM: 8B2. Consider a resolution authorizing the Mayor to execute a Construction Contract with BRH Garver Construction for the Phase 1B Southwest Area Downtown Infrastructure Project. Department: Staff Person: Justification: Transportation Services Tom Martin, P.E., Director of Transportation Services This construction project includes water, storm water, dry utility infrastructure improvements and ROW finishes for the area around the Southwest Downtown. Improvements will be designed for sections of Brown, West Main, Bagdad, Florence, Harris and San Saba Streets. Funding: Cost: $3,121,260.00 Source of funds: Capital Project Funds (GO Bonds 2001) Outside Resources: N/A Background Information: At the November 18, 2008 bid opening, seven (7) bids were received by the City of Round Rock for construction on the Southwest Downtown project. BRH Garver Construction submitted the lowest, responsive base bid in the amount of $3,121,260.00. Public Comment: N/A